Click to edit Master subtitle style
Trent Smith 1st Internship
Mechanical Engineer, OSU Mentor: Ron Elliott / Adam Reiner
April – September 2013
Click to edit Master subtitle style Some smaller projects • Yaneng & Albright
contactor improvement • Vantage motor & gear
train performance • Vantage 2000 cost
down • Vantage drum support
update • Small winch OEM
support • Series 18 refresh • Drill winch
16.5
17
17.5
18
18.5
19
19.5
0 2 4 6 8
Line
spe
ed (f
t/sec
)
Gear train
Performance - varying gear train
Motor 1
Motor 2
Motor 3
Motor 4
Motor 5
Motor 6
Click to edit Master subtitle style Vantage carrier test fixture Background:
• Small winch engineers previously had no way to determine whether or not Vantage gear carriers were assembled correctly
My task: • Design and build test fixture to determine and verify proper carrier pin staking pressure
• Outline testing procedure to verify current staking pressure
Results:
• Test fixtures have been made for Vantage 2000, 3000 and 4000 winches. A test procedure has been outlined which will benchmark future planetary carrier performance
Click to edit Master subtitle style Vantage carrier test fixture Design: • Fixture emulates gear housing • Accurate, high strength tooling • Interchangeable design – parts can be
quickly changed to test each gear set
Test Procedure: • Carrier strength verified through input torque • Overall deflection measured • Process repeated with varying staking
pressures • Benchmark for future changes
My benefit: • Working with TDM • Tooling design • Modeling & drawing • Manufacturing engineer cooperation • Work w/ corporate purchasing for wave
springs
Click to edit Master subtitle style Vantage housing failure
Background:
• Vantage 2000 housings were cracking in the field from plow stalling
• Vantage 4000 housings were cracking during new supplier validation testing
My task: • Root cause determination • Solution brainstorming • Stall testing • Strength analysis • Solution implementation
Results:
• Both Vantage 2000 and 3/4000 housing issues have been resolved and implemented
Click to edit Master subtitle style Vantage housing failure
Exploration:
V2000 • Loctite 410 to secure fixed ring gear • Housing tab radius stress concentration & analysis • Glass fiber content • Over-performance
V4000 • Supplier change • Over-performance • Pelletized colorant
My benefit:
• Hands on winch experience • Supplier communication • Finite element analysis (FEA) • Engineering drawings • Communication and problem solving
Click to edit Master subtitle style Universal Plow Mount
Background:
• Plow mounts are vehicle specific • Large inventory for dealers • Confusing purchasing process for
customers
My task: • Lead the design and development
of a Universal Plow Mount that fits a majority of ATV’s
• Tight timeline of design and release in under 6 months
Results:
• Pilot run date of September 20th, 2013
Click to edit Master subtitle style
Design process: • Brainstorming & competitive
benchmarking • Concept selection and modeling • Strength analysis and FEA • Prototype build and testing • Improvements and iterations
Experience gained:
• DFMEA – design requirements • DVP&R – testing outline • Vehicle fit-ups and dealer visits • Design of testing tools • Cost down efforts • Strength testing • Company wide interaction –
finance, corp. purchasing, fab, mfg, quality, marketing, distribution
• Dealership interaction
Universal Plow Mount
Click to edit Master subtitle style Universal Plow Mount
Additional work:
• Drawing dimensioning, tolerancing and reviews
• Make vs. buy • Installation instructions • Box selection & artwork • Customer reviews • BOM creation • Tolerance stack analysis • ECN promotion • Hardware kit
Final product
• Fits on most popular utility ATV’s • Fully adjustable design – highly
likely to fit on future models without need to re-design
• Easy to install and durable
Click to edit Master subtitle style Summary of Benefits & Experience • Analysis Experience
– Pull testing – Stack analysis – Finite element analysis – Motor torque and speed – Gear train performance
• Experience with NX Modeling and Drawing – Good understanding of drafting standards – NX Sheet Metal & Modeling
• Communication Experience – E-mails – Meetings – Drawing Reviews – ECN Reviews – Supplier interaction
• Experience coordinating with other departments – Marketing – Small winch – TDM – Manufacturing/Fabrication – Test lab – Corporate purchasing – Product marketing & management – Quality
• Sheet Metal Experience – Capabilities of press brake – Sheet metal tolerances – Selection of punch hole sizes – Capabilities of Laser and sheet layout – Capabilities of robotic welder
• Documentation – Bill of Materials for finished goods
and sub assemblies – Installation instructions – DFMEA, DVP&R – FEA report – Test report
• Fabrication & manufacturing – Material treatment – Lean manufacturing – Broaching – Assembly line/collaboration