Introduction.Attributes of Water. Need to apply to water supply.How water supply system should be done.Design Period & Factor on which design period depends.Population Forcasting & Method of forcasting.Water Demand & Variation in water demand.Per capita demand.
prepared by: Masud Alam Ansari
Water supply & waste water Engineering
![Page 2: Water supply & waste water](https://reader030.vdocument.in/reader030/viewer/2022020723/588415a41a28ab95518b6949/html5/thumbnails/2.jpg)
Introduction- It deals with the study of supply of water in various Sector for various purposes.
Attributes of Water - Asthetic - Safety - Economical
![Page 3: Water supply & waste water](https://reader030.vdocument.in/reader030/viewer/2022020723/588415a41a28ab95518b6949/html5/thumbnails/3.jpg)
Some chemical that is harmful for our body Arsenic – Cancer Flouride – Reduction of calcium Nitrate – Blue baby syndrome Mercury – Instant Death
Why do we need to apply water supply ?- So, consumer can use pure water for various purposes like cooking, bathing, fire fighting, in industries etc.
How water supply system should be done ?
![Page 4: Water supply & waste water](https://reader030.vdocument.in/reader030/viewer/2022020723/588415a41a28ab95518b6949/html5/thumbnails/4.jpg)
- Should have permanent water resources.- Uniform Distribution of water.- Treatment procedure should be superior.- Maintenance should be very good .
Design Period - The time period or the number of year for which the component of water supply system can serve satisfactory.
Factor on which design period depends .- Useful life of material.- Population.- Cost involved.- Expansion of town or area.
![Page 5: Water supply & waste water](https://reader030.vdocument.in/reader030/viewer/2022020723/588415a41a28ab95518b6949/html5/thumbnails/5.jpg)
What is population forcasting ?- Prediction of increase in population in future. It is depend upon birth, death and migration rate.
Method of population forcasting .i . Arithmetic increase method Suitability- Developed City. Advantage – Calculation is easy. Disadvantage – cannot applied for developing .
ii. Geometric Increase method Suitability/ Advantage – Applied for newly immersed city & short duration of time. Disadvantage – cannot used for forcasting of long term.
![Page 6: Water supply & waste water](https://reader030.vdocument.in/reader030/viewer/2022020723/588415a41a28ab95518b6949/html5/thumbnails/6.jpg)
iii. Increasemental increase method . - It is also called ideal method because it gives the moderate value when compare with the two method. Suitability – Both developed and developing city.
What is water demand ? - Total volume of Water required by a population in a particular area for a definite
period of time. It is depend upon per capita demand and total popn on the area.
Variation in water demand . -Seasonal Variation . -Daily Variation . -Hourly Variation.
![Page 7: Water supply & waste water](https://reader030.vdocument.in/reader030/viewer/2022020723/588415a41a28ab95518b6949/html5/thumbnails/7.jpg)
What is per capita demand ? - The requirement of water by 1 person for various purposes i.e. domestic uses, commercial etc. for 1 day .
Factor on which per capita demand depend .i. Climate condition ii. Habit of individualiii. Industries iv. Pressure distribution systemv. Method of charging vi. Sanitation facilityvii. Supply system viii.Quality of water
![Page 8: Water supply & waste water](https://reader030.vdocument.in/reader030/viewer/2022020723/588415a41a28ab95518b6949/html5/thumbnails/8.jpg)
i. Mechanical Straining ii. Sedimentation and
flocculationiii. Biological metabolism iv. Electrolytic action
Filtration Process