Warren SmithDigital Marketplace DirectorHead of the Global Digital MarketplaceUK Government Digital Service@wdangersmith
![Page 2: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/2.jpg)
21st Century Procurement in the UK Supporting Smart Sustainable Cities and the UN Sustainable Development Goals
![Page 3: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/3.jpg)
Today I will cover:
Evolution of the UK Digital MarketplaceGlobal Digital Marketplace ProgrammeFuture Opportunities
![Page 4: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/4.jpg)
Global Digital Marketplace
Where screenshots of UK government websites or online reports have been shown, the website addresses have been included in the speaker notes for your reference.
![Page 5: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/5.jpg)
Evolution of the UK Digital MarketplaceGlobal Digital Marketplace ProgrammeFuture Opportunities
![Page 6: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/6.jpg)
2009
“...an estimated £16 billion per annum across government…80% of central government ICT work undertaken by 18 suppliers...”
![Page 7: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/7.jpg)
Global Digital Marketplace
Based on lessons learnt by GDS over the last 7 years, four high-level elements work together throughout the end-to-end lifecycle of government ICT delivery:
1. Assuring plans before money is spent2. Designing procurements and contracts3. Assuring service delivery4. Building capability and capacity*
![Page 8: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/8.jpg)
Global Digital Marketplace
Digital MarketplacePlatform
Commercial AgreementsICT Commissioning
Service AssessmentsDigital (Government) Service Standard
Spend ControlTechnology Code of PracticePipeline Assurance Process
GDS
Assuring plans before money is
spent
* Building capability and capacity cuts across all elements
![Page 9: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/9.jpg)
Global Digital Marketplace
![Page 10: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/10.jpg)
Global Digital Marketplace
Since 2012, there have been over £1.2 billion savings through spending controls, including £450 million saved in 2016 to 2017 alone.
![Page 11: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/11.jpg)
![Page 12: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/12.jpg)
![Page 13: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/13.jpg)
2018
![Page 14: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/14.jpg)
Global Digital Marketplace
2018
In 2016 to 2017, Crown Commercial Service estimated that the Digital Marketplace contributed over £132 million (almost 20%) of the £725 million they saved for UK taxpayers.
![Page 15: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/15.jpg)
![Page 16: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/16.jpg)
![Page 17: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/17.jpg)
![Page 18: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/18.jpg)
![Page 19: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/19.jpg)
![Page 20: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/20.jpg)
![Page 21: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/21.jpg)
![Page 22: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/22.jpg)
![Page 23: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/23.jpg)
![Page 24: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/24.jpg)
![Page 25: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/25.jpg)
![Page 26: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/26.jpg)
![Page 27: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/27.jpg)
![Page 28: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/28.jpg)
1.7.1.2 Addressing Procurement Issues
The debate continues as to how public sector procurementcan be better designed to accommodate innovation, newtechnologies, and outcome-based approaches. This is notan issue restricted to the UK, similar challenges face citiesacross Europe and in other parts of the world.
![Page 29: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/29.jpg)
![Page 30: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/30.jpg)
![Page 31: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/31.jpg)
Global Digital Marketplace
ICT commissioning: beyond procurement● Focus on users’ needs, problems to solve
and outcomes to achieve● Form collaborative and constructive
relationships across civil society, focussed on joint design and delivery
● Be open by default and secure by design● Start small, experiment, test with users ● Be agile - measure, learn and adapt
![Page 32: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/32.jpg)
![Page 33: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/33.jpg)
![Page 34: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/34.jpg)
Evolution of the UK Digital MarketplaceGlobal Digital Marketplace ProgrammeFuture Opportunities
![Page 35: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/35.jpg)
Global Digital Marketplace
The Global Digital Marketplace is funded by the Cross-Government Prosperity Fund Global Anti-Corruption Programme, led by the Foreign & Commonwealth Office.
![Page 36: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/36.jpg)
Global Digital Marketplace
Anti-Corruption is one of 12 Prosperity Fund Global Programmes, alongside:
TradeHealthcareFuture CitiesInfrastructureEducation & SkillsBusiness Environment
DigitalEnergyInsuranceFinancial ServicesRegulatory Reform
![Page 37: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/37.jpg)
Global Digital Marketplace
Global Digital Marketplace is a commitment under Priority 4 (Reduce Corruption in Public Procurement and Grants).
![Page 38: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/38.jpg)
Global Digital Marketplace
The goal of the Global Digital Marketplace is to partner with national and subnational governments in emerging economies, to help tackle corruption by opening up procurement and contracting in the end-to-end delivery lifecycle of ICTs.
![Page 39: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/39.jpg)
Global Digital Marketplace
‘Place’ based drivers of environmental, economic, social and cultural ambitions● ICT commissioning as an enabler of
improved local services, greater competition and value for money
● Promoting and attracting investment● Creating fair and inclusive places● Engaged civil society and transparency● Environment and sustainability
![Page 40: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/40.jpg)
Global Digital Marketplace
The Global Digital Marketplace offer is being developed iteratively, informed by the feasibility scoping visits completed in:
Latin America: Mexico, ColombiaSouth East Asia: Indonesia, MalaysiaSouthern Africa: South Africa, Botswana
![Page 41: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/41.jpg)
Global Digital Marketplace
Digital MarketplacePlatform
Commercial AgreementsICT Commissioning
Service AssessmentsDigital (Government) Service Standard
Spend ControlTechnology Code of PracticePipeline Assurance Process
GDMP
Assuring plans before money is
spent
* Building capability and capacity cuts across all elements
![Page 42: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/42.jpg)
Global Digital Marketplace
Throughout the Global Digital Marketplace delivery stages, we propose embedding the Open Contracting Data Standard (OCDS).
This will enable the progressive public disclosure of data and informationrelating to forward-look plans, procurements, contracts awarded, and service delivery.
![Page 43: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/43.jpg)
Global Digital Marketplace
OCDS ‘Award’ stage(details of award, bidder
information, bid evaluation, values)OCDS ‘Implementation’ stage
(payments, progress updates, location, extensions, amendments, completion or termination
information)
OCDS ‘Planning’ stage(budgets, project plans, procurement plans, market studies, public hearing
information)
GDMP
Assuring plans before money is
spent OCDS ‘Invitation (Tender)’ stage(tender notices, specifications,line items, values, enquiries)
OCDS ‘Contract’ stage(final details, signed contract,
amendments, values)* Building capability and capacity cuts across all elements
![Page 44: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/44.jpg)
Evolution of the UK Digital MarketplaceGlobal Digital Marketplace ProgrammeFuture Opportunities
![Page 45: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/45.jpg)
Global Digital Marketplace
Q2 2019-20
Implementation
3-6 month ‘Betas’ across a range of scenarios, building on the insights gained during the ‘Alphas’ and continuing with incremental and collaborative delivery
Q1 2019-20
Prototyping, design and long-term delivery refinement, with partner organisations3-month ‘Alphas’ to test and iterate minimum viable approaches to meeting users’ needs, identified during ‘Discoveries’
Q4 2018-19
Needs analysis, early delivery scoping and MOUs established with partner organisationsMalaysia ‘Discovery’South Africa ‘Discovery’Botswana ‘ Discovery’
Q3 2018-19
Needs analysis, early delivery scoping and potential partners identifiedMexico ‘Discovery’Malaysia ‘Inception’Indonesia ‘Discovery’Colombia ‘Discovery’
Future Opportunities
![Page 46: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/46.jpg)
Global Digital Marketplace
Future Opportunities
MedellínManizales Colombia
Mexico CityGuadalajara Mexico
Durban*Cape Town*Johannesburg* South Africa
Bandung*Surabaya*Indonesia
Iskandar*Malacca (state)*Selangor (state)Malaysia
Gaborone Botswana
BristolLondonGlasgow... UK
![Page 47: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/47.jpg)
Global Digital Marketplace
Future Opportunities
![Page 48: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/48.jpg)
Global Digital Marketplace
Future Opportunities
![Page 49: Warren Smith - UNECE · OCDS ‘Implementation’ stage (payments, progress updates, location, extensions, amendments, completion or termination information) OCDS ‘Planning’ stage](https://reader034.vdocument.in/reader034/viewer/2022042916/5f55d1d3a41dc24c4d5de7b9/html5/thumbnails/49.jpg)
Thank you
Warren Smith@wdangersmith