Recurr
ence
Budget
Impact$ or Time
(hrs)
Person
Responsible
Consensus
Priority
08/09 Status
Comment
Timing as
of 09/10
09/10 Mid-Yr
Status
0910 End of
Yr Status
09/10 Status
Comment
1.1.1.b Implement a spiritual formation
master plan.
Evidenced by documentable, visible progress in
implementing the plan (e.g., lists of conducted
programs, etc.)
The plan will be re-circulated in November and
March annually for feedback.
Ongoing No VPMin 1-Must
do/High
Risk,
Exposure or
Impact
Split at year's end 09/10 FY Done Done
1.1.2. Implement initiatives that connect
campus with SDA congregations.
Activities conducted that clearly interconnect
WAU with area churches.
Ongoing No VPMin 1-Must
do/High
Risk,
09/10 FY Done Done
1.1.3.a Explore ideas for faculty, staff, and
student spiritual growth.
Several events or activities conducted that
address spiritual growth for faculty, staff, and
students (all three).
Ongoing Yes VPMin 1-Must
do/High
Risk,
Exposure or
09/10 FY Started, need to
revise finish
date
Started, need to
revise finish date
End-Yr: This is a
duplicate of #18
1.1.3.b Implement ideas for faculty, staff, and
student spiritual growth, such as a symposium
focused on personal spiritual growth, an annual
retreat, Bible Study groups, etc.
Several events or activities conducted that
address spiritual growth for faculty, staff, and
students (all three).
E.g., the bulletin board to the right of the
Accounting Office (upon entering Wilkinson
Hall through the main entrance) has a schedule
this semester of the daily Bible studies being
offered on campus.
Ongoing Yes VPMin 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, need to
revise finish
date
Started, need to
revise finish date
End-Yr: This
begins in 10-11
Washington Adventist University
Strategic Plan
Strategy One
Encourage Faith Development that is Deliberate, Personal, and Critically Aware
As a Seventh-day Adventist institution of higher education, Washington Adventist University has the opportunity and privilege
to help in the development of thoughtful, moral, and committed people of faith. Building on its spiritual master plan, the
school responds to this opportunity through its commitment to:
2009=>
Imperatives
#1 – Facilitate a life- and church-changing dialogue centered on Adventism,
spiritual formation, and love in action.
8/17/2010 Draft
1.1.4. Continue to involve the Sligo Church
pastoral staff and other area pastors our worship
programs and in the spiritual training of the
campus faculty, staff and students.
Local pastoral staff incorporated into faculty,
and conducting activities targeted for faculty,
staff and students – all 3.
· Continue with the weekly Sligo Church
bulletin which publishes our weekend activities.
· In partnership with Sligo Church we also
make the campus aware of the variety of
meaningful settings for worship offered at the
church.
· Campus Ministries hosts Friday night
worship services and Sabbath School Bible
study.
· Sligo presents three Sabbath worship
times: 8:45 a.m., 11:15 a.m., and New
Community Fellowship at 6:00 p.m.
· Every Sabbath afternoon Project Sunshine
visits area nursing homes.
· The Student Association Religious VP
plans regular Sabbath Surge activities that vary
between prayer, service, and nature activities.
Ongoing No VPMin 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done Done
1.1.5. Reinvent the weekly faith-building
chapel service for students, staff and faculty to
include:
· a general community chapel,
· a greater degree of interaction with
campus community.
· local speakers from General Conference
(GC), local churches, community leaders, and
other professionals.
A roster of local speakers at chapel, attendance
numbers reflecting campus involvement.
Ongoing No VPMin 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done Done
1.1.6. Continue to enable students to worship
in a wide variety of settings.
A variety of settings (list) and the measures
taken to make these available for worship by the
students. E.g., the Marketing and
Communications Department sends out regular
emails that, along with our posters, enable us to
promote various worship opportunities
throughout the week.
Ongoing No VPMin 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
End-Yr: Begins
in earnest in 10-
11
1.1.7.a Continue the Spiritual formation
class and other academic courses that
respectfully examine belief systems of other
faiths and ways in which they intersect and
diverge, and that expose our students to
respectful dialogue with other belief systems.
Classes scheduled and conducted. Ongoing No Provost (SASS) 1-Must
do/High
Risk,
Exposure or
Impact
End-Yr:
Academic
courses are being
offered, but need
to be reviewed.
Split academic
from not-for-
credit.
09/10 FY Started, should
complete on
time
Done Mid-Yr assigned
to Dr. Colon
1.1.7.b Offer co-curricular classes that
respectfully examine belief systems of other
faiths and ways in which they intersect and
diverge, and that expose our students to
respectful dialogue with other belief systems.
Courses scheduled and conducted. Ongoing No VPMin 1-Must
do/High
Risk,
Exposure or
Impact
End-Yr:
Academic
courses are being
offered, but need
to be reviewed.
Split academic
from not-for-
credit.
09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
End-Yr: Begins
in 10-11
8/17/2010 Draft
1.1.8. Continue the annual Keough
Lectureships (currently sponsored by the
Religion Department) which provide a
symposium for members of the campus
community to gather together and focus on
subjects that foster spiritual growth.
Keogh Lectureship conducted. Ongoing Yes Provost (SASS) 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done Done
1.1.9. Implement guidelines and provide
training on how to link Christianity to the
classroom.
Annual training and published guidelines on
specific how-to’s and expectations.
Ongoing No Provost (SASS) 1-Must
do/High
Risk,
Exposure or
Impact
End of Yr : still
need to work on
guidelines
09/10 FY Started, should
complete on
time
Done Mid-Yr Christ in
the Classroom
info to be
provided by
Wisel
End-Yr:
Evidence Faith in
Learning1.1.10. Implement initiatives on spiritual
formation, which would involve training faculty
as spiritual mentors who would lead small
groups, in order to focus on integrating campus
spiritual life.
Group activities initiated that allow faculty to
serve as spiritual mentors.
Ongoing Yes VPMin 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
End-Yr: Begins
in 10-11
1.2.1. Faculty, staff, and students must be
made fully aware of the Christ-centered nature of
the campus.
Establish symbols of Christian faith and
Adventist heritage.
Continue to provide inspiring artwork on
campus. Many of the bulletin boards are being
designed with appropriate and uplifting
messages that remind us of our purpose and
reason for being at a Christian university. The
Religion Department just unveiled two paintings
in the building’s main hall.
At the opening events for First Year Experience,
clearly explain to the incoming students that this
is an Adventist campus and the particulars of
what that means for them. Each incoming
student should receive Life on a Christian
Campus and Student Life & Residence Hall
Handbook in their entrance packet.
Ongoing No VPMin 1-Must
do/High
Risk,
Exposure or
Impact
Dropped
MarComm from
responsibility at
MidYr Status
09/10 FY Started, need to
revise finish
date
Started, need to
revise finish date
End-Yr: Begins
in earnest in 10-
11 and continues
annually
1.2.2. Implement faith-building initiatives
that connect the campus with non-SDA
congregations.
Have guest speakers from other faith traditions
address our campus in chapels and in
lectureships.
Sligo Church also widely publicizes its inter-
faith New Community Fellowship program.
Additional initiatives are to be sought.
Ongoing Yes VPMin 09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
End-Yr: Begins
in 10-11 and
continues
annually
1.2.3. Implement initiatives that connect the
campus with non-SDA Christian high schools.
Activities initiated that clearly link the campus
with non-SDA Christian high schools.
Ongoing No VPMin, VPMR 2-Should do/
Medium
Risk/Exposur
e
10/11 FY
#2 – Nurture an atmosphere where persons of various faiths feel valued and
respected
8/17/2010 Draft
1.2.4. Implement initiatives for faculty, staff,
and students that demonstrate the openness,
welcoming spirit, and respect for diversity of
faith.
Evidenced by a listing of initiatives and
programs that target a respect for diversity of
faith.
One of those initiatives is to continue to conduct
a Student Life retreat at the beginning of every
school year to help our campus staff and student
leaders and faculty/staff sponsors know how to
conduct themselves within our multi-cultural and
multi-faith campus.
Our connection with Action in Montgomery
(AIM) gives members of our campus community
an essential network with people from various
faith communities. We are also encouraging
participation in a variety of inter-faith ventures
such as the March for Peace which occurred in
March 2007. Additional Actions are to be
sought.
Ongoing No [VPSL&R] &
VPMin
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done Done Mid-Yr:
VPSL&R-
suggested
clarification or
narrowing of
scope, wording
change
Need to define
leader vs.
support
End-Yr:
VPSL&R
suggested
VPMin to lead;
VPSL&R to
support
1.2.5. Assure that all of our published material
(electronic or print) uses language that is
sensitive to our multi-faith community.
100 percent of published material (electronic &
printed) is reviewed by CommQI for language
that is sensitive to our multi-faith community.
Ongoing No CommQI 1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Done Mid-Yr-
Measurement is
difficult to
provide
1.3.1.a Make service a core curriculum
element in each academic department.
Each academic department can show service to
be a core element. Each service activity/project
should have 3 components - 1) planning and
training, 2) provide service, and 3) reflect.
Develop a workshop for faculty and student as
participants on what is service learning and
incorporating servant leadership into service.
Conduct reflection activity after service
activities.
Ongoing No Provost 1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
1.3.1.b Make service a core curriculum
element in each non-academic department.
Each non-academic department can show
service to be a core element. Each service
activity/project should have 3 components - 1)
planning and training, 2) provide service, and 3)
reflect.
Develop a workshop for faculty and student as
participants on what is service learning and
incorporating servant leadership into service.
Conduct reflection activity after service
activities.
Ongoing No VPFA, [Dir
HR]
1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
#3 – Create a campus atmosphere in which service permeates life and
learning
8/17/2010 Draft
1.3.2.a Implement initiative that encourages
faculty, staff, and students to support and
participate in organized service opportunities,
e.g. Service Day. This will help foster the true
culture of service promised by our “Gateway To
Service” motto.
Continue our tradition of Service Day in the fall
of every school year, plus other initiatives.
Offer Service Stations one weekend per month.
On the Sabbath afternoon of that weekend,
organize relationally-oriented service
opportunities in the community. Then on the
Sunday morning of that same weekend, have a
work-related service project.
Ongoing No VPMin,
[VPSL&R]
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: removed
CommQI
09/10 FY Started, need to
revise finish
date
Started, need to
revise finish date
End-Yr:
VPSL&R
initiative?
End-Yr: VPMin
suggests adding
two full Service
Days in 10-11.
Also including
FYE dimension
in the Service 1.3.2.b Track service hours by staff
employees.
Service hours tracked by staff in the annual
performance tool.
Ongoing No VPFA, (Dir
HR)
1-Must
do/High
09/10 FY Done Done Mid-Yr: HR has
a form
1.3.2.c Track service hours by faculty
employees to church and community.
Service hours tracked by faculty in the PAS. Ongoing Yes Provost (SASS,
SHPSW)
1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
End-Yr: 10-11
1.3.3. Implement service initiatives that
connect K-12 and Columbia Union constituency
with campus academic and non-academic
activities.
Yearly service activities with Columbia Union
Adventist academies and with select area
elementary schools.
Ongoing Yes VPMin 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Not started,
should complete
on time
Not started, need
to revise finish
date
End-Yr: This is
a project for 10-
11.
1.3.4. Provide students with service-related
networking and resource opportunities as well as
training and leadership development.
Continue to attend the annual NAD Campus
Ministries Convention. Also work with the
Volunteerism Department at the GC and with
Action in Montgomery (AIM) to provide the
mentoring and training for our student leaders.
Ongoing No VPMin
[VPSL&R]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done Done End-Yr:
VPSL&R
initiative?
1.4.1. Implement programs that will prepare
students to live as responsible and productive
Christians, including worship with themes and
objectives centered on empowering residents to
live spiritually accountable lifestyles.
List of implemented programs and activities
with the goal of preparing students to live as
responsible and productive Christians.
Ongoing No VPMin 1-Must
do/High
Risk,
Exposure or
Impact
MidYr changed
responsibility to
VPM
09/10 FY Started, need to
revise finish
date
Done End-Yr: This is a
continuous
program that
occurs annually.
1.4.2. Implement programs that encourage
positive behaviors, morality, dress, and Adventist
living. Establish dialogue with our students
about behavior issues.
List of implemented programs and activities
with the goal of encouraging moral ethical
behavior in students.
For 09/10 on, track student disciplinary reports.
Ongoing Yes VPSL&R &
[VPMin]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Done End-Yr: VPMin
says this is a
VPSL&R project
and not VPMin
1.4.3. Increase upper-class worship
attendance by 20%; engage upperclassmen in
planning worships.
Tracking attendance and involvement of upper
classmen, comparing against a baseline.
Ongoing No VPSL&R 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Mid-Yr:
Recommended
be removed
1.4.4.b Strengthen the Fellowship of
Christian Athletes at WAU—a national
organization found in most colleges and
universities with athletic programs.
Encourage students to maintain the Christian
atmosphere at WAU and participate in spiritual
activities on and off campus. Track number of
athletes attending spiritual meetings e.g. chapel,
vespers, church.
Ongoing No VPSL&R 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Done Mid-Yr:
recommend
reassignment to
VPMin
End-Yr: Done on
campus1.4.5. Recruit student, faculty, and staff help
in planning and executing the weekly
chapel/convocation program. Conduct various
surveys for chapel feedback.
The Office of Student Life and Retention
regularly examines the comments on the back of
chapel attendance cards. One way participation
is being increased is through Chapel 4 U. This
offers everyone choices between 4 programs
occurring simultaneously during normal chapel
time. Continuation of these activities is sought.
Ongoing No VPMin 1-Must
do/High
Risk,
Exposure or
Impact
Reporting Error,
did not pull onto
VPSL&R report
09/10 FY Not started,
need to revise
finish date
Done End-Yr: A
variety of chapel
programs will be
instituted in 10-
11
#4 – Enable students to develop as moral and ethical beings
8/17/2010 Draft
1.4.6. Develop and implement the "Expect
Respect" campaign materials.
Implementation of the "program," and visible
changes in behavior of the campus community.
Evidence of campaign materials posted around
campus.
Track correlation with RA (Residents'
Assistants) incident reports.
Ongoing Yes VPSL&R 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, need to
revise finish
date
Mid-Yr: make
due 10/11
End-Yr:
VPSL&R
suggests launch
campaign at
leadership retreat
1.4.7.a Ensure that courses in each
department include values, or include in Gen. Ed
curriculum, such as in Philosophy and Religion
classes.
Review of course syllabi and course evaluations. Ongoing No Provost
(SASS,
SHPSW)
1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Done End-Yr: Split
SASS and SHPW
from SGPS
1.4.7.b Ensure that courses in each
department include values, or include in Gen. Ed
curriculum, such as in Philosophy and Religion
classes.
Review of course syllabi and course evaluations. Ongoing No Provost (SGPS) 1-Must
do/High
Risk,
Exposure or
09/10 FY End-Yr: Split
SASS and SHPW
from SGPS
1.5.1. Continue involvement with Action in
Montgomery (AIM). Continue to invite students
to get involved with AIM and also with the many
community service opportunities that can be
found in the Service Book compiled and
published by the Center for Metropolitan
Ministry.
Continued participation of students with AIM
and other service activities; Students
participating with Sligo's New Community
Fellowship's Feed the Homeless Ministry.
Ongoing No VPMin 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, need to
revise finish
date
Not started, need
to revise finish
date
End-Yr: This
project will begin
in 10-11 and will
be continuous
annually.
1.5.2 Reinstate missions programs, such as
the Share Him mission trip.
Evidenced by list of implemented missions
programs, scheduled missions-related events.
Ongoing Yes VPMin 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Done Done End-Yr: Planning
a new mission
initiative for 10-
11 &11-12
1.6.2. Anchor the culture change initiative in
the Center for Prevention and Lifestyle Support
(CPLS).
Collaboration among students, Physical
Education instructors, General Conference and
NAD and NIH medical personnel (including
groups listed in 1.6.1)
VPSL&R,
Provost
3-Nice to
Have
End-Yr: Action
to be reviewed by
Wellness
Council.
Mid-Yr: tabled
1.6.3. The Health and Wellness council
should set an action plan for the 2009-2010
school year. At this meeting, plans for the fall
Health and Wellness Week should be made. A
possible weekend workshop for the end of
Health and Wellness week should be discussed
and if feasible, marketing should begin in
May/June.
Continue to maintain the WAU Health and
Wellness Week. Evidence will be committee
minutes.
One
Time
Yes VPSL&R,
[VPFA, (Dir
HR)]
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Action
to be reviewed by
Wellness
Council.
MidYr:
responsibility
changed from
Provost to VPFA
over Dir HR
09/10 FY Done Done End-Yr:
VPSL&R Nov 15-
19, 2010
1.6.4. Under the direction of the Chair of the
Health, Wellness and PE department, plans
should be made for assessments and outcomes
tracking.
Continue to evaluate the plans to see if the
desired outcomes have been achieved.
VPSL&R,
Provost, Prof.
Bio.
2-Should do/
Medium
Risk/Exposur
e
End-Yr: Action
to be reviewed by
Wellness
Council.
End-Yr: Provost
requests 1 leader,
remove from
Provost
Mid-Yr: tabled
#5 – Provide diverse opportunities for students to promote social change
through their interactions in the broader community
#6 – Create a culture of Christ-centered wellness
8/17/2010 Draft
1.6.5. Establish a five-year plan which
includes the approach to spreading the Christ-
centered wellness model to the churches of the
Columbia Union. The model will spread with
directions on how to collect baseline and
outcomes data to substantiate the results of
implementation of the model.
Development and implementation of a Christ-
centered wellness model.
VPSL&R,
Provost
2-Should do/
Medium
Risk/Exposur
e
End-Yr: Action
to be reviewed by
Wellness
Council.
End-Yr: Provost
requests 1 leader,
remove from
Provost
08/09 Status
Comment
Mid-Yr: tabled
1.6.6. Establish a “Healthiest Christian
Campus in America” competition among
Adventist campuses and then expand to include
non-Adventist Christian colleges.
Collaborate with other persons responsible to set
parameters and markers for indices examined.
VPSL&R,
Provost
3-Nice to
Have
End-Yr: Action
to be reviewed by
Wellness
Council.
End-Yr: Provost
requests 1 leader,
remove from
Provost
Mid-Yr: tabled
1.6.7. Supporting partners such as
healthy/wealthy alumni, healthcare businesses
and independent ministries will be invited to
sponsor CPLS and the culture change initiative.
The Wellness Council will brainstorm these
possibilities and be careful not to approach
potential sponsors/partners without the guidance
and input of the University’s
development/fundraising office. Every effort will
be made to ensure that CPLS is a self-support
entity and that all programs break even or
produce net income.
Evidence that the Wellness Council has
interested appropriate individuals to support the
program financially.
VPSL&R,
Provost
3-Nice to
Have
End-Yr: Action
to be reviewed by
Wellness
Council.
End-Yr: Provost
requests 1 leader,
remove from
Provost
End-Yr: Provost
requests 1 leader,
remove from
Provost
Mid-Yr: tabled
2.1.1.a Implement a formal faculty, staff,
and student orientation program that includes
safety, diversity (with diversity to include gender
and disability), and other required topics.
A formal orientation program for students
addressing safety, diversity (including gender
and disability), and other required topics.
Ongoing Yes VPSL&R 1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Provost
requests 1 leader,
remove from
Provost
09/10 FY Done Done Mid-Yr:
Evidence is
diversity training/
colloquium
Mid-Yr: VPSLR-
make due 10/11
Mid-Yr. Split
into a & b
End-Yr: Gender
Aug 10-12, 2010
Washington Adventist University aims to be a premiere place to learn, grow, and work, and recognizes that people are most
likely to flourish and experience transformative growth when they are supported by a community that truly cares. The
University, therefore, will seek to become a model caring community and will pursue this goal through its commitment to:
Strategy Two
Deeply Engage and Value People
8/17/2010 Draft
2.1.1.b Implement a formal faculty, staff, and
student orientation program that includes safety,
diversity (with diversity to include gender and
disability), and other required topics.
Completion of on-going seminars (five and on-
line, blackboard etc.); verification of training
recorded in appropriate file.
Ongoing Yes VPFA, (Dir
HR)
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Provost
requests 1 leader,
remove from
Provost
09/10 FY Done Done Mid-Yr:
Evidence is
diversity training/
colloquium
Mid-Yr: VPSLR-
make due 10/11
Mid-Yr. Split
into a & b
2.1.2. Establish a diversity team to create a
Comprehensive Diversity program.
An implemented Diversity program addressing
varied diversity initiatives, and a team (of
faculty, staff, and students) in place to work
these initiatives.
Formation of team that will be responsible for
evaluation of the program and tweaking, where
necessary, for optimum success.
Ongoing Yes VPSL&R,
[VPFA, (Dir
HR)]
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Provost
requests 1 leader,
remove from
Provost
09/10 FY Not started,
should complete
on time
Done Mid-Yr: moving
VPFA to
supporting
End-Yr:
VPSL&R
suggests moving
to mid-yr 10/11
2.1.3. Implement a Diversity Leadership
Training component to train faculty and staff to
lead the activities prescribed in the
Comprehensive Diversity program.
A Diversity Leadership Training program for
faculty and staff training on how to lead the
initiatives in the Diversity Program (2.1.2).
Ongoing Yes VPFA, [Dir
HR]
2-Should do/
Medium
Risk/Exposur
e
End of Yr:
Provost requests
1 leader, remove
from Provost
10/11 FY
2.1.4. Implement cultural activities that
promote diversity issues.
Evidenced by list of cultural activities and
programs.
For 09/10 forward, conduct program evaluations
on these programs.
Ongoing Yes VPSL&R 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done Done End-Yr:
Emphasis weeks,
clubs, and
organizations;
café dining
events
2.1.5. Continue integrating diversity into the
curriculum. In Gen. Ed classes; Psychology,
Sociology classes, and intercultural
communication classes.
Deans to provide list of classes, e.g., Cross
cultural ministry. The list to be generated by
review of syllabi
Ongoing Yes Provost 1-Must
do/High
Risk,
Exposure or
Impact
End-Yr:
Ongoing, thus
will continue to
review
09/10 FY Started, should
complete on
time
Done Mid-Yr: Deans
to provide list of
classes, e.g.,
Cross cultural
ministry2.1.6. Provide English classes for adult
learners / ESL classes, and including English for
Speakers of Languages for Traditional students.
English classes offered for the specified groups. Ongoing Yes Provost 3-Nice to
Have
10/11 FY
2.1.7. Provide training for student leaders, by
groups such as the Anti-defamation League.
Evidenced by list of groups invited to conduct
this training. In addition, this training can be
provided via train-the-trainer approach, by
having students who are trained train others.
Ongoing No VPSL&R 1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
2.1.8. Create a diversity task force for
planning and implementing activities, programs
addressing various cultures, and other diversity
issues.
Formation of a diversity task force with
appropriately trained personnel; True success
mandates additional staff in the VPSL&R
office.
One
Time
Yes VPSL&R 1-Must
do/High
Risk,
Exposure or
Impact
End of Yr:
Suggest timing
change from
09/10 to 10/11.
10/11 FY
#2 – Create a student-centered learning community
8/17/2010 Draft
2.2.1. Develop a comprehensive plan for a
cohesive, fully-integrated student success system,
to include:
· Intake/assessment/orientation
· Advising/Educational plan development
· Mandatory freshman course
· Intervention process
· Case management process
· Enhanced faculty involvement in
advising/intervention processes.
Plan developed. One
Time
Yes Provost
(ADAS),
[VPSL&R]
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Need to
revise
measurement.
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
End-Yr:
VPSL&R says
FYE - Full time
DIR, Bridge
2.2.2. Create a centrally-located student
success center and implement the plan. Assess
system effectiveness annually.
Center for Learning Resources will be
responsible for implementing the plan.
Evidence of each component of the plan being
reviewed annually.
Ongoing Yes Provost
(ADAS),
[VPSL&R]
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Need to
revise
measurement.
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
End-Yr: Done
but revise the
plan to address
external
assessment/
rebranding.2.2.3. Activate DATATEL components
essential to increasing the effectiveness of the
student support system (degree audit module,
communications planning, online/web
withdrawal capability, web registration, etc).
Datatel new modules are activated, users are
trained and can successfully use modules.
One
Time
Yes Provost
(ADAR),
[VPFA
(AVPITS)]
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Provost-
Some
components
completed; some
still in progress
should complete
09/10
ITS-Records
dept. has been
trained on Degree
Audit module.
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
Mid-Yr: Some
will be done this
year, some next
year
Mid-Yr: Provost-
done except for
adding the
critical
component of
advisor sign-off
for registration;
students can
register online
without any
advisor check.
End-Yr: Datatel
Users SubComm
will help address
in future2.2.4. Activate a system to block students
from withdrawing from specific courses, such as
enrichment courses, first year courses, or other
prescribed classes.
The ability to block students from withdrawing
from specific courses.
One
Time
No Provost
(ADAR),
[VPFA
(AVPITS)]
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Provost-
Plan to complete
by Sept 2009;
change
completion to
09/10
ITS-This is
currently being
worked on by the
Provost, Records
& ITS
09/10 FY Done Done
2.2.5. Orientate faculty, staff, and students
to the breadth and scope of the University’s
support services and implement a student success
day.
On-going -- conduct an annual student success
celebration.
Ongoing No VPSL&R 1-Must
do/High
Risk,
Exposure or
MidYr: change
due date to 09/10
09/10 FY Done Done
8/17/2010 Draft
2.2.6. Assess/revise the University’s
current polices and procedures regarding
developmental course placement, development,
student enrollment, course sequencing, and
GPA/academic status.
Committee minutes and policy statements. Ongoing No Provost
(ADAR),
[VPFA
(AVPITS)]
1-Must
do/High
Risk,
Exposure or
Impact
Ongoing, thus
will continue to
monitor
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
End-Yr: ITS
requests they be
removed from
this item as it
deals with
academic
policies and
procedures2.2.7. Institute pre-requisites (English,
reading and math), for selected higher level
classes.
Committee minutes, policy statements, records
system Datatel functioning.
One
Time
No Provost
(ADAR),
[VPFA
(AVPITS)]
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Provost-
Will test in 09/10
ITS-There is an
upper division
eligibility rule in
place
09/10 FY Done Done
2.2.8. Institute a summer pre-immersion
developmental skill-building program that is
funded by an outside source or sponsorship.
Funding obtained for program; program offered Ongoing Yes Provost
(ADAS)
2-Should do/
Medium
Risk/Exposur
e
09/10 FY Started, should
complete on
time
Done Mid-Yr: one
grant submitted,
internal funding
supplied, another
grant being
considered
End-Yr: Done
but funded by
university.
2.2.9. Initiate faculty workshops and
developmental advising training to enhance
awareness of the needs of under-prepared/ at-risk
student populations and provide tools for
working more effectively with these students.
Workshop scheduled and completed; faculty
attendance
Ongoing Yes Provost (SASS) 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Done
2.2.10. Continue assigning each first year
student to a faculty or staff mentor, as is being
done by the Center for Learning Resources.
Annual audit/review of mentor list. Ongoing Yes Provost
(ADAS),
[VPSL&R]
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: New
form will be
tested in 09/10.
New
Measurement
being provided.
09/10 FY Started, should
complete on
time
Done Mid-Yr:
Clarification
added that this is
for first year only
Measurement is
the list of
mentors.
End-Yr: Should
be for all four
years out; at least
a minimum of
two
2.2.11. Conduct training/refresher courses for
mentors.
Documentation of training and course; record of
who attended and outline of training offered
Ongoing Yes Provost
(ADAS)
2-Should do/
Medium
Risk/Exposur
e
End-Yr: will be
scheduled in
09/10
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
2.2.12. Define components and implement
specifications for a student performance tracking
and alert system, and assess performance
tracking and alert system efficiency and
effectiveness annually.
Outline of procedures followed to track student
performance.
Annual review of procedures.
Ongoing Yes Provost
(ADAS),
[VPSL&R],
[DIR]
1-Must
do/High
Risk,
Exposure or
Impact
MidYr:
Measurement
will be modified
by Provost
End-Yr: Will be
scheduled in
09/10
09/10 FY Started, should
complete on
time
Done End-Yr: Early
Alert Form
#3 – Ensure that faculty and staff feel highly valued
8/17/2010 Draft
2.3.0 Increase Employee job satisfaction index
from 3.75 to 4.25.
Job satisfaction increase as measured by
employee job satisfaction survey
Ongoing Y VPFA, [Dir
HR]
1-Must
do/High
Risk,
Exposure or
Impact
Added to link
with Bal. Scard.
12/13 FY
2.3.1.a Implement and track the progress of a
Human Resources training and development
program on the following:
· Time Management
· Project Management
· Stress Management
· Wellness
· Sexual Harassment
· Customer Service
· Safety
Consider rollout of these to faculty and staff via a
yearly fall or late summer Colloquium, with
break-out sessions as necessary for staff and
faculty groups.
An ongoing training program coordinated by
HR, tracking attendance, that addresses the
prescribed areas. Measurement includes
schedule of each event and attendance tracking.
Ongoing Yes VPFA,
(Dir HR)
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Provost
requests 1 leader,
remove from
Provost
09/10 FY Done Done Mid-Yr:
Evidenced by
"lunch and
learns".
Changing "job
functions" to
"customer
service". Sexual
harassment is
every other year.
2.3.1.b Implement and track the progress of a
Human Resources training and development
program on the following:
· Culture Changes / Total Quality
Management
An ongoing training program coordinated by
HR, tracking attendance, that addresses the
prescribed area. Measurement includes schedule
of each event and attendance tracking.
Ongoing Yes VPFA, Dir HR,
[CommQI]
1-Must
do/High
Risk,
Exposure or
Impact
End of Yr: Need
definition,
priority,
assignment,
timing
Provost requests
1 leader, remove
from Provost
10/11 FY
2.3.1.c Implement and track the progress of a
Human Resources training and development
program on the following:
· Academic Freedom
An ongoing training program that addresses the
prescribed area. Measurement includes schedule
of each event and attendance tracking.
Ongoing Yes Provost 1-Must
do/High
Risk,
Exposure or
Impact
VPFA requests
remove from
VPFA/ Dir HR
10/11 FY
2.3.2.a Implement and continue Employee
Recognition programs such as:
· Employee Appreciation banquets
· PRAISE cards
Evidence of recognition programs being actively
conducted, specifically but not exclusively: the
appreciation banquets, PRAISE cards.
Ongoing Y Est.
4.3k
VPFA,
(Dir HR)
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Done Mid Yr: Banquet
is in the spring.
2.3.2.b Implement Employee Recognition
programs such as:
· Employee of the month
Evidence of recognition of employee of the
month,.
Ongoing Yes VPFA,
(Dir HR)
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr:
Recommend due
9/10
09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
Mid Yr: deferred
to 10/11.
Predecessor
should be
performance
appraisal system
End-Yr: Defer to
11-12
2.3.2.c Implement Employee Recognition
programs such as:
· Bonus and Pay for Performance Initiatives
(PfPI)
Plan to be presented to the Compensation
committee of the BOT, and approved.
Ongoing Bonus/
PfPI - Yes
Est. TBD
VPFA, Dir HR 1-Must
do/High
Risk,
Exposure or
Impact
End of Yr:
Recommend due
10/11
10/11 FY
8/17/2010 Draft
2.3.3. Provide for benefits such as Life and
Work Balance.
Continue to provide for Life & Work Balance as
part of the Wellness Program being developed.
Ongoing Yes VPFA,
(Dir HR)
1-Must
do/High
Risk,
Exposure or
Wellness
Training
Addresses Issues
09/10 FY Done Done Mid Yr: Lunch
and Learns
2.3.4.a Conduct Pay Analysis against Church
guidelines and policies (Church Wage scale), for:
staff and faculty (all levels).
Documented pay analysis, showing deltas
between actual and target pay, or ranges of
target pay versus actual pay.
One
Time
Yes VPFA,
(Dir HR)
2-Should do/
Medium
Risk/Exposur
e
End-Yr: Move
earlier from
10/11, to 09/10
Split a) job
analysis, b)
compare job
analysis to wages
09/10 FY Done Done Mid Yr: done
Feb, '10
2.3.6. Provide opportunities for employee
socialization and team building, such as
socials/parties, etc.
Social Committee to provide schedule of events
and activities.
Ongoing Yes
Est. 7k
VPFA,
(Dir HR)
1-Must
do/High
Risk,
Exposure or
09/10 FY Done Done
2.3.7. Realign job performance evaluations
to align with Actions from The Plan (for
management) and to match specific job
descriptions.
Performance evaluation format addresses
Actions from The Plan for management and
matches job descriptions.
One
Time
Yes
Est. 1k
VPFA,
(Dir HR)
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr:
Managers have
the ability to
enter these into
the appraisals
Make due 09/10
09/10 FY Done Done
2.3.9. Identify family centered activities
involving faculty and staff along with the
administration of the University to be developed
and designed to give a “family setting” to the
University.
Schedule of events and activities providing for
family setting, conducted by a group such as the
Social Committee.
Ongoing Yes
Est. 4k
President,
VPFA
3-Nice to
Have
Fall Sabbath
lunch, Summer
picnic and
recognition lunch
09/10 FY Started, should
complete on
time
Done Mid Yr:
Christmas dinner
theater &
birthday lunch
VPFA/HR report
as done2.3.10a Supply CommQI information related to
faculty achievement and appreciation to ensure
coverage in WAU and external
publications/media.
Information supplied Ongoing No Provost 1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Done
2.3.10b Supply CommQI & HR stories on
related to staff achievement and appreciation to
ensure coverage in WAU and external
publications/media.
Number of stories supplied from HR, VPs and
directors)
Ongoing No All
VPs/Directors
1-Must
do/High
Risk,
Exposure or
09/10 FY
2.3.10c Produce a monthly faculty/staff
newsletter (electronic or hard copy) that will
have a section dedicated to employee
achievements and appreciation
Evidence of such newsletter (to be supplied from
CommQI)
Ongoing Yes CommQI 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done Done Mid Yr: remove
newsletter,
replace with
Twitter; not
replace but add
End-Yr:
CommQI says
when did this
become only
CommQI? We
were to support
HR.
End-Yr: HR says
defer to 1/15/112.3.10d Include Faculty/Staff achievements in
media outreach strategy.
Number of stories covered in both internal and
external media.
Ongoing No CommQI 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Started, should
complete on
time
Done Mid-Yr:
CommQI-need to
receive this
information
8/17/2010 Draft
2.3.10e Revive the Zapara Award and/or other
faculty awards and recognize winner at spring
commencement.
Documented criteria and selection process for
award selection and evidence of recognition of
Zapara Award winner at spring commencement.
Ongoing Yes Provost 3-Nice to
Have
End of Yr:
VPAAR to
research
10/11 FY
2.3.10f Host a reception open to WAU
faculty/staff/students and family of faculty/staff
member upon retirement.
Evidence of such events taking place. Ongoing Yes VPFA, Dir HR 3-Nice to
Have
10/11 FY
2.3.10g Promote a “Casual Friday” program,
approved by an administrative committee.
“Casual Friday” program, approved by an
administrative committee.
Ongoing No VPFA,
(Dir HR)
3-Nice to
Have
09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
Mid-Yr: 10/11
End-Yr: HR 11-
12
2.3.10h Recognize faculty and staff years of
service with a monetary gift or surprise trip.
Recognition of faculty and staff years of service
with a monetary gift or surprise trip.
Ongoing Yes VPFA, Dir HR 3-Nice to
Have
10/11 FY
2.3.11. Work on creating a culture of regular
Sabbaticals for faculty with full teaching loads.
Sabbatical program established; sabbaticals
granted.
Ongoing Yes Provost,
[VPFA, Dir
HR]
2-Should do/
Medium
Risk/Exposur
e
10/11 FY
2.3.12. Address shared governance and faculty
senate.
Committee terms of reference and flow chart. One
Time
No President 1-Must
do/High
Risk,
Exposure or
Impact
Committee
review
completed; need
to review
recommendations
in 09/10
09/10 FY Started, should
complete on
time
Done Mid-Yr: place a
student & faculty
member on
committees
End-Yr: Dr.
Johnson this
projection
provide
exceptional
support.
2.4.2. Implement customer service training as
a component of a comprehensive staff (including
point-of-contact, student workers) and faculty
development training program.
Customer service training scheduled for the
campus, with attendance tracked by HR.
One
Time
Y Est. 3k VPFA,
(Dir HR)
1-Must
do/High
Risk,
Exposure or
End-Yr: Make
due 09/10
09/10 FY Done Done Mid-Yr:
Program/
Schedule
2.4.3. Conduct an annual presentation to the
University community on customer satisfaction.
Event scheduled and held on customer
satisfaction to entire university community.
Ongoing No VPFA,
(Dir HR)
1-Must
do/High
Risk,
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
End-Yr: HR 11-
12
2.4.4. Conduct annual customer satisfaction
surveys across the university (for external and
internal customers), including all service
departments. Annually evaluate the customer
satisfaction data of departments.
Survey customer satisfaction at point of service,
providing annual feedback on summarized
results to departments.
Increase customer satisfaction score from 3.4 to
4, on a scale of 1-5 by year 2013.
Ongoing Y Est. 1k VPFA,
(Dir HR)
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Make
due 09/10
09/10 FY Started, should
complete on
time
Done Mid-Yr: will
complete in May
2.5.1. Develop a program of communication
with constituency, such as a bi-annual or other
recurring meeting.
President will provide reports to BOT, Formal
Faculty/staff meetings, student meetings. Will
also implement informal town hall meetings
with faculty and staff and fireside chats with
students.
Ongoing No President 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Done End-Yr: Working
on scheduling for
coming year.
2.5.2. Increase profile to constituency of
music, Acro-Airs, mock trial, and other flagship
programs.
Implement a minimum of five events that will be
conducted throughout the Columbia Union each
academic year, such as camp meeting visits,
Academic visits, etc.
Ongoing Yes VPMR 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done Done
2.5.3. Conduct advisor training workshops;
conduct semester reviews of advisor lists and
advisor records.
Scheduled workshops, evidence of reviews of
advisor lists and records.
Ongoing Yes Provost (SASS) 1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: semester
reviews in place;
need more
training for
advisors
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
#4 – Create a culture around customer satisfaction
#5 – Fully engage constituencies
8/17/2010 Draft
2.5.4. Encourage faculty and staff to attend
an identified number of student activities
annually.
Track that faculty and staff will attend and/or
participate in a minimum of five student events
annually, to be self reported.
Ongoing No President,
Provost & all
VPs
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Pres-
waiting on
reports from VPs
Need to
implement
tracking system
for 09/10
09/10 FY Started, should
complete on
time
Done Mid-Yr: changed
the measurement
from "student
sponsored
activities" to
"student
activities" All
VPs will self-
report
2.5.5.a. Position WAU more effectively by
developing profiles of its main audiences in
order to develop priorities and strengthen
messages.
Documented profiles One
Time
No CommQI 1-Must
do/High
Risk,
Exposure or
Part of PR
consultant
planning
09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
End-Yr: Move to
10-11.
2.5.5.b Analyze information and work with
administration and the WAU Board to decide on
the appropriate image for WAU.
Brand book and rollout Ongoing Y CommQI 1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Done
2.5.6.b Continue efforts to instill or
strengthen trust in WAU as a Seventh-day
Adventist institution which fosters spiritual
values by developing a communication program
for spiritual values.
Publicized Spiritual Master Plan (with web
presence, and as bound brochure).
One
Time
Y VPMin 1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Pres-
Still waiting on
master plan
CommQI-
supporting VP
Min on Spiritual
Master Plan
09/10 FY Done Done
2.5.7. Increase the number of WAU
articles/coverage in external media (not
controlled by WAU).
Monthly articles in external media. Ongoing No CommQI 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Started, should
complete on
time
Done
2.5.8 Develop and implement an internal
communication plan that uses multiple outlets
and technologies to ensure that faculty, staff &
students receive timely announcements and other
information (news, policy changes,
appreciations, etc.)
Evidence of a plan, quantifiable evidence of
timely communication tactics (may include
website, email, texting, social media, print,
posters, etc.)
Ongoing Y CommQI 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Done
2.5.9.a Develop and implement a
communications plan for Alumni and Friends
that includes a magazine and other periodic news
delivery methods (print, electronic, etc.)
Evidence of a plan, quantifiable evidence of
communication tactics (may include website,
email, texting, social media, print, mailings,
magazine, etc.)
Ongoing Y VPAAR,
[CommQI]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Mid-Yr: VPAAR
running behind
Need to define
who is primary
vs. supporting
End-Yr:
CommQI says
magazine done.
Some email
outreach.
2.5.9.b Increase engagement in the local region
through meetings with political and business
leaders and participation in local events.
At least two contacts per month. Ongoing Y President,
[VPAAR]
1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Need to define
who is primary
vs. supporting
2.5.10. Plan presidential inauguration and
provide inauguration materials for Inauguration
Weekend. Images and multimedia content should
be captured and archived for future use.
Evidence of inauguration materials. One
Time
Y BOT 2-Should do/
Medium
Risk/Exposur
e
Reassigned at
MidYR from
MarComm to
BOT
09/10 FY Done
8/17/2010 Draft
2.6.1. Resident Deans will inform faculty
and staff of the needs of the residence halls.
Discussion items strategically placed on
appropriate agendas.
For 09/10 on, conduct student focus groups to
capture dorm needs which would be provided.
Ongoing No VPSL&R 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Mid-Yr:
Recommend
removing from
plan. Will
continue annually
2.6.2. Resident Deans will invite faculty and
staff to select a time to meet with residents about
what their needs are and how they can help.
Written documentation of who has been invited
and of who accepted and who declined the
invitation.
Ongoing No VPSL&R 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Mid-Yr:
Recommend
removing from
plan. Will
continue annually
2.6.3. Resident Deans will develop a
calendar of available dates for faculty and staff to
interact with residents.
Evidenced by the completed calendar. Ongoing No VPSL&R 1-Must
do/High
Risk,
Exposure or
09/10 FY Done Done
2.6.4. Post fliers annually beginning mid-
August with dates and topics for worship.
Postings of appropriate flyers and other
information on bulletin boards, e-mail etc.
Ongoing Yes VPSL&R 2-Should do/
Medium
Risk/Exposur
09/10 FY Started, should
complete on
time
3.1.1.a Establish criteria for “Programs of Criteria established. One No Provost 2-Should do/ End of Yr: Make 10/11 FY
3.1.2. Ensure that new Master’s programs
(specifically SGPS) will be established
minimally at one per year (if financing is
permissible and as need requires).
Approval of program by MHEC Ongoing Yes Provost (SGPS) 2-Should do/
Medium
Risk/Exposur
e
End-Yr: Should
review current
programs and get
new programs
established
before adding
additional
09/10 FY Started, should
complete on
time
Done
3.1.3. Ensure that a PhD program will be
established by 2011.
Approval of program by MHEC One
Time
Yes Provost 2-Should do/
Medium
Risk/Exposur
e
10/11 FY
3.2.1. Integrate the resource of the
Washington Metropolitan area into the
curriculum use for classes, such as the National
Institutes of Health (NIH), the Smithsonian
museums, the GC.
Inclusion in course syllabi. Ongoing Yes Provost 1-Must
do/High
Risk,
Exposure or
Impact
need to remind
faculty to include
in syllabi
09/10 FY Started, should
complete on
time
Done
Strategy Three
Create a Distinctive and Distinguished Learning Culture
Building on its heritage and location, Washington Adventist University seeks to become a highly prized home for those students and faculty who are
unusually eager to engage with the broader world and who desire to reach their full potential within their chosen academic disciplines. Programs will be
distinctive because of their Christ-centered spirituality and their high level of academic rigor. Specifically, the University aims to fully meet the
expectations of these students and faculty through its commitment to:
#3 – Strengthen student development
#2 – Fully integrate the resources of the nation’s capital into general student
learning
#6 – Ensure the value of an enduring, strong, and supportive learning
community, including a residential, developmental learning environment
within which students, faculty, and staff practice the values of a Washington
Adventist University education every day
8/17/2010 Draft
3.3.1. Develop and implement systems and
programs to achieve retention benchmarks.
Move target retention rates from 63% to 90% by
2014.
List of systems and programs implemented.
Ongoing Yes VPSL&R 1-Must
do/High
Risk,
Exposure or
Impact
End of Yr Target
date needs to
align with Bal.
Scard.
12/13 FY
3.3.2. Develop and implement systems and
programs to achieve graduation benchmarks
(such as Capstone courses).
Curriculum review and minutes of committees.
Increase graduation rate from 35% to 55% by
2014.
Ongoing Yes Provost 2-Should do/
Medium
Risk/Exposur
e
End of Yr Need
to link target and
date with Bal.
Scard.
13/14 FY
3.3.3. Improve the class schedule to reduce
small enrollment classes (less than 7 students).
Class schedule, number of classes and class size
data.
One
Time
Yes Provost
(3 Deans,
ADAR, ADAS)
1-Must
do/High
Risk,
Exposure or
Impact
In progress;
reviewing
scheduling
programs
09/10 FY Done Done Mid-Yr: Provost-
Ongoing: will
continue to
monitor class
size3.3.4. Continue to support honors program
and the leadership aspect of the program.
Faculty course load forms which include load for
director and teachers; class schedule listing
courses each semester; course syllabi.
Ongoing Yes Provost
(ADAS)
2-Should do/
Medium
Risk/Exposur
e
09/10 FY Started, should
complete on
time
Done
3.3.6. Improve academic advising and
mentoring by conducting Advisor workshops and
keeping Advisor Handbook up to date.
Annual workshops and annual updates/releases
of the Advisor Handbook .
Ongoing Yes Provost 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Not started,
should complete
on time
Started, need to
revise finish date
Mid-Yr, make
this one
handbook only
3.3.7. Assess and strengthen the
University’s honors, accelerated and integrated
programming to increase/enrich opportunities for
accelerated learning and variety of credentialing.
Documentation of program review Ongoing No Provost
(ADAS)
2-Should do/
Medium
Risk/Exposur
e
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
Mid-Yr, consider
combining with
3.3.4
3.3.8.a Continue to support and improve the
first-year experience program with a focus on
academic success of all students including at-risk
students.
Enhance the first-year experience program to a
be cohesive and holistic. Consider adjusting the
structure for better coordination-- to address
counseling, academic warning systems,
residential life, and other aspects of first year
experience. The academic FYE offering should
compliment what is being offered in the
residential program for first year students, and
vice versa.
Continued improvement of first-year retention
rates, as measured by KPIs.
An established coordinator with FYE director as
part of job description.
Evidence of yearly program review with
recorded minutes.
Ongoing Yes Provost
(ADAS)
[VPSL&R]
1-Must
do/High
Risk,
Exposure or
Impact
FYE budget and
program review
09/10 FY Started, should
complete on
time
Done
3.3.8.b. Create policy to require residency for
first year students for at least one year. Potential
positive impact on engagement, possibly
retention, finances.
Documented policy, and evidence of adherence
to policy.
One
Time
Yes,
revenue
generating
VPSL&R Added by
VPSL&R at End
of Yr 08/09.
10/11 FY
3.3.9. Improve student writing and speaking
across the curriculum by incorporating writing
into the classes within majors.
Annual review of assessment outcome review
for each major.
Ongoing No Provost,
[VPSL&R]
2-Should do/
Medium
Risk/Exposur
e
End of Yr: Make
due 10/11. Will
be recommended
as part of
curriculum
review in 09/10
10/11 FY
3.3.10. Connect students with mentors (such
as alumni) to support student
development/success.
Annual review of mentor list in the Center for
Learning Resources.
Ongoing No Provost 3-Nice to
Have
10/11 FY
8/17/2010 Draft
3.3.11. Assess/revise the University’s
current policies and procedures regarding
development course placement, development
student enrollment, course sequencing, and
GPA/academic status.
Policies reviewed, approved, minutes recorded,
published in bulletin
Ongoing No Provost
(ADAS)
1-Must
do/High
Risk,
Exposure or
Impact
New placement
tests have been
selected and need
to be tested in
09/10
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
Mid-Yr Consider
combining with
2.2.6
3.3.12. Complete a systematic review and
analysis of existing developmental course
formats and delivery methods and develop
recommendations for action.
Documentation of program review; changes
proposed
Ongoing No Provost
(ADAS)
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
3.3.13. Recognize and publish student
success through internal and external
communication sources. Reinstitute publication
of Dean’s List; publish student success stories in
CJ, other university publications, and external
publications.
Evidence of submission of Deans list (once each
semester), honors program and honor society
inductees (annually), and other student academic
success stories.
Ongoing No Provost 1-Must
do/High
Risk,
Exposure or
Impact
End-Yr:
CommQI-CJ
articles are not
controllable.
Provost- Dean's
list publication in
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
Mid-Yr Honor
society induction,
student awards
ceremony - add
as documentation
3.3.14. Implement a communication system
that informs potential and current students of the
system and programs in place that support
student development/success. Develop this on
the web.
Comparative annual student satisfaction reports
demonstrate a measurable increase each year in
areas related to student support services.
One
Time
Yes Provost,
AVPITS
[VPFA]
2-Should do/
Medium
Risk/Exposur
e
10/11 FY
3.3.16. Redevelop the Washington
Experience (a program like Adventist Colleges
Abroad, but in Washington) to attract students
from other colleges. Conduct both in summer
and in semesters.
Program developed; offer program summer
2010
One
Time
Yes Provost 2-Should do/
Medium
Risk/Exposur
e
11/12 FY Not started,
should complete
on time
Not started, need
to revise finish
date
Mid-Yr: Capital
Summer Session
'10 will include
some courses &
one class with
Loma Linda.
Consider
changing
wording on
"Washington
Experience"3.3.17. Expand the student intake process to
include academic skill assessment, learning style
assessment, and career assessment as necessary.
Assessment tools selected and assessment
implemented
One
Time
Yes Provost
(ADAS)
2-Should do/
Medium
Risk/Exposur
e
09/10 FY Started, should
complete on
time
Done Mid-Yr: doing
this for selected
students currently
End-Yr: Done
for select
students
3.3.18. Involve residents in residence hall life. Provide opportunities for increased student
involvement in the governance of the residence
halls. Budgetary support can be provided
through retaining a percentage of the money
raised from guest rooms, etc.
Ongoing Yes VPSL&R 1-Must
do/High
Risk,
Exposure or
Impact
MidYr: removed
Provost as
assignee
09/10 FY Done Done End-Yr: Not yet
retaining funds
3.3.21. Successful training of student leaders,
who will in turn, become effective leaders.
Hold two student leadership training sessions
annually.
Ongoing No VPSL&R 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Done Done Mid-Yr:
conducted 3
sessions this yr
Suggested
wording change3.3.22. Develop brochures on academic
support services including the Library & Center
for Learning Resources.
Evidence of brochure(s). One
Time
Yes Provost,
[CommQI]
1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY Started, need to
revise finish
date
Started, need to
revise finish date
Mid-Yr: some
done for LCLR
Adjusting date &
perhaps media
for Library
#4 – Enhance faculty development
8/17/2010 Draft
3.4.1. Increase Professional Growth
Allowance to accommodate pay for conferences.
PGA adjusted for 2010-11 budget One
Time
Yes Provost,
[VPFA]
2-Should do/
Medium
Risk/Exposur
e
Recommend
move from 09/10
to 10/11
10/11 FY
3.4.2. Provide opportunities for faculty to
share information and research.
Documentation of scheduled meetings or
postings.
Ongoing No Provost (SASS) 2-Should do/
Medium
Risk/Exposur
e
Faculty
Development
committee will
implement in
09/10
09/10 FY Started, should
complete on
time
Done Mid-Yr:
Rescheduling,
were waiting for
new web page
Mid-Yr: Provost-
new website has
included faculty
items; need to
further develop
this option with
designated
webpage
3.4.3. Continue providing interdisciplinary
classes.
Course offerings each semester; course syllabi. Ongoing No Provost 1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
3.4.4. Encourage and provide opportunities
for faculty to collaborate with colleagues from
institutions in the area.
Documented collaboration; evidenced by
membership dues.
Ongoing No Provost (SASS) 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Started, should
complete on
time
Done End-Yr:
Recommend not
track yearly.
3.4.5. Establish a comprehensive
Leadership Institute to develop and manage the
delivery of a mandatory faculty/staff
development program addressing university
needs as defined by an annual Professional
Developmental and Training Plan.
Professional development plan developed.
Leadership Institute established.
One
Time
Yes Provost 2-Should do/
Medium
Risk/Exposur
e
10/11 FY
3.4.6. Create clear criteria for faculty
teaching loads and apply consistently across all
schools and departments.
Review of current policies; revisions approved
by committee; revisions published in faculty
section of employee handbook.
One
Time
No Provost 1-Must
do/High
Risk,
Exposure or
Impact
Partially
completed; will
complete in
09/10
09/10 FY Started, need to
revise finish
date
Started, need to
revise finish date
Mid-Yr: will
complete next
year
Mid-Yr: some
areas reviewed;
other areas still
need review;
should complete
by fall 2010
3.4.7. Utilize assessment data to define
new systems and structures to address the
University's staffing patterns and utilization
needs in cost effective ways
Assessment tools selected and assessment
implemented
Ongoing Yes Provost 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Mid-yr:
Imperative is
not clear;
however
program
reviews are in
progress
End-Yr: Remove
3.5.3. Identify and implement a plan in
which all degree programs will have some
courses available on-line by 2010.
Evidence of plan. Ongoing Yes Provost 1-Must
do/High
Risk,
Exposure or
Impact
11/12 FY
#5 – Reengineer and vitalize the academic programs of the University
8/17/2010 Draft
3.5.4 Restructure academic support services. Revised job descriptions One
Time
No Provost 1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY Started, should
complete on
time
Started, need to
revise finish date
3.5.5 Initiate program reviews in all programs
that have not been reviewed in two years
Committee minutes (department and AC) Ongoing No Provost 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, need to
revise finish
date
Started, need to
revise finish date
Mid-Yr: initiated
in SASS and
SHPSW; still
need to start in
SGPS; all should
be completed in
2010-11
3.5.6 Review General Education requirements GE committee minutes; AC & FC minutes Ongoing No Provost
(SASS), [DIR]
1-Must
do/High
Risk,
09/10 FY Started, should
complete on
time
Done
3.5.7 Appoint outcomes assessment
coordinator
Coordinator appointed One
Time
Yes Provost 1-Must
do/High
09/10 FY Done Done
3.5.8 Review outcomes assessment process
and outcomes assessment plans.
Academic Council minutes Ongoing No Provost 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, need to
revise finish
date
Done Mid-Yr: in
progress, but
may not be fully
completed by
June3.5.9 Appoint accreditation committee List of committee members One
Time
No Provost 1-Must
do/High
09/10 FY Done Done
3.5.10 Submit progress letter for Middle
States
Report submitted One
Time
No Provost 1-Must
do/High
09/10 FY Done Done
3.5.11 Prepare plan for 2011-12 Middle States
Accreditation Report
Plan prepared and submitted One
Time
Yes Provost 1-Must
do/High
Risk,
09/10 FY Started, should
complete on
time
Done
3.5.12 Attend Middle States accreditation
workshop.
Workshops attended One
Time
Yes Provost 1-Must
do/High
Risk,
09/10 FY Done Done
3.5.13 Action: Adjust the academic calendar
to 15 week semesters.
Measurement: calendar revised to 15 weeks;
approved; published
One
Time
Yes Provost 1-Must
do/High
Risk,
09/10 FY Started, should
complete on
time
Done
3.6.1. Develop a comprehensive plan for
developing/implementing a cohesive, fully
integrated student life program.
VPSL&R to work in collaboration with Provost
to ensure the Office of Student Life and
Retention is a full participant in the planning of
FYE, registration, etc. Evidence of the plan and
collaborative efforts.
One
Time
Yes VPSL&R 1-Must
do/High
Risk,
Exposure or
Impact
Is this action
duplicative?
09/10 FY Started, need to
revise finish
date
Mid-Yr:
reschedule to
10/11
4.1.1 Increase support of campus building
and equipment projects through capital gifts, by
identifying, cultivating, and soliciting donors for
lead gifts to the Umbrella Capital Campaign.
Development of a realistic and productive
program.
Ongoing No President,
[VPAAR]
1-Must
do/High
Risk,
Exposure or
Impact
Early 09/10 FY Started, need to
revise finish
date
Started, need to
revise finish date
Mid-Yr: VPAAR-
identified started
asking process
Need to define
who is primary
vs. supporting
Strategy Four
Transform Governance and the Physical Campus
Washington Adventist University, emboldened by a critical opportunity to transform its aging physical campus and meet the
spiritual, cultural, learning, teaching, technology, and governance needs of its student body, faculty, and staff, will
continuously assess its governance structure and transform its physical campus through its commitment to:
#6 – Create a student life program that focuses on the balanced integration of
curricular and co-curricular programs
8/17/2010 Draft
4.1.2 Implement a comprehensive
development communication program to support
the capital campaign, annual fund and other
activities. This may include: logo/theme, case
statement, major donor communications,
building/naming inserts, materials for the Board
retreat, stand-alone Report of Gifts, and versions
of materials for use with constant contact.
Evidence of a productive program. Ongoing Y President,
[CommQI,
VPAAR]
1-Must
do/High
Risk,
Exposure or
Impact
MidYr comment:
currently seeking
a VPAAR
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
Need to define
who is primary
vs. supporting
4.1.3. Build a Music Building (Performing Arts
Center).
Building built that meets agreed upon
specifications and requirements of the Music
department.
One
Time
Y President,
VPFA
1-Must
do/High
Risk,
Exposure or
Impact
11/12 FY Need to define
who is primary
vs. supporting
4.2.2 Identify specifications of all available
instruction space.
Published, current, updated list of instruction
space, with specifications (e.g., available
seating, etc.).
One
Time
No VPFA 1-Must
do/High
Risk,
Exposure or
End-Yr: Make
due 09/10
09/10 FY Done Done Mid-Yr: Dir. Fac
needs to provide
inventory
4.2.3 Develop a long-term plan to update
instruction space to meet SMART classroom
specifications, and short-term to address basic
equipment needs (e.g., TV, DVD player, white
or chalk boards, etc.).
Long term and short term plans documented to
update instruction space. Tracked percentage or
other ratio of SMART vs. non-SMART space.
Documented measurement of rooms, other
relevant room data.
One
Time
Yes Provost,
[VPFA]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, need to
revise finish
date
Started, need to
revise finish date
Mid-Year: make
due 11/12, 2 yr
project (VPFA)
Mid-Yr: Provost-
this item is
linked to
program reviews
& the scheduling
program; should
complete in 2010-
11
4.2.4 Develop a master scheduling system
for all instructional space.
Scheduling program selected; program linked to
Datatel; implemented
One
Time
Yes,
$50,000
Provost,
[VPFA
(AVPITS)]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, need to
revise finish
date
Started, need to
revise finish date
Mid-Yr: planned
by Sept. '10
(VPFA)
Mid-Yr: Provost-
program
selected; need to
order, install and
implement;
should be in
place by fall
20104.2.5 Initiate a space utilization/efficiency
study to inform of/improve space usage at the
university; implement study results.
Documented space utilization study. Ongoing
documentable activity to improve upon
utilization/efficiency results.
One
Time
Yes VPFA 1-Must
do/High
Risk,
Exposure or
End of Yr 08/09 -
Started (early)
09/10 FY Started, should
complete on
time
Mid-Yr:
Will be done
June '10
4.2.6 Identify specifications and a process
for beautifying the campus both internal and
external environments, including both one time
and recurring (such as repaint) activity.
Process implemented (such as a committee,
addressing prioritizations) for beautifying
campus. Evidenced by committee minutes.
Ongoing Yes VPFA 1-Must
do/High
Risk,
Exposure or
09/10 FY Not started,
need to revise
finish date
Mid-Yr:
Committee is in
place &
functioning
#2 – Renovate buildings and beautify the campus
8/17/2010 Draft
4.2.7 Enhance our Security Infrastructure:
- Physical
- IT/Technology
- Internal Controls
- Capital Improvements/Deferred
Maintenance impacting safety/security
Implement Safety initiatives, tracking:
- Number of buildings with new key system
change over.
- Number of video cameras added to the
campus.
- Number of Security drills
Enhanced Security Infrastructure:
- Documented Safety Infrastructure Study
- Proposal for Installation
- Funding /Board Approval (estimated at $.5
million)
A qualitative and quantitative audit of security
once system has been deployed.
Multiyear deployment plan annual achievements
successful.
One
Time
(see
options
below)
VPFA,
AVPITS, DIR
SEC, DIR FAC
1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
4.2.7.a (option) Enhance our Security
Infrastructure:
- Physical
- IT/Technology
- Internal Controls
- Capital Improvements/Deferred
Maintenance impacting safety/security
Implement Safety initiatives, tracking:
- Implement new key system
One
Time
without
loan
VPFA,
AVPITS, DIR
SEC, DIR FAC
End of Yr - 5 yrs
to implement,
due 13/14
13/14 FY
4.2.7.b (option) Enhance our Security
Infrastructure:
- Physical
- IT/Technology
- Internal Controls
- Capital Improvements/Deferred
Maintenance impacting safety/security
- Installation of video cameras One
Time
without
loan
VPFA,
AVPITS, DIR
SEC, DIR FAC
End of Yr - 5 yrs
to implement,
due 13/14
13/14 FY
4.2.7.c (option) Enhance our Security
Infrastructure:
- Physical
- IT/Technology
- Internal Controls
- Capital Improvements/Deferred
Maintenance impacting safety/security
Implement Safety initiatives, tracking:
- Implement new key system
One
Time
with loan VPFA,
AVPITS, DIR
SEC, DIR FAC
End of yr - 2 yrs
to implement due
10/11
10/11 FY
4.2.7.d (option) Enhance our Security
Infrastructure:
- Physical
- IT/Technology
- Internal Controls
- Capital Improvements/Deferred
Maintenance impacting safety/security
- Installation of video cameras One
Time
with loan VPFA,
AVPITS, DIR
SEC, DIR FAC
End of yr - 2 yrs
to implement due
10/11
10/11 FY
4.2.8 Initiate repairs/upgrades for any items
that are salvageable, e.g., carpet removal,
painting, furniture, doors, etc. (Halcyon &
Morrison Halls).
List of requested/implemented facilities requests.
Make use of appropriate recycled items.
Ongoing Y VPFA, Dir
Facilities
[VPSL&R,
Residence
Deans]
1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
8/17/2010 Draft
4.2.10 Morrison Hall renovation -
Bathrooms, kitchen area.
Proposal/recommendation for renovation with
timeline, funding secured / Board Approval,
implemented changes.
One
Time
Y Est.
100k
VPFA, Dir
Facilities
1-Must
do/High
Risk,
Exposure or
Impact
End of Yr: Make
due 10/11
10/11 FY
4.2.11 Determine alternative usage for dorm
space.
List of feasible alternative uses for dormitories. One
Time
No VPFA 3-Nice to
Have
Recommend due
date 10/11
(changed in mtg
to 9/10)
09/10 FY Done Done Mid-Yr:
Alternatives are
being used (e.g.,
Business, Music
Dept, AIMU)4.2.12 Implement alternative usage for
dormitory space.
Implementation of best uses for dormitories. Ongoing Y VPFA 1-Must
do/High
Risk,
Exposure or
Impact
Recommend due
date 10/11
10/11 FY
4.2.13 Redecorate campus interiors & exteriors
with updated photography, motivational art,
banners, signage, etc., reflecting new name &
status.
Evidence of new brand, university status in
interior & exterior spaces.
One
Time
Y CommQI 1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
End-Yr: Next
Year
4.3.1. Develop a comprehensive multi-year
technology plan. This plan will include the
inventory of unmet user needs, cost and labor
saving initiatives, and new technology
developments.
A documented multi-year technology plan (after
Datatel is fully implemented).
Completion of the multi-year plan. Required
quarterly updates (live document).
Ongoing No VPFA,
(AVPITS)
2-Should do/
Medium
Risk/Exposur
e
09/10 FY Started, need to
revise finish
date
Started, need to
revise finish date
Mid-Yr: External
IT Assessment
recommendation
s need to be
incorporated
End-Yr: Due 2nd
qtr 10/114.3.2. Continue to provide training that
ensures faculty and staff maintain the appropriate
level of technological currency/ relevancy.
- Job Function – general technology
- Application (i.e., Datatel)
Percentage increase in usage by faculty of
Webadvisor and D2L. Staff training on
application software and documentation of
Datatel.
Increase in the number of employees who attend
training. Required CE credits during job review
process.
Ongoing Y Est.
30k
VPFA,
(Dir HR,
AVPITS)
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Make
due 09/10
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
End-Yr: HR 11-
12; ITS indicates
this is Done for
this yr
4.3.3. Implement ‘anytime-anywhere’ access
for faculty/staff/students to allow secure remote
access to the university network and services
(e.g., wireless, VPN, etc.).
After identification of critical wireless areas, a
multi-year program to install wireless in various
buildings. Student congregation areas are mostly
done.
Increase the number of wireless "hot spots"
across campus for students, staff and faculty.
Common student gathering areas are already
active hot spots.
Ongoing Y VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
10/11 FY
4.3.5. Evaluate and conduct web-based
training for staff.
List of training sessions provided and list of staff
who participated
Ongoing Y VPFA,
(Dir HR,
AVPITS)
1-Must
do/High
Risk,
Exposure or
Impact
Done for Datatel
Web based
training for
Records
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
Mid-Yr:
Webadvisor
training at
Management
Committee
End-Yr: HR 11-
12; ITS requests
they be removed
from this item
#3 – Write and implement a comprehensive technology plan that increases
efficiencies and effectiveness through technology capabilities investments.
8/17/2010 Draft
4.3.6. Evaluate and conduct web-based
training for faculty.
List of training sessions provided and list of
faculty who participated
Ongoing Y Provost
[VPFA,
(AVPITS,
Dir HR)]
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: ITS-
SGPS Faculty are
now required by
contract to used
D2L. Multiple
training sessions
have been
provided.
09/10 FY Done Started, need to
revise finish date
Mid-Yr: D2L
End-Yr: HR
defer to 11-12;
ITS indicates this
is Done for this
yr. ITS requests
they be removed
from this item
4.3.7. Evaluate the quality and effectiveness
of distance learning, and increase the delivery via
distance education.
Increase D2L (or related tool) usage for Faculty.
Increased number of 100% online courses.
Increase number of students successfully
completing online courses.
Ongoing Yes Provost
[VPFA,
(AVPITS)]
1-Must
do/High
Risk,
Exposure or
End-Yr: Provost
requests 1 leader
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
End-Yr: ITS
suggests this be
due 10/11
4.3.8 Conduct training for directors in how to
create and maintain internal procedures manuals
for their area of responsibility.
Track number of departments who have received
training on procedure manuals.
Ongoing No VPFA
(AVPITS)
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: Make
due 09/10
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
Mid-Yr: To be
done April '10
End-Yr: TSC
will help address.
Make due 10/114.3.10.a Provide for a means of tracking
technology requests and providing feedback on
status to requesters for pc support.
A tracking system for PC repairs is already in
place.
One
Time
Y VPFA
(AVPITS)
2-Should do/
Medium
Risk/Exposur
e
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
Mid-Yr:
Feedback not
web based, but
provided
End-Yr: Make
due 10/11 for
funding reasons4.3.10.b Provide for a means of tracking
technology requests and providing feedback on
status to requesters for programming changes.
A tracking system for programming changes
could be added.
One
Time
Y VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
10/11 FY
4.3.11. Update phone technology to address
needed features, such as external caller ID –
consider phased approach.
Additional funding is required to enable this
service by working through Payteac.
One
Time
Y VPFA,
AVPITS
3-Nice to
Have
End of Yr: Make
due 10/11
10/11 FY
4.3.12. Protect student, staff personal
information by conducting an audit of data
vulnerabilities and tightening security of key data
elements (such as SSN, passwords) by
encryption, replacement on print (e.g.,
timesheets), and screens as needed.
Documented evidence of IT security audit of
data vulnerabilities.
Ongoing No VPFA
(AVPITS)
1-Must
do/High
Risk,
Exposure or
Impact
Question on
approach
09/10 FY Started, should
complete on
time
Done Mid-Yr: IT
Assessment,
blocking SSNs
underway,
timesheets have
SSNs removed4.3.13. Fund PC Replacement Cycle Money budgeted for Desktops and Laptops
replacement on a three rotation.
Ongoing Yes
$25K
VPFA,
AVPITS
1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
4.3.14. Fund Server Replacement Cycle Money Budgeted for Servers, Infrastructure and
Security Architecture Replacement on a three
year rotation.
Ongoing Yes
$35K
VPFA,
AVPITS
1-Must
do/High
Risk,
Exposure or
Impact
11/12 FY
8/17/2010 Draft
4.3.15.a Research Active Admissions Capability
Ability for perspective students to play an active
part in the funnel process online.
Proposal for Active Admissions. One
Time
No VPFA
(AVPITS)
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
Mid-Yr:
Research
underway,
recommend
adding VPEM as
primary
End-Yr: ITS
recommends
TSC has input on
desired goals4.3.15.b Implement Active Admissions
Capability
Active Admissions Process is in Place. One
Time
Yes
$200K
VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
10/11 FY
4.3.16.a Research Document Management
Ability to scan, index and use documents
electronically for work flows and processes
across various departments, such as HR,
Financial Aid, Records, Admissions and
Accounting.
Proposal for Document Management One
Time
No VPFA
(AVPITS)
2-Should do/
Medium
Risk/Exposur
e
09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
Mid-Yr: For
10/11
End-Yr: ITS
recommends
TSC owns this
4.3.16.b Implement Document Management Document Management Processing in Place One
Time
Yes
$75K
VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
10/11 FY
4.3.17 Distance Education Classroom Build a high tech classroom that can be used for
Distance Education and Video Streaming of
lectures.
One
Time
Yes
$150K
VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
11/12 FY
4.3.18 Clickers for Campus Vendor selected and clickers sold in bookstore. One
Time
No VPFA,
AVPITS
3-Nice to
Have
10/11 FY
4.3.19 Central File Server (SAN)
Implement a central file server (SAN + Remote
Backup + Controller)
Central File Server in Place One
Time
Yes
$50K
VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
10/11 FY
4.3.20 Laptops for Faculty
Every fulltime faculty receive a new laptop.
New Laptop for each faculty. Ongoing Yes
$50K
VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
10/11 FY
4.3.21 Cost Recovery Printing Controls
Implement a campus wide cost recovery system
for student printing in computer labs
Cost Recovery Implemented One
Time
Yes
$35K
VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
10/11 FY
4.3.22 Increase Multi Media Classrooms
Add computer projector, screens and speakers in
classrooms.
Increase in Multi Media Classrooms Ongoing Yes VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
10/11 FY
4.3.23 Increase Campus Internet Bandwidth
Internet speed needs to double every 15 to 18
months according to Morres Law.
Increased Internet Speed Implemented Ongoing Yes VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
11/12 FY
4.3.24 Move to Active Directory (AD)
AD will increase the campus security and
technology capabilities. It's the foundation for
several new technologies.
AD implemented One
Time
Yes
$5K
VPFA,
AVPITS
1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
8/17/2010 Draft
4.3.25 Exchange Server with BBS
Provide Exchange services with Blackberry
Services (BBS) that would allow real time
remote scheduling and email connectivity to
computers and cell phones.
Ability to access schedules and email remotely
through cell phones
One
Time
Yes
$35K
VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
11/12 FY
4.3.26 Implement ODS-Orchestrator
Allow end users to create and run custom reports
via web technology.
ODS-Orchestrator Implemented One
Time
Yes
$15K
VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
10/11 FY
4.3.27 MS SharePoint Services Implement SharePoint One
Time
Yes
$25K
VPFA,
AVPITS
3-Nice to
Have
12/13 FY
4.3.28 Create Central Printing Plan
All copiers and printers strategically cascade into
central work group multi-function printers
(MFP).
Proposal for Central Printing (MFP) One
Time
No VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
11/12 FY
4.3.29 Implement Central Printing Plan Multi year roll out of centralized printing plan Ongoing Yes
$50K
VPFA,
AVPITS
2-Should do/
Medium
Risk/Exposur
e
11/12 FY
4.3.30 Implement "Greener" Servers
Implement VMware to consolidate servers thus
reducing size, power consumptions, cooling and
increase Disaster Recovery (DR) abilities.
VMware implemented Ongoing Yes
$25K
VPFA,
AVPITS
3-Nice to
Have
12/13 FY
4.3.33 Telephone System Upgrade
New PBX or VoIP system.
Upgraded phone system One
Time
Yes VPFA,
AVPITS
3-Nice to
Have
12/13 FY
4.3.34 Wire Upgrades (CAT-3 to CAT-6) Upgraded wire system Ongoing Yes VPFA,
AVPITS
3-Nice to
Have
12/13 FY
4.4.1. Inventory all furniture (tag each usable Evidenced by report of all inventory. Ongoing Yes VPFA 1-Must 10/11 FY Started, need to Started, need to Mid-Yr: As per
4.5.2.b Establish managerial Accounting
reports to help with 4.5.1
This will have to be a long-term plan. Currently,
we need financial reports and statements first,
before we can begin with managerial accounting
issues. High priority must be put on managerial
reports by FY 10/11.
One
Time
Y Est.
30k/ yr
VPFA 1-Must
do/High
Risk,
Exposure or
Impact
End of Yr: Make
due 10/11
10/11 FY
4.5.5. Annually assess the effectiveness of
the governance and communicating system.
Implement an employee satisfaction survey. Ongoing No President,
VPFA
(Dir HR)
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done Done Need to define
who is primary
vs. supporting
End-Yr: HR
says incomplete;
move to 10-11.
4.5.6.a Assess and modify the annual
performance review process to measure all staff
effectiveness in such areas as a) communicating
with supervisors, peers, subordinates, b)
university core values and c) collaborating as a
team member.
Management committee will complete an
assessment of the current performance
evaluation tool.
Ongoing No President,
VPFA
(Dir HR)
1-Must
do/High
Risk,
Exposure or
Impact
MidYr: action
split between
Staff and Faculty
Done but will
refine annually
09/10 FY Done Done Mid-Yr:
Performance
Appraisal
revision
Need to define
who is primary
vs. supporting
#5 – Assess and implement an efficient and effective governance structure
#4 – Develop a list of capital equipment
8/17/2010 Draft
4.5.6.b Assess and modify the annual faculty
performance review process to measure all
faculty effectiveness in such areas as a)
communicating with supervisors, peers,
subordinates, b) institution-wide core values and
c) collaborating as a team member.
PAS reviewed and modified, if needed. Ongoing Yes Provost,
[VPFA
(Dir HR)]
1-Must
do/High
Risk,
Exposure or
Impact
MidYr: action
split between
Staff and Faculty
09/10 FY Started, should
complete on
time
Done Mid-Yr: Provost-
change wording
of imperative to
read: Assess &
modify the
faculty
performance
review process;
will need further
review and
refinement in
2010-114.5.6.c Conduct annual faculty performance
reviews. Evaluations will be completed
annually.
Evaluation by appropriate committee(s)
reviewing rank, etc.; approval by committee(s);
guidelines published in faculty section of
employee handbook.
Ongoing Yes Provost 1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: rank &
review committee
is reviewing; all
steps should be
completed 09/10.
Changed from
review to "do"
and moved from
2.3.13.
09/10 FY Started, should
complete on
time
Done Mid-Yr: change
wording of
imperative to
read: Conduct
annual faculty
performance
evaluations
4.5.7. Restructure and realign key programs
and non-academic departments with the Office of
Student Life & Retention.
Realignment of programs and non-academic
departments; appropriate staff levels for Office
of Student Life and Retention.
Ongoing No VPSL&R,
[President]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Mid-Yr:
VPSL&R-
conversations
only. Make due
10/11
5.1.1. Institute a centralized process for
enrollment management.
There will be an established Strategic
Enrollment Management Committee (SEM) to
establish enrollment goals between all 3 schools.
The committee will be chaired by the VPMR
will include the President, Provost, VPFA,
Deans of SGPS and SASS, and Director of
Institutional Research. This committee will
meet quarterly to set and evaluate goals.
One
Time
Yes VPMR 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
5.1.2. Assess student retention per course
and per program.
Statistical reports will be generated at the end of
each semester per course and per program.
Ongoing No Provost 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Not started,
should complete
on time
Started, need to
revise finish date
5.1.3.a Establish enrollment goals for all
schools for turning prospects into enrolled
students.
Ongoing measurement by semester and
academic year.
Ongoing No VPMR 1-Must
do/High
Risk,
End-Yr: split
goals and process
09/10 FY Done Done
5.1.3.b Facilitate intentional process of
turning prospects into enrolled students.
Ongoing measurement by semester and
academic year.
One
Time
No VPMR 1-Must
do/High
Risk,
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
Strategy Five
Expand and Strengthen Financial Resources
Washington Adventist University will achieve a strong financial position, and will demonstrate wise Christian stewardship and
fiscal responsibility through accountable management and its commitment to:
8/17/2010 Draft
5.1.4. Select a model and develop a three-
year rolling enrollment management plan that
clearly articulates annual (semester to semester),
total (day & evening), and program-specific
enrollment targets as well as quantifiable
increases in new and retained student
populations.
A 3-year strategic enrollment management plan
for all 3 schools will be established in
conjunction with the overall strategic plan of the
university. This plan will detail strategies,
imperatives, and actions that outline all activities
for the office of enrollment management.
Ongoing No VPMR 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
5.1.5. Develop and implement a plan in
which a university recruiter will be assigned
everywhere that there is an official group of
WAU ambassadors (Choir, Acro Airs, etc)
A recruiter (Assoc. or Asst. Director) will be
assigned to lead this initiative and develop a
written plan which will be implemented as a part
of the overall enrollment strategy.
Ongoing Y VPMR 1-Must
do/High
Risk,
Exposure or
Impact
Should appear on
operating plan for
09-10 as this is a
continuous
process.
09/10 FY Done Done
5.1.6. Identify how the University follows
up with students who are interested in WAU
which should take place within 48 hours (via
phone, e-mail, contact, etc)
A recruiter (Assoc. or Asst. Director) will be
assigned this task, which has already been
implemented. An evaluation tool will be put in
place to measure effectiveness of the initiative.
Ongoing Y VPMR 1-Must
do/High
Risk,
Exposure or
Impact
Need to develop
an evaluation
tool.
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
5.1.7. Identify and conduct a plan in which
student acceptances will take place within 1
week once the file is complete, and follow
through contact via mail should take place within
2 weeks.
Evidence of a plan for student acceptance
processing, and adherence to it. Monitor
effectiveness of plan (track timing).
One
Time
No VPMR,
[Provost]
1-Must
do/High
Risk,
Exposure or
Impact
End-Yr: working
on a similar plan
for traditional
programs
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
5.1.8.a Identify and implement academic
links with SDA and other Christian based K-12
systems.
A recruiter (Assoc. or Asst. Director) will be
assigned this task. Monthly reports will be
provided to assess ongoing progress.
Ongoing Y Provost 1-Must
do/High
Risk,
Exposure or
Impact
Should appear on
operating plan for
09-10 as this is a
continuous
process.
09/10 FY Started, should
complete on
time
Done End-Yr: VPMR
says need to look
at leader if this is
an academic
issue.
End-Yr: Provost
agrees with
VPMR5.1.8.b Conduct WAU Sabbath at area SDA
churches.
Evidence of WAU Sabbath in the form of
assigned individuals, church schedules, and
reports of experiences.
Ongoing Y VPMR 1-Must
do/High
Risk,
09/10 FY Started, should
complete on
time
Done
5.1.9. Implement a new admissions
marketing campaign to include completion of the
view book. Ensure consistency among schools
under an umbrella brand.
Evidence of items in admissions marketing
campaign.
Ongoing Y VPMR,
[CommQI]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
5.1.9.a Ensure use of podcasts and e-
communication as appropriate for new
admissions marketing campaign. Create a new
piece for You Tube focused on the 3-school
model. Update You Tube and other online
profiles/videos.
Evidence of items in admissions marketing
campaign.
Ongoing Y VPMR,
[CommQI]
1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
5.1.10 Obtain demographical information on
the potential students within the Columbia
Union.
Evidence of tracked demographics Ongoing Y VPMR 1-Must
do/High
Risk,
09/10 FY Done Done
5.1.11. Implement recruiting initiatives that
connect the campus with non-SDA
congregations.
Developed database and points of contact for the
non-SDA congregations.
Ongoing N VPMR 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
#2 – Establish a culture of fiscal responsibility
8/17/2010 Draft
5.2.1. Establish and enforce financial and
internal controls.
A risk assessment will be completed this year.
From this risk assessment will come policies and
procedures to improve controls.
Financial/Accounting controls to include:
- Weekly cash balance reports
- Monthly operating statements, balance sheets,
cash position report
- Quarterly financial reports
- Annual cash budget; property, plant, and
equipment; operating budget, and tax returns.
Ongoing N VPFA 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done Done Mid-Yr:
recommend
removing Dir HR
Removing
Quarterly
Finance Rpts
5.2.2. Map Internal control of the
university.
Documented and complete internal controls. Ongoing N VPFA 1-Must
do/High
End-Yr: Make
due 09/10
09/10 FY Done Done
5.2.4. Establish budget contingency for 5%
of projected revenues in the budget.
Budget contingency in place for 5% of projected
revenues in the budget.
Ongoing Y VPFA 1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
5.2.5.b Implement managerial reports. Evidenced by Datatel FRx for managerial
reporting.
One
Time
Y VPFA,
AVPITS
Make due 10/11 10/11 FY
5.3.1. Develop a comprehensive auxiliary
services program that focuses on the creation of
new revenues in the service areas of event and
conference services, dining services, university
store and debit programs.
Documented number of new revenue sources.
Evidence of improvement in current revenue.
Ongoing Y VPFA 3-Nice to
Have
11/12 FY
5.3.2. Investigate grants as revenue sources. Documented increase in number of grant
applications and number of new grants.
Ongoing No,
within
regular
budget
VPAAR,
[Provost]
2-Should do/
Medium
Risk/Exposur
e
09/10 FY Started, should
complete on
time
Done Mid-Yr: Provost-
some submitted
from academic
areas
Mid-Yr: VPAAR-
joined national
database5.3.3. Implementation of a comprehensive
advancement plan.
Evidence of funds to supplement the basic
university budget and other specific purposes
through donations from representative segments
of the constituency annually
- Raise $150,000 through the phonation from
alumni and friends).
- Raise $25,000 from graduates through the class
agent program.
- Raise $25,000 from local businesses.
- Raise $25,000 from faculty and staff.
Ongoing No VPAAR 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Mid-Yr: faculty
and staff payroll
deduction and
board support set
up.
Switched action
with
measurement.
5.3.4. Provide support for departments as
they solicit funds for departmental needs.
Produce annual orientation and continuing
education regarding friend and fund raising.
Ongoing No VPAAR 1-Must
do/High
Risk,
09/10 FY Started, need to
revise finish
date
Mid-Yr: Colon
grant
#3 – Significantly strengthen the external funding of the University
8/17/2010 Draft
5.3.5. Keep the Board informed on all
advancement-related issues, whether from
alumni, development or public relations.
Generate a quarterly report for the BOT.
Other evidence shown by below:
- Prepare an agenda for presentation to the
Board on all development-related issues.
- Train Board members in the cultivation and
solicitation of major donors.
- Interact with Board members to:
Inform them of and involve them in current
development projects.
Ask for their suggestions of resources whom
they or someone else might cultivate and solicit
at the appropriate time.
- Evaluate the funding potential of identified
individuals, foundations and corporations as this
information is needed by University
Advancement.
- Analyze advancement policies and procedures
and recommend any proposed changes to the
Board.
- Plan and host ongoing professional
philanthropy presentations during lunch at a
regularly scheduled colloquium meeting.
Ongoing No President,
[VPAAR]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, need to
revise finish
date
Done Mid-Yr: sub-
committee
reviewing
procedures and
direction
5.3.6. Involve the Board more specifically in
the support of Advancement activities, and show
appreciation for this support.
- Establish Board Advisory Council.
- Train Board Advisory Council members in the
cultivation and solicitation of major donors.
- Encourage board members through phone calls,
visits, letters, to become active in on-going
development activities of their choosing. Get
suggestions on potential contact, resources and
invite board member(s) to host a special event
inviting friends, potential donors.
- Review Advancement strategic plan with Board
Advisory Council and recommend any proposed
changes to the Board.
Encourage BOT participation (give or get) and
provide a report to the BOT at each board
meeting.
Ongoing No VPAAR 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Mid-Yr: goals
starting to be
met. Information
and support
materials for
April 9th meeting
here
5.3.7. Implement a Planned Giving
program, offering to Alumni, Board Members,
and other constituencies appealing friend-raising
and opportunities for Planned Gifts and bequests.
A developed implemented plan. Ongoing Yes,
$50,000
VPAAR 1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY Not started,
need to revise
finish date
Mid-Yr:
contacted support
group
5.3.8. Identify giving patterns and provide a
review of current fund-raising activities against
available data from comparable institutions.
Produce quarterly report to president's cabinet. Ongoing No VPAAR 1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
5.3.9. Establish a systematic method of
gift recognition and an awareness of university
progress philanthropy.
Review and refine the process of gift
recognition.
Ongoing Budget
already in
place
VPAAR 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done
8/17/2010 Draft
5.3.10. Establish and strengthen the
President’s Circle.
Establish minimal amounts of giving for
inclusion in the President's circle, and set means
for tracking if the circle is functional.
Ongoing No VPAAR,
President
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Not started,
should complete
on time
Mid-Yr: amounts
set. Not members
Need to define
leader vs.
support
5.3.11. Upgrade database of development
information to improve the accuracy,
completeness, timeliness and accessibility of
records and reports to meet the needs of various
constituencies.
Database will be accurate and update. Ongoing Budget
already in
place
VPAAR 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done
5.3.12. Gather and track information on
major gift prospects.
Quarterly reports to cabinet. Ongoing No VPAAR 1-Must
do/High
Risk,
09/10 FY Started, should
complete on
time
5.3.13. Position an aggressive program of
foundation support.
- Investigate Foundation for WAU.
Documented best practices and recommendation
and regarding the establishment of a foundation.
One
Time
No VPAAR 2-Should do/
Medium
Risk/Exposur
09/10 FY Not started,
need to revise
finish date
Mid-Yr: look at
best practices
5.3.14. Identify attitudes and perceptions of
select events or groups through informal
qualitative research (to increase support through
prospect and market research).
Quarterly reports to cabinet. Ongoing No VPAAR 1-Must
do/High
Risk,
Exposure or
09/10 FY Started, need to
revise finish
date
Mid-Yr:
developing tool
5.4.1.a Offer alumni and other appropriate
constituencies appealing friend-raising activities:
- Schedule 5-10 alumni activities. Work with
local alumni in regard to scheduling and
conducting activities.
- Plan the following events:
A least 7 chapter meetings across the US.
Young Alumni Career Day.
Class Reunions.
Planned Giving Seminar for Retired Workers.
Annual Alumni Basketball game.
- Invite alumni to all appropriate activities.
- Encourage alumni to attend alumni activities
scheduled in their communities through letters
and personal calls.
Quarterly reports to cabinet. Ongoing Yes,
$20,000
VPAAR 1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY Started, need to
revise finish
date
5.4.1.b. Communicate with alumni and other
appropriate constituencies on friend-raising
activities.
Prepare and send church bulletin and union
paper announcements for each alumni activity.
Ongoing No VPAAR,
[CommQI]
09/10 FY Started, need to
revise finish
date
Mid-Yr: VPAAR-
late send outs
5.4.2. Plan an alumni weekend with
appealing activities that are educational, social,
athletic, and cultural.
Implemented alumni weekend plan annually. Ongoing Budget
already in
place
VPAAR 1-Must
do/High
Risk,
Exposure or
09/10 FY Done
#4 – Create and implement a long-term development program
8/17/2010 Draft
5.4.3. Recognize alumni for their value to the
university, The Alumni Association, and society.
- Honor distinguished alumni during Alumni
Weekend.
- Honor distinguished alumni through the
Alumni Achievement Awards.
- Feature alumni achievements in the ReUnion.
- Publish alumni news notes in the ReUnion.
- Recognize Alumni of the Year.
Quarterly reports to cabinet. Ongoing No VPAAR 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Mid-Yr: set for
Alumni weekend
5.4.4. Provide benefits and services for
alumni:
- Maintain alumni database.
- Review and expand income-producing service
programs.
- Provide miniature copy of diploma for small
fee.
- Provide permanent alumni ID card and alumni
services, with brochure describing services.
Develop a printed and electronic list with
method of communicating to alumni.
Ongoing No VPAAR 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, need to
revise finish
date
Mid-Yr: database
improved.
Diploma in
development
5.4.5. Communicate with alumni through
published materials that give a general awareness
of life on our campus and update them on the
activities of their fellow alumni.
Evidence of published materials. Ongoing No VPAAR ,
[CommQI]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Not started,
need to revise
finish date
Mid-Yr: VPAAR-
Tanadi group
with send outs
for events
End-Yr:
CommQI
magazine,
mailouts on
alumni weekend,
groundbreaking,
strathmore.5.4.6. Maintain the alumni homepage for the
WAU website.
Homepage will be current and accurate. Ongoing No VPAAR
[(AVPITS),
CommQI]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done Done End-Yr:
CommQI Need
to assign web
advocate.
5.4.7. Meet with the Alumni Executive
Committee on a monthly basis, host dinner for
Alumni Board members (include Alumni
Finance Committee), and hold Annual Business
Meeting once a year.
Minutes of meetings. Ongoing No VPAAR 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Not started,
need to revise
finish date
5.4.8. Prepare and present an Alumni
Association report and the Annual Advancement
Strategic plan to the Board of Trustees.
Quarterly reports to the BOT. Ongoing No VPAAR 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
5.4.9. Research the Alumni Association
endowed funds through the use of an
Endowment Committee.
- Manage, invest and re-invest the endowment
fund.
- Transfer appropriate percentage of funds raised
through phonation into endowment.
- Transfer funds from endowment into
scholarship funds.
- Prepare and present an annual report for the
WAU BOT and Alumni Board.
Quarterly reports to cabinet. Ongoing No VPFA 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Done Mid-Yr, done via
subcommittee of
the BOT
8/17/2010 Draft
5.4.10. Work closely with the Alumni
Association leadership in administering the
needs of the Association by producing an Alumni
directory every 5 years.
Meeting minutes Every 5
years
Yes,
$25,000
VPAAR 1-Must
do/High
Risk,
Exposure or
Impact
13/14 FY Not started,
should complete
on time
Mid-Yr: started
with cleaned
database
5.4.11. Offer younger alumni appealing
friend-raising activities.
A documented and implemented plan.
- Survey graduates from the past 7-8 years to
find out what their needs are.
- Provide permanent alumni ID card and alumni
services, with brochure describing services.
- Meet with Student Services VP to discuss
partnering on some activities for students during
the school year.
Ongoing No VPAAR,
[VPSL&R]
1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY Started, should
complete on
time
Mid-Yr: gospel
concert
5.4.12. Establish a campus-wide awareness
for the need to obtain and maintain information
on friends and alumni.
Quarterly reports to cabinet. Ongoing No VPAAR 1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Mid-Yr: meet
with selected
departments
5.4.13. Produce an informative President's
Annual Report to include content such as: letter
from the President, campus initiatives, academic
accomplishments, enrollment services, university
life, development and alumni relations,
administrative highlights, technology, finance
and administration.
Evidence of publication. Ongoing Yes CommQI 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
End-Yr: Next
year.
5.5.1. Implement a marketing planning
system to insure the university achieves annual
enrollment and retention targets.
Evidence of implemented marketing plan,
enrollment plan and retention plan.
Ongoing Yes VPMR,
[VPSL&R]
1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
5.5.2. Review website monthly for accuracy,
navigation and attractiveness.
Website will be accurate and updated Ongoing No President, All
VPs,
[CommQI]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Not started, need
to revise finish
date
Need to define a
leader
End-Yr:
Communications
5.5.3. Define, develop and implement new
university website garnering needs assessments
from all WAU departments and including a
content management system that allows for easy
updating with appropriate built-in authorities.
Evidence of websites. One
Time
Y $35k CommQI 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Done
5.5.4.a Write and publish articles of
accomplishments of students, staff and faculty
for internal and external publications.
Monthly articles of faculty and student
accomplishments
Ongoing No CommQI 1-Must
do/High
Risk,
Exposure or
MidYr: action
split between
Staff and Faculty
09/10 FY Started, should
complete on
time
Done
5.5.4.b Recognize student accomplishments. Continue use of "You've Been Caught" board. Ongoing Yes VPSL&R 1-Must
do/High
09/10 FY Done Done
5.5.6. Develop and implement plans to
leverage radio asset (WGTS) to support our
communication and media/marketing needs.
Evidence of implemented plan. Communicate
WAU expectations of the radio station to the
radio station board and to the BOT.
Ongoing No
Expense,
Yes
$400k
leveraged
income
President,
CommQI,
[VPMR]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
End-Yr:
CommQI
Supporting?
End-Yr:
Leader: President
#5 – Establish marketing and communications plans that support all
strategies and imperatives
8/17/2010 Draft
5.5.7 Develop and implement a public
relations strategy that includes media outreach to
generate awareness and support of WAU in the
metro region, nationally and internationally.
Documented plan by September 09, evidence of
monthly publicity tactics designed to generate
awareness and support in the community,
nationally & internationally.
One
Time
Y CommQI 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
End-Yr: Next
year.
5.5.8.a Increase visibility of the university in
the community by holding WAU events for the
community including: major spring community
day, president's reception for neighbors,
lectureships open to public, and others.
Evidence of one major and three minor events
throughout year.
Ongoing Y VPAAR,
[CommQI]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Mid-Yr: street
fair, Taste, May
3rd, President's
potluck
5.5.8.b Increase visibility of university by
sponsoring or advertising in community
events/publications (TP Street Festival, July 4
Parade, TP Folk Festival, Silver Spring events,
etc.)
Evidence of sponsorship of no fewer than four
events per year
Ongoing Y CommQI,
[VPAAR,
VPMR]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Done Mid-Yr: booth at
events so far
5.5.9.a Develop and implement a plan for
internal communications of campus events,
news, and announcements.
Documented plan by August (end) 09, evidence
of daily and weekly communication tactics (print
and/or electronic).
Ongoing Y CommQI 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
End-Yr: In
progress - next
year. Not
documented
5.5.9.b Develop and implement a
communications plan for the Adventist
constituency in the Columbia Union including
bulletin announcements to churches,
communiques with pastors, announcements and
press releases to the General Conference
(Communique & ANN) and other Adventist
Media, and continuing publication in Visitor.
Documented plan by September 09, evidence of
weekly communication tactics (electronic or
print) with Adventist constituency.
Ongoing Y CommQI 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
End-Yr: In
progress - next
year. Not
documented
5.5.10. Inform hometown and local media of
student graduations.
Evidence of published materials. Ongoing No CommQI 3-Nice to
Have
09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
Mid-Yr: level 3
priority
End-Yr: Next
year5.5.11. Increase the number of WAU speakers
at constituent churches.
Evidence of connection with at least 75% of
churches in the Union.
Ongoing Y VPMR 2-Should do/
Medium
Risk/Exposur
e
10/11 FY
5.5.12. Complete and distribute the graphic
standards manual to include guidelines for the
web, for and Bookstore merchandise.
New Branding Manual distributed to campus One
Time
Y CommQI 1-Must
do/High
Risk,
09/10 FY Started, should
complete on
time
Done
5.5.13 Develop a pool of skilled freelance
writers to augment stories submitted by
departments.
List of writers One
Time
No CommQI 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Started, should
complete on
time
Done
5.5.14 Augment public relations strategic
initiatives, particularly in areas relating to media
outreach and external publics, by contracting
with professional public relations personnel or
firm to assist with planning & implementation.
Contract with defined deliverables, completed on
time and within budget.
One
Time
Y $30k CommQI 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Done
5.5.15 Restore in-house communications
resources by increasing staffing to bring public
relations activities in-house.
Hire PR specialist Ongoing Y CommQI 1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
8/17/2010 Draft
5.5.16 Develop a central list of WAU friends,
supporters, churches, pastors, church and
community leaders, etc. to be used by all WAU
departments responsible for communicating in
mass to the public, in order to ensure accuracy
and to eliminate duplication of effort.
Existence of accessible master contacts list. Ongoing N CommQI,
[VPMR,
VPAAR]
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Done Mid-Yr: formed
and cleaned
5.5.17 Establish a taskforce to plan and
implement WAU presence at General
Conference Session 2010.
Taskforce assigned, documented plan,
production of collateral, display and promotional
items, presence at GC session.
One
Time
Y VPAAR,
[VPMR]
1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
5.6.1. Design an annual planning and
budgeting process linked to assessment results;
pilot process, assess effectiveness and improve
each year.
Evidence of an annual planning and budgeting
process in place, linked as required. Evidence of
improvement in process yearly
Ongoing No VPFA 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Done Done
5.6.2. Prepare a cost assessment of the
completed strategic plan to inform multi-year
(three year) budgeting.
This began for FY 08/09, but will need to be
refined for FY 09/10.
Ongoing No VPFA 1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY Started, need to
revise finish
date
Mid-Yr: make
due 10/11.
Suggested
rewording to be
"prepare
investment
needed to
complete the
strategic plan...".
Predecessors
need to be the
reengineering of
the academic
programs,
retention,
growth. Plan in
place for
facilities and IT
(infrastructure).
6.1.2. Develop institutional partnerships that
are congruent with the school’s mission and that
provide additional funding streams into the
school and also increase WAU’s reputation and
prestige.
Develop a minimum of five partnerships each
year.
Work with appropriate campus administrators
and leaders, and with community groups and
agencies to share information about WAU, and
also inquire about ways we can be of service to
them.
Ongoing Yes
Expense
&
Revenue
President
[VPSL&R,
Provost]
1-Must
do/High
Risk,
Exposure or
Impact
WAH partnership 09/10 FY Started, should
complete on
time
Started, need to
revise finish date
Mid-Yr: Provost-
linked to 6.1.3
#6 – Link the capital and operational budgets to The Plan for Washington
Strategy Six
Embrace and Explore the Opportunities of the Nation’s Capital
Washington Adventist University is privileged to reside near one of the world’s greatest cities. Responding to this privilege
and opportunity, the University will fully enable its students and faculty to benefit from this remarkable location and will
enlarge the perceived University campus to include the nation’s capital area through its commitment to:
8/17/2010 Draft
6.1.3. Develop affiliation, articulation
and/or consortium arrangements with area
universities for programs that are not offered at
WAU.
Memorandum of Understanding for affiliation or
articulation agreements.
Ongoing No Provost 2-Should do/
Medium
Risk/Exposur
e
End-Yr: have
some; need to
add more
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
Mid-Yr:
recommend
changing
wording of
imperative to
delete area
universities to
read universities,
since some are
not in the area
6.1.5. Strengthen coops (cooperative
education) and communicate about opportunities
and success stories.
Document cooperative education programs and
internships annually.
Ongoing No Provost
(ADAS)
2-Should do/
Medium
Risk/Exposur
09/10 FY Started, should
complete on
time
Done
6.1.6. Develop, as needed, communications
materials to use in cultivating/closing
partnerships.
Evidence of published materials. Ongoing No CommQI 3-Nice to
Have
09/10 FY Not started,
need to revise
finish date
Not started, need
to revise finish
date
Mid-Yr: level 3
priority
End-Yr: Next
year6.1.7. Create a space where faculty can post
their planned trips so teachers can collaborate on
trips, presentations.
Space created; documentation of items posted. One
Time
No Provost 2-Should do/
Medium
Risk/Exposur
e
End-Yr: Need to
develop this as
we update the
website
09/10 FY Not started,
should complete
on time
Not started, need
to revise finish
date
Mid-Yr: website
page created with
link to
departments
6.1.8. Link with other institutions to attend
presentations/ lectures on their campus.
Track options available. Ongoing No Provost 2-Should do/
Medium
Risk/Exposur
e
09/10 FY Not started,
should complete
on time
Started, need to
revise finish date
Mid-YR:
webpage can be
created now that
new site is in
place6.1.9. Invite speakers to campus; take
students to listen to speakers and programs in
DC.
Schedule of speaking events, programs, etc. Ongoing Yes VPSL&R 1-Must
do/High
Risk,
09/10 FY Done Done
6.1.10. Strengthen the programs that have
internship as part of the curriculum and
encourage other departments to implement this
too.
Documentation of programs with internships. Ongoing No Provost
(Deans; ADAS)
2-Should do/
Medium
Risk/Exposur
e
09/10 FY Started, should
complete on
time
Done
6.1.11. Assist students in selecting
internships.
Documentation of procedures for arranging
internships; documentation of student
internships.
Ongoing No Provost
(Deans; ADAS)
2-Should do/
Medium
Risk/Exposur
Learning Center 09/10 FY Started, should
complete on
time
Done
6.2.3.a Provide CommQI with regular
information regarding opportunities for and
successes with student, faculty & staff
involvement in ministry events
Evidence of monthly stories provided to
CommQI
Ongoing No VPMin 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, need to
revise finish date
End-Yr: This is a
continuous
project that will
be refined in 10-
11.6.2.3.b Publish spiritual opportunity and
success stories in WAU and external publication
Evidence of monthly stories published Ongoing No CommQI 1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Done
6.2.4. Develop and publish an annual
schedule of area events – academic and
cultural—(such as at the Smithsonian, National
Archives; etc.) that faculty, staff and students
may participate in that will enhance the learning
community.
Publication of schedule. Ongoing Yes VPSL&R 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
#3 – Identify and cultivate strategic partnerships with the General
Conference of Seventh-day Adventists
#2 – Facilitate broad student involvement in the constellation of area events
and activities
8/17/2010 Draft
6.3.2. Distribute President's Annual Report
to GC leaders.
Evidence of distribution Ongoing Yes President,
[CommQI]
1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Done End-Yr:
CommQI says
magazine went to
GC leaders.
7.1.1.a Create a Balanced Scorecard to report
on KPIs to the BOT.
Balanced Scorecard of institution-wide KPIs that
are targeted for BOT and external reporting.
One
Time
No Provost
(Dir IR)
1-Must
do/High
Risk,
09/10 FY Done Done
7.1.2. Design and implement an annualized,
and quarterly assessment report to show
improvement activity of each KPI.
Annual, quarterly or other recurring KPI reports. One
Time
Yes Dir IR,
AVPITS,
[VPFA,
Provost]
1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
7.1.3. Assess/report on KPIs monthly and
annually.
Recurring (monthly or annual) KPI reports. Ongoing No Dir IR,
AVPITS,
[VPFA,
Provost]
1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
7.1.4. Review each Imperative and
underlying Actions to ascertain its goals. If
unclear, work with Imperative owner to clarify.
Clear, restated (as necessary) Imperatives and
defined Action Plans
Ongoing No Provost
(Dir IR)
1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Done
7.2.1. Review Imperatives with PAC, and
President Stategic Planning Committee and
suggest/agree upon assignments of each, and
review and adjust as necessary.
Assignments to Imperatives and related Action
Plans.
Ongoing No Provost
(Dir IR)
1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Done MidYr: Dir IR-
suggested
rewording
7.3.1. Prioritization of Imperative Actions by
PAC, subject to resource availability, budget, etc.
Imperatives prioritized into current Operating
Plan vs. future annual plans
Ongoing No Provost
(Dir IR)
1-Must
do/High
Risk,
Exposure or
09/10 FY Done Done MidYr: suggest
combining into
one, 7.3.2
7.3.2. Set priorities for each Imperative and
Action.
Priorities set for each Imperative and Action
within current annual Operating Plan.
Ongoing No President,
Provost
(Dir IR)
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done Done MidYr: Dir IR-
priorities set via
Strategic
Planning
Committee7.3.3. Review each Imperative and Step to
ensure that Strategy Owner/Imperative owner has
set dates. Seek activity related to external
accrediting and other review and ensure
corresponding dates are aligned.
Confirmed dates set for each Imperative within
current annual Operating Plan
Ongoing No Provost
(Dir IR)
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Done
7.3.4. Create timeline or project plan to
communicate major milestones for strategies and
imperatives.
Published dates for each Imperative within
current annual Operating Plan
Ongoing No Provost
(Dir IR)
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Done Done MidYr: Dir IR-
Timeline
distributed July
'09
Strategy Seven
Through continued development and refinement of policies, systems, processes, planning, and application of resources,
Washington Adventist University will emphasize institutional integrity by embracing diversity, setting high performance
standards, assessing program effectiveness, and systematically improving to achieve high quality, access, responsiveness, and
accountability.
Implement an Institutional Assessment Plan and Metrics
#4 – Determine which metrics will be used to gauge the success of each
imperative
#3 – Determine the due date for each action within the plan
#2 – Determine who is responsible for accomplishing each imperative and
action within the plan
8/17/2010 Draft
7.4.1. Review Imperatives for each strategy
area for attainability, measurability, and clarify
any imperatives as needed.
Measurable Imperatives. Ongoing No Provost
(Dir IR)
1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Done
7.4.2. Identify and suggest metrics to
Imperative Owner, and gain agreement on how
and when they can be measured. Measurement
techniques can be done such as graduate,
employer and learner surveys.
Each Imperative has an appropriate Metric. Ongoing No Provost
(Dir IR)
1-Must
do/High
Risk,
Exposure or
Impact
MidYr - Actions
outside of current
Operating Plan
may need
additional metric
work
09/10 FY Started, should
complete on
time
Done
7.4.3. Document metric checkpoints by
building into the annual/operating plan.
Operating Plan/Timeline has checkpoints for
each metric/imperative.
Ongoing No Provost
(Dir IR)
1-Must
do/High
Risk,
Exposure or
09/10 FY Started, should
complete on
time
Done
7.4.4. Develop or define the appropriate
assessment databases to facilitate the production
of an annual assessment report and
longitudinal/trend analysis (i.e., automate or inter-
relate reporting to Fact Book, KPIs, other
reporting trends).
Appropriate assessment databases to facilitate
the production of an annual assessment report
and longitudinal/trend analysis.
Ongoing Y Dir IR,
AVPITS,
[VPFA,
Provost]
1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
7.4.5 Initiate across all academic and non-
academic departments a key performance
accountability system at the institution/
departmental level to inform operational and
strategic improvements.
Automated KPIs reporting on recurring cycles. Ongoing Y Dir IR,
AVPITS,
[VPFA,
Provost]
1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
7.4.6. Research and link the institution's
performance with Baldridge criteria.
Baldridge criteria documented within institution-
wide performance tracking mechanisms.
Ongoing No Dir IR
[Provost]
2-Should do/
Medium
Risk/Exposur
e
10/11 FY
7.4.7. Utilize external accreditation criteria
as benchmark measurements.
External accreditation criteria documented
within performance tracking and measurement
mechanisms.
Ongoing No Dir IR
[Provost]
1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
7.5.1 Redesign ALL campus forms for new
brand and relevance to current processes.
Existence of new forms One
Time
Yes CommQI, All
VPs
1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Started, should
complete on
time
Started, need to
revise finish date
End-Yr:
CommQI says
lower priority.
Some done.
7.5.2 Research and select an established,
documented quality improvement initiative (i.e.
LEAN, Six Sigma, etc.) to refine processes and
procedures to achieve better efficiency and
effectiveness, thus reducing strain on existing
resources.
Documented plan for WAU Continuous Quality
Improvement initiative.
One
Time
Yes CommQI 1-Must
do/High
Risk,
Exposure or
Impact
09/10 FY Not started,
need to revise
finish date
Mid-Yr: priority
shifted to Comm
this FY. Move to
next FY.
End-Yr:
Recommends
Delete7.5.3 Implement WAU Continuous Quality
Improvement initiative developed in 09/10
Evidence of implementation to be determined by
plan developed in 09/10
Ongoing Yes CommQI 1-Must
do/High
Risk,
Exposure or
Impact
10/11 FY
#5 – Strive for continuous quality improvements to the institution’s internal
operations
8/17/2010 Draft