wastewater effluent reuse – irrigation relief in the high desert city of albuquerque, nm by james...
TRANSCRIPT
Wastewater Effluent Reuse –Wastewater Effluent Reuse –Irrigation Relief in the High DesertIrrigation Relief in the High Desert
City of AlbuquerqueCity of Albuquerque, NM, NMbybyJames Chavez, PE, City of AlbuquerqueJames Chavez, PE, City of AlbuquerqueBob Paulette, PE, Wilson & CompanyBob Paulette, PE, Wilson & CompanyRon Mosher, PE, Molzen-Corbin & AssociatesRon Mosher, PE, Molzen-Corbin & Associates
presented to the presented to the Rocky Mountain Section WEA/AWWA Rocky Mountain Section WEA/AWWA Annual Conference, Casper WyomingAnnual Conference, Casper WyomingSeptember 17, 2003September 17, 2003
MOLZEN-CORBIN& Associates
PaperPaper Outline Outline
IntroductionDevelopment of Effluent Reuse “Users”New NMED Reuse Discharge GuidelinesEffluent Polishing TreatmentReuse PipelineConclusions
IntroductionIntroduction
Effluent Reuse Part of Overall Water Resources Management Plan
Two Non-Potable Reuse ProjectsNorth – Saves 2,296 Ac-ft/yrSouth – Saves 2,455 Ac-ft/yrIn range of water for 2,000 homesEA & FONSI Complete 2001
Effluent Reuse “Users”Effluent Reuse “Users”Existing Potable Water UsersTurf IrrigationCooling WaterFeasibility Analysis Identified PotentialDesign Analysis Further Defined
– Quantity, Quality– Connection Points, Pressure– Existing System Modifications Required
(Drinking Fountains, etc)
Effluent Reuse Water Users
User Type of Irrigation Irrigated DemandFacilities Use Acres Avg Ac-ft/yr Max MGD
PNM - Cobisa Power Plant Cooling Water NA 93 0.17Ethicon Commercial Turf Irrigation 3 10 0.02Regional Recreation Complex Various Turf Irrigation 51 202 0.38Barelas Railroad Park Museum Turf Irrigation 11.5 38 0.09San Jose Park Athletic Fields Turf Irrigation 3.5 12 0.03Chavez Park Park Turf Irrigation 7.3 24 0.06Spirit/Clark Carr Road Roadway Median Greenbelt Irrigation 42.5 142 0.34UNM South Golf Course Golf Course Turf Irrigation 240 800 1.93Sunport Boulevard/Park Roadway Median Greenbelt Irrigation 2.5 8 0.02Albuquerque International Airport Airport Turf Irrigation 28.2 94 0.23Kirtland Park Park Turf Irrigation 8.5 29 0.07Puerto del Sol Golf Course Golf Course Turf Irrigation 72 240 0.58University Stadium/Sports Complex Athletic Fields Turf Irrigation 33.7 112 0.27Roosevelt Park Area Park Turf Irrigation 27.3 92 0.22Bullhead Park Park & Atheltic Fields Turf Irrigation 41.9 141 0.34Phil Chacon Park Park Turf Irrigation 58 195 0.47Future Medians Allowance Medians/Parks Turf Irrigation 66.5 223 0.52
697 2455 5.74
NMED Reuse GuidelinesNMED Reuse Guidelines
Finalized August 7, 2003Classes of Reuse - IA, IB, 2, 3Sets Performance LimitationsMore Flexibility in Facilities
Reuse Quality GuidelinesReuse Quality GuidelinesClass Parameter 30-Day Avg Maximum
Class 1A BOD5 10 15
Turbidity 3 NTU 5 NTU
Fecal Coliform 5 per 100 ml 23 per 100 ml
Class 1B BOD5 30 mg/l 45 mg/l
TSS 30 mg/l 45 mg/l
Fecal Coliform 100 per 100 ml 200 per 100 ml
Class 2 BOD5 30 mg/l 45 mg/l
TSS 30 mg/l 45 mg/l
Fecal Coliform 200 per 100 ml 400 per 100 ml
Class 3 BOD5 30 mg/l 45 mg/l
TSS 75 mg/l 90 mg/l
Fecal Coliform 1,000 per 100 ml 5,000 per 100 ml
Effluent Polishing TreatmentEffluent Polishing Treatment
Low Lift Pumping from Chlorine Contact Chamber
FiltrationDisinfectionClearwellHigh Lift Pumping
Overall Reuse Polishing Overall Reuse Polishing LayoutLayout
Filtration Screening StudyFiltration Screening Study
Conventional Deep Bed Coarse MediaAutomatic Backwash Traveling BridgeCloth FiltersDisk FiltersMembrane Filtration“Fuzzy” Filters
Reuse PipelineReuse Pipeline
Alignment Set By Feasibility Study, EA & FONSI
All in Existing R/WLocate within Corridors to Minimize Utility
ConflictsCrossing Permits – AMAFCA, MRGCD,
BNSF, NMDOT
Pipeline Alignment MapPipeline Alignment Map
Mid-Point Storage & PumpMid-Point Storage & Pump
Puerto Del Sol Golf Course1.9 million gallon Storage Tank560 gpm Pumping StationHeight Constraints – FAA & EstheticsLocation Constraints – Golfers & NeighborhoodPipeline Location Along Fairway
Mesa Del Sol Recreation AreaMesa Del Sol Recreation AreaNew Roadway Not BuiltFollow “Proposed” Right-of-Way40-50 Foot Cut/Fill
Pipeline Constraints – Pipeline Constraints – Non-Residential AreasNon-Residential Areas
Within Existing R/W Utility Conflict
Potential Permitting Issues
– MRGCD– AMAFCA– BNSF– NMDOT
Pipeline Installation – Pipeline Installation – Residential AreasResidential Areas
Residential “Issues” Traffic Control Residential Access “Good Neighbor”
THANK YOU!THANK YOU!
Now-------Questions???