water conservation through re-cycle and re-use, presented by acc limited damodhar cement works
DESCRIPTION
This is a presentation from ACC Limited Damodhar Cement Works, one of the finalists at the 5th CII-GBC National Award for Excellence in Water Management in 2008The awards are in 2 categories, Within the Fence for work done on minimizing the organisations water footprint, and Beyond the Fence for work done in the community around the industry. This presentation was in the "Within the Fence" category.We thank CII and the respective companies for giving us permission to upload these presentations on the India Water Portal website for dissemination to a wider audience.TRANSCRIPT
Damodhar Ce ment Works
ExcellenceExcellence Through TeamworkThrough Teamwork
Water conservation through Water conservation through recycle and reuserecycle and reuse
Presented ByPresented By
ACC LimitedACC LimitedDamodhar Cement WorksDamodhar Cement Works
Damodhar Ce ment Works
Damodhar at a glance Damodhar at a glance ……..
•• DCSL commenced commercial production in October 1990 as a DCSL commenced commercial production in October 1990 as a joint venture project of WBIDC and Cement Corporation of India joint venture project of WBIDC and Cement Corporation of India LtdLtd
•• In September 1996 ACC Ltd. took over the management of the In September 1996 ACC Ltd. took over the management of the Company and it became a Subsidiary of the ACC Ltd. With Company and it became a Subsidiary of the ACC Ltd. With WBIDC as a partnerWBIDC as a partner
•• Capacity enhancement from 2.70 to 5.25 LTPA of Portland Slag Capacity enhancement from 2.70 to 5.25 LTPA of Portland Slag Cement in the year 1998 was taken up by ACCCement in the year 1998 was taken up by ACC
•• An ISO 9001 : 2000 and ISO 14001:2004 certified unitAn ISO 9001 : 2000 and ISO 14001:2004 certified unit
Damodhar Ce ment Works
Our Strategic VisionOur Strategic Vision
Damodhar Ce ment Works
Our Environmental Policy
Damodhar Ce ment Works
Cement Manufacturing ProcessCement Manufacturing Process
Ball Mill-2 16 T/H
Wet Slag sto rage at Ropeway Loading
Station
Ropeway 2.6 KM, Capacity 135 TPH
Bagging
RotoPacker
2 x 3800 T
Coal Mill
3 TPH
Coal Storag e
800 MT
Ball Mill-149 TPH
Slag Dryer
60TP H
Wagon Tippler 600 TPH
100 T Cap.2 nos
Ball Mill-3 15 TPH
Open Wet Slag Storag e
Capacity 35 KT
Covered storag e Hall
Clinker18000TDry Sl ag5000T
Gypsum8000T
Cement Sto rage SiloClinker
And Gypsum
Damodhar Ce ment Works
Drinking Water ConsumptionDrinking Water Consumption
Water consumption in Factory
166.25
242.36198.21 185.93
050
100150200250300
'04-'05 '05-'06 '06-'07 '07-'08
Year
Lit /
Pers
on /D
ay
Water Consumption in Colony
184
262.39196.48 200.22
050
100150200250300
'04-'05 '05-'06 '06-'07 '07-'08
Year
Lit /
Pers
on /D
ay
•2005-06 water con sumption high due to fly ash silo and cement silo
project
•2007-08 water con sumption high due to new construction of quarters
Damodhar Ce ment Works
Bench MarkingBench Marking
43.1
74
41.9
4
30.3
23
78.7
34
113.
009
93.2
33
91.9
62
156.
183
135.
173
40.7
91
122.
285
119.
526
0
20
40
60
80
100
120
140
160
180
'04-'05 '05 -'06 '06-'07 '07-'08Yea r
Cons
umpt
ion
(K m
3)
IndustrialDrinking/Domestic UseTotal
0.07
8
0.08
5
0.08
1
0.06
0.280.28 0.28
0.28
0.50.50.50.5
0
0.1
0.2
0.3
0.4
0.5
0.6
'04-'05 '05-'06 '06-'07 '07-'08
YearSp
ecifi
c W
ater
Co
nsum
ptio
n (m
3/T)
DCWNational BenchmarkInternational Benthmark
Damodhar Ce ment Works
Damodhar Riv er
Drinking WaterReserv oir
Process water Ta nk
Over Head Tank
Drinking Water
Process Water
Proc
ess
Wat
er Drinking Water
Water Flow Diagram
Plant Colony Village
Plant
FM FM
FM
Damodhar Ce ment Works
Sewage Treatment Plant
SWEAGE COLLECTION
SUMP
OXIDIZATION PLANT
CIRCULAR TANK
FILTER
SUPPLY FOR
IRRIGATION
BACK WASH
WATER TANK
TREATED WATER
RESERVOIR
Damodhar Ce ment Works
•• Applying Analog Applying Analog Flow Meter for Flow Meter for accuracyaccuracy
•• Maintain daily log Maintain daily log sheet to feed the sheet to feed the readingsreadings
•• Weekly report to Weekly report to Chief Manager Chief Manager Engg., Plant Engg., Plant operation head & operation head & Director PlantDirector Plant
Monitoring & Reporting SystemMonitoring & Reporting System
Damodhar Ce ment Works
The previous system of domestic waste water treatment having following demerits :
• The Domestic Waste water including the kitchen and washroom dischar ge is treated at sewage treatment plant
• After the plant expansion, filtration capacity of STP was not sufficient to take the increase of waste water day to day due to increase of population and quarters in colony
Idea Generation• Disconnection of Kitchen and bathroom line of A-Block &
Hutment buildings from main STP line • Waste water from kitchen and bathroom collect in a pond after
gravitation f iltration process and this water use for gardening and breeding fish
Project Project --1 : Reuse of Domestic Waste Water1 : Reuse of Domestic Waste Water
Damodhar Ce ment Works
Kitche n and Was hroom Water Collecte d into Pond
Plantation at Colony
Project Project -- 1 : Reuse of domestic waste water1 : Reuse of domestic waste water
Damodhar Ce ment Works
RESULTS :RESULTS :
––Recycling of waste Recycling of waste water and optimum water and optimum usage of resource usage of resource
––Smooth and efficient Smooth and efficient operation of STPoperation of STP
––Ensure ZERO dischargeEnsure ZERO discharge
0 0 0 0
600
'03-'04
'04-'05
'05-'06
'06-'07
'07-'08
YearV
olum
e (L
it.)
Dischargewater (KL)
Project Project -- 1 : Reuse of domestic waste water1 : Reuse of domestic waste water
Damodhar Ce ment Works
The previous water supply system (surface water from Damodar river) had the following demerits:
• Unhygienic water quality specially during monsoon.• During summer and winter, 10 nos. labor used daily for
channeling the water to the pumping point• 18 KW pumps used for lif ting the water and 7.5 KW pump
used for pressure f iltration• High treatment cost of Rs. 4000.00 per month
The Cost of production was Rs. 5.50 per KL.
Project Project –– 2 : Reduction of river water usage2 : Reduction of river water usage
Damodhar Ce ment Works
IDEA GENERATION :IDEA GENERATION :
•• Elimination of the surface water supply and associated Elimination of the surface water supply and associated filtration system by installation of a deep bore well filtration system by installation of a deep bore well pumping unit at middle of river bedpumping unit at middle of river bed
•• Drawing the subsoil water which is much more hygienic Drawing the subsoil water which is much more hygienic and available throughout the yearand available throughout the year
Project Project –– 2 : Reduction of river water usage2 : Reduction of river water usage
Damodhar Ce ment Works
Actions ImplementedActions Implementedü 40 feet deep bore well pump has been installed ü Water treatment plant operation has been stopped
Project Project –– 2 : Reduction of river water usage2 : Reduction of river water usage
Damodhar Ce ment Works
RESULTS:RESULTS:
•• Continuous supply of good quality drinking Continuous supply of good quality drinking water even in rainy season water even in rainy season
•• Operation and maintenance cost have been Operation and maintenance cost have been reduced to reduced to RsRs. 1.20 per KL. 1.20 per KL
•• Hence annual saving is Hence annual saving is RsRs. 2.40 . 2.40 LakhsLakhs
Project Project –– 2 : Reduction of river water usage2 : Reduction of river water usage
Damodhar Ce ment Works
Previous water supply system :
• Cooling water supplied to the machines was not recirculated and reused
• High water loss• High amount of water cess paid by the company
Idea Generation
All the return water lines have been connected to the main return water pipe.
Project Project –– 3 : Close circuiting of process water3 : Close circuiting of process water
Damodhar Ce ment Works
Result :
• Reduction if water consumption as well as discharge by 8%
• Reduction in pump house power consumption by 6%
Project Project –– 3 : Close circuiting of process water3 : Close circuiting of process water
Damodhar Ce ment Works
AwarenessAwareness
•• DCW sent representative to Delhi for training on Water DCW sent representative to Delhi for training on Water Management systemManagement system
•• Mass awareness of taking hygienic water through distribution of Mass awareness of taking hygienic water through distribution of leaflets & electronic media among the nearby community & leaflets & electronic media among the nearby community & colony inhabitants colony inhabitants
•• Providing hygienic water to the nearby v illagers Providing hygienic water to the nearby v illagers •• Periodic checking of quality of water by internal as well as Periodic checking of quality of water by internal as well as
exter nal authority exter nal authority •• Distribution of leaf lets for awareness towards water borne Distribution of leaf lets for awareness towards water borne
diseasesdiseases•• Arrange drawing competition on Arrange drawing competition on ‘‘Conservation Of Natural Conservation Of Natural
resour cesresour ces’’ among the colony & nearby inhabitantsamong the colony & nearby inhabitants’’ childrenchildren•• ‘‘Suggestion SchemeSuggestion Scheme’’ for new idea generationfor new idea generation•• Envir onmental Quiz Competition conducted by DCW clubEnvir onmental Quiz Competition conducted by DCW club
Damodhar Ce ment Works
Sustainable DevelopmentSustainable Development
•• Rain Water Harvesting: Constructed Rain Water Harvesting: Constructed earthen pond at Colony & concrete earthen pond at Colony & concrete reservoir inside plant reservoir inside plant
•• Use of Treated water from Sewage Use of Treated water from Sewage Treatment plant for plant & colony Treatment plant for plant & colony plantation & gardeningplantation & gardening
•• Reserve shower & kitchen water into Reserve shower & kitchen water into pond for plantation pond for plantation
•• Complete Looping of process water for Complete Looping of process water for recirculationrecirculation
•• Optimizing the water distribution Optimizing the water distribution cycle frequency towards colony & cycle frequency towards colony & near by inhabitantsnear by inhabitants
•• Installation of float valves to all the Installation of float valves to all the water reservoirs (tanks) at all the water reservoirs (tanks) at all the colony buildingscolony buildings
Damodhar Ce ment Works
Our Future PlanOur Future Plan…………....
•• Integration with OSHAS 18001Integration with OSHAS 18001•• Annual external audits through authorized auditing Annual external audits through authorized auditing
agenciesagencies•• Involvement of people through small group activitiesInvolvement of people through small group activities•• Developing InDeveloping In--house expertise for auditshouse expertise for audits•• Installation of flow meter at consumption points for Installation of flow meter at consumption points for
better monitoringbetter monitoring•• Zero water leakageZero water leakage•• Arrangements for collecting storm water from roof Arrangements for collecting storm water from roof
shed and collecting in the earthen pondsshed and collecting in the earthen ponds
Damodhar Ce ment Works
We can do no great things ; We can do no great things ; only small things with great love.only small things with great love.
-- Mother TeresaMother Teresa
Damodhar Ce ment Works