wc1 water connection application
TRANSCRIPT
When completing this form please refer
to the guidance section for assistance.
For further support please
contact us as follows:
E-mail our team:
Main office contact address:
Development Operations
Scottish Water
The Bridge,
Buchanan Gate Business Park,
Cumbernauld Road,
Stepps, G33 6FB
Main office phone number:
0800 3890379
Our main office operates 9am–5pm
Monday–Friday within business hours.
This application form is to be used for connections to a public water main for the following:
• Housing Units • Site Accommodation • Student Accommodation • Building Water
This form is for domestic connections only. For non-domestic connections please see www.scotlandontap.gov.uk
If you require a lead replacement please contact our Customer Helpline on 0800 0778778 and they will provide you with an application.
Other applications available are:
Water Connection Application
Guidance section
Water Connection Application
WC1
For further information or assistance in completing this form please call Development Operations on our dedicated phone number, 0800 3890379 or visit our website at:
www.scottishwater.co.uk/connections
These guidance notes relate to
each numbered question on the
application form.
1. Application Details
1.1 Please include any Scottish Water
reference number relevant to this
site i.e your Pre Development
Enquiry (PDE) reference number
or if you have previously applied
for this site and have a reference
number please quote this.
1.2 The applicant will be the
designated point of contact unless
otherwise notified.
1.3 Complete the developer section
only if this is different from the
applicant.
1.4 Please indicate who the billable
customer is by ticking the
appropriate box. The invoice
will be addressed and sent to
this customer.
Water Connection Application
Guidance section
1. Application Details Please quote any Scottish Water reference previously given that relates to your site.
1.1 Scottish Water Reference No: ______________________________________________
1.2 Applicant Details:
Contact Name: * __________________________________________________________
Company Name (if applicable): _____________________________________________
Address: * _______________________________________________________________
_________________________________________________________________________
_________________________________ Postcode: * ____________________________
Phone: * _________________________________________________________________
Mobile: __________________________________________________________________
Email: ___________________________________________________________________
1.3 Developer Details: (if different from above)
Contact Name: ___________________________________________________________
Company Name (if applicable): _____________________________________________
Address: _________________________________________________________________
_________________________________________________________________________
___________________________________ Postcode: ____________________________
Phone: __________________________________________________________________
Mobile: __________________________________________________________________
Email: ___________________________________________________________________
1.4 Please indicate who the billable customer is by ticking the appropriate box: *
Applicant:
Developer:
Other:
If ‘other’ please provide details: ____________________________________________
_________________________________________________________________________
_________________________________________________________________________
02
For official use only
Date received:
All fields marked with an asterix (*) are mandatory.
Water Connection Application
WC1
For more information:
Development Operations 0800 3890379 www.scottishwater.co.uk/connections [email protected]
2. Site Details
2.1 If you do not have a full postal
address please provide as much
location information as possible
e.g. name of adjacent road.
If you are building more than one
property please be aware that the
plot numbers must be numerical,
run consecutively, and correspond
with the drawings provided.
2.2 If you are building in an
undeveloped area you may
not have a postcode. If you
have a nearby postcode please
provide this.
2.3 If you have a 12 digit Ordnance
Survey reference point then please
include this.
2.5 For new premises we require the full
planning reference number and the
date when planning was granted.
2.6 For existing premises please
provide this information only
if applicable.
2.7 We require confirmation of the
local authority area where your site
is located in all cases.
2.8 If this is an existing build please
state what this was previously
used for i.e; Offices, Housing,
Industrial/Commercial.
2.9 If there are any land contamination
issues relating to your site, please
confirm how your site has been
cleared of contamination, or
provide the necessary third party
assessment that confirms the choice
of pipe material and/or measures
taken to protect the public
water supply.
2.10 Existing supply refers to a supply
on site of previous use. This does
not include any temporary site
connections you have previously
applied for. Indicate the retained
connections quantity/diameter in
your drawings provided, as well as
any disconnections required.
2. Site Details2.1 Site address: * ____________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
2.2 Nearest Postcode: ________________________________________________________
2.3 Ordnance Survey Ref (12 Fig):
2.4 Type of premises: * New: Existing:
2.5 Planning Reference (if applicable): __________________________________________
2.6 Date Granted (if applicable): _______________________________________________
2.7 Local Authority Area: *_____________________________________________________
2.8 If ‘Existing’, please specify existing use of premise? ___________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
2.9 Are there any potential contaminated land issues? * Yes No
If Yes please state what action is being taken to negate contamination risk:
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
2.10 Is there an existing public supply at the site? Yes No
If Yes, are any supplies metered? Yes No
If Yes, please supply the meter serial number:
_________________________________________________________________________
Do you wish to retain this supply? Yes No
03
Water Connection Application
WC1
For more information:
Development Operations 0800 3890379 www.scottishwater.co.uk/connections [email protected]
3. Connection Details
Please note that we offer
a connection only service you
are responsible for all other
work including provision of all
materials; excavation; pipe laying
and reinstatement. You are also
responsible for obtaining any
necessary road opening permits
and traffic management from the
local authority.
3.2 Please tick the boxes that apply.
If you are looking for a new supply
to an existing premise please
include a brief summary under
3.3 to give us a full understanding
of your needs i.e. transferring from
a private to public water supply etc.
If you are constructing flats three
stories or above you should make
provision for pumps and 24 hour
storage in order to ensure each
property has adequate pressure.
Please note student accomodation
will require a metered connection.
Please provide meter requirements
in section 3.4 under other.
A temporary water supply can be
used for site accommodation, sales
cabin, temporary caravan, etc. If you
intend to utilise this as a permanent
connection for a property
please tick yes.
3. Connection Details 3.1 Anticipated date for water connection: ______________________________________
3.2 Type and number of properties to be connected:
Tick all boxes that apply: Quantity
New housing unit(s)
Property Type:
Detached houses:
Semi-detached houses:
Flats/apartments (see guidance):
Terraced:
Total Number of New Housing Units
Existing housing unit(s)
Student Accomodation
Site Accomodation
Standpipe for Building Water
Other
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
If you require a connection for ‘Site Accomodation’ or ‘Building Water’ purpose will it be utilised as a permanent plot? Yes No
If Yes, please supply plot number _________________________________________________
If No, please provide estimated disconnection date _________________________________
3.3 If you have nominated your Utility Connection Provider (UCP) please complete below:
Contact Name: ___________________________________________________________
UCP Contractor: __________________________________________________________
In order for any water mains to be considered for adoption by Scottish Water they must be laid by an accredited Utility Connection Provider (UCP). A full list of Scottish Water’s accredited UCP’s can be found on the Lloyds Register website www.lloydsregister.co.uk/schemes/WIRS/
A UCP is a company which meets the requirements for accreditation and which has been assessed as competent in accordance with the WIRS scheme requirements.
The Water Industry Registration Scheme (WIRS) was established to accredit and regulate Utility Connection Providers. This is a national scheme, and ensures regular audit and management of the activity of accredited companies which meet the standards set out for such companies.
If you do not know these details at the time of submitting the form, please inform Scottish Water once the UCP is confirmed.
04
Water Connection Application
WC1
For more information:
Development Operations 0800 3890379 www.scottishwater.co.uk/connections [email protected]
3.4 Please note that domestic
properties are not required to
be metered as water charges in
Scotland are collected through
Council Tax payments. However,
if a metered supply is required
please request under ‘other’
in table provided.
Connection Size — You are
responsible for making the
necessary assessments and for
the sizing of your connections.
As a guideline for small, single
domestic supplies, a service pipe of
25mm diameter is usually sufficient.
If a service pipe is greater than
32mm please note this is classed
as a non standard connection
and as such your application will
require the following additional
information:
• A Soil Investigation report
• Fire Authority Approval Letter
• Detailed drawing showing valve
arrangements
Material Type — The most
commonly used pipe material for
single properties is Medium-density
polyethylene (MDPE). If however
there are contaminated land issues
copper or barrier pipe may be
a suitable alternative material.
3.5 Please provide information if you
have been requested by building
control or the Fire Authority to
install any fire hydrants and confirm
details of any flow requirements
stipulated.
3.6 If you propose to include a Sprinkler
System at your development, you
will need to submit the following:
• Internal schematics
• Manufacturing specifications
Please ensure any fixtures and
fittings used within the proposed
sprinkler system conform to the
appropriate byelaws.
3.8 If a connection to the public sewer
has still to be applied for, please
complete a Sewer Connection
(SC1) application form.
3.4 Size of Connection(s) required and Material Type:
3.5 Please provide details of any fire fighting requirements.* (Please note: Scottish Water may not be able to meet the flows stipulated)
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
3.6 Do you propose to include any sprinkler systems? * Yes No
3.7 Are you required to work on third party land? * Yes No
If yes, please forward written permission by land owner.
3.8 Have you applied for a new sewer? * Yes No
If yes, please provide the Scottish Waste Water Application Reference number:
_________________________________________________________________________
If no, what provisions have you made for draining your site? ____________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
05
Water Connection Application
WC1
Size Quantity* Material Type
25mm
32mm
63mm
90mm
Other:
For more information:
Development Operations 0800 3890379 www.scottishwater.co.uk/connections [email protected]
4. Checklist
Drawings
Please ensure you include the
following drawings:
• Proposed route and point
of connection.
• Location and footprint of
property in relation to the
surrounding area.
Connections over 32mm
Please ensure you include the
following information:
• Soil Investigation report.
• Fire Authority approval letter.
• Detailed drawing showing valve arrangements.
5. Declaration
Please ensure that you have
read, understood and signed
the declaration.
4. ChecklistDrawings
Site Location Plan
Fire Authority approval (if applicable)
Soil Investigation (SI) report (if applicable)
Written permission to carry out work on land outwith your ownership (if applicable)
Sprinkler system schematic drawings and manufacturing specifications (if applicable)
Internal Plumbing schematics for flatted developments (if applicable)
5. Declaration I/We hereby make application to Scottish Water for a supply of water as detailed above.
I/We abide by the terms and conditions of current Scottish Water Byelaws on date of application.
I/We understand that any alterations made to this application must be declared to Scottish Water.
I/We have filled in all the mandatory sections of this form.
The details I/we have given with this application are accurate.
I/We have read and understood the guidance notes.
I/We have enclosed all the necessary supporting documentation.
Your details
Signature: * ____________________________________________________________________
Date: * ________________________________________________________________________
Your full name (in capitals): * ______________________________________________________
Company name: ________________________________________________________________
Please note: in consideration of the environment, we seek to correspond with customers via email. If you wish to receive correspondence via email, please tick this box and complete your email details in section 1.2:
06
Water Connection Application
WC1
For more information:
Development Operations 0800 3890379 www.scottishwater.co.uk/connections [email protected]
6. Charges
Your quote will be based on the
following charges.
Application fee — This fee relates
to the administration work and
technical assessment involved in
processing this application.
Connection charge — This
is applicable per connection
and incorporates the fee for an
inspection and the physical cost
of a connection.
Infrastructure charge — This is
applicable on a per property basis.
All new properties connecting
to our water mains increase the
flow demand within the water
network. In order to fund upgrades
of the public water network, any
new connections to the public
water main are required to pay an
infrastructure charge.
Building water — You will pay
a flat rate charge for the water
used in the building of ALL
new properties, whether part of
a development or a single property.
The actual charge will depend on
the type of house you are building
i.e. Terraced/Semi-detached/
Detached/Flat.
If this application is for a temporary
supply the charges for building
water and infrastructure will be
charged when you apply for the
permanent connections.
6. ChargesWe will issue you with a quote based on our current Scheme of Charges which is available on our website www.scottishwater.co.uk
The quote will be made up of the following charges:
• Application Fee
• Connection charge
• Infrastructure charge per property
• Building Water charge per property
Upon your acceptance of the quote we will issue an invoice. Payment should not be made until an invoice has been issued.
07
Water Connection Application
WC1
Alternative formats of this form can be made available free of charge. For information on Braille, large print, audio and a variety of languages, please call our Customer Helpline on 0800 0778778.
If you have a disability, medical condition or other reason where you may need additional assistance from Scottish Water then please contact us and we can add your name, address and special requirements to our confidential Additional Support Register.
We record all calls for quality and training purposes. SW WC1 03/17
For more information:
Development Operations 0800 3890379 www.scottishwater.co.uk/connections [email protected]
Please return pages 2 – 6
of this application to:
Email:
or
Write to:
Development Operations
Scottish Water
The Bridge,
Buchanan Gate Business Park,
Cumbernauld Road,
Stepps, G33 6FB
08
Water Connection Application
WC1
Notes _________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________
For more information:
Development Operations 0800 3890379 www.scottishwater.co.uk/connections [email protected]