Introduction
EastLink: largest urban infrastructure project in Australia
$2.5 billion, 45 km toll road project
PB and Hyder Joint Venture
71 of 84 bridges in original scope
Currently under construction
Hyder Consulting Pty Ltd4
Introduction contd
45 km toll road from Mitcham to Frankston
-
8/10/2019 Warren - Eastlink Super T Bridges
3/23
Hyder Consulting Pty Ltd5
Introduction contd
71 Bridges over 5 regions
Hyder Consulting Pty Ltd6
Precast Planning
Standard Precast Units
Super-T to AS5100 profile
-
8/10/2019 Warren - Eastlink Super T Bridges
4/23
Hyder Consulting Pty Ltd7
Detailed Design
Standard Precast Units
1800mm Deep Super-T Beams
Can span up to 38m long and weigh over 80 tonnes
Reduced the number of spans required for each bridge
Hyder Consulting Pty Ltd8
Precast Planning
Standard Precast Units
Precast Pier
& Crosshead Construction
close to movingtraffic
Reduce site costs
-
8/10/2019 Warren - Eastlink Super T Bridges
5/23
Hyder Consulting Pty Ltd9
Precast Planning
Standard Precast Units
Barrier Unit
Hyder Consulting Pty Ltd10
Precast Planning
Standard Precast Units
Wingwalls and Fenderwalls
-
8/10/2019 Warren - Eastlink Super T Bridges
6/23
Hyder Consulting Pty Ltd11
Precast Planning
Standard Precast Units
Noise WallPanels
Hyder Consulting Pty Ltd12
Detailed Design
D&C Contract O&M Contract
Concessionaire
Southern & Eastern
Integrated Transport
Authority (SEITA)
ConnectEast
Independent Review (IR)
SKM/Maunsell/Davis
Langdon
Environmental ManagementRepresentative
Financier EngineerURS/Evans & Peck
Thiess John Holland
(TJH)Transfield Services
(TSL)
Proof Engineer/
Construction Verifier
SMEC/KBR
Independent Quality
Auditor
Tolling
SICE ConstructionDesign
Parsons Brinckerhoff
Hyder JV
Wood Marsh
UGR
Connell Wagner
Road Safety
Auditor
Design
Consultant
Review Process:
-
8/10/2019 Warren - Eastlink Super T Bridges
7/23
Hyder Consulting Pty Ltd13
Detailed Design
Standardised approach used in design
Details of connections of precast critical to design
Lifting of precast incorporated in design
Inclusion of Urban Design features
Safety in design was considered
Value Engineering process continued duringdetailed design
Hyder Consulting Pty Ltd14
Detailed Design
Super T beams
PBHyder designed58 Super-T bridges
-
8/10/2019 Warren - Eastlink Super T Bridges
8/23
Hyder Consulting Pty Ltd15
Detailed Design
Super T beam Design involved:
Standardising Super-T beam sizes toensure 24 hour turn around inproduction
Allowing for long periods of storagebefore erection
Using integral abutments for bridgesgiving greater tolerance during erection
Hyder Consulting Pty Ltd16
Detailed Design
Super T beam Design
-
8/10/2019 Warren - Eastlink Super T Bridges
9/23
Hyder Consulting Pty Ltd17
Detailed Design
Precast Segmental Pier Design
Hyder Consulting Pty Ltd18
Detailed Design
Detailing incorporating Urban Design features
Pier constructionwith falsework
Precast Segmental Pier Design
-
8/10/2019 Warren - Eastlink Super T Bridges
10/23
Hyder Consulting Pty Ltd19
Detailed Design
Precast Wing Walls
Wingwall Lifted into place
Abutment beam poured
Insitu concrete fenderwall pouredconnecting to wingwall
Hyder Consulting Pty Ltd20
Detailed Design
Barriers
Designed for Highand MediumContainment Levels
(High 1000 kN) Connection using
stitch joint to deckand pin joint forcontinutiy
Incorporating UrbanDesign patterning
-
8/10/2019 Warren - Eastlink Super T Bridges
11/23
Hyder Consulting Pty Ltd21
Detailed Design
Precast Components designed using 3D CAD
Hyder Consulting Pty Ltd22
Detailed Design
Precast Components designed using 3D CAD
-
8/10/2019 Warren - Eastlink Super T Bridges
12/23
Hyder Consulting Pty Ltd23
Precast Facility
Site selected in Morwell
with following benefits: Using an established
Plant (Di Fabro)
Availability of Labour
Close to concrete supplierand other resources
Established TransportRoutes to Eastlink
Hyder Consulting Pty Ltd24
Precast Facility
Steel Super-TMoulds
Fabricated inChina
750 2 beamcapacity mould
1350 2 beamcapacity mould
1500 2 beamcapacity mould
1800 1 beamcapacity mould
-
8/10/2019 Warren - Eastlink Super T Bridges
13/23
Hyder Consulting Pty Ltd25
Flat Beds for Wingwalls & Fenderwalls
Precast Facility
Hyder Consulting Pty Ltd26
Precast Facility
Standard Precast Pier Mould
-
8/10/2019 Warren - Eastlink Super T Bridges
14/23
Hyder Consulting Pty Ltd27
Precast Facility
Barrier moulds designed for
upside down casting
Hyder Consulting Pty Ltd28
Precast Production
Super-T Beams
Radiant Heat curing
24 Hour turn-around
Double stacking
-
8/10/2019 Warren - Eastlink Super T Bridges
15/23
Hyder Consulting Pty Ltd29
Precast Production
Barriers
Standard lengthsto maximiseoutput
Developing aPin ConnectionDetail
Hyder Consulting Pty Ltd30
Precast Production
Noise Walls
Post & Panel Wall units castvertically in Battery Moulds
Rock Face template for cantilever walls
-
8/10/2019 Warren - Eastlink Super T Bridges
16/23
Hyder Consulting Pty Ltd31
Construction
Transportation
Super-T beams:
87 tonnes
40 m long
Transport studyundertaken
Hyder Consulting Pty Ltd32
Construction
Lifting
500 tonne crane
Snow Whitepurchasedspecifically for project
-
8/10/2019 Warren - Eastlink Super T Bridges
17/23
Hyder Consulting Pty Ltd33
Construction
Lifting
Flexibility in lifting(end to - end)
Hyder Consulting Pty Ltd34
Construction
Installation
Placement &Levelling
Connected byStitch Joints,BoltedConnections orStressed anchors
-
8/10/2019 Warren - Eastlink Super T Bridges
18/23
Hyder Consulting Pty Ltd35
Additional Structures
Other Precast Elements include:
Noise walls
Precast soil wall facing
Humedeck units
Culverts and Pits
Hyder Consulting Pty Ltd36
EastLink Bridges 17 EastLink bridges over local roads
EastLink over Railway Parade
38m spans, 1800mm deep Super-T beams
-
8/10/2019 Warren - Eastlink Super T Bridges
19/23
Hyder Consulting Pty Ltd37
EastLink Bridges
16 EastLink bridges over waterways
Bored piles and columns at pier
Hyder Consulting Pty Ltd38
EastLink BridgesMonash Interchange 3rd largest interchange in Southern Hemisphere
Nine bridges
Aerial view ofinterchange
Under construction
EastLink N/B Entry Ramp
128m, 4 span Trouser Leg
bifurcation for multiple access
-
8/10/2019 Warren - Eastlink Super T Bridges
20/23
-
8/10/2019 Warren - Eastlink Super T Bridges
21/23
Hyder Consulting Pty Ltd41
Construction Progress(cont.)
Hyder Consulting Pty Ltd42
Construction Progress(cont.)
-
8/10/2019 Warren - Eastlink Super T Bridges
22/23
Hyder Consulting Pty Ltd43
Construction Progress(cont.)
Hyder Consulting Pty Ltd44
Construction Progress(cont.)
-
8/10/2019 Warren - Eastlink Super T Bridges
23/23
Hyder Consulting Pty Ltd45
TJH / PBHyder
Thank You