WASTE MANAGEMENT PLAN ELARA NEIGHBOURHOOD CENTRE
26 NOVEMBER 2017
PRESENTED BY:
JO DRUMMOND
ECCELL ENVIRONMENTAL MANAGEMENT PTYLTD 35 WAVERLY CRST, BONDI JUNCTION NSW 2022
SUBMITTED TO:
STOCKLAND
LEVEL 25, 133 CASTLEREAGH STREET SYDNEY 2000, AUSTRALIA
![Page 2: Waste Management Plan - City of Blacktown · waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste](https://reader033.vdocument.in/reader033/viewer/2022042111/5e8c26c510d4d770ce710882/html5/thumbnails/2.jpg)
ELARA NEIGHBOURHOOD CENTRE - WASTE MANAGEMENT PLAN
1 ECCELL ENVIRONMENTAL MANAGEMENT PTY LTD 2017
TABLE OF CONTENTS 1. INTRODUCTION ___________________________________________________________ 2
2. PROJECT PROFILE _________________________________________________________ 2
3. OBJECTIVES & TARGETS ____________________________________________________ 2
4. LEGISLATIVE REQUIREMENTS AND GUIDELINES _________________________________ 2
5. RISK MANAGEMENT _______________________________________________________ 3
6. GREEN STAR REQUIREMENTS ________________________________________________ 3
7. WASTE MANAGEMENT STRATEGIES ___________________________________________ 4
8. WASTE MANAGEMENT PLAN FOR DEVELOPMENT APPLICATION ___________________ 5
PHASE 1: DEMOLITION ______________________________________________________________ 6
PHASE 2: EXCAVATION ______________________________________________________________ 6
PHASE 3: CONSTRUCTION ___________________________________________________________ 7
![Page 3: Waste Management Plan - City of Blacktown · waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste](https://reader033.vdocument.in/reader033/viewer/2022042111/5e8c26c510d4d770ce710882/html5/thumbnails/3.jpg)
ELARA NEIGHBOURHOOD CENTRE - WASTE MANAGEMENT PLAN
2 ECCELL ENVIRONMENTAL MANAGEMENT PTY LTD 2017
1. INTRODUCTION This report has been prepared based on the Blacktown City Council DCP, requirements for a
Construction Waste Management Plan. The Waste Management Plan provides practical measures and
actions that will be put in place to manage construction waste on-site and to monitor the waste
contractor recycling and disposal of waste off-site.
2. PROJECT PROFILE
The Stockland Elara Neighborhood Centre Elara Boulevard Marsden Park NSW is a neighborhood
shopping center to support the growing community at the Elara residential estate. The center will
include retail and food services, as well as a medical center, childcare and community center. There is a
supermarket proposed in stage 2 of the development.
3. OBJECTIVES & TARGETS The project objectives include:
• Meeting all waste management standards while ensuring the health and safety of the workers on the project.
• Maximising the quantities of materials diverted from landfill by reusing, recycling and reprocessing off-site.
• Disposal of the 10% residual waste materials to a licensed landfill in accordance with both regulatory and legal requirements.
• The diversion from landfill of 90% of construction waste by weight, to meet the criteria of the NSW State Government’s waste legislation, waste policy settings and regulatory regime.
• Comply to Green Star Design & As-Built v1.1
4. LEGISLATIVE REQUIREMENTS AND GUIDELINES Relevant key legislation and guidelines applicable to the project include
• Protection of the Environment Operations Act 1997
• Protection of the Environment (General) Operations Act 1998
• Waste Avoidance and Resource Recovery Act 2001
• Protection of the Environment Operations (Waste} Regulation 2014
• Blacktown Council DA Conditions
![Page 4: Waste Management Plan - City of Blacktown · waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste](https://reader033.vdocument.in/reader033/viewer/2022042111/5e8c26c510d4d770ce710882/html5/thumbnails/4.jpg)
ELARA NEIGHBOURHOOD CENTRE - WASTE MANAGEMENT PLAN
3 ECCELL ENVIRONMENTAL MANAGEMENT PTY LTD 2017
5. RISK MANAGEMENT The current legislation determines that the generator of waste is the owner of the waste until the waste crosses a weighbridge into a licensed facility. Waste contractors including construction contractors are the primary transporters of waste off-site ,accordingly contractors will be required to provide monthly reports on waste reused, reprocessed or recycled, thus diverted from landfill or waste sent to landfill. These reports have a direct bearing on the generator’s regulations.
The WMP will be implemented on site throughout excavation and construction.
All entries in the Waste Data File must include:
• Time and Date
• Description and size of waste
• Waste facility used
• Vehicle registrations and Company name
The Waste Data File will be available for inspection to any authorised Council Officer at any time during site works. At the conclusion of site works, the designated person will retain all waste documentation and make this validating documentation available for inspection.
6. GREEN STAR REQUIREMENTS
The Green Building Council of Australia ,Green Star Design & As-Built v1.1, construction and demolition waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste Management Plan aims to achieve minimum 90% recycling of construction / demolition waste to be diverted from landfill however Stockland will Target 95% recycling of Construction and Demolition Waste.
![Page 5: Waste Management Plan - City of Blacktown · waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste](https://reader033.vdocument.in/reader033/viewer/2022042111/5e8c26c510d4d770ce710882/html5/thumbnails/5.jpg)
ELARA NEIGHBOURHOOD CENTRE - WASTE MANAGEMENT PLAN
4 ECCELL ENVIRONMENTAL MANAGEMENT PTY LTD 2017
7. WASTE MANAGEMENT STRATEGIES The waste management strategy for the project will operate over the design, procurement, and construction including fit out of the project.
Management Strategies Responsibilities
Design:
Use of modular components in design
Use of prefabricated components in design
Design for materials to standard sizes
Design for operational waste minimisation
Architect & Engineer
Architect, Builder, Subcontractors.
Architect, Subcontractors
Architect & Builder
Procurement:
Select recycled and reprocesses materials
Components that can be reuse after deconstruction
Architect, Engineer, Builder & Sub Contractors
Architect, Engineer & Builder
Pre-construction
Waste management plan to be reviewed & approved prior to construction
Stockland
Construction on-site:
Use the avoid, reuse, reduce, recycle principles
Minimisation of recurring packaging materials
Returning packaging to the supplier
Separation of recycling of materials off site
Audit & monitor the correct usage of bins
Audit and monitor the Waste Contractor
Litter management principals
Builder & Waste Contractor
Sub-contractors
Builder & Sub-contractor
Waste Contractor
Builder & Waste Contractor
Builder
Builder
![Page 6: Waste Management Plan - City of Blacktown · waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste](https://reader033.vdocument.in/reader033/viewer/2022042111/5e8c26c510d4d770ce710882/html5/thumbnails/6.jpg)
ELARA NEIGHBOURHOOD CENTRE - WASTE MANAGEMENT PLAN
5 ECCELL ENVIRONMENTAL MANAGEMENT PTY LTD 2017
8. WASTE MANAGEMENT PLAN FOR DEVELOPMENT APPLICATION Brief Outline of Proposal
Elara Neighborhood Centre Elara Boulevard Marsden Park NSW will be built in two Stages ,this report is for Stage 1 only : Stage 1, covers the childcare center, a medical center , a retail and community hub (pods 1) with a total of 200 car spaces.
Project Site Address:
The block bordering Elara Boulevard, Northbourne Drive, Parish Street and Harvest Street and Marsden Park NSW
Applicant’s Name
Maud Garnier,
Development Manager,
Stockland care of GLN Planning
Applicant’s Address:
Stockland ,Level 25,133 Castlereagh Street,Sydney,2000
Buildings and other structures currently on site:
Currently a Greenfield Site
Signature of Applicant:
Date: / / 2017
![Page 7: Waste Management Plan - City of Blacktown · waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste](https://reader033.vdocument.in/reader033/viewer/2022042111/5e8c26c510d4d770ce710882/html5/thumbnails/7.jpg)
ELARA NEIGHBOURHOOD CENTRE - WASTE MANAGEMENT PLAN
6 ECCELL ENVIRONMENTAL MANAGEMENT PTY LTD 2017
PHASE 1: DEMOLITION
Material Type on Site
Estimated Volume (m3) or Weight (t)
(Most Favourable Least)
ON-SITE TREATMENT OFF-SITE TREATMENT
Reuse Recycling Disposal Proposed reuse and/or recycling
collection methods
Disposal / Transport
Contractor
Waste Depot, Recycling Outlet or
Landfill site
Narrative:
The Elara Neighbourhood Centre is a Greenfield Site
PHASE 2: EXCAVATION
Material Type on Site
Estimated Volume (m3) or Weight (t)
(Most Favourable Least)
ON-SITE TREATMENT OFF-SITE TREATMENT
Reuse Recycling Disposal Proposed reuse and/or recycling
collection methods
Disposal / Transport
Contractor
Waste Depot, Recycling Outlet or
Landfill site
Excavation
Other
TOTAL
Narrative:
The Elara Neighbourhood Centre is a Greenfield site and excavation material will be reused back onsite for fill.
![Page 8: Waste Management Plan - City of Blacktown · waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste](https://reader033.vdocument.in/reader033/viewer/2022042111/5e8c26c510d4d770ce710882/html5/thumbnails/8.jpg)
ELARA NEIGHBOURHOOD CENTRE - WASTE MANAGEMENT PLAN
7 ECCELL ENVIRONMENTAL MANAGEMENT PTY LTD 2017
PHASE 3: CONSTRUCTION
Material Type on Site
Estimated Volume (m3) or Weight (t)
(Most Favourable Least)
ON-SITE TREATMENT OFF-SITE TREATMENT
Reuse Recycling Disposal Proposed reuse and/or recycling
collection methods
Disposal / Transport
Contractor
Recycling Outlet or Landfill site
Concrete 15m3 Co-mingled Bins TBA Crushed for road base
Metal 26 m3 Co-mingled Bins TBA Scrap metal recycled
Aluminium 10m3 Co-mingled Bins TBA Scrap metal recycled
Rio 4m3 Co-mingled Bins TBA Scrap metal recycled
Hebel blocks 32 m3 Co-mingled Bins TBA Crushed for road base
Timber off-cuts 22 m3 Co-mingled Bins TBA Recycled for mulch
Cardboard packaging
42 m3 Co-mingled Bins TBA Recycled into cardboard
Plasterboard Offcuts
18 m3 Co-mingled Bins TBA Recycled and used as soil conditioner
Floor coverings 2 m3 Co-mingled Bins TBA Transfer to Licensed Landfill
Packaging, plastic
10m3 Co-mingled Bins TBA Plastic recycled
Pallets 15m3 Return to the supplier Return to the supplier
Insulation offcuts
1m3 Co-mingled Bins TBA Transfer to Licensed Landfill
Green waste 5m3 Co-mingled Bins TBA Mulched for landscaping
![Page 9: Waste Management Plan - City of Blacktown · waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste](https://reader033.vdocument.in/reader033/viewer/2022042111/5e8c26c510d4d770ce710882/html5/thumbnails/9.jpg)
ELARA NEIGHBOURHOOD CENTRE - WASTE MANAGEMENT PLAN
8 ECCELL ENVIRONMENTAL MANAGEMENT PTY LTD 2017
Material Type on Site
Estimated Volume (m3) or Weight (t)
(Most Favourable Least)
ON-SITE TREATMENT OFF-SITE TREATMENT
Reuse Recycling Disposal Proposed reuse and/or recycling
collection methods
Disposal / Transport
Contractor
Recycling Outlet or Landfill site
Tiles 18m3 Co-mingled Bins TBA Crushed for road base
Plastic plant containers
8m3 Co-mingled Bins TBA Recycled for other products
Soft Plastic 5m3 Co-mingled Bins TBA Recycled for other products
Glass 1m3 Co-mingled Bins TBA Recycled for other products
Ceiling Tiles 3m3 Return to the supplier Return to the supplier
Paint Tins 4m3 Co-mingled Bins TBA Scrap metal recycled
General Waste 8m3 Co-mingled Bins TBA Transfer to Licensed Landfill
Sub Total 238m3 11m3
TOTAL 249m3
Narrative:
All waste generated will be co-mingled on the floors and placed in a 2 Meter waste bins. These will be transported by forklift and taken to a centralized area where the waste will be placed in a large co-mingled bin. All waste leaving the site will be entered in a Waste Data File including , Time , Date ,Description and size of waste, the Waste facility used ,Vehicle registrations and Company name .Monthly reports will be provided by the waste contractor on the diversion rate and materials recycled. All information will be made available for compliance to Green Star Design & As-Built v1.1,
![Page 10: Waste Management Plan - City of Blacktown · waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste](https://reader033.vdocument.in/reader033/viewer/2022042111/5e8c26c510d4d770ce710882/html5/thumbnails/10.jpg)
![Page 11: Waste Management Plan - City of Blacktown · waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste](https://reader033.vdocument.in/reader033/viewer/2022042111/5e8c26c510d4d770ce710882/html5/thumbnails/11.jpg)
![Page 12: Waste Management Plan - City of Blacktown · waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste](https://reader033.vdocument.in/reader033/viewer/2022042111/5e8c26c510d4d770ce710882/html5/thumbnails/12.jpg)
![Page 13: Waste Management Plan - City of Blacktown · waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste](https://reader033.vdocument.in/reader033/viewer/2022042111/5e8c26c510d4d770ce710882/html5/thumbnails/13.jpg)
![Page 14: Waste Management Plan - City of Blacktown · waste requirements reward projects that reduce construction waste going to landfill by reusing or recycling building materials. The Waste](https://reader033.vdocument.in/reader033/viewer/2022042111/5e8c26c510d4d770ce710882/html5/thumbnails/14.jpg)