waste infrastructure community engagement – a uk toolkit
DESCRIPTION
A presentation by AEA's Technical Director, David Lerpiniere, originally delivered at the International Solid Waste Association's annual conference in Florence, Italy (September 2012).TRANSCRIPT
![Page 1: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/1.jpg)
WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT
David Lerpiniere - Technical Director Waste Management & Resource Efficiency, AEA ISWA 2012 17-19 September Florence, Italy
A world leading energy and climate change consultancy
![Page 2: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/2.jpg)
An Overview …. In 15 minutes …..
+ Introduce the context
+ Why is consultation important?
+ Development of a communications toolkit for Wales
+ The training programme
+ Some conclusions
2
![Page 3: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/3.jpg)
A personal welcome
+ David Lerpiniere
- Technical Director @ AEA for Waste and Resource Management
- 15 years of consultancy experience in waste management service and infrastructure delivery
+ Acknowledgements
- Adam Read, Sarahjane Widdowson, Gareth Morton and Gwyndaf Parry
- AEA for their support in allowing me to be here today
3
![Page 4: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/4.jpg)
My sponsors ….
4
![Page 5: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/5.jpg)
Introduction
5
![Page 6: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/6.jpg)
The UK Context
+ Landfill disposal cost is increasing each year
- Landfill tax is increasing by £8 per tonne (currently £64/tonne)
+ EU Waste Framework Directive requires:
- 50% recycling 2025
- 75% reduction on 1995 levels of BMW going to landfill by 2020
+ Recycling targets set by Devolved Administrations in the UK
- 70% target for Scotland by 2020
- 70% target for Wales by 2025
+ These are driving local authorities to introduce comprehensive services to reduce, recycle and recover waste
+ An estimated 750 new waste treatment facilities needed
- before 2020 so the UK can meet its obligations 6
![Page 7: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/7.jpg)
Community Engagement is key ….
+ UK is a tiny island!
+ Land is in competition
- Housing, retail, industry
+ Planning is a local political issue
+ People power is an increasing trend
+ A Government who are encouraging ‘localism’
+ Waste facilities are not popular neighbours!
+ Yet waste facilities should be ‘urban’
- feedstock & markets
7
![Page 8: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/8.jpg)
Public consultation
+ Is a fact of life…
- By law
- By encouragement
- By popular demand …
![Page 9: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/9.jpg)
But…
+ People are often reluctant to trust decision makers!
![Page 10: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/10.jpg)
What is the public concerned about?
+ Fear of impact to health
+ Effects on quality of life
+ Damage to natural environment
+ Lack of trust in authority
+ Traffic movements
+ Local house prices (NIMBY)
+ Local landscape
+ What technology will be used
+ These need to be addressed
- design them into your engagement plan right from the start
10
![Page 11: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/11.jpg)
The NIMBY response!
+ Hull Opposing The Incinerator (HOTI)
![Page 12: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/12.jpg)
People need to have their ‘say’
![Page 13: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/13.jpg)
The results of ‘not listening’
![Page 14: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/14.jpg)
SITA Public Meeting in a Marquee in St Dennis attracted 800 people
from all parts of Cornwall
![Page 15: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/15.jpg)
The challenge….
![Page 16: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/16.jpg)
UK EfW facilities – May 2012
16
Operational, proposed
& in planning
![Page 17: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/17.jpg)
Cost of Residual Waste Procurement?
+ Authority X have spent £3/4 million on
- Strategy & Outline Business Case
- Procurement (EOI to full tender)
- Staff & Advisors
- 3-5 years of work
+ Value of contract procured?
- £1 billion (over 25 years)
+ Value of communications budget = insignificant!
- £300,000
- Would you mind paying £900,00 if it guarantees success?
+ But what is the cost of not operational on Day 1?
![Page 18: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/18.jpg)
Cost of delays ? Every month ….
+ Contract penalties
- £100 per tonne (£3 million)
+ On-going landfill fees & taxes
- £100 per tonne (£3 million)
+ Planning Appeals & Enquiries
- £500,000 - £1 Million
+ Main reason for infrastructure delays = PLANNING
- Driven by local concerns and the rejection of proposals by the public
+ Spending wisely on community engagement = INVESTMENT! 18
![Page 19: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/19.jpg)
What are the sustainable solutions?
+ Ones that help the UK meet its statutory targets
+ Ones that are affordable
+ Ones that are environmentally acceptable
+ Ones that generate jobs
+ Ones that protect human health
+ Ones that are deliverable in the time available
+ Ones that are robust and flexible
+ Ones that are politically acceptable
+ Ones that are publicly acceptable
- Ones that have been fully consulted on……
19
![Page 20: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/20.jpg)
So public engagement is vital to…
+ Provide people with accurate information
+ Understand public concerns
+ Gain the support of the wider community
+ Encourage positive action
+ Provide a sense of ‘ownership’
- of the problem
- and of the solutions
+ Develop a proposal which is mutually beneficial
+ Providing a community benefit
20
![Page 21: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/21.jpg)
Waste Management - WALES
Millennium Stadium, Cardiff, 1st November 2007
How to Consult?
+ The team conducting the consultation need to be active and believe in the process
+ There is no point carrying out a consultation if it is just a tick box exercise
- Stakeholders will see through this quickly and won’t engage
+ Options
- Public Meetings / Focus Groups
- Shopping Centre Roadshows
- Newspaper articles
- Radio and TV advertising
- Leaflets / Website
- Home visits / School visits
- Community Advisory Groups / Citizen Juries
![Page 22: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/22.jpg)
Business Case Development
Contractor PQQ & Procurement
Permitting
Construction
Commissioning
Procurement Strategy & Market Engagement
Outline Business Case
Options Appraisal
Strategy and SEA
Focus Groups
Strategy Consultation
Preferred Option Communication
Public Information Giving
Waste Planning Guide and Site Selection
Site Selection Criteria Consultation
Site Specific Consultation
Public Information Giving
Planning and site acquisition
When to consult
A procurement timetable and
consultation/engagement
opportunities
![Page 23: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/23.jpg)
Literature
![Page 24: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/24.jpg)
Online Surveys & Information
![Page 25: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/25.jpg)
Waste Management - WALES
Millennium Stadium, Cardiff, 1st November 2007
![Page 26: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/26.jpg)
Waste Management - WALES
Millennium Stadium, Cardiff, 1st November 2007
![Page 27: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/27.jpg)
Waste Management - WALES
Millennium Stadium, Cardiff, 1st November 2007
![Page 28: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/28.jpg)
The Toolkit
28
![Page 29: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/29.jpg)
About Wales
+ Part of UK
+ 3m population
+ 22 local authorities, including a mix of rural, urban and valley regions
+ Devolved Government
+ Target of 70% recycling by 2025
29
![Page 30: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/30.jpg)
Setting the Scene in Wales …
+ European and UK legislative drivers aim to divert waste from landfill
+ The Welsh Government (WG) published its revised National Waste Strategy (2010)
- Towards Zero Waste
+ The strategy set a
- 70% recycling target
- cap of 30% on high efficiency EfW plants
+ Recognition that new infrastructure was necessary
- sorting, treatment, reprocessing
- all needing to get through the planning system
30
![Page 31: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/31.jpg)
Delivering waste facilities in Wales
+ Planning of waste management infrastructure has been historically difficult
- even including bring banks
+ Pressure to meet European Union landfill diversion Targets
+ Several hundred new waste facilities needed
- from bring banks to treatment plants
+ Welsh Government commissioned the production of a new public engagement toolkit
- help local authorities consult and engage more effectively with the general public on waste infrastructure issues 31
![Page 32: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/32.jpg)
Why a training programme too?
The Welsh Government recognised two things:
+ Public acceptance of new facilities would be crucial to keeping their waste strategy on track and local authorities would need help in developing better practices
+ The relevant local authority officers and personnel from the Environment Agency in Wales needed to be, not only made aware of the toolkits existence, but also trained in its use
- Just possessing the toolkit wasn’t enough
- How many guides sit on a shelf?
32
![Page 33: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/33.jpg)
The aim
Enable any ‘user’ to develop a local campaign which is appropriate and focused on local solutions
33
![Page 34: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/34.jpg)
How does is work?
+ The toolkit is a step-by-step guide to consulting with all stakeholders on waste infrastructure issues
+ It is based around the following concepts:
- Why consult
- When should you consult
- Who should you consult with
- How do you consult?
+ It uses best practice and a detailed literature review of existing documents with relevance to communications, consultation, and waste management
34
![Page 35: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/35.jpg)
Toolkit contents
+ Tick sheets of key tasks
+ Project Timetables
+ Stakeholder Involvement
- How to
- When to
- Reason to
+ Stakeholder roles
+ Events Management
+ Costs
- Outline budgets
+ Monitoring and Evaluation tools
35
![Page 36: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/36.jpg)
What’s in it?
36
![Page 37: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/37.jpg)
Media guide
+ FAQs
+ Press release template
- advertising consultation events
+ PowerPoint presentations
- for use at consultation events / public meetings etc
- covering technologies
37
![Page 38: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/38.jpg)
Why is it different?
+ There are excellent guidance documents on stakeholder consultation already available
- it is not a new concept in the environment field
- nor the waste management sector
+ The difference lies in its practical nature
+ As well as conventional guidance, it provides:
- indicative timings and costs for running campaigns
- detailed fact sheets and images of all types of waste treatment technologies that can be provided to the public to help explain these issues and help to demystify the subject
38
![Page 39: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/39.jpg)
The training programme
39
![Page 40: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/40.jpg)
Target audiences and aims
+ Awareness Raising:
- Targeting those involved in the procurement process, ensuring they had a broad understanding of the main issues, processes and objectives of good consultation
+ Member Training:
- Targeting local elected councillors with a responsibility for or an interest in waste management to give an understanding of the need for, and their role in, community engagement during the procurement of new food processing and residual waste treatment technologies
+ Local Authority Officer Training:
- Specifically those involved in the procurement of residual and food waste treatment facilities
- Providing the knowledge and confidence to create an appropriate communications plan for their particular procurement process, and to organise and conduct appropriate types of engagement 40
![Page 41: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/41.jpg)
Detailed course aims
+ Provide delegates with appropriate ‘tools’ for use during planned Community Engagement
+ Increase understanding of the current waste infrastructure procurement programmes and their timetables amongst the delegates
+ Provide delegates with details of when, how and with whom to engage throughout the procurement of any new facility
+ Supply delegates with sufficient knowledge to deal satisfactorily with any planned ‘merchant facilities’
+ Advise delegates on how to deal with the media
+ Enable delegates to create a communications plan for their area / projects
41
![Page 42: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/42.jpg)
How the training was delivered
+ Geography - The training was designed to run in locations that were:
- accessible to the widely dispersed audience
- matched the locations of a number of waste treatment facility procurement ‘hubs’ that were operating
+ Convenience - The 3 day course was also designed to have minimum impact on officer’s time by:
- scheduling sessions for just one day per week in each of the three locations over three weeks
+ Accreditation
- 18 hours of Continued Professional Development (CPD) approved by Chartered Institute of Wastes Management (UK professional body for waste managers) 42
![Page 43: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/43.jpg)
The procurement hubs and training locations
+ Initial 3 day programme
+ Follow up ‘all-Wales’ training
+ Training for elected members at national conference in Cardiff
43
![Page 44: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/44.jpg)
Who attended?
+ Over 50 officers (from all of the 22 local authorities in Wales) attended the training courses
+ Around 30 councillors attended the special session held at the national conference in Cardiff
44
![Page 45: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/45.jpg)
Outcomes
45
![Page 46: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/46.jpg)
The current situation
A major waste management infrastructure delivery programme is now firmly underway:
+ Out of the 22 local authorities in Wales:
- 18 are part of one of 5 food waste focused procurement hubs to jointly procure waste management infrastructure
- 4 other authorities have already secured appropriate measures
+ For residual waste in particular….
- 6 procurement hubs are in place. Each hub has a projected capacity requirement for the treatment of residual waste ranging from 45,000 tonnes to 230,000 tonnes per annum
- Total waste tonnage treatment capacity for the whole of Wales is up to 815,000 tonnes
- The hubs are technology neutral (i.e. no specific technology specified)
oMakes engagement even more critical! 46
![Page 47: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/47.jpg)
The role of the hubs
+ These hubs (both residual waste treatment and AD focused) will be responsible for designing and procuring over 25 major new facilities by 2020
+ All will need careful community and stakeholder engagement if they are to proceed smoothly to their operational stage
+ All must demonstrate they have an engagement plan and are implementing effectively to retain Government funding & support!
47
![Page 48: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/48.jpg)
Use of the toolkit?
+ 57% (12) local authorities in Wales used the Toolkit for:
- generic awareness raising activities related to reduce, reuse and recycling messages as well as waste infrastructure campaigns
+ Of these authorities, 30% (4) had used it, or were intending on using it, specifically for:
- awareness raising activities surrounding the introduction of new waste infrastructure
+ A further 41% of local authorities in Wales were:
- planning to use the Toolkit over the next 24 months in conjunction with their infrastructure delivery plans
+ Many local authorities were planning to use the toolkit
- for more general recycling and waste campaigns, addressing waste prevention, home composting and litter
48
![Page 49: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/49.jpg)
Conclusions
49
![Page 50: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/50.jpg)
You’ve got to engage
+ The community is an essential part of the waste management process
+ Facilities and more likely to be accepted if communities are involved in a dialogue with the provider
+ A lack of consultation can
- Increase your costs
- Stop your project
- Devalue your brand
+ It pays to engage!
50
![Page 51: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/51.jpg)
![Page 52: WASTE INFRASTRUCTURE COMMUNITY ENGAGEMENT – A UK TOOLKIT](https://reader034.vdocument.in/reader034/viewer/2022052316/558409e2d8b42a126e8b4c2f/html5/thumbnails/52.jpg)
Thank you!
52