Presented by
Kendall West Utility and
Integrated Water Services, Inc. Specializing in Decentralized Wastewater Treatment
DesignPermitting
Construction
Wastewater Treatment Plan for Tapatio Development
Tapatio Development WWTF by Kendall West Utility
![Page 2: Wastewater Treatment Plan for Tapatio Development · PowerPoint Presentation Author: Gretchen Howell Created Date: 6/11/2019 9:48:04 AM](https://reader034.vdocument.in/reader034/viewer/2022043000/5f742ebbd6f8243cb961f5a2/html5/thumbnails/2.jpg)
Existing system
TCEQ Land Application Permit
150,000 gallon per day system
Approaching 40 years old with lease to expire
Treatment process - activated sludge with clarifier
Tapatio Wastewater Treatment Plant
Tapatio Development by Kendall West Utilities
![Page 3: Wastewater Treatment Plan for Tapatio Development · PowerPoint Presentation Author: Gretchen Howell Created Date: 6/11/2019 9:48:04 AM](https://reader034.vdocument.in/reader034/viewer/2022043000/5f742ebbd6f8243cb961f5a2/html5/thumbnails/3.jpg)
Proposed plant
Three phases with full build out to 500,000 gallons per day
TCEQ Surface discharge permit with type 1 reuse for golf course
irrigation
Treatment process - activated sludge with membrane
bioreactor (MBR)
Tapatio Wastewater Treatment Plant
Tapatio Development by Kendall West Utilities
![Page 4: Wastewater Treatment Plan for Tapatio Development · PowerPoint Presentation Author: Gretchen Howell Created Date: 6/11/2019 9:48:04 AM](https://reader034.vdocument.in/reader034/viewer/2022043000/5f742ebbd6f8243cb961f5a2/html5/thumbnails/4.jpg)
Tapatio WWTP Renderings
Tapatio Development by Kendall West Utilities
![Page 5: Wastewater Treatment Plan for Tapatio Development · PowerPoint Presentation Author: Gretchen Howell Created Date: 6/11/2019 9:48:04 AM](https://reader034.vdocument.in/reader034/viewer/2022043000/5f742ebbd6f8243cb961f5a2/html5/thumbnails/5.jpg)
Tapatio WWTP Site Layout
Tapatio Deveopment by Kendall West Utilities
No gravel drive here.
![Page 6: Wastewater Treatment Plan for Tapatio Development · PowerPoint Presentation Author: Gretchen Howell Created Date: 6/11/2019 9:48:04 AM](https://reader034.vdocument.in/reader034/viewer/2022043000/5f742ebbd6f8243cb961f5a2/html5/thumbnails/6.jpg)
Tapatio WWTP Discharge Map
Tapatio Deveopment by Kendall West Utilities
![Page 7: Wastewater Treatment Plan for Tapatio Development · PowerPoint Presentation Author: Gretchen Howell Created Date: 6/11/2019 9:48:04 AM](https://reader034.vdocument.in/reader034/viewer/2022043000/5f742ebbd6f8243cb961f5a2/html5/thumbnails/7.jpg)
Dennis Livingston, PE
Technical Director
Wastewater Treatment Technologies
Tapatio Development by Kendall West Utilities
Microdyn MBR Systems
![Page 8: Wastewater Treatment Plan for Tapatio Development · PowerPoint Presentation Author: Gretchen Howell Created Date: 6/11/2019 9:48:04 AM](https://reader034.vdocument.in/reader034/viewer/2022043000/5f742ebbd6f8243cb961f5a2/html5/thumbnails/8.jpg)
History of Wastewater Technologies
Tapatio Development by Kendall West Utilities
1914 the first activated sludge patent 1914
Roughly 16,000 permitted WWTPs
32 BGD of WWT
1966 first MBR patent
![Page 9: Wastewater Treatment Plan for Tapatio Development · PowerPoint Presentation Author: Gretchen Howell Created Date: 6/11/2019 9:48:04 AM](https://reader034.vdocument.in/reader034/viewer/2022043000/5f742ebbd6f8243cb961f5a2/html5/thumbnails/9.jpg)
Treatment Technologies and Options Septic Tanks
Trickling Filter
Conventional Activated Sludge
Sequencing Batch Reactor (SBR)
Membrane Bio Reactor (MBR)
Tapatio Development by Kendall West Utilities
![Page 10: Wastewater Treatment Plan for Tapatio Development · PowerPoint Presentation Author: Gretchen Howell Created Date: 6/11/2019 9:48:04 AM](https://reader034.vdocument.in/reader034/viewer/2022043000/5f742ebbd6f8243cb961f5a2/html5/thumbnails/10.jpg)
MBR Technology
Tapatio Development by Kendall West Utilities
Permeate QualityParameters Typical
ValuesAchievable
ValuesBOD5 < 2.0 mg/l Non-Detect
TSS < 2.0 mg/l Non-DetectAmmonia (NH3) < 1.0 mg/l Non-Detect
Total Nitrogen (TN) < 10.0 mg/l < 3.0 mg/lPhosphorus (TP) < 1.0 mg/l < 0.03 mg/l
Turbidity < 0.10 NTU < 0.05 NTUFecal Coliform < 2.2 CFU/100ml Non-Detect
SDI < 3 < 2
![Page 11: Wastewater Treatment Plan for Tapatio Development · PowerPoint Presentation Author: Gretchen Howell Created Date: 6/11/2019 9:48:04 AM](https://reader034.vdocument.in/reader034/viewer/2022043000/5f742ebbd6f8243cb961f5a2/html5/thumbnails/11.jpg)
11 ovivowater.com/mbrCopyright© 2015 Ovivo Inc. All rights reserved
E f f e c t i v e F i l t r a t i o n
Multiple BarriersMembranes submerged in mixed liquor have an effective pore size of < 0.01 micron
![Page 12: Wastewater Treatment Plan for Tapatio Development · PowerPoint Presentation Author: Gretchen Howell Created Date: 6/11/2019 9:48:04 AM](https://reader034.vdocument.in/reader034/viewer/2022043000/5f742ebbd6f8243cb961f5a2/html5/thumbnails/12.jpg)
12 ovivowater.com/mbrCopyright© 2015 Ovivo Inc. All rights reserved
E f f e c t i v e F i l t r a t i o n
PathogenRemovalPathogens rejected by multiple barriers withoutpost disinfection