Carillion M40 Project GPT Waste Management Limited 14 Whitworth Court, Manor Farm Road, Manor Park, Runcorn, Cheshire WA7 1WA Tel: 0844 854 5000 Fax: 01928 571 335 www.gptwaste.com About the Project: Carillion operate the management of the entire M40 motorway system in respect of traffic management, waste management, litter pick and other specialist services to ensure that the motorway operates safely and efficiently. Based at 3 depots along the length of the motorway, operatives clear the carriageways of all general waste, as well as waste generated from RTAs, shredded tyres and other traffic related waste. This is then transported back to the various yards for collection and disposal. Client: Carillion M40 Project Location: 3 x sites along M40 motorway - High Wycombe, Thame and Banbury Date: Ongoing Sector: General Motorway Case Study Thanks for all your help today in what is a very high pressure situation. It was a credit to GPT providing such an efficient service. Darran Leak, Depot Foreman, Milton Common Depot, Carillion M40 DBFO 40yrd Roll on Off Containers for GMW 40yrd Roll on Off Containers for Metal Waste 20yrds Roll on Containers for Inerts 8yrd Skip for tyres 205Ltr Drums for various Hazardous Waste and Contaminated Waste Services and Products: Project Challenges: GPT took over the management of the project in June 2011 and were asked to provide a full waste manage- ment service for the network. Site visits were undertaken and proposals made for an improved service, including a reduction in the number of containers on sites, as well as the way the waste is managed. On occasions, due to the nature and urgency of the service provision, it is often necessary to provide Roll On / Off containers onto the carriageway itself at very short notice following major RTAs, something that GPT has always accomplished in order to keep the motorway operating smoothly. The UK’s leading independent provider of waste management solutions to both the public and private sector.

Upload: simply-marcomms

Post on 21-Mar-2016

223 views

Category:

Documents


7 download

DESCRIPTION

GPT Waste Management provides waste solutions for Carillion.

TRANSCRIPT

Page 1: Waste management solutions - Carillion case study

Carillion M40 Project

GPT Waste Management Limited14 Whitworth Court, Manor Farm Road, Manor Park, Runcorn, Cheshire WA7 1WATel: 0844 854 5000 Fax: 01928 571 335www.gptwaste.com

About the Project:

Carillion operate the management of the entire M40 motorway system in respect of traffic management, waste management, litter pick and other specialist services to ensure that the motorway operates safely and efficiently.

Based at 3 depots along the length of the motorway, operatives clear the carriageways of all general waste, as well as waste generated from RTAs, shredded tyres and other traffic related waste.

This is then transported back to the various yards for collection and disposal.

Client: Carillion M40 ProjectLocation: 3 x sites along M40 motorway - High Wycombe, Thame and BanburyDate: OngoingSector: General

Motorway Case Study

Thanks for all your help today in what is a very high pressure situation. It was a credit to GPT providing such an efficient service.

Darran Leak, Depot Foreman,Milton Common Depot, Carillion M40 DBFO

“ “

40yrd Roll on Off Containers for GMW

40yrd Roll on Off Containers for Metal Waste

20yrds Roll on Containers for Inerts

8yrd Skip for tyres

205Ltr Drums for various Hazardous Waste and Contaminated Waste

Services and Products:

✓✓✓✓

Project Challenges:

GPT took over the management of the project in June 2011 and were asked to provide a full waste manage-ment service for the network.

Site visits were undertaken and proposals made for an improved service, including a reduction in the number of containers on sites, as well as the way the waste is managed.

On occasions, due to the nature and urgency of the service provision, it is often necessary to provide Roll On / Off containers onto the carriageway itself at very short notice following major RTAs, something that GPT has always accomplished in order to keep the motorway operating smoothly.

The UK’s leading independent provider of waste management solutions to both the public and private sector.