Page 1: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

Water Rehab Project

Page 2: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

Committee Members

• Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ Senior Analyst • Steve Cordes, Welch-Comer Engineering • Phil Noel, Advisor • Ron Nicolson, Water Operator • Dan Rife, Water Operator • Dave Henderson, CBPOA President

Page 3: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

History

• Direct Pressure Filtration • Built in 1972

Page 4: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

History

• Lake Pumps 47 years old • Parts of distribution system are 4” schedule 40

PVC pipe • 2 million gallons of water unaccounted for per

year

Page 5: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

The Plan Upgrade Current System

• Replace Filtration System with Rapid Sand Filtration

• Replace Lake Pumps – Onshore pumps with building – Extend intake – Increase flow rate to 175 GPM per pump

• Replace water line from lake pumps to clearwell with 6” C900 pipe

Page 6: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

Upgrade Current System Reservoirs

• Clearwell pipes & straps have heavy corrosion life expectancy of 2-3 years

Page 7: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

Upgrade Current System Reservoirs

• All Reservoirs need tops re-coated • Replace Reservoir pumps • Supply power to Reservoir 2 • New 60K-90K gallon Reservoir on Parker

– Dependent on available funds

• Supply power to Parker Reservoir • Install Water mains with Hydrants on Parker

Rd. for Fire suppression

Page 8: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ
Page 9: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ
Page 10: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ
Page 11: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

Steps for Improving System and Status?

Motion from Members – 2018 Hire Engineering firm (Welch Comer) Submit Letter of Intent (LOI) to DEQ Visit Water plants in Idaho Determine type of filtration system Contact Filtration Manufacturing Companies • Submit Planning Grant Application • Submit Construction Loan Application

Page 12: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

Steps for Improving System and Status?

• Welch Comer to develop required Plans Pilot Study Plan – Facility Plan – Environmental Plan – Preliminary Engineering Reports – Construction Plan

• Property purchase for new filtration system 3 week Pilot Study

Page 13: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

Pilot Study

Page 14: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

Pilot Study Purpose

• Completed a successful 3 week pilot study • Demonstrate that a Rapid Sand Filtration

system would provide safe drinking water • Determine coagulant and dosages • WesTech to provide pilot study report

Page 15: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

Funding

• DEQ loan $2.5M, 30 yr. term at 1.75% interest – Principal forgiveness of $467,765

• USDA grant – buy back loan from DEQ at 2% interest and 25% principal forgiveness

• Total loan forgiveness approx. $1.0M

Page 16: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

Water Income &Expense 2016-2018

Year Income Expense Delta

2016 $15.8K $65.2K ($49.4)

2017 $15.0K $61.9K ($46.9)

2018 $15.1K $78.1 ($63.0)

Paid out of the General Fund All properties paying for water

Page 17: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

How Can We Balance the Water Account?

• Water Rate Restructure – Charge for usage per gallon – Include water base rate (properties connected) – Include standby rates (properties with access)

• Encourage members currently connected to water to replace water meters with remote read meters (2M gallon shortfall)

Page 18: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

Preliminary Rate Structure Members Connected to Water

Current Fees

Proposed based on new water plant and fees Fee

Proposed based on new water plant and fees $10.0K Reserve Fee

Gen Op & Maint fees $57.44 $57.44 - $26.00 $31.44 $57.44 - $26.00 $31.44 HOA Admin $8.11 $8.11 $8.11 Waste water loan $42.00 $42.00 $42.00 Waste water op $27.56 $27.56 $27.56 Waste water gen maint fee $12.16 $12.16 $12.16 Marina Op assessment $1.10 $1.10 $1.10 Water Base Rate $19.15 $35.00 $40.00 Usage Fee $2.20 per 1000 gallons Example 250 gallons per day $16.50 $16.50 Water Loan * $33.00 $33.00

Total $167.52 $206.87 $211.87

* Based on $1.5M loan depending on the scope of the project and final project costs

Page 19: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

Preliminary Rate Structure Members with Access to Water

Current Fees

Proposed based on new water plant and fees Fee

Proposed based on new water plant and fees $10.0K Reserve Fee

Gen Op & Maint fees $57.44 $57.44 - $26.00 $31.44 $57.44 - $26.00 $31.44 HOA Admin $8.11 $8.11 $8.11 Waste water loan $42.00 $42.00 $42.00 Waste water op $4.63 $4.63 $4.63 Waste water gen maint fee $12.16 $12.16 $12.16 Marina Op assessment $1.10 $1.10 $1.10 Water Standby Rate $26.00 $28.00 Water Loan * $33.00 $33.00

Total $125.44 $158.44 $160.44

* Based on $1.5M loan depending on the scope of the project and final project costs

Page 20: Water Rehab Project - cbpoa.info06-2019).pdf · Water Rehab Project . Committee Members • Dave Banks, Licensed Water Operator • John Aldrich, Advisor • Suzanne Scheidt, DEQ

Preliminary Rate Structure Parker Residents

Current Fees

Proposed based on new water plant and fees – Water Main Fee

Proposed based on new water plant and fees - No Water Main Fee

Gen Op & Maint fees $57.44 $57.44 - $26.00 $31.44 $57.44 - $26.00 $31.44 HOA Admin $8.11 $8.11 $8.11 Waste water loan $42.00 $42.00 $42.00 Waste water op $4.63 $4.63 $4.63 Waste water gen maint fee $12.16 $12.16 $12.16 Marina Op assessment $1.10 $1.10 $1.10 Water Standby Rate $26.00

Water Loan * $33.00 $33.00

Total $125.44 $158.44 $132.44

* Based on $1.5M loan depending on the scope of the project and final project costs