we are calling welders, journeymen ...3729 commerce st. sw canton, oh 44706 michels pipeline nexus...

59
"Be optimistic about the future." (The Union Workers Bible) Welders ‐ 698 Journeyman ‐ 39 Helpers ‐ 584 Abbreviations on Tests ‐ BH‐Bell hole, W‐Wall, 3BC‐3 Bead Cap, SC‐Stringer Cap, PC‐Puddle Cap, DH‐Down Hill, UP‐Up Hill, B‐Bead, HP‐Hot Pass, HF‐Hot Filler, FC‐Fill & Cap, LH‐Low Hydrogen, BS‐Band Setter, HDPE‐High Density Poly Ethylene, HHW‐Hand Held Wire, Inservice‐ Water Running through it WE ARE CALLING WELDERS, JOURNEYMEN, & HELPERS OFF THE TOP OF THE WHEEL To Apply For Job Call ‐ (918) 610‐2745 Dispatch Direct Line ‐ (918) 610‐2761 To Get On Wheel ‐ (918) 663‐3200 To Check Your Position on List ‐ (918) 610‐2746 Twic‐Card ‐ (866) 289‐9673 Online OSHA 10 http://careersafeonline.com https://vimeopro.com/user8645635/local‐798/video/250472813 ‐ Video For Online Job Bidding Through Member's Only Login http://www.local798.org/assets/2018DOTUpdated.pdf ‐ Changes to Department of Transportation Drug Testing Protocols http://local798.org/assets/2018wages.pdf ‐ For 2017‐2018 Wages and Benefits https://vimeo.com/250892869 ‐ Video on Job Bidding Through the Phone. http://action.local798.org ‐ to check the Action Network To opt‐in to receiving text message from the local text the word "Alert" to number "22300" JOBS AVAILABLE FOR DISPATCH THURSDAY, MAY 24, 2018 Job # Class Contractor Location Description Gas Company Skills Date Needed Duration Special Request 1 1 W needed N/A 6x10 $53.95 4.5 miles or 36" New‐lay 63940 Klee Cross Rd Bellaire, OH 43940 Enbridge FRCs, Double eye protection, muddy & hilly terrain, a lot of walking, W‐scoop hood available, cant reteset for Enbridge or Spectra or Nerxus for 6 months Michels Pipeline WF ‐ Walker, Johnny D Steward ‐ Morgan, Tommy R Pre Job #: 13534 (1) 1/2 36", 45, .515 W, 3BC, (2) 12" Branch, .250 W, 2BC 5/29/2018 8 weeks + or ‐

Upload: others

Post on 20-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

"Be optimistic about the future."(The Union Workers Bible)

Welders ‐ 698   Journeyman ‐ 39   Helpers ‐ 584Abbreviations on Tests ‐ BH‐Bell hole, W‐Wall, 3BC‐3 Bead Cap, SC‐Stringer Cap, PC‐Puddle Cap, DH‐Down Hill, UP‐Up Hill, B‐Bead, HP‐Hot Pass, HF‐Hot Filler, FC‐Fill & 

Cap, LH‐Low Hydrogen, BS‐Band Setter, HDPE‐High Density Poly Ethylene, HHW‐Hand Held Wire, Inservice‐ Water Running through it

WE ARE CALLING WELDERS, JOURNEYMEN, & HELPERS OFF THE TOP OF THE WHEEL

To Apply For Job Call ‐ (918) 610‐2745 Dispatch Direct Line ‐ (918) 610‐2761 To Get On Wheel ‐ (918) 663‐3200 To Check Your Position on List ‐ (918) 610‐2746 Twic‐Card ‐ (866) 289‐9673   Online OSHA 10 ‐ http://careersafeonline.com

https://vimeopro.com/user8645635/local‐798/video/250472813 ‐ Video For Online Job Bidding Through Member's Only Loginhttp://www.local798.org/assets/2018DOTUpdated.pdf ‐ Changes to Department of Transportation Drug Testing Protocols

http://local798.org/assets/2018wages.pdf ‐ For 2017‐2018 Wages and Benefitshttps://vimeo.com/250892869 ‐ Video on Job Bidding Through the Phone.

http://action.local798.org ‐ to check the Action Network

  

To opt‐in to receiving text message from the local text the word "Alert" to number "22300"

JOBS AVAILABLE FOR DISPATCH THURSDAY, MAY 24, 2018

Job # Class Contractor Location Description Gas Company SkillsDate

Needed Duration Special Request1 1 W needed

N/A 6x10$53.95

4.5 miles or 36" New‐lay

63940 Klee Cross RdBellaire, OH  43940

Enbridge FRCs, Double eye protection, muddy & hilly terrain, a lot of 

walking, W‐scoop hood 

available, cant reteset for Enbridge or Spectra or Nerxus for 6 months

Michels PipelineWF ‐ Walker, Johnny 

DSteward ‐ Morgan, 

Tommy RPre Job #: 13534

(1) 1/2 36", 45, .515 W, 3BC, (2) 12" Branch, 

.250 W, 2BC

5/29/2018 8 weeks+ or ‐

Page 2: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

2 1 W neededN/A 6x10$53.95

20.7 mi. of 36" New‐lay

(MXP Spread 5)

272 Frontage Rd.Mineral Wells, WV 

26150

Columbia Gas/TransCanada

no hoodies allowed, extensive walking, steep and muddy 

terrain.

Price Gregory International

WF ‐ Padgett, Jeremy JSteward ‐ Hartle, Randall T (Todd)Pre Job #: 13504

(1) 1/2 36" 45, .515 W, 6010 B, 8010 out, 3BC (2) 12" BH, .375W, 6010 B, 8010 HP, 8018 LH F&C (3) 12" Branch, .375W, 6010 B, 8010 HP,  8018 LH F&C

5/30/2018 22 weeks+ or ‐

3 2 W neededN/A 6x10$53.95

Compressor station & Shop fabrication 

12"

500 Erie StHubbard, OH  44425

Columbia Gas/TransCanada

FRCs, side impact hard hats, several work 

locations

VEC, Inc.WF ‐ Loudan, Shane RSteward ‐ Carlson, 

Aaron PPre Job #: 13539

(1) 12" 45, .250,  5/32 B, PC (2) 12" Branch, .250W, 5/32 B, 2BC

5/29/2018 18 weeks + or ‐

4 1 W neededN/A 6x10$53.95

577ft of 30" 329ft of 12"

7.7mi. of 36"  New‐lay

515 Neversink Dr.Port Jervis, NY

12771

Millennium Pipeline / 

Columbia Gas

OQ test, Limited RV spots,  Call WF when 

dispatched

Precision Pipeline, LLCWF ‐ Meche, Joseph SSteward ‐ Thomas, Richard L (Rick)Pre Job #: 13510

(1) 12" 45, .250 W, 5/32 B, PC (2) 12" Branch, 

.250 W, 3 BC

5/29/2018 6 weeks+ or ‐

5 1 W neededN/A 6x10$53.95

577ft of 30" 329ft of 12"

7.7mi. of 36"  New‐lay

515 Neversink Dr.Port Jervis, NY

12771

Millennium Pipeline / 

Columbia Gas

OQ test, Limited RV spots,  Call WF when 

dispatched

Precision Pipeline, LLCWF ‐ Meche, Joseph SSteward ‐ Thomas, Richard L (Rick)Pre Job #: 13510

(1) 12" 45, .250 W, 5/32 B, PC (2) 12" Branch, 

.250 W, 3 BC

5/26/2018 6 weeks+ or ‐

6 6 W neededN/A 6x10$53.95

56 mi. of 36" New‐Lay

3729 Commerce St. SW

Canton, OH 44706

Nexus double eye protectionMichels PipelineWF ‐ Hawkins, 

Michael SSteward ‐ Houston, 

Robert LPre Job #: 13529

(1) 1/2 36" BH, .515W, 6010 B, 8010 Fill & 3BC (2) 12" Branch, .375W, 6010 B, 8010 Fill & 3BC

5/29/2018 14 Weeks + or ‐

Page 3: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

7 3 W neededN/A 6x10$53.95

26.7 mi. of 42" New‐Lay 

(MVP Spread H)

Report to: 525 McClellan St. Salem, WV 24153

Work at:5381 Northfork Rd.Elliston, VA 24087

Eqt Call WF when dispatched, 2 day OQ 

test

Precision Pipeline, LLCWF ‐ Morris, Stephen 

BSteward ‐ Hall, David 

NPre Job #: 13519

Automatic(1) 1/2 42" BH, .888w, 5P+B, 8010 HP & HF, CRC UH BUG F&C (2) 1/2 24" 45, 

.500W, 5p+B, 8010 HP, F&3BC (3) 12" Branch, .250W, 5p+B, 8010 HP, 

F&3BC

5/31/2018 18 weeks + or ‐

8 1 W neededN/A 6x10$53.95

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT extra hour for warehouse location, call 

WF when dispatched,99% of job is 

in VA

Precision Pipeline, LLCWF ‐ Houser, Harry HSteward ‐ Riddle, James E (Jim)

Pre Job #: 13518

(1) ½ 24”, 45, .500 W, 5P+ B, Arc80 out, 

3BC,(2) 12” Branch, .250 W, 5P+ B, Arc80 out, 3BC,(3) ½ 42”, BH 

,.888W, 5P+B, ARC80, HP & HF, F&C UH, 

FluxCore bug

6/4/2018 17 weeks+ or ‐

9 2 W neededN/A 6x10$53.95

34.8mi. 42" New‐lay for

 (MVP Spread A)

1007 Meadowbrook Rd.

Bridgeport, WV 26330

Eqt Limited RV Spots, Safety strictly enforced, Call WF when dispatched

Precision Pipeline, LLCWF ‐ Dick, Jimmy RSteward ‐ Guffey, 

Daniel HPre Job #: 13514

(1) 1/2 24" 45, .500W, 3BC (2) 12" Branch, 

.250W, 3BC (3) 1/2 42" BH, .888W, Flux Core, 

UH, CRC Bug

5/30/2018 18 Weeks + or ‐

10 2 W neededN/A 6x10$53.95

install 41.5 miles of 42"

 (ASR Spread 6)

1752 Heilmandale Lebanon, PA  17042

Williams/  Transco OQ test, Call WF when dispatched

Welded ConstructionWF ‐ Loggins, Anthony E

Steward ‐ Teague, Justin R

Pre Job #: 11262

 (1) 12" 45, .688 W, 6010 B, 8010 out, 3 BC

5/29/2018 4 weeks+ or ‐

11 1 W neededN/A 6x12$53.95

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

working 7AM to 7PM, FRCs, no hoodies, 

double eye protection,W‐no pancakes, bottles have to be standing up

Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

(1) 1/2 36" 45, .515 W,  6010 B, 8010 out, 3 BC

5/31/2018 24 weeks + or ‐

Page 4: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

12 4 W neededN/A 6x10$53.95

19 miles of 36" (MXP Spread 1)

1407 Wheeling Ave. Glendale, WV 26041

Columbia Gas/TransCanada

Possible warehouse move, steep and hilly terrain, safety strictly enforced, Call WF when 

Dispatched  W‐No Pancakes Allowed

Welded ConstructionWF ‐ Calvert, Frederick N

Steward ‐ Park, Jeffrey J

Pre Job #: 13555

(1) 1/2 36" BH, .515 W, 6010 B, 8010 out, 3BC (2) 12" Branch, .375W, 6010B 8010 out, 3BC

5/30/2018 20 weeks + or ‐

13 5 W neededN/A 6x11$53.95

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

FRCs, no hoodies, extra hour for WH location, 

Call WF when dispatched 

W‐  double eye protection, Some will be 

asked to take ‐12" Branch, .375W, 6010B, LH, F&C, no templates 

on branch

Henkels & McCoy IncWF ‐ Hankins, Jamie LSteward ‐ Rogers, 

Raymie SPre Job #: 13471

(1) 1/2 36", 45, .515 W, 3BC

5/29/2018 24 weeks+ or ‐

Job # Class Contractor Location Description Gas Company SkillsDate

Needed Duration Special Request1 1 J needed

N/A 6x10$53.95

23.4 mi. of 36" (MXP Spread 4)

200 Lamberton RdEllenboro, WV 26346

Columbia Gas / Transcanada

extra hour for warehouse location, 

Call WF when dispatched

Associated Pipeline Contractor

WF ‐ McDougal, James (Leroy)

Steward ‐ Davis, David B

Pre Job #: 13564

Stabber 5/29/2018 12 weeks+ or ‐

2 1 J neededN/A 6x10$53.95

23.4 mi. of 36" (MXP Spread 4)

200 Lamberton RdEllenboro, WV 26346

Columbia Gas / Transcanada

extra hour for warehouse location, 

Call WF when dispatched

Associated Pipeline Contractor

WF ‐ McDougal, James (Leroy)

Steward ‐ Davis, David B

Pre Job #: 13564

Stabber 5/29/2018 12 weeks+ or ‐

Page 5: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

3 1 J neededN/A 6x11$53.95

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

FRCs, no hoodies, extra hour for WH location, 

Call WF when dispatched Pipeman‐

Ismael Quijada

Henkels & McCoy IncWF ‐ Hankins, Jamie LSteward ‐ Rogers, 

Raymie SPre Job #: 13471

Stabber, Spacer, Facing 5/29/2018 24 weeks+ or ‐

4 1 J neededN/A 6x10$53.95

1/2"‐36" Comp. Station Install 

w/prefab from VEC shop

998 US Rte. 11 Factoryville, PA 18419

Williams/Transco Please call WF when DispatchedNo Pipeman

VEC, Inc.WF ‐ Myers, Larry 

CraigSteward ‐ Ashby, 

Peter LPre Job #: 11267

Bolt up, jfabrication 5/29/2018 4 weeks + or ‐

5 1 J neededN/A 6x10$53.95

Approx  111 miles of 36" 

(Spread 4)

1975 East Broadway Street 

Northwood, OH 43619

Nexus call WF when dispatchedPipeman ‐ Justin Cobb

Michels PipelineWF ‐ Overstreet Jr, 

Carl VSteward ‐ Croley, 

Cassidy CPre Job #: 11319

Spacer, Facing, Line Carrier

5/29/2018 7  weeks + or ‐

Job # Class Contractor Location Description Gas Company SkillsDate

Needed Duration Special Request1 1 H needed

N/A 6x10$27.40

29.6 mi. 42" New‐lay (MVP Spread D)

1396 Glen Oaks Dr. Summersville, WV 

26651

Eqt Call WF when dispatched, Rough 

terrain

Precision Pipeline, LLCWF ‐ Hawkins, Billy ESteward ‐ Scott, 

Zachery WPre Job #: 13517

General Helper Duties 5/30/2018 18 Weeks + or ‐

2 1 H neededN/A 6x10$27.40

20.7 mi. of 36" New‐lay

(MXP Spread 5)

272 Frontage Rd.Mineral Wells, WV 

26150

Columbia Gas/TransCanada

no hoodies allowed, extensive walking, steep and muddy 

terrain.

Price Gregory International

WF ‐ Padgett, Jeremy JSteward ‐ Hartle, Randall T (Todd)Pre Job #: 13504

General Helper Duties 5/30/2018 22 weeks+ or ‐

Page 6: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

3 2 H neededN/A 6x10$30.43

Integrity Maintenance Digs Multiple States

22050 Pillsbury AveLakeVille, MN 55044

Northern Natural Gas

FRCs required, multiple warehouse moves, $60 a day perdiem increase. H‐must be willing to 

firewatch, Call WF when dispatched

Michels PipelineWF ‐ Straight, Brian LSteward ‐ Gardner Ii, 

Johnny E (Josh)Pre Job #: 13501

General Helper Duties 5/30/2018 8 weeks + or ‐

4 1 H neededN/A 6x10$30.43

Various‐ emergency & call out work all in 

MI

29366 S Wixom Rd Wixom, MI 48393

ConsumersR L Morris & SonsWF ‐ Gardell, Brett WSteward ‐ Gardell, 

Brett WPre Job #: 13432‐1

General Helper Duties 5/29/2018 1  weeks + or ‐

5 3 H neededN/A 6x10$31.75

80 mi. of 36" New‐Lay

377 Woodland Ave Elyria, OH 44035

Nexus OQ testing, call WF when dispatched W ‐ required to use double eye protection, cant retest on Nexus for 6 

months

Latex Construction Company

WF ‐ Elliott Jr, Mitchell D (Dwayne)Steward ‐ Seale, Charles W (Chuck)Pre Job #: 13427

General Helper Duties 5/30/2018 14 weeks + or ‐

6 2 H neededI/A 6x10$21.38

Gathering Lines, Station & Pad Work

6391 Prairie Rose AveTioga, ND 58852

Hess, Tosoro, Enbridge, TCPL

FRCs are required, Call WF when Dispatched

Minnesota Limited, Inc

WF ‐ Schwartz, Ryan SSteward ‐ Hiller, 

Corey DPre Job #: 13500

General Helper Duties 5/30/2018 8 weeks + or ‐

7 2 H neededN/A 6x10$31.75

Compressor station & Shop fabrication 

12"

500 Erie StHubbard, OH  44425

Columbia Gas/TransCanada

FRCs, side impact hard hats

VEC, Inc.WF ‐ Loudan, Shane RSteward ‐ Carlson, 

Aaron PPre Job #: 13539

General Helper Duties 5/29/2018 18 weeks + or ‐

8 2 H neededI/A 6x10$25.23

Integrity pipe and valve replacement, hydro test, and maintenance

134 BP Tank Ln.Greensburg, PA

15601

Buckeye Must be willing to fire watch, Call WF when 

dispatched

Infrasource Construction

WF ‐ Kimmell, Jody WSteward ‐ Hall, Brad L

Pre Job #: 13470

General Helper Duties 5/30/2018 4‐5 weeks + or ‐

Page 7: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

9 5 H neededN/A 6x10$31.75

56 mi. of 36" New‐Lay

3729 Commerce St. SW

Canton, OH 44706

Nexus double eye protectionMichels PipelineWF ‐ Hawkins, 

Michael SSteward ‐ Houston, 

Robert LPre Job #: 13529

General Helper Duties 5/29/2018 14Weeks + or ‐

10 1 H neededN/A 5x10$32.69

Prefab 4 meter station 1‐16"

134 Samoset St.Plymouth, MA

02360

Enbridge FRCs, Call WF when dispatched, H‐must be willing to fire watch

Bond Brothers, IncWF ‐ Stockwell Jr, 

Edward RSteward ‐ Whitmore, 

Jeffrey EPre Job #: 11273

General Helper Duties 5/29/2018 6 weeks+ or ‐

11 5 H neededN/A 6x10 $23.75

26.7 mi. of 42" New‐Lay 

(MVP Spread H)

Report to: 525 McClellan St. Salem, WV 24153

Work at:5381 Northfork Rd.Elliston, VA 24087

Eqt Call WF when dispatched, 2 day OQ 

test

Precision Pipeline, LLCWF ‐ Morris, Stephen 

BSteward ‐ Hall, David 

NPre Job #: 13519

General Helper Duties 5/31/2018 18 weeks + or ‐

12 3 H neededN/A 6x10 VA‐$23.75 WV‐$27.40

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT extra hour for warehouse location, call 

WF when dispatched,99% of job is in VA H‐Will possibly be asked to sandblast, 

None of the sandblasting will be in 

VA

Precision Pipeline, LLCWF ‐ Houser, Harry HSteward ‐ Riddle, James E (Jim)

Pre Job #: 13518

General Helper Duties 5/29/2018 17 weeks+ or ‐

13 2 H neededN/A 6x10$31.75

station mod, Launcher & Receiver, Filter Seperator, & 

1800ft of 30" New Lay

67447 BansfieldSt. Clairsville, OH

43950

Enbridge call WF when dispatched, FRCs, H‐must be willing to fire 

watch

U.S. Pipeline, Inc.WF ‐ Bennington, 

Michael JSteward ‐ Torres, 

Joseph PPre Job #: 13426

General Helper Duties 5/29/2018 2 ‐ 3 weeks + or ‐

Page 8: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

14 6 H neededN/A 6x11 $27.40

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

FRCs, no hoodies, extra hour for WH location, 

Call WF when dispatched

Henkels & McCoy IncWF ‐ Hankins, Jamie LSteward ‐ Rogers, 

Raymie SPre Job #: 13471

 General Helper Duties 5/29/2018 24 weeks+ or ‐

15 3 H neededN/A 6x10$28.03

1/2"‐36" Comp. Station Install 

w/prefab from VEC shop

998 US Rte. 11 Factoryville, PA 18419

Williams/Transco Please call WF when Dispatched

VEC, Inc.WF ‐ Myers, Larry 

CraigSteward ‐ Ashby, 

Peter LPre Job #: 11267

General Helper Duties 5/29/2018 4 weeks + or ‐

16 1 H neededN/A 6x10$27.40

34.8mi. 42" New‐lay for

 (MVP Spread A)

1007 Meadowbrook Rd.

Bridgeport, WV 26330

Eqt Limited RV Spots, Safety strictly enforced, Call WF when dispatched,

Precision Pipeline, LLCWF ‐ Dick, Jimmy RSteward ‐ Guffey, 

Daniel HPre Job #: 13514

Bending Mandrel 5/29/2018 18 Weeks + or ‐

17 2 H neededN/A 6x10$27.40

34.8mi. 42" New‐lay for

 (MVP Spread A)

1007 Meadowbrook Rd.

Bridgeport, WV 26330

Eqt Limited RV Spots, Safety strictly enforced, Call WF when dispatched,

Precision Pipeline, LLCWF ‐ Dick, Jimmy RSteward ‐ Guffey, 

Daniel HPre Job #: 13514

General Helper Duties 5/30/2018 18 Weeks + or ‐

18 2 H neededN/A 6x10$28.03

install 41.5 miles of 42"

 (ASR Spread 6)

1752 Heilmandale Lebanon, PA  17042

Williams/  Transco OQ test, Call WF when dispatched

Welded ConstructionWF ‐ Loggins, Anthony E

Steward ‐ Teague, Justin R

Pre Job #: 11262

General Helper Duties 5/29/2018 4 weeks+ or ‐

19 1 H neededN/A 6x12$27.40

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

working 7AM to 7PM, FRCs, no hoodies, 

double eye protection

Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

General Helper Duties 5/31/2018 24 weeks + or ‐

Page 9: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

JOBS FILLED FOR DISPATCH WEDNESDAY, MAY 23, 2018

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 W needed

N/A 4x121X10$53.95

 11 mi. of 26" take‐up and relay

(WB Express, Eastern Build, West Spread)

440 Wildcat DriveElkins, WV 

26241

Columbia Gas/TransCanada

81ApexWF ‐ Lancaster, Kevin PSteward ‐ Jones, Eric S

Pre Job #: 13344

(1) 12", 45, .250 W, 6010 B, 8010 out (2) 12" Branch, .250 W, 6010 B, 

8010 out

5/29/2018 8 weeks + or ‐

2 2 W neededN/A 6x10$53.95

40.6 miles of 42" New‐lay

 (MVP Spread F)

194 Southern Industrial Park

Beaver, WV  25813

Eqt 372, 472U.s. Trinity Energy Labor Services, Llc

WF ‐ Rice, Troy WSteward ‐ Whipkey, 

Timothy LPre Job #: 13546

(1) 1/2 42" .888 W, RMS Automatic

5/29/2018 20 weeks + or ‐

3 2 W neededN/A 6x10$53.95

40.6 miles of 42" New‐lay

 (MVP Spread F)

194 Southern Industrial Park

Beaver, WV  25813

Eqt 130, 200U.s. Trinity Energy Labor Services, Llc

WF ‐ Rice, Troy WSteward ‐ Whipkey, 

Timothy LPre Job #: 13546

(1) 1/2 20" 45, .500W, 6010 B, 8010 out, (2) 12" Branch, .250 W, 3 BC (3)  1/2 20", BH, 

.500W, 5P+ B, 8010 HP & HF, 9045 DH,  LH F&C (4) 12" Branch, .250W, 5P+ B, 8010 HP & HF, 9045 DH,  LH F&C

5/29/2018 20 weeks + or ‐

20 5 H neededN/A 6x10$27.40

19 miles of 36" (MXP Spread 1)

1407 Wheeling Ave. Glendale, WV 26041

Columbia Gas/TransCanada

Possible warehouse move, steep and hilly terrain, safety strictly enforced, Call WF when 

Dispatched

Welded ConstructionWF ‐ Calvert, Frederick N

Steward ‐ Park, Jeffrey J

Pre Job #: 13555

General Helper Duties 5/30/2018 20 weeks + or ‐

Page 10: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

4 9 W neededN/A 6x10$53.95

29.6 mi. 42" new‐lay for MVP Spread D

1396 Glen Oaks Dr. Summersville, WV 

26651

Eqt 156, 300, 302, 433, 484, 538, 541, 551, 

552

Precision Pipeline, LLCWF ‐ Hawkins, Billy E

Steward ‐ Scott, Zachery W

Pre Job #: 13517

Automatic (1) 1/2 42" BH, .888W

5/30/2018 18 Weeks + or ‐

5 1 W neededN/A 6x10$53.95

30.2 mi. 36" New‐lay

(MXP Spread 6)

10256 pt. Pleasant RdMillwood, WV 25262

Transcanada/ Columbia Gas

33Price Gregory International

WF ‐ Burns Jr, Billy GSteward ‐ Smith, Bradley 

DPre Job #: 13505

(1)1/2 36" 45, .515W, 6010 B, 8010 Out, 3BC (2) 12" Branch, .375W, 

6010 B, 8010 Out

5/30/2018 23 Weeks+ or ‐

6 1 W neededN/A 6x10$53.95

577ft of 30" 329ft of 12"

7.7mi. of 36"  New‐lay

515 Neversink Dr.Port Jervis, NY

12771

Millennium Pipeline / 

Columbia Gas

PPC11Precision Pipeline, LLCWF ‐ Meche, Joseph SSteward ‐ Thomas, Richard L (Rick)Pre Job #: 13510

(1) 12" 45, .250 W, 5/32 B, PC (2) 12" Branch, 

.250 W, 3 BC

5/25/2018 6 weeks+ or ‐

7 1 W neededN/A 6x10$53.95

20 mi of 36" New‐lay 

(MXP Spread 2)

38 Athens LnSt Marys, WV  26170

Columbia Gas/TransCanada

144Snelson Companies, IncWF ‐ Morris, Carroll C

Steward ‐ Head, Justin EPre Job #: 13455

(1) 1/2 36" 45, .515W, 3BC (2) Full penetration repair, dead bottom of pipe 6010 B, 70+ HP, 

F&C LH (3) Back weld 8" top quarter, LH

5/25/2018 24 weeks + or ‐

8 4 W neededN/A 6x10$53.95

30.6 mi. of 42" New‐lay  

(MVP Spread B)

109 Platinum DriveBridgeport, WV  

26330

Eqt 31, 135, 210, 232Precision Pipeline, LLCWF ‐ Jackson, Dennis LeeSteward ‐ Layton, David G

Pre Job #: 13515

(1) 42", .888w automatic CRC

5/29/2018 16 weeks + or ‐

9 3 W neededN/A 6x12$53.95

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

131, 173, 632Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

(1) 1/2 36" 45, .515 W,  6010 B, 8010 out, 3 BC

5/25/2018 24 weeks + or ‐

Page 11: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

10 1 W neededN/A 6x10$53.95

Compressor station & Shop fabrication 

12"

500 Erie StHubbard, OH  44425

Columbia Gas/TransCanada

PPC11VEC, Inc.WF ‐ Loudan, Shane R

Steward ‐ Carlson, Aaron P

Pre Job #: 13539

(1) 12" Branch, .250W, 5/32 B, PC (2) 12" 45, 

.250,  5/32 B, PC

5/29/2018 18 weeks + or ‐

11 2 W neededN/A 6x10$53.95

6022.6 ft of 20" New‐Lay

44961 Old Hoedale Rd.

Cadiz, OH43907

Markwest 59, 60Union Pipeline, Inc.WF ‐ Raymond, Eric WSteward ‐ Johnson, 

Benjamin MPre Job #: 13662

(1) 12" 45, .250W, 6010 B, 8010 out (2) 12" 

Branch, .250W, 6010 B, 8010 out

5/29/2018 4 weeks+ or ‐

12 5 W neededN/A 6x10$53.95

23.4 mi. of 36" (MXP Spread 4)

200 Lamberton RdEllenboro, WV 26346

Columbia Gas / Transcanada

71, 242, 416, 480, 585

Associated Pipeline Contractor

WF ‐ McDougal, James (Leroy)

Steward ‐ Davis, David BPre Job #: 13564

(1) 1/2 36" BH, .515W, 6010B 8010 out (2) 12" Branch, .375W, 6010B, 

8010 out

5/29/2018 12 weeks+ or ‐

13 3 W neededN/A 6x10$53.95

4.5 miles or 36" New‐lay

63940 Klee Cross RdBellaire, OH  43940

Enbridge 2, 411 RERUN

Michels PipelineWF ‐ Walker, Johnny DSteward ‐ Morgan, 

Tommy RPre Job #: 13534

(1) 1/2 36", 45, .515 W, 3BC, (2) 12" Branch, 

.250 W, 2BC

5/29/2018 8 weeks+ or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 J needed

N/A 6x10$53.95

13.57 mi. of 36", 6.2 mi. of 24"

(MXP Spread 3)

20 Lane DrClarksburg, WV 26301

Columbia Gas/transcanada

33Associated Pipeline Contractor

WF ‐ Beddingfield, Charles D

Steward ‐ Cazaux, MarkPre Job #: 13563

Spacer 5/30/2018 16 weeks + or ‐

Page 12: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

2 2 J neededN/A 6x10$53.95

40.6 miles of 42" New‐lay

 (MVP Spread F)

194 Southern Industrial Park

Beaver, WV  25813

Eqt 6, 30U.s. Trinity Energy Labor Services, Llc

WF ‐ Rice, Troy WSteward ‐ Whipkey, 

Timothy LPre Job #: 13546

Spacer / Line Carrier 5/29/2018 20 weeks + or ‐

3 1 J neededN/A 6x10$53.95

29.6 mi. 42" new‐lay for MVP Spread D

1396 Glen Oaks Dr. Summersville, WV 

26651

Eqt 9Precision Pipeline, LLCWF ‐ Hawkins, Billy E

Steward ‐ Scott, Zachery W

Pre Job #: 13517

Stabber 5/30/2018 18 Weeks + or ‐

4 1 J neededN/A 6x10$53.95

56 mi. of 36" New‐Lay

3729 Commerce St. SW

Canton, OH 44706

Nexus PPC11Michels PipelineWF ‐ Hawkins, Michael S

Steward ‐ Houston, Robert L

Pre Job #: 13529

Facing 5/25/2018 14 Weeks + or ‐

5 1 J neededN/A 6x10$53.95

56 mi. of 36" New‐Lay

3729 Commerce St. SW

Canton, OH 44706

Nexus PPC11Michels PipelineWF ‐ Hawkins, Michael S

Steward ‐ Houston, Robert L

Pre Job #: 13529

Spacer 5/25/2018 14 Weeks + or ‐

6 1 J neededN/A 6x10$53.95

6022.6 ft of 20" New‐Lay

44961 Old Hoedale Rd.

Cadiz, OH43907

Markwest PPC11Union Pipeline, Inc.WF ‐ Raymond, Eric WSteward ‐ Johnson, 

Benjamin MPre Job #: 13662

Spacer 5/29/2018 4 weeks+ or ‐

7 1 J neededN/A 6x10$53.95

23.4 mi. of 36" (MXP Spread 4)

200 Lamberton RdEllenboro, WV 26346

Columbia Gas / Transcanada

17Associated Pipeline Contractor

WF ‐ McDougal, James (Leroy)

Steward ‐ Davis, David BPre Job #: 13564

Stabber 5/29/2018 12 weeks+ or ‐

Page 13: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

8 1 J neededN/A 6x10$53.95

23.4 mi. of 36" (MXP Spread 4)

200 Lamberton RdEllenboro, WV 26346

Columbia Gas / Transcanada

RERUNAssociated Pipeline Contractor

WF ‐ McDougal, James (Leroy)

Steward ‐ Davis, David BPre Job #: 13564

Facing 5/29/2018 12 weeks+ or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 5 H needed

N/A 6x10$27.40

13.57 mi. of 36", 6.2 mi. of 24"

(MXP Spread 3)

20 Lane DrClarksburg, WV 26301

Columbia Gas/transcanada

5544 PPC11

Associated Pipeline Contractor

WF ‐ Beddingfield, Charles D

Steward ‐ Cazaux, MarkPre Job #: 13563

General Helper Duties 5/30/2018 16 weeks + or ‐

2 2 H neededN/A 4x121X10$27.40

 11 mi. of 26" take‐up and relay

(WB Express, Eastern Build, West Spread)

440 Wildcat DriveElkins, WV 

26241

Columbia Gas/TransCanada

5551 PPC11

ApexWF ‐ Lancaster, Kevin PSteward ‐ Jones, Eric S

Pre Job #: 13344

General Helper Duties 5/29/2018 8 weeks + or ‐

3 1 H neededN/A 6x11 $27.40

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

PPC11Henkels & McCoy IncWF ‐ Hankins, Jamie L

Steward ‐ Rogers, Raymie S

Pre Job #: 13471

 General Helper Duties 5/25/2018 24 weeks+ or ‐

4 1 H neededN/A 6x12$27.40

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

PPC11Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

General Helper Duties 5/30/2018 24 weeks + or ‐

Page 14: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

5 1 H neededN/A 6x12$27.40

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

PPC11Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

General Helper Duties 5/25/2018 24 weeks + or ‐

6 6 H neededN/A 6x10$27.40

40.6 miles of 42" New‐lay

 (MVP Spread F)

194 Southern Industrial Park

Beaver, WV  25813

Eqt 12, 119, 289, 306, 482, 499

U.s. Trinity Energy Labor Services, Llc

WF ‐ Rice, Troy WSteward ‐ Whipkey, 

Timothy LPre Job #: 13546

General Helper Duties 5/29/2018 20 weeks + or ‐

7 2 H neededN/A 6x10$27.40

9.6 miles of 30" new‐lay, 3.4 miles of 30"

528 Outlet Rd Smithburg, WV 26436

Antero Resources 2 PPC11Blue Flame Pipeline, LlcWF ‐ Harris, Matthew FSteward ‐ Starkey, John A

Pre Job #: 11271

General Helper Duties 5/29/2018 6 weeks + or ‐

8 9 H neededN/A 6x10$27.40

29.6 mi. 42" new‐lay for MVP Spread D

1396 Glen Oaks Dr. Summersville, WV 

26651

Eqt 25, 49, 68, 338, 362, 501, 546, 5721 RERUN

Precision Pipeline, LLCWF ‐ Hawkins, Billy E

Steward ‐ Scott, Zachery W

Pre Job #: 13517

General Helper Duties 5/30/2018 18 Weeks + or ‐

9 1 H neededN/A 6x10$27.40

30.2 mi. 36" New‐lay

(MXP Spread 6)

10256 pt. Pleasant RdMillwood, WV 25262

Transcanada/ Columbia Gas

2Price Gregory International

WF ‐ Burns Jr, Billy GSteward ‐ Smith, Bradley 

DPre Job #: 13505

General Helper Duties 5/30/2018 23 Weeks+ or ‐

10 1 H neededN/A 6x10$30.63

577ft of 30" 329ft of 12"

7.7mi. of 36"  New‐lay

515 Neversink Dr.Port Jervis, NY

12771

Millennium Pipeline / 

Columbia Gas

PPC11Precision Pipeline, LLCWF ‐ Meche, Joseph SSteward ‐ Thomas, Richard L (Rick)Pre Job #: 13510

General Helper Duties 5/25/2018 6 weeks+ or ‐

Page 15: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

11 1 H neededN/A 6x10$27.40

22,000 ft of 30", and 22,000 ft of 36" lift 

and lay

1433 12th StMoundsville, WV  

26041

Enbridge PPC11Michels PipelineWF ‐ Sheffield, 

Christopher ShaneSteward ‐  Bigley, Joseph T

Pre Job #: 13467

General Helper Duties 5/25/2018 12 weeks + or ‐

12 1 H neededN/A 6x10$28.03

58.5 miles of 20", 58.5 miles of 16"

155 Luciousboro Rd Blairsville PA 15717

Sunoco PPC11U.S. Trinity Energy Labor Services, Llc

WF ‐ Chastain, Eddie KSteward ‐ Hime, Cecil R

Pre Job #: 13127

General Helper Duties 5/25/2018 2 weeks+ or ‐

13 5 H neededN/A 6x10$27.40

30.6 mi. of 42" New‐lay  

(MVP Spread B)

109 Platinum DriveBridgeport, WV  

26330

Eqt 5 PPC11Precision Pipeline, LLCWF ‐ Jackson, Dennis LeeSteward ‐ Layton, David G

Pre Job #: 13515

General Helper Duties 5/29/2018 16 weeks + or ‐

14 2 H neededN/A 5x10$25.14

Anomaly Digs212 SE 10th St Grand Rapids, MN 55744

Enbridge 75, 553Casper Construction, Inc.WF ‐ Novacek, Levi M

Steward ‐ Comstock, Kyle A

Pre Job #: 13570

General Helper Duties 6/4/2018 4‐6 weeks+ or ‐

15 1 H neededN/A 6x10$31.75

Compressor station & Shop fabrication 

12"

500 Erie StHubbard, OH  44425

Columbia Gas/TransCanada

455VEC, Inc.WF ‐ Loudan, Shane R

Steward ‐ Carlson, Aaron P

Pre Job #: 13539

General Helper Duties 5/29/2018 18 weeks + or ‐

16 4 H neededN/A 6x10 $31.75

6022.6 ft of 20" New‐Lay

44961 Old Hoedale Rd.

Cadiz, OH43907

Markwest 553 PPC11

Union Pipeline, Inc.WF ‐ Raymond, Eric WSteward ‐ Johnson, 

Benjamin MPre Job #: 13662

General Helper Duties 5/29/2018 4 weeks+ or ‐

Page 16: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

17 1 H neededN/A 6x10 $31.75

6022.6 ft of 20" New‐Lay

44961 Old Hoedale Rd.

Cadiz, OH43907

Markwest PPC11Union Pipeline, Inc.WF ‐ Raymond, Eric WSteward ‐ Johnson, 

Benjamin MPre Job #: 13662

BendingMandrel 5/29/2018 4 weeks+ or ‐

18 12 H neededN/A 6x10$27.40

23.4 mi. of 36" (MXP Spread 4)

200 Lamberton RdEllenboro, WV 26346

Columbia Gas / Transcanada

544, 55110 PPC11

Associated Pipeline Contractor

WF ‐ McDougal, James (Leroy)

Steward ‐ Davis, David BPre Job #: 13564

General Helper Duties 5/29/2018 12 weeks+ or ‐

19 2 H neededN/A 6x10$31.75

investigative Digs and Sleeve repair

1x30" and 3x42"

11 Dennison Yard Circle

Dennison, OH 44621

Rover Pipeline 15, 104U.S. Pipeline, Inc.WF ‐ Cowan, Heath G

Steward ‐ Wallace, David R

Pre Job #: 13544

General Helper Duties 5/26/2018 2 Weeks + or ‐

20 3 H neededN/A 6x10$31.75

4.5 miles or 36" New‐lay

63940 Klee Cross RdBellaire, OH  43940

Enbridge 3 PPC11Michels PipelineWF ‐ Walker, Johnny DSteward ‐ Morgan, 

Tommy RPre Job #: 13534

General Helper Duties 5/29/2018 8 weeks+ or ‐

JOBS FILLED FOR DISPATCH TUESDAY, MAY 22, 2018

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #

Page 17: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

1 1 W neededN/A 6x10$53.95

Take up and Relay 14 mi. of 20", install 7.6 mi. of 20", abandon 17.5 mi. of 20", 

install 300 feet of 4"

3015 Lithopolis Road Lancaster, OH

43130

Columbia Gas /Transcanada

299Price Gregory International

WF ‐ Yates, Steve KSteward ‐ Yates, Charles 

ClintonPre Job #: 13424

(1) 12" BH, .375 W, 6010 B, 8010 out (2) 12" Branch, .375 W, 6010 B, 8010 out (3) 12" BH, .375 W, 6010 B, 8010 

HP, 8018 LH F&C (4) 12" Branch, .375 W, 6010 B, 8010  HP, 8018 LH F&C

5/25/2018 10 weeks + or ‐

2 6 W neededN/A 6x10$53.95

13.57 mi. of 36", 6.2 mi. of 24"

(MXP Spread 3)

20 Lane DrClarksburg, WV 26301

Columbia Gas/transcanada

354, 393, 412, 484, 496, 552

Associated Pipeline Contractor

WF ‐ Beddingfield, Charles D

Steward ‐ Cazaux, MarkPre Job #: 13563

(1) 1/2 36", BH, .515W, SC, (2) 12" Branch, 

.375W, SC

5/30/2018 16 weeks + or ‐

3 3 W neededN/A 6x12$53.95

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

19, 40, 131Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

(1) 1/2 36" 45, .515 W,  6010 B, 8010 out, 3 BC

5/30/2018 20 weeks + or ‐

4 2 W neededN/A 4x121X10$53.95

 11 mi. of 26" take‐up and relay

(WB Express, Eastern Build, West Spread)

440 Wildcat DriveElkins, WV 

26241

Columbia Gas/TransCanada

4921 RERUN

ApexWF ‐ Lancaster, Kevin PSteward ‐ Jones, Eric S

Pre Job #: 13344

(1) 12", 45, .250 W, 6010 B, 8010 out (2) 12" Branch, .250 W, 6010 B, 

8010 out

5/29/2018 8 weeks + or ‐

5 1 W neededN/A 6x10$53.95

30.6 mi. of 42" New‐lay  

(MVP Spread B)

109 Platinum DriveBridgeport, WV  

26330

Eqt 183Precision Pipeline, LLCWF ‐ Jackson, Dennis LeeSteward ‐ Layton, David G

Pre Job #: 13515

(1) 1/2 24" 45, .500W, 3BC (2) 12" Branch, 

.250W, 3BC (3) 1/2 42" BH, .617W, 5P + B, 8010 HP & HF, UH CRC Bug, 

F&C

5/25/2018 16 weeks + or ‐

Page 18: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

6 2 W neededN/A 6x11$53.95

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

36, 268Henkels & McCoy IncWF ‐ Hankins, Jamie L

Steward ‐ Rogers, Raymie S

Pre Job #: 13471

(1) 1/2 36", 45, .515 W, 3BC

5/24/2018 24 weeks+ or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 J needed

N/A 5x8$53.95

Call out Maintenance Integrity Blanket

3066 Spruce StLittle Canada, MN

55117

Xcel Energy 22Q3 ContractingWF ‐ Bennerotte, Roger A 

(LU 6)Steward ‐ Bardwell, Leslie 

BPre Job #: 13484

Stabber 6/5/2018 25 weeks + or ‐

2 1 J neededN/A 6x10$53.95

13.57 mi. of 36", 6.2 mi. of 24"

(MXP Spread 3)

20 Lane DrClarksburg, WV 26301

Columbia Gas/transcanada

50Associated Pipeline Contractor

WF ‐ Beddingfield, Charles D

Steward ‐ Cazaux, MarkPre Job #: 13563

Stabber 5/30/2018 16 weeks + or ‐

3 1 J neededN/A 6x10$53.95

13.57 mi. of 36", 6.2 mi. of 24"

(MXP Spread 3)

20 Lane DrClarksburg, WV 26301

Columbia Gas/transcanada

RERUNAssociated Pipeline Contractor

WF ‐ Beddingfield, Charles D

Steward ‐ Cazaux, MarkPre Job #: 13563

Spacer 5/30/2018 16 weeks + or ‐

4 1 J neededN/A 6x12$53.95

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

14Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

Line Carrier / Spacer 5/30/2018 20 weeks + or ‐

Page 19: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

5 1 J neededN/A 6x10$53.95

34.8mi. 42" New‐lay for

 (MVP Spread A)

1007 Meadowbrook Rd.

Bridgeport, WV 26330

Eqt 34Precision Pipeline, LLCWF ‐ Dick, Jimmy R

Steward ‐ Guffey, Daniel HPre Job #: 13514

Facing 5/26/2018 18 Weeks + or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 H needed

N/A 6x10 VA‐$23.75 WV‐$27.40

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT 622Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

General Helper Duties 5/29/2018 17 weeks+ or ‐

2 2 H neededN/A 6x10$27.40

30.6 mi. of 42" New‐lay 

 (MVP Spread B)

109 Platinum DriveBridgeport, WV  

26330

Eqt 2 PPC11Precision Pipeline, LLCWF ‐ Jackson, Dennis LeeSteward ‐ Layton, David G

Pre Job #: 13515

General Helper Duties 5/24/2018 16 weeks + or ‐

3 1 H neededN/A 6x10$27.40

30.6 mi. of 42" New‐lay 

 (MVP Spread B)

109 Platinum DriveBridgeport, WV  

26330

Eqt 22Precision Pipeline, LLCWF ‐ Jackson, Dennis LeeSteward ‐ Layton, David G

Pre Job #: 13515

General Helper Duties 5/25/2018 16 weeks + or ‐

4 11 H neededN/A 6x10$27.40

13.57 mi. of 36", 6.2 mi. of 24"

(MXP Spread 3)

20 Lane DrClarksburg, WV 26301

Columbia Gas/transcanada

24, 72, 314, 564, 619, 6205 RERUN

Associated Pipeline Contractor

WF ‐ Beddingfield, Charles D

Steward ‐ Cazaux, MarkPre Job #: 13563

General Helper Duties 5/30/2018 16 weeks + or ‐

Page 20: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

5 1 H neededN/A 5x10$25.14

integrity digs in Minnesota

433 Tower St NWClearbrook, MN 

56634

Koch 37Charps, LlcWF ‐ King, Donald JSteward ‐ Dremmel, 

Tanner LPre Job #: 13567

General Helper Duties 5/29/2018 6 weeks + or ‐

6 6 H neededN/A 6x12$27.40

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

46, 82, 472, 575, 5961 RERUN

Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

General Helper Duties 5/30/2018 20 weeks + or ‐

7 2 H neededN/A 4x121X10$27.40

 11 mi. of 26" take‐up and relay

(WB Express, Eastern Build, West Spread)

440 Wildcat DriveElkins, WV 

26241

Columbia Gas/TransCanada

2 RERUNApexWF ‐ Lancaster, Kevin PSteward ‐ Jones, Eric S

Pre Job #: 13344

General Helper Duties 5/29/2018 8 weeks + or ‐

8 1 H neededN/A 6x10$27.40

34.8mi. 42" New‐lay for

 (MVP Spread A)

1007 Meadowbrook Rd.

Bridgeport, WV 26330

Eqt 412Precision Pipeline, LLCWF ‐ Dick, Jimmy R

Steward ‐ Guffey, Daniel HPre Job #: 13514

General Helper Duties 5/26/2018 18 Weeks + or ‐

9 1 H neededN/A 5x10$28.03

4000ft of 8", 14000ft of 12", 5800ft of 24" 

New‐Lay

14091 Wilcox /  Claremont Rd.Mt. Jewett, PA

16740

National Fuel PPC11Kirila Contractors IncWF ‐ Blakeslee, Andrew N

Steward ‐ Hazelet, Theodore J (Ted)Pre Job #: 13521

General Helper Duties 5/24/2018 9 weeks + or ‐

10 1 H neededN/A 6x10$31.75

station mod, Launcher & Receiver, Filter Seperator, & 

1800ft of 30" New Lay

67447 BansfieldSt. Clairsville, OH

43950

Enbridge 34U.S. Pipeline, Inc.WF ‐ Bennington, Michael 

JSteward ‐ Torres, Joseph P

Pre Job #: 13426

General Helper Duties 5/24/2018 2‐3 Weeks + or ‐

Page 21: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

11 2 H neededN/A 6x11 $27.40

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

6211 RERUN

Henkels & McCoy IncWF ‐ Hankins, Jamie L

Steward ‐ Rogers, Raymie S

Pre Job #: 13471

General Helper Duties 5/24/2018 24 weeks+ or ‐

JOBS FILLED FOR DISPATCH MONDAY, MAY 21, 2018

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 W needed

N/A 6x10$53.95

7.1 mi. of 20", 20.8 mi. of 16" new lay, Tie‐ins HDDs

16310 Croghan PikeShirleysburg, PA

17260

Sunoco 515Michels PipelineWF ‐ Anderson, Thomas B 

(Brian)Steward ‐ Roof, Cyrus D

Pre Job #: 13351

(1) 1/2 20" 45, .380W x65,  6010B, 8010 F&C, 

1, 2, or 3 BC

5/23/2018 2 weeks + or ‐

2 1 W neededN/A 6x10$53.95

20 mi of 36" New‐lay 

(MXP Spread 2)

38 Athens LnSt Marys, WV  26170

Columbia Gas/TransCanada

405Snelson Companies, IncWF ‐ Morris, Carroll C

Steward ‐ Head, Justin EPre Job #: 13455

(1) 1/2 36" 45, .515W, 3BC (2) Full penetration repair, dead bottom of pipe 6010 B, 70+ HP, 

F&C LH (3) Back weld 8" top quarter, LH

5/23/2018 24 weeks + or ‐

3 1 W neededN/A 6x10$53.95

33.2 mi. of 42", 1,200ft of 24" new‐lay for MVP Spread C

22 Locust Stump RdSutton, WV  26601

Eqt 119Precision Pipeline, LLCWF ‐ Johnson, Raymond LSteward ‐ Lemon, William 

A (Bill)Pre Job #: 13516

(1) 1/2 24", 45, .500W, 3BC, (2) 12" Branch, .250 W, 3 BC (3) 1/2 

42", BH, DH B HP & HF, UH Flux core CRC 

Automatic

5/30/2018 24 weeks+ or ‐

4 1 W neededN/A 6x10$53.95

33.2 mi. of 42", 1,200ft of 24" new‐lay for MVP Spread C

22 Locust Stump RdSutton, WV  26601

Eqt 135Precision Pipeline, LLCWF ‐ Johnson, Raymond LSteward ‐ Lemon, William 

A (Bill)Pre Job #: 13516

(1) 1/2 24", 45, .500W, 3BC, (2) 12" Branch, .250 W, 3 BC (3) 1/2 

42", BH, DH B HP & HF, UH Flux core CRC 

Automatic

5/29/2018 24 weeks+ or ‐

Page 22: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

5 1 W neededN/A 6x10$53.95

33.2 mi. of 42", 1,200ft of 24" new‐lay for MVP Spread C

22 Locust Stump RdSutton, WV  26601

Eqt 107Precision Pipeline, LLCWF ‐ Johnson, Raymond LSteward ‐ Lemon, William 

A (Bill)Pre Job #: 13516

(1) 1/2 24", 45, .500W, 3BC, (2) 12" Branch, .250 W, 3 BC (3) 1/2 

42", BH, DH B HP & HF, UH Flux core CRC 

Automatic

5/25/2018 24 weeks+ or ‐

6 2 W neededN/A 6x10$53.95

19 miles of 36" (MXP Spread 1)

1407 Wheeling Ave. Glendale, WV 26041

Columbia Gas/TransCanada

48, 571Welded ConstructionWF ‐ Calvert, Frederick NSteward ‐ Park, Jeffrey J

Pre Job #: 13555

(1) 1/2 36" BH, .515 W, 6010 B, 8010 out, 3BC (2) 12" Branch, .375W, 6010B 8010 out, 3BC

5/23/2018 20 weeks + or ‐

7 2 W neededN/A 6x10$53.95

2,600ft of 12", 63,000ft of 20", 

4,300ft of 12" steel pipe

1500 Commercial Ave.Mingo Junction, OH 

43938

Markwest 223, 504Minnesota Limited, IncWF ‐ Simpson Jr, Douglas 

R (Doug)Steward ‐ Kongsjord, 

Keith APre Job #: 13527

(1) 12" 45 .375W 6010B, 8010 Out, PC, (2) 12" Branch, 6010B, 8010 

Out, 3BC

5/24/2018 8‐10 weeks + or ‐

8 1 W neededN/A 6x10$53.95

install 17 mi. of 42" (ASR Spread 5)

7 East Franklin Rd.Tremont, PA

17981

Williams/ Transco PPC11Welded ConstructionWF ‐ Lewis, Mark A 

(Dusty)Steward ‐ Simms, Guy A

Pre Job #: 11261

(1)12", 45, .688 W, 6010 B, 8010 out, 3 BC, cut straps (2) 1/2, 42", BH  

.740 W, xray only

5/23/2018 4 weeks+ or ‐

9 2 W neededN/A 6x10$53.95

install 41.5 miles of 42"

 (ASR Spread 6)

1752 Heilmandale Lebanon, PA  17042

Williams/  Transco 2 PPC11Welded ConstructionWF ‐ Loggins, Anthony ESteward ‐ Teague, Justin R

Pre Job #: 11262

(1) 12" 45, .688 W, 6010 B, 8010 out, 3 BC

5/23/2018 4 weeks+ or ‐

10 1 W neededN/A 6x10$53.95

577ft of 30" 329ft of 12"

7.7mi. of 36"  New‐lay

515 Neversink Dr.Port Jervis, NY

12771

Millennium Pipeline / 

Columbia Gas

549Precision Pipeline, LLCWF ‐ Meche, Joseph SSteward ‐ Thomas, Richard L (Rick)Pre Job #: 13510

(1) 12" 45, .250 W, 5/32 B, PC (2) 12" Branch, 

.250 W, 3 BC

5/23/2018 8 weeks+ or ‐

Page 23: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

11 3 W neededN/A 6x11$53.95

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

29, 343, 376Henkels & McCoy IncWF ‐ Hankins, Jamie L

Steward ‐ Rogers, Raymie S

Pre Job #: 13471

(1) 1/2 36", 45, .515 W, 3BC

5/23/2018 24 weeks+ or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 2 J needed

N/A 6x10$53.95

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT 2 PPC11Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

Facing 5/23/2018 17 weeks+ or ‐

2 1 J neededN/A 6x10$53.95

7.1 mi. of 20", 20.8 mi. of 16" new lay, Tie‐ins HDDs

16310 Croghan PikeShirleysburg, PA

17260

Sunoco 49Michels PipelineWF ‐ Anderson, Thomas B 

(Brian)Steward ‐ Roof, Cyrus D

Pre Job #: 13351

Spacer 5/23/2018 2 weeks + or ‐

3 1 J neededN/A 6x10$53.95

30.6 mi. of 42" New‐lay  (MVP Spread B)

109 Platinum DriveBridgeport, WV  

26330

Eqt PPC11Precision Pipeline, LLCWF ‐ Jackson, Dennis LeeSteward ‐ Layton, David G

Pre Job #: 13515

Facing 5/24/2018 16 weeks + or ‐

4 1 J neededN/A 6x10$53.95

30.6 mi. of 42" New‐lay  (MVP Spread B)

109 Platinum DriveBridgeport, WV  

26330

Eqt PPC11Precision Pipeline, LLCWF ‐ Jackson, Dennis LeeSteward ‐ Layton, David G

Pre Job #: 13515

Stabber / Spacer 5/24/2018 16 weeks + or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #

Page 24: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

1 1 H neededN/A 6x10 VA‐$23.75 WV‐$27.40

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT RERUNPrecision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

General Helper Duties 5/29/2018 17 weeks+ or ‐

2 4 H neededN/A 6x10 VA‐$23.75 WV‐$27.40

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT 363 PPC11

Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

General Helper Duties 5/23/2018 17 weeks+ or ‐

3 1 H neededN/A 6x11 $27.40

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

659Henkels & McCoy IncWF ‐ Hankins, Jamie L

Steward ‐ Rogers, Raymie S

Pre Job #: 13471

General Helper Duties 5/23/2018 24 weeks+ or ‐

4 4 H neededN/A 6x11 $27.40

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

75, 589, 607, 613Henkels & McCoy IncWF ‐ Hankins, Jamie L

Steward ‐ Rogers, Raymie S

Pre Job #: 13471

General Helper Duties 5/23/2018 24 weeks+ or ‐

5 3 H neededN/A 6x10$27.40

20 mi of 36" New‐lay 

(MXP Spread 2)

38 Athens LnSt Marys, WV  26170

Columbia Gas/TransCanada

313, 481 PPC11

Snelson Companies, IncWF ‐ Morris, Carroll C

Steward ‐ Head, Justin EPre Job #: 13455

General Helper Duties 5/23/2018 24 weeks + or ‐

6 1 H neededN/A 6x10$28.03

13.2 mi of 12"  steel new lay

1141 Memorial Highway

Oley, PA  19547

Dte Energy 444Infrasource ConstructionWF ‐ Crocker, Robert L

Steward ‐ Lively, Wallace E (Wally)

Pre Job #: 13558

General Helpers Duties 5/25/2018 4 weeks+ or ‐

Page 25: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

7 1 H neededN/A 6x10$31.75

Take up and Relay 14 mi. of 20", install 7.6 mi. of 20", abandon 17.5 mi. of 20", 

install 300 feet of 4"

3015 Lithopolis Road Lancaster, OH

43130

Columbia Gas /Transcanada

468Price Gregory International

WF ‐ Yates, Steve KSteward ‐ Yates, Charles 

ClintonPre Job #: 13424

General Helper Duties 5/23/2018 16 weeks + or ‐

8 2 H neededN/A 6x10$31.75

56 mi. of 36" New‐Lay

3729 Commerce St. SW

Canton, OH 44706

Nexus 3, 48Michels PipelineWF ‐ Hawkins, Michael S

Steward ‐ Houston, Robert L

Pre Job #: 13529

General Helper Duties 5/23/2018 16 Weeks + or ‐

9 5 H neededN/A 6x10$28.03

8.5 mi. 42" New‐lay

825 Rte. 405 HwyHughesville, PA 17737

Williams/ Transco 212, 3593 PPC11

Henkels & McCoy IncWF ‐ Mason, Brett H

Steward ‐ Whitten, John W

Pre Job #: 13507

General Helper Duties 5/23/2018 3 Weeks + or ‐

10 3 H neededN/A 6x10$27.40

33.2 mi. of 42", 1,200ft of 24" new‐lay for MVP Spread C

22 Locust Stump RdSutton, WV  26601

Eqt 2, 18, 71Precision Pipeline, LLCWF ‐ Johnson, Raymond LSteward ‐ Lemon, William 

A (Bill)Pre Job #: 13516

General Helper Duties 5/29/2018 24 weeks+ or ‐

11 2 H neededN/A 6x10$27.40

33.2 mi. of 42", 1,200ft of 24" new‐lay for MVP Spread C

22 Locust Stump RdSutton, WV  26601

Eqt 116, 474Precision Pipeline, LLCWF ‐ Johnson, Raymond LSteward ‐ Lemon, William 

A (Bill)Pre Job #: 13516

General Helper Duties 5/25/2018 24 weeks+ or ‐

12 1 H neededN/A 6x10$27.40

19 miles of 36" (MXP Spread 1)

1407 Wheeling Ave. Glendale, WV 26041

Columbia Gas/TransCanada

318Welded ConstructionWF ‐ Calvert, Frederick NSteward ‐ Park, Jeffrey J

Pre Job #: 13555

General Helper Duties 5/23/2018 20 weeks + or ‐

Page 26: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

13 2 H neededN/A 6x10OH‐$31.75 WV‐$27.40

2,600ft of 12", 63,000ft of 20", 

4,300ft of 12" steel pipe

1500 Commercial Ave.Mingo Junction, OH 

43938

Markwest 411 PPC11

Minnesota Limited, IncWF ‐ Simpson Jr, Douglas 

R (Doug)Steward ‐ Kongsjord, 

Keith APre Job #: 13527

General Helper Duties 5/24/2018 8‐10 weeks + or ‐

14 1 H neededN/A 6x10$31.75

Approx  111 miles of 36" 

(Spread 4)

1975 East Broadway Street 

Northwood, OH 43619

Nexus 39Michels PipelineWF ‐ Overstreet Jr, Carl VSteward ‐ Croley, Cassidy 

CPre Job #: 11319

General Helper Duties 5/23/2018 10  weeks + or ‐

15 2 H neededN/A 6x10$28.03

install 17 mi. of 42" (ASR Spread 5)

7 East Franklin Rd.Tremont, PA

17981

Williams/ Transco 531 PPC11

Welded ConstructionWF ‐ Lewis, Mark A 

(Dusty)Steward ‐ Simms, Guy A

Pre Job #: 11261

General Helper Duties 5/23/2018 4 weeks+ or ‐

16 2 H neededN/A 6x10$27.40

30.6 mi. of 42" New‐lay  (MVP Spread B)

109 Platinum DriveBridgeport, WV  

26330

Eqt RERUNPrecision Pipeline, LLCWF ‐ Jackson, Dennis LeeSteward ‐ Layton, David G

Pre Job #: 13515

General Helper Duties 5/24/2018 16 weeks + or ‐

JOBS FILLED FOR DISPATCH FRIDAY, MAY 18, 2018

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #

Page 27: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

1 2 W neededN/A 6x10$53.95

Integrity Maintenance Digs Multiple States

22050 Pillsbury AveLakeVille, MN 55044

Northern Natural Gas

478Michels PipelineWF ‐ Straight, Brian LSteward ‐ Gardner Ii, 

Johnny E (Josh)Pre Job #: 13501

(1) 12" BH, .250W 6010 B, 8010 out (2) 12" 

Branch. .250 W, 6010 B, 8010 out (3) 12" 

inservice Branch, .250 W, 7018 out (4) 12" inservice Branch 

temperbead sequence, .188 W, 7018 out

5/21/2018 8 weeks + or ‐

2 1 W neededN/A 6x10$53.95

29.6 mi. 42" new‐lay for MVP Spread D

1396 Glen Oaks Dr. Summersville, WV 

26651

Eqt 336Precision Pipeline, LLCWF ‐ Hawkins, Billy E

Steward ‐ Scott, Zachery W

Pre Job #: 13517

(1) 1/2 24" 45 .500W, 5 P + B, Arc 80 out, X70 (2) 12" Branch,  .250 

W,5 P+ B, Arc 80 out, (3) 1/2 42", 45, .600 W, DH, 5P +B, Arc 80, HP & 1st Fill CRC Bug UH, F&C

5/23/2018 24 Weeks + or ‐

3 2 W neededN/A 6x10$53.95

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT 28, 213Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

automatic (1) 1/2 42" BH .888W, CRC

5/29/2018 17 weeks+ or ‐

4 1 W neededN/A 6x10$53.95

3.6 mi. of 24", 16", & 10" New‐Lay

17860 State Rd 7063Montrose, PA

18801

Williams/Transco 163Rockford CorporationWF ‐ Davis, Jesse A

Steward ‐ Lively, Wallace E (Wally)

Pre Job #: 13562

(1) 12" 45, .500 W, 6010 B, 7010 out, SC  (2) 2" 45, .218 W, 6010 B, 

7010 out, (3) 2" 45, .438 W, 6010 B, 7018 LH out, 

Wfabrication

5/21/2018 8 weeks + or ‐

5 2 W neededN/A 6x10$53.95

20.7 mi. of 36" New‐lay

(MXP Spread 5)

272 Frontage Rd.Mineral Wells, WV 

26150

Columbia Gas/TransCanada

201, 258Price Gregory International

WF ‐ Padgett, Jeremy JSteward ‐ Hartle, Randall 

T (Todd)Pre Job #: 13504

(1) 1/2 36" 45, .515 W, 6010 B, 8010 out, 3BC

5/25/2018 23 weeks+ or ‐

Page 28: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

6 1 W neededN/A 6x10$53.95

20 mi of 36" New‐lay 

(MXP Spread 2)

38 Athens LnSt Marys, WV  26170

Columbia Gas/TransCanada

474Snelson Companies, IncWF ‐ Morris, Carroll C

Steward ‐ Head, Justin EPre Job #: 13455

(1) 1/2 36" 45, .515W, 3BC (2) Full penetration repair, dead bottom of pipe 6010 B, 70+ HP, 

F&C LH (3) Back weld 8" top quarter, LH

5/21/2018 24 weeks + or ‐

7 1 W neededN/A 6x10$53.95

install 41.5 miles of 42"

 (ASR Spread 6)

1752 Heilmandale Lebanon, PA  17042

Williams/  Transco PPC11Welded ConstructionWF ‐ Loggins, Anthony ESteward ‐ Teague, Justin R

Pre Job #: 11262

(1) 12" 45, .688 W, 6010 B, 8010 out, 3 BC

5/21/2018 4 weeks+ or ‐

8 1 W neededN/A 6x10$53.95

build compressor station 1" to 36"

11323 State Route 644 Kensington, OH

44427

Nexus 590Snelson Companies, IncWF ‐ Haynes, Cody S

Steward ‐ Shaffer, Colby TPre Job #: 13388

(1) 1/2 36" BH .515, 6010 B, 8010 out, 3 BC (2) 12" Branch .250W, 6010B, 8010 out, 2BC

5/23/2018 4‐6 Weeks+ or ‐

9 3 W neededN/A 6x10$53.95

80 mi. of 36" New‐Lay

377 Woodland Ave Elyria, OH 44035

Nexus 190, 433, 600Latex Construction Company

WF ‐ Elliott Jr, Mitchell D (Dwayne)

Steward ‐ Seale, Charles W (Chuck)

Pre Job #: 13427

 (1) 1/2 36" BH, .515 W, 3BC,(2) back weld 9" top 1/4 and 9" bottom 

1/4

5/23/2018 14 weeks + or ‐

10 2 W neededN/A 6x11$53.95

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

198, 318Henkels & McCoy IncWF ‐ Hankins, Jamie L

Steward ‐ Rogers, Raymie S

Pre Job #: 13471

(1) 1/2 36", 45, .515 W, 3BC

5/23/2018 24 weeks+ or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #

Page 29: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

1 2 J neededN/A 6x10$53.95

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT 54, 65Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

Spacing / Stabber / LineCarrier

6/2/2018 17 weeks+ or ‐

2 2 J neededN/A 6x10$53.95

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT ReRunPrecision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

Facing 5/23/2018 17 weeks+ or ‐

3 1 J neededN/A 6x10$53.95

Compressor station & Shop fabrication 

12"

500 Erie StHubbard, OH  44425

Columbia Gas/TransCanada

50VEC, Inc.WF ‐ Loudan, Shane R

Steward ‐ Carlson, Aaron P

Pre Job #: 13539

Jfabrication 5/22/2018 18 weeks + or ‐

4 1 J neededN/A 6x10$53.95

Approx  111 miles of 36" 

(Spread 4)

1975 East Broadway Street 

Northwood, OH 43619

Nexus PPC11Michels PipelineWF ‐ Overstreet Jr, Carl VSteward ‐ Croley, Cassidy 

CPre Job #: 11319

Facing 5/21/2018 10  weeks + or ‐

5 1 J neededN/A 6x11$53.95

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

4Henkels & McCoy IncWF ‐ Hankins, Jamie L

Steward ‐ Rogers, Raymie S

Pre Job #: 13471

Spacer 5/21/2018 24 weeks+ or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #

Page 30: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

1 3 H neededN/A 6x10$30.43

Integrity Maintenance Digs Multiple States

22050 Pillsbury AveLakeVille, MN 55044

Northern Natural Gas

88, 891 PPC11

Michels PipelineWF ‐ Straight, Brian LSteward ‐ Gardner Ii, 

Johnny E (Josh)Pre Job #: 13501

General Helper Duties 5/21/2018 8 weeks + or ‐

2 2 H neededN/A 6x10 VA‐$23.75 WV‐$27.40

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT 1171 RERUN

Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

General Helper Duties 5/29/2018 17 weeks+ or ‐

3 4 H neededN/A 6x10 VA‐$23.75 WV‐$27.40

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT 4 RERUNPrecision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

General Helper Duties 5/23/2018 17 weeks+ or ‐

4 3 H neededN/A 6x10$27.40

29.6 mi. 42" new‐lay for MVP Spread D

1396 Glen Oaks Dr. Summersville, WV 

26651

Eqt 131, 136, 70Precision Pipeline, LLCWF ‐ Hawkins, Billy E

Steward ‐ Scott, Zachery W

Pre Job #: 13517

General Helper Duties 5/23/2018 24 Weeks + or ‐

5 8 H neededN/A 6x10$27.40

16.7 mi of 42", 4.3 mi of 24", 34 mi of 36", 6 mi of 24" in Noble 

County OH

43840 Ohio 7 Clarington, OH  43915

Energy Transfer 5, 1486 PPC11

Precision Pipeline, LLCWF ‐ Gumpert, Edward GSteward ‐ Davis, Paul D

Pre Job #: 13145

General Helper Duties 5/21/2018 2 weeks+ or ‐

6 1 H neededN/A 6x12$27.40

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

13Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

General Helper Duties 5/21/2018 24 weeks + or ‐

Page 31: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

7 1 H neededN/A 6x10$30.63

577ft of 30" 329ft of 12"

7.7mi. of 36"  New‐lay

515 Neversink Dr.Port Jervis, NY

12771

Millennium Pipeline / 

Columbia Gas

PPC11Precision Pipeline, LLCWF ‐ Meche, Joseph SSteward ‐ Thomas, Richard L (Rick)Pre Job #: 13510

General Helper Duties 5/21/2018 8 weeks+ or ‐

8 2 H neededN/A 6x10$27.40

20.7 mi. of 36" New‐lay

(MXP Spread 5)

272 Frontage Rd.Mineral Wells, WV 

26150

Columbia Gas/TransCanada

14, 130Price Gregory International

WF ‐ Padgett, Jeremy JSteward ‐ Hartle, Randall 

T (Todd)Pre Job #: 13504

General Helper Duties 5/25/2018 23 weeks+ or ‐

9 1 H neededN/A 6x10$23.75

4 mi. of 16" and 5 TBS Stations

3103 21st Street Camanche, IA 52730

Alliant Energy 698KS Energy Services, Inc.WF ‐ Stephens Jr, George 

ASteward ‐ Mincoff, Mitch 

RPre Job #: 13483

General Helper Duties 5/21/2018 2‐ 3 weeks+ or ‐

10 3 H neededN/A 6x10$31.75

Approx  111 miles of 36" 

(Spread 4)

1975 East Broadway Street 

Northwood, OH 43619

Nexus 253, 301, 659Michels PipelineWF ‐ Overstreet Jr, Carl VSteward ‐ Croley, Cassidy 

CPre Job #: 11319

General Helper Duties 5/21/2018 10  weeks + or ‐

11 1 H neededN/A 6x10$23.75

5400ft of 16" Stopples & Tie‐ins

58062 195th St.Pacific Jct., IA

51561

Northern Natural Gas

365Intercon Construction Co, Inc.

WF ‐ Kingsland, Patrick JSteward ‐ Anderson, 

Darrell WPre Job #: 13488

General Helper Duties 5/21/2018 2‐3 weeks +  or ‐

12 4 H neededN/A 6x10$31.75

80 mi. of 36" New‐Lay

377 Woodland Ave Elyria, OH 44035

Nexus 12, 39, 211, 255Latex Construction Company

WF ‐ Elliott Jr, Mitchell D (Dwayne)

Steward ‐ Seale, Charles W (Chuck)

Pre Job #: 13427

General Helper Duties 5/23/2018 14 weeks + or ‐

Page 32: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

13 2 H neededN/A 6x10$31.75

26000 horse power turbine and 

associated piping

8793 Guliford RdSeville OH 44273

Nexus 11, 91Michels PipelineWF ‐ Monden Jr, John ASteward ‐ Oaks, Gary R

Pre Job #: 11331

General Helper Duties 5/21/2018 6 Weeks + or ‐

14 4 H neededN/A 6x11 $27.40

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

113, 147, 4921 RERUN

Henkels & McCoy IncWF ‐ Hankins, Jamie L

Steward ‐ Rogers, Raymie S

Pre Job #: 13471

General Helper Duties 5/23/2018 24 weeks+ or ‐

JOBS FILLED FOR DISPATCH THURSDAY, MAY 17, 2018

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 W needed

N/A 5x101X8

$53.96

34 mi. of 30" New‐Lay136 Tipple Rd.Salem, WV 

26426

Dominion 166Ace Pipeline, Inc.WF ‐ Pitts, Jason RSteward ‐ Strother, 

Matthew JPre Job #: 13596

(1) 12" 45, .250W, 5/32 B‐Fill, 3/16 Cap (2) 12" Branch, .250W, 5/32 B, 

F&C

5/22/2018 25 weeks+ or ‐

2 3 W neededN/A 6x10$53.95

30.2 mi. 36" New‐lay

(MXP Spread 6)

10256 pt. Pleasant RdMillwood, WV 25262

Transcanada/ Columbia Gas

189, 203, 239Price Gregory International

WF ‐ Burns Jr, Billy GSteward ‐ Smith, Bradley 

DPre Job #: 13505

(1)1/2 36" 45, .515W, 6010 B, 8010 Out, 3BC (2) 12" Branch, .375W, 

6010 B, 8010 Out

5/24/2018 23 Weeks+ or ‐

3 4 W neededN/A 6x10$53.95

23.4 mi. of 36" (MXP Spread 4)

200 Lamberton RdEllenboro, WV 26346

Columbia Gas / Transcanada

35, 163, 222, 281Associated Pipeline Contractor

WF ‐ McDougal, James (Leroy)

Steward ‐ Davis, David BPre Job #: 13564

(1) 1/2 36" BH, .515W, 6010B 8010 out (2) 12" Branch, .375W, 6010B, 

8010 out

5/21/2018 12 weeks+ or ‐

Page 33: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

4 2 W neededN/A 6x12$53.95

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

214, 495Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

(1) 1/2 36" 45, .515 W,  6010 B, 8010 out, 3 BC

5/19/2018 24 weeks + or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 J needed

N/A 6x10$53.95

20.7 mi. of 36" New‐lay

(MXP Spread 5)

272 Frontage Rd.Mineral Wells, WV 

26150

Columbia Gas/TransCanada

8Price Gregory International

WF ‐ Padgett, Jeremy JSteward ‐ Hartle, Randall 

T (Todd)Pre Job #: 13504

LineCarrier 5/19/2018 23 weeks+ or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 H needed

N/A 5x10$25.90

3000ft of 24" steel road change out

9722 Pulaski HwyMiddle River, MD 

21220

Bge PPC11Intren, Inc.WF ‐ White, Westlee J (LU 

601)Steward ‐ Rogers, Jody L

Pre Job #: 13557

General Helper Duties 5/23/2018 12 weeks+ or ‐

2 2 H neededN/A 6x10 VA‐$23.75 WV‐$27.40

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT 2 PPC11Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

General Helper Duties 5/21/2018 17 weeks+ or ‐

3 1 H neededN/A 6x10$26.92

Re‐Build regulator station levee station in Vanderburg, Co. IN

2519 Calf LnEvansville, IN

47715

Vectren 125Infrasource ConstructionWF ‐ Martin, Charlie C

Steward ‐ Hawks, William J

Pre Job #: 13542

General Helper Duties 5/21/2018 6‐8 weeks + or ‐

Page 34: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

4 2 H neededN/A 5x10

1X8 $27.50

34 mi. of 30" New‐Lay136 Tipple Rd.Salem, WV 

26426

Dominion 329, 43Ace Pipeline, Inc.WF ‐ Pitts, Jason RSteward ‐ Strother, 

Matthew JPre Job #: 13596

General Helper Duties 5/22/2018 25 weeks+ or ‐

5 1 H neededN/A 6x10$23.75

4 mi. of 16" and 5 TBS Stations

3103 21st Street Camanche, IA 52730

Alliant Energy PPC11KS Energy Services, Inc.WF ‐ Stephens Jr, George 

ASteward ‐ Mincoff, Mitch 

RPre Job #: 13483

General Helper Duties 5/21/2018 2 ‐ 3 weeks+ or ‐

6 2 H neededN/A 6x10 $26.92

7mi of 8" takeup, 10mi of 12", 3000ft of  16" and fittings, 

6000ft of 16" testing & fab

11528 N US Highway 231

Linden, IN  47955

Vectren 411 PPC11

MeadeWF ‐ McGee, Joshua R

Steward ‐ Skidmore, Tim A

Pre Job #: 13431

General Helper Duties 5/19/2018 8 Weeks + or ‐

7 5 H neededN/A 6x10$27.40

30.2 mi. 36" New‐lay

(MXP Spread 6)

10256 pt. Pleasant RdMillwood, WV 25262

Transcanada/ Columbia Gas

27, 264, 303, 553, 702

Price Gregory International

WF ‐ Burns Jr, Billy GSteward ‐ Smith, Bradley 

DPre Job #: 13505

General Heper Duties 5/24/2018 23 Weeks+ or ‐

8 4 H neededN/A 6x10 $27.40

23.4 mi. of 36" (MXP Spread 4)

200 Lamberton RdEllenboro, WV 26346

Columbia Gas / Transcanada

39, 709, 741, 773Associated Pipeline Contractor

WF ‐ McDougal, James (Leroy)

Steward ‐ Davis, David BPre Job #: 13564

General Helper Duties 5/21/2018 12 weeks+ or ‐

9 4 H neededN/A 6x10$23.75

50.2 mi. of 42" New‐lay for

(MVP Spread 1)

549 Tripple Creek Rd.Rocky Mount, VA

24151

Eqt 74, 1762 PPC11

Precision Pipeline, LLCWF ‐ Gintz, Timothy ASteward ‐ Anderson, 

Robert A (Andy)Pre Job #: 13520

General Helper Duties 5/21/2018 16 Weeks+ or ‐

Page 35: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

10 2 H neededN/A 6x10$ 28.03

13.2 mi 12" steel new lay

1141 Memorial Highway

Oley, PA  19547

Dte Energy 49, 135Infrasource ConstructionWF ‐ Crocker, Robert L

Steward ‐ Lively, Wallace E

Pre Job #: 13558

General Helper Duties 5/21/2018 5 Weeks+ or ‐

JOBS FILLED FOR DISPATCH WEDNESDAY, MAY 16, 2018

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 W needed

N/A 6x10$53.95

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT 115Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

automatic (1) 1/2 42" BH 888W, CRC

5/21/2018 17 weeks+ or ‐

2 4 W neededN/A 6x10$53.95

16.7 mi of 42", 4.3 mi of 24", 34 mi of 36", 6 mi of 24" in Noble 

County OH

43840 Ohio 7 Clarington, OH  43915

Energy Transfer 7863 PPC11

Precision Pipeline, LLCWF ‐ Gumpert, Edward GSteward ‐ Davis, Paul D

Pre Job #: 13145

(1) 1/2 36" BH .515W, DH B, 3 BC (2) 12" 

Branch, 6010B, arc 80 out (3) 12", BH, .250W, LH All the way out (4) 12", Branch, .250W, LH 

All the way out

5/18/2018 2‐3 weeks+ or ‐

3 1 W neededN/A 6x10$53.95

Re‐Build regulator station levee station in Vanderburg, Co. IN

Arrive at: Hampton Inn, 8000 Eagle Crest Blvd. Evansville, IN 

47715work at

2519 Calf LnEvansville, IN 47715

Vectren 158Infrasource ConstructionWF ‐ Martin, Charlie C

Steward ‐ Hawks, William J

Pre Job #: 13542

(1) 12" BH, .375W 6010 B, 8010 out (2) 12" 

Branch, .250W, 6010 B, 8010 out

5/21/2018 6‐8 Weeks+ or ‐

Page 36: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

4 1 W neededN/A 4x121x10$53.95

5,000 feet of 36" new lay & fabrication 

install

5518 Elk River RdElk View, WV

25071

Columbia Gas/TransCanada

462ApexWF ‐ Smith, Jason M

Steward ‐ Smith, MichaelPre Job #: 13343

(1) 12", 45, .250 W, 5/32 B, (2) 12", Branch,  

.250 W, 5/32 B

5/21/2018 3‐4 Weeks + or ‐

5 1 W neededN/A 6x10$53.95

30.2 mi. 36" New‐lay

(MXP Spread 6)

10256 pt. Pleasant RdMillwood, WV 25262

Transcanada/ Columbia Gas

155Price Gregory International

WF ‐ Burns Jr, Billy GSteward ‐ Smith, Bradley 

DPre Job #: 13505

(1)1/2 36" 45, .515W, 6010 B, 8010 Out, 3BC (2) 12" Branch, .375W, 

6010 B, 8010 Out

5/21/2018 22 Weeks+ or ‐

6 3 W neededN/A 6x10$53.95

19 miles of 36" (MXP Spread 1)

1407 Wheeling Ave. Glendale, WV 26041

Columbia Gas/TransCanada

244, 458, 681Welded ConstructionWF ‐ Calvert, Frederick NSteward ‐ Park, Jeffrey J

Pre Job #: 13555

(1) 1/2 36" BH, .515 W, 6010 B, 8010 out, 3BC (2) 12" Branch, .375W, 6010B 8010 out, 3BC

5/18/2018 20 weeks + or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 H needed

N/A 5x10$25.90

3000ft of 24" steel road change out

9722 Pulaski HwyMiddle River, MD 

21220

Bge ReRunIntren, Inc.WF ‐ White, Westlee J (LU 

601)Steward ‐ Rogers, Jody L

Pre Job #: 13557

General Helper Duties 5/23/2018 12 weeks+ or ‐

2 2 H neededN/A 6x10OH‐$31.75 WV‐$27.40

2,600ft of 12", 63,000ft of 20", 

4,300ft of 12" steel pipe

1500 Commercial Ave.Mingo Junction, OH 

43938

Markwest 421, 517Minnesota Limited, IncWF ‐ Simpson Jr, Douglas 

R (Doug)Steward ‐ Kongsjord, 

Keith APre Job #: 13527

General Helper Duties 5/18/2018 12‐14 weeks + or ‐

Page 37: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

3 1 H neededN/A 6x12$27.40

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

752Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

General Helper Duties 5/21/2018 24 weeks + or ‐

4 2 H neededN/A 6x10 VA‐$23.75 WV‐$27.40

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT ReRunPrecision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

General Helper Duties 5/21/2018 17 weeks+ or ‐

5 1 H neededN/A 6x10 VA‐$23.75 WV‐$27.40

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT 416Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

BendingMandrel 5/21/2018 17 weeks+ or ‐

6 1 H neededN/A 6x10$30.43

Various‐ emergency & call out work all in 

MI

29366 S Wixom Rd Wixom, MI 48393

Consumers 54R L Morris & SonsWF ‐ Gardell, Brett W

Steward ‐ Gardell, Brett WPre Job #: 13432‐1

General Helper Duties 5/18/2018 1 ‐ 2 weeks + or ‐

7 1 H neededN/A 6x10$27.40

4 mi of 24", 1.8 mi of 12", 

 2.1 mi of 4" New‐lay, plus L&R

1200 First St.Moundsville, WV 

26041

Xcl Midstream 773Minnesota Limited, IncWF ‐ Tyson, Willis J (Jim)Steward ‐ Staten, Charles 

JasonPre Job #: 13548

General Helper Duties 5/21/2018 12 Weeks+ or ‐

8 7 H neededN/A 6x10$27.40

16.7 mi of 42", 4.3 mi of 24", 34 mi of 36", 6 mi of 24" in Noble 

County OH

43840 Ohio 7 Clarington, OH  43915

Energy Transfer 53, 676 5 PPC11

Precision Pipeline, LLCWF ‐ Gumpert, Edward GSteward ‐ Davis, Paul D

Pre Job #: 13145

General Helper Duties 5/18/2018 2‐3 weeks+ or ‐

Page 38: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

9 2 H neededN/A 6x10$26.92

Re‐Build regulator station levee station in Vanderburg, Co. IN

Arrive at: Hampton Inn, 8000 Eagle Crest Blvd. Evansville, IN 

47715work at

2519 Calf LnEvansville, IN

Vectren 800ReRun

Infrasource ConstructionWF ‐ Martin, Charlie C

Steward ‐ Hawks, William J

Pre Job #: 13542

General Helper Duties 5/21/2018 6‐8 Weeks+ or ‐

10 1 H neededI/A 6x10$21.38

Gathering Lines, Station & Pad Work

6391 Prairie Rose AveTioga, ND 58852

Hess, Tosoro, Enbridge, TCPL

PPC11Minnesota Limited, IncWF ‐ Schwartz, Ryan S

Steward ‐ Hiller, Corey DPre Job #: 13500

General Helper Duties 5/18/2018 8 weeks + or ‐

11 4 H neededN/A 6x10$31.75

Approx  111 miles of 36" 

(Spread 4)

1975 East Broadway Street 

Northwood, OH 43619

Nexus 146, 244, 322, 337Michels PipelineWF ‐ Overstreet Jr, Carl VSteward ‐ Croley, Cassidy 

CPre Job #: 11319

General Helper Duties 5/21/2018 10  weeks + or ‐

12 1 H neededN/A 4x121x10$27.40

5,000 feet of 36" new lay & fabrication 

install

5518 Elk River RdElk View, WV

25071

Columbia Gas/TransCanada

706ApexWF ‐ Smith, Jason M

Steward ‐ Smith, MichaelPre Job #: 13343

General Helper Duties 5/21/2018 3‐4 Weeks + or ‐

13 1 H neededN/A 6x10$27.40

30.2 mi. 36" New‐lay

(MXP Spread 6)

10256 pt. Pleasant RdMillwood, WV 25262

Transcanada/ Columbia Gas

5Price Gregory International

WF ‐ Burns Jr, Billy GSteward ‐ Smith, Bradley 

DPre Job #: 13505

General Helper Duties 5/21/2018 22 Weeks+ or ‐

14 3 H neededN/A 6x10$27.40

19 miles of 36" (MXP Spread 1)

1407 Wheeling Ave. Glendale, WV 26041

Columbia Gas/TransCanada

124, 3821 PPC11

Welded ConstructionWF ‐ Calvert, Frederick NSteward ‐ Park, Jeffrey J

Pre Job #: 13555

General Helper Duties 5/18/2018 20 weeks + or ‐

Page 39: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

JOBS FILLED FOR DISPATCH TUESDAY, MAY 15, 2018

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 W needed

N/A 6x10$53.95

50.2 mi. of 42" New‐lay for

(MVP Spread 1)

549 Tripple Creek Rd.Rocky Mount, VA

24151

Eqt 240Precision Pipeline, LLCWF ‐ Gintz, Timothy ASteward ‐ Anderson, 

Robert A (Andy)Pre Job #: 13520

(1) 1/2 24" 45, .500W, 3BC (2) 12" Branch 

.250W, 2BC

5/17/2018 16 Weeks+ or ‐

2 4 W neededN/A 6x12$53.95

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

153, 223, 259, 547Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

(1) 1/2 36" 45, .515 W,  6010 B, 8010 out, 3 BC

5/21/2018 24 weeks + or ‐

3 1 W neededN/A 6x10$53.95

4100ft  of 24" take‐up and relay and fab and 

valve replace

234 N Hunter HwyDrums, PA  18222

Williams/transco 647Michels PipelineWF ‐ Mitchell, Thomas JSteward ‐ Slate, Jeremy C

Pre Job #: 13523

(1) 12" 45, .500 W,6010 B DH, 7010 FC (2) 2" 45 .218W, 6010 DH B, 7018 

FC,UH

5/21/2018 4 weeks+ or ‐

4 1 W neededN/A 6x10$53.95

20 mi of 36" New‐lay 

(MXP Spread 2)

38 Athens LnSt Marys, WV  26170

Columbia Gas/TransCanada

275Snelson Companies, IncWF ‐ Morris, Carroll C

Steward ‐ Head, Justin EPre Job #: 13455

(1) 1/2 36" 45, .515W, 3BC (2) Full penetration repair, dead bottom of pipe 6010 B, 70+ HP, 

F&C LH (3) Back weld 8" top quarter, LH

5/22/2018 24 weeks + or ‐

5 1 W neededN/A 6x10$53.95

20 mi of 36" New‐lay 

(MXP Spread 2)

38 Athens LnSt Marys, WV  26170

Columbia Gas/TransCanada

158Snelson Companies, IncWF ‐ Morris, Carroll C

Steward ‐ Head, Justin EPre Job #: 13455

(1) 1/2 36" 45, .515W, 3BC (2) Full penetration repair, dead bottom of pipe 6010 B, 70+ HP, 

F&C LH (3) Back weld 8" top quarter, LH

5/21/2018 24 weeks + or ‐

Page 40: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

6 2 W neededN/A 6x10$53.95

build compressor station 1" to 36"

11323 State Route 644 Kensington, OH

44427

Nexus 492, 537Snelson Companies, IncWF ‐ Haynes, Cody S

Steward ‐ Shaffer, Colby TPre Job #: 13388

(1) 1/2 36" BH .515, 6010 B, 8010 out, 3 BC (2) 12" Branch .250W, 6010B, 8010 out, 2BC

5/18/2018 4‐6 Weeks+ or ‐

7 1 W neededN/A 5x10$54.58

8.7 mi. of 16" street work, and misc. fab

35 North Plains Industrial Park Rd.Wallingford, CT

06492

Eversource Energy PPC11G P L Construction, Inc.WF ‐ Jones, Kenneth C

Steward ‐ Jones, Casey CPre Job #: 13464

(1) 12" 45, .375W, 6010B, 7010 out (2) 12" Branch, .375W, 6010 B, 

7010 out

5/17/2018 16 weeks+ or ‐

8 1 W neededN/A 6x10$53.95

30.6 mi. of 42" New‐lay

  (MVP Spread B)

Report109 Platinum DriveBridgeport, WV  

26330

Eqt 247Precision Pipeline, LLCWF ‐ Jackson, Dennis LeeSteward ‐ Layton, David G

Pre Job #: 13515

(1) 42", .888w autormatic CRC

5/17/2018 16 weeks + or ‐

9 1 W neededN/A 6x10$53.95

install 17 mi. of 42" (ASR Spread 5)

7 East Franklin Rd.Tremont, PA

17981

Williams/ Transco PPC11Welded ConstructionWF ‐ Lewis, Mark A 

(Dusty)Steward ‐ Simms, Guy A

Pre Job #: 11261

(1)12", 45, .688 W, 6010 B, 8010 out, 3 BC, cut straps (2) 1/2, 42", BH  

.740 W, xray only

5/17/2018 6 weeks+ or ‐

10 2 W neededN/A 6x10$53.95

7208 ft of 12" New‐Lay

256 Twp RoadBloomingdale, OH 

49310

MarkWest 516, 619Intercon Construction Co, Inc.

WF ‐ Thornburg, Joseph CSteward ‐ Rudd, Jason R

Pre Job #: 13540

(1) 12" BH, .375W, 6010B 8010out (2) 12" Branch, .375W, 6010B, 

8010out

5/21/2018 4 weeks+ or ‐

11 1 W neededN/A 6x10$53.95

34.8mi. 42" New‐lay for

 (MVP Spread A)

1007 Meadowbrook Rd.

Bridgeport, WV 26330

Eqt 98Precision Pipeline, LLCWF ‐ Dick, Jimmy R

Steward ‐ Guffey, Daniel HPre Job #: 13514

(1) 1/2 42".888W, Automatic, CRC

5/19/2018 18 Weeks + or ‐

Page 41: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 J needed

N/A 6x10$53.95

9.6 miles of 30" new‐lay, 3.4 miles of 30"

528 Outlet Rd Smithburg, WV 26436

Antero Resources PPC11Blue Flame Pipeline, LlcWF ‐ Harris, Matthew FSteward ‐ Starkey, John A

Pre Job #: 11271

Line Carrier, Spacer, Bolt up

5/17/2018 3‐4 weeks + or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 H needed

N/A 6x10$27.40

40.6 miles of 42" New‐lay

 (MVP Spread F)

194 Southern Industrial Park

Beaver, WV  25813

Eqt PPC11U.s. Trinity Energy Labor Services, Llc

WF ‐ Rice, Troy WSteward ‐ Whipkey, 

Timothy LPre Job #: 13546

General Helper Duties 5/17/2018 20 weeks + or ‐

2 1 H neededN/A 6x10 VA‐$23.75 WV‐$27.40

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT 395Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

General Helper Duties 5/21/2018 17 weeks+ or ‐

3 6 H neededN/A 6x10 VA‐$23.75 WV‐$27.40

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, VA

24136

EQT 6 PPC11Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

General Helper Duties 5/18/2018 17 weeks+ or ‐

4 1 H neededN/A 6x11 $27.40

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

PPC11Henkels & McCoy IncWF ‐ Hankins, Jamie L

Steward ‐ Rogers, Raymie S

Pre Job #: 13471

General Helper Duties 5/17/2018 24 weeks+ or ‐

Page 42: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

5 1 H neededN/A 5x10$25.90

3000ft of 24" steel road change out

9722 Pulaski HwyMiddle River, MD 

21220

Bge ReRunIntren, Inc.WF ‐ White, Westlee J (LU 

601)Steward ‐ Rogers, Jody L

Pre Job #: 13557

General Helper Duties 5/23/2018 12 weeks+ or ‐

6 2 H neededN/A 6x10$28.03

8.5 mi. 42" New‐lay

825 Rte. 405 HwyHughesville, PA 17737

Williams/ Transco 725, 815Henkels & McCoy IncWF ‐ Mason, Brett H

Steward ‐ Whitten, John W

Pre Job #: 13507

General Helper Duties 5/17/2018 3 Weeks + or ‐

7 2 H neededN/A 6x10OH‐$31.75 WV‐$27.40

2,600ft of 12", 63,000ft of 20", 

4,300ft of 12" steel pipe

1500 Commercial Ave.Mingo Junction, OH 

43938

Markwest 794ReRun

Minnesota Limited, IncWF ‐ Simpson Jr, Douglas 

R (Doug)Steward ‐ Kongsjord, 

Keith APre Job #: 13527

General Helper Duties 5/18/2018 12‐14 weeks + or ‐

8 1 H neededI/A 6x10$25.23

Integrity pipe and valve replacement, hydro test, and maintenance

134 BP Tank Ln.Greensburg, PA

15601

Buckeye 37Infrasource ConstructionWF ‐ Kimmell, Jody WSteward ‐ Hall, Brad L

Pre Job #: 13470

General Helper Duties 5/17/2018 4‐5 weeks + or ‐

9 3 H neededN/A 6x12$27.40

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

7, 9ReRun

Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

General Helper Duties 5/21/2018 24 weeks + or ‐

10 2 H neededN/A 6x10$27.40

22,000 ft of 30", and 22,000 ft of 36" lift 

and lay

1433 12th StMoundsville, WV  

26041

Enbridge 2 PPC11Michels PipelineWF ‐ Sheffield, 

Christopher ShaneSteward ‐  Bigley, Joseph T

Pre Job #: 13467

General Helper Duties 5/17/2018 12 weeks + or ‐

Page 43: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

11 1 H neededN/A 6x10$28.03

4100ft  of 24" take‐up and relay and fab and 

valve replace

234 N Hunter HwyDrums, PA  18222

Williams/transco 5Michels PipelineWF ‐ Mitchell, Thomas JSteward ‐ Slate, Jeremy C

Pre Job #: 13523

General Helper Duties 5/21/2018 4 weeks+ or ‐

12 1 H neededN/A 6x10$31.75

Take up and Relay 14 mi. of 20", install 7.6 mi. of 20", abandon 17.5 mi. of 20", 

install 300 feet of 4"

3015 Lithopolis Road Lancaster, OH

43130

Columbia Gas /Transcanada

26Price Gregory International

WF ‐ Yates, Steve KSteward ‐ Shepherd, 

Randy LPre Job #: 13424

General Helper Duties 5/17/2018 16 weeks + or ‐

13 1 H neededN/A 6x10$27.40

20 mi of 36" New‐lay 

(MXP Spread 2)

38 Athens LnSt Marys, WV  26170

Columbia Gas/TransCanada

439Snelson Companies, IncWF ‐ Morris, Carroll C

Steward ‐ Head, Justin EPre Job #: 13455

General Helper Duties 5/22/2018 24 weeks + or ‐

14 1 H neededN/A 6x10$27.40

20 mi of 36" New‐lay 

(MXP Spread 2)

38 Athens LnSt Marys, WV  26170

Columbia Gas/TransCanada

67Snelson Companies, IncWF ‐ Morris, Carroll C

Steward ‐ Head, Justin EPre Job #: 13455

General Helper Duties 5/21/2018 24 weeks + or ‐

15 1 H neededN/A 6x10$29.78

Station Prefab and install 6‐20"

7285 Mutton Hill RdAuburn, Ny  13021

National Grid 261Over & Under Piping Contractor

WF ‐ Coghlan, Chad CSteward ‐ Simms, Tyler D

Pre Job #: 13559

General Helper Duties 5/17/2018 22 Weeks + or ‐

16 4 H neededN/A 6x10$31.75

build compressor station 1" to 36"

11323 State Route 644 Kensington, OH

44427

Nexus 108, 4642 PPC11

Snelson Companies, IncWF ‐ Haynes, Cody S

Steward ‐ Shaffer, Colby TPre Job #: 13388

General Helper Duties 5/18/2018 4‐6 Weeks+ or ‐

Page 44: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

17 2 H neededN/A 6x10$27.40

30.6 mi. of 42" new‐lay for MVP Spread B

109 Platinum DriveBridgeport, WV  

26330

Eqt 43, 721Precision Pipeline, LLCWF ‐ Jackson, Dennis LeeSteward ‐ Layton, David G

Pre Job #: 13515

General Helper Duties 5/17/2018 16 weeks + or ‐

18 4 H neededN/A 6x10$28.03

install 17 mi. of 42" (ASR Spread 5)

7 East Franklin Rd.Tremont, PA

17981

Williams/ Transco 4 PPC11Welded ConstructionWF ‐ Lewis, Mark A 

(Dusty)Steward ‐ Simms, Guy A

Pre Job #: 11261

General Helper Duties 5/17/2018 6 weeks+ or ‐

19 3 H neededN/A 6x10$31.75

7208 ft of 12" New‐Lay

256 Twp RoadBloomingdale, OH 

49310

MarkWest 63, 737, 814Intercon Construction Co, Inc.

WF ‐ Thornburg, Joseph CSteward ‐ Rudd, Jason R

Pre Job #: 13540

General Helper Duties 5/21/2018 4 weeks+ or ‐

20 1 H neededN/A 6x10$31.75

7208 ft of 12" New‐Lay

256 Twp RoadBloomingdale, OH 

49310

MarkWest PPC11Intercon Construction Co, Inc.

WF ‐ Thornburg, Joseph CSteward ‐ Rudd, Jason R

Pre Job #: 13540

Bending Mandrel 5/17/2018 4 weeks+ or ‐

21 1 H neededN/A 6x10$27.40

34.8mi. 42" New‐lay for

 (MVP Spread A)

1007 Meadowbrook Rd.

Bridgeport, WV 26330

Eqt 695Precision Pipeline, LLCWF ‐ Dick, Jimmy R

Steward ‐ Guffey, Daniel HPre Job #: 13514

General Helper Duties 5/19/2018 18 Weeks + or ‐

JOBS FILLED FOR DISPATCH MONDAY, MAY 14, 2018

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #

Page 45: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

1 1 W neededN/A 6x10$53.95

7208 ft of 12" New‐Lay

256 Twp RoadBloomingdale, OH 

49310

MarkWest 330Intercon Construction Co, Inc.

WF ‐ Thornburg, Joseph CSteward ‐ Rudd, Jason R

Pre Job #: 13540

(1) 12" BH, .375W, 6010B 8010out (2) 12" Branch, .375W, 6010B, 8010out (3) 45 inservice 

sleeve with LH out

5/17/2018 4 weeks+ or ‐

2 1 W neededN/A 6x10$53.95

50.2 mi. of 42" New‐lay for

(MVP Spread 1)

549 Tripple Creek Rd.Rocky Mount, VA

24151

Eqt 180Precision Pipeline, LLCWF ‐ Gintz, Timothy ASteward ‐ Anderson, 

Robert A (Andy)Pre Job #: 13520

(1) 1/2 24" 45, .500W, 3BC (2) 12" Branch 

.250W, 2BC

5/16/2018 16 Weeks+ or ‐

3 1 W neededN/A 6x10$53.95

Take up and Relay 14 mi. of 20", install 7.6 mi. of 20", abandon 17.5 mi. of 20", 

install 300 feet of 4"

3015 Lithopolis Road Lancaster, OH

43130

Columbia Gas /Transcanada

313Price Gregory International

WF ‐ Yates, Steve KSteward ‐ Shepherd, 

Randy LPre Job #: 13424

(1) 12" BH, .375 W, 6010 B, 8010 out (2) 12" Branch, .375 W, 6010 B, 8010 out (3) 12" BH, .375 W, 6010 B, 8010 

HP, 8018 LH F&C (4) 12" Branch, .375 W, 6010 B, 8010  HP, 8018 LH F&C

5/16/2018 16 weeks + or ‐

4 4 W neededN/A 6x12$53.95

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

130, 335, 446, 544Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

(1) 1/2 36" 45, .515 W,  6010 B, 8010 out, 3 BC

5/17/2018 24 weeks + or ‐

5 2 W neededN/A 6x10$53.95

install 41.5 miles of 42"

 (ASR Spread 6)

1752 Heilmandale Lebanon, PA  17042

Williams/  Transco 488PPC11

Welded ConstructionWF ‐ Loggins, Anthony ESteward ‐ Teague, Justin R

Pre Job #: 11262

(1) 12" 45, .688 W, 6010 B, 8010 out, 3 BC

5/16/2018 6 weeks+ or ‐

Page 46: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

6 2 W neededN/A 6x10$53.95

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, WV

24136

EQT 445, 500Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

(1) 42" BH, .888W, CRC 5/21/2018 17 weeks+ or ‐

7 2 W neededN/A 6x10$53.95

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, WV

24136

EQT 604, 716Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

(1) 42" BH, .888W, CRC 5/18/2018 17 weeks+ or ‐

8 2 W neededN/A 6x10$53.95

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, WV

24136

EQT 541, 562Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

(1) ½ 24”, 45, .500 W, 5P+ B, Arc80 out, 

3BC,(2) 12” Branch, .250 W, 5P+ B, Arc80 out, 3BC,(3) ½ 42”, BH 

,.888W, 5P+B, ARC80, HP & HF, F&C UH, 

FluxCore bug

5/18/2018 17 weeks+ or ‐

9 1 W neededN/A 6x10$53.95

4.5 miles or 36" New‐lay

63940 Klee Cross RdBellaire, OH  43940

Enbridge 285Michels PipelineWF ‐ Walker, Johnny DSteward ‐ Morgan, 

Tommy RPre Job #: 13534

(1) 1/2 36", 45, .515 W, 3BC, (2) 12" Branch, 

.250 W, 2BC

5/16/2018 8 weeks+ or ‐

10 2 W neededN/A 6x10$53.95

13.57 mi. of 36", 6.2 mi. of 24"

(MXP Spread 3)

20 Lane DrClarksburg, WV 26301

Columbia Gas/transcanada

213, 304Associated Pipeline Contractor

WF ‐ Beddingfield, Charles D

Steward ‐ Cazaux, MarkPre Job #: 13563

(1) 1/2 36", BH, .515W, SC, (2) 1/2 36", BH, 

.515W, DH B & HP, UP Flux Core,  HHW, (3) 12" Branch, .375W, SC (4) 1/2 36", BH, .515W, DH B & HP, UH Flux Core, 

HHW

5/19/2018 16 weeks + or ‐

Page 47: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

11 2 W neededN/A 6x10$53.95

40.6 miles of 42" New‐lay

 (MVP Spread F)

194 Southern Industrial Park

Beaver, WV  25813

Eqt 333, 344U.s. Trinity Energy Labor Services, Llc

WF ‐ Rice, Troy WSteward ‐ Whipkey, 

Timothy LPre Job #: 13546

(1) 1/2 24" 45, .500W, 6010 B, 8010 out (2) 12" Branch, .250W, 6010 B, 

8010 out

5/17/2018 20 weeks + or ‐

12 1 W neededN/A 6x10$53.95

80 mi. of 36" New‐Lay

377 Woodland Ave Elyria, OH 44035

Nexus 204Latex Construction Company

WF ‐ Elliott Jr, Mitchell D (Dwayne)

Steward ‐ Seale, Charles W (Chuck)

Pre Job #: 13427

 (1) 1/2 36" BH, .515 W, 3BC, (2) back weld 9" top 1/4 and 9" bottom 

1/4

5/18/2018 14 weeks + or ‐

13 1 W neededN/A 6x10$53.95

Install 18.8 mi. 24" in Saginaw, Co. MI

10155 North Genesse Rd.

Mount Morris, MI48458

Consumers 379Welded ConstructionWF ‐ Berry, William OSteward ‐ Birgy, Steve L

Pre Job #: 13541

(1)12"BH .250w, 1/8 5P+ B, 7010HYP ,out(2)12"Branch .250w, 1/8 5P+B, 7010HYP out

5/17/2018 8 Weeks+ or ‐

14 4 W neededN/A 6x11$53.95

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

211, 331, 382, 442Henkels & McCoy IncWF ‐ Hankins, Jamie L

Steward ‐ Rogers, Raymie S

Pre Job #: 13471

(1) 1/2 36", 45, .515 W, 3BC

5/16/2018 24 weeks+ or ‐

15 2 W neededN/A 6x10$53.95

20 mi of 36" New‐lay 

(MXP Spread 2)

38 Athens LnSt Marys, WV  26170

Columbia Gas/TransCanada

863, 331Snelson Companies, IncWF ‐ Morris, Carroll C

Steward ‐ Head, Justin EPre Job #: 13455

(1) 1/2 36" 45, .515W, 3BC (2) Full penetration repair, dead bottom of pipe 6010 B, 70+ HP, 

F&C LH (3) Back weld 8" top quarter, LH

5/16/2018 24 weeks + or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #

Page 48: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

1 1 J neededN/A 6x10$53.95

40.6 miles of 42" New‐lay

 (MVP Spread F)

194 Southern Industrial Park

Beaver, WV  25813

Eqt 73U.s. Trinity Energy Labor Services, Llc

WF ‐ Rice, Troy WSteward ‐ Whipkey, 

Timothy LPre Job #: 13546

Spacer 5/17/2018 20 weeks + or ‐

2 1 J neededN/A 6x10$53.95

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, WV

24136

EQT 48Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

Line Carrier, Spacer 5/18/2018 17 weeks+ or ‐

3 1 J neededN/A 4x121x10$53.95

 11 mi. of 26" take‐up and relay

(WB Express, Eastern Build, West Spread)

440 Wildcat DriveElkins, WV 

26241

Columbia Gas/TransCanada

72ApexWF ‐ Lancaster, Kevin PSteward ‐ Jones, Eric S

Pre Job #: 13344

LineCarrier / Spacer 5/16/2018 10 weeks + or ‐

4 1 J neededN/A 6x10$53.95

80 mi. of 36" New‐Lay

377 Woodland Ave Elyria, OH 44035

Nexus 68Latex Construction Company

WF ‐ Elliott Jr, Mitchell D (Dwayne)

Steward ‐ Seale, Charles W (Chuck)

Pre Job #: 13427

Facing 5/18/2018 14 weeks + or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 H needed

N/A 6x10$26.82

Integrity and Maintenance Work of 

16" pipe Hwy crossing repl, short hydro test & fab

2717 Kotter Ave.Evansville, IN

47715

Vectren 10Minnesota Limited, IncWF ‐ Kidd, Timothy S

Steward ‐ Jones, Joshua RPre Job #: 13422

General Helper Duties 5/16/2018 3 weeks+ or ‐

Page 49: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

2 3 H neededN/A 6x10$27.40

30.2 mi. 36" New‐lay

(MXP Spread 6)

10256 pt. Pleasant RdMillwood, WV 25262

Transcanada/ Columbia Gas

829, PPC11PPC11

Price Gregory International

WF ‐ Burns Jr, Billy GSteward ‐ Smith, Bradley 

DPre Job #: 13505

General Helper Duties 5/16/2018 22 Weeks+ or ‐

3 2 H neededN/A 6x10 $28.03

9 mi. of 20" take‐up and re‐lay

2295 Hill Church Houston RD

Canonsburg, PA15317

Columbia Gas/TransCanada

255, 361Otis Eastern Service IncWF ‐ Marsh, David JSteward ‐ Williams, 

Richard NPre Job #: 13465

General Helper Duties 5/16/2018 16 weeks + or ‐

4 2 H neededN/A 6x10$23.75

1000ft of 16" HDD2436 Bluff Creek Rd Winthrip, IA 50682

Northern Natural Gas

2 PPC11Michels PipelineWF ‐ Meintzer, Joseph CSteward ‐ Galley, Zachary 

RPre Job #: 13566

General Helper Duties 5/16/2018 6 weeks + or ‐

5 12 H neededN/A 6x12$27.40

 17 mi. of 36" New‐lay

(MXP Spread 8)

101 Thompson RdCulloden, WV  25510

Columbia Gas/TransCanada

13, 90, 356, 475, 483, 513, 656, 724, 

817, 839, 840507

Henkels & McCoy IncWF ‐ Wilcox, Jerrid W

Steward ‐ Cater, Waymon E

Pre Job #: 13472

General Helper Duties 5/17/2018 24 weeks + or ‐

6 5 H neededN/A 6x10$27.40

40.6 miles of 42" New‐lay

 (MVP Spread F)

194 Southern Industrial Park

Beaver, WV  25813

Eqt 33, 265, 416, 612, 1 ReRun

U.s. Trinity Energy Labor Services, Llc

WF ‐ Rice, Troy WSteward ‐ Whipkey, 

Timothy LPre Job #: 13546

General Helper Duties 5/17/2018 20 weeks + or ‐

7 1 H neededN/A 6x10$26.92

under 2 mi. to fabricate, build 2 

stations, bore 1,000ft and open cut 8,700ft 

of 16"

850 Fellow StSouth Bend, IN  46601

Nipsco 3MeadeWF ‐ Rose, Robert (LU 

597)Steward ‐ Johnson, John 

WPre Job #: 13401

General Helper Duties 5/16/2018 1 week + or ‐

Page 50: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

8 3 H neededN/A 6x10VA‐$23.75 WV‐$27.40

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, WV

24136

EQT 429, 6661 ReRun

Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

General Helper Duties 5/21/2018 17 weeks+ or ‐

9 8 H neededN/A 6x10 VA‐$23.75 WV‐$27.40

33.7 mi. of 42" New‐Lay 

(MVP Spread G)

133 Bostic LNPembroke, WV

24136

EQT 789, 8156 ReRun

Precision Pipeline, LLCWF ‐ Houser, Harry H

Steward ‐ Riddle, James E (Jim)

Pre Job #: 13518

General Helper Duties 5/18/2018 17 weeks+ or ‐

10 1 H neededN/A 6x10$31.75

4.5 miles or 36" New‐lay

63940 Klee Cross RdBellaire, OH  43940

Enbridge 407Michels PipelineWF ‐ Walker, Johnny DSteward ‐ Morgan, 

Tommy RPre Job #: 13534

General Helper Duties 5/16/2018 8 weeks+ or ‐

11 5 H neededN/A 4x121x10$27.40

 11 mi. of 26" take‐up and relay

(WB Express, Eastern Build, West Spread)

440 Wildcat DriveElkins, WV 

26241

Columbia Gas/TransCanada

142, 315, 7772 PPC11

ApexWF ‐ Lancaster, Kevin PSteward ‐ Jones, Eric S

Pre Job #: 13344

General Helper Duties 5/16/2018 10 weeks + or ‐

12 1 H neededN/A 5x10$23.75

16.9 m  of 10" new‐lay plus Misc. station 

work

5670 Forrest Ave.Dover, DE 19904

Esng PPC11Voshell Bros. Welding Inc.WF ‐ Milstead, Daniel SSteward ‐ Folk Jr, James L

Pre Job #: 13338

General Helper Duties 5/16/2018 12 Weeks+ or ‐

13 1 H neededI/A 6x10$21.38

Gathering Lines, Station & Pad Work

6391 Prairie Rose AveTioga, ND 58852

Hess, Tosoro, Enbridge, TCPL

PPC11Minnesota Limited, IncWF ‐ Schwartz, Ryan S

Steward ‐ Hiller, Corey DPre Job #: 13500

General Helper Duties 5/16/2018 8 weeks + or ‐

Page 51: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

14 3 H neededN/A 6x10$27.40

13.57 mi. of 36", 6.2 mi. of 24"

(MXP Spread 3)

20 Lane DrClarksburg, WV 26301

Columbia Gas/transcanada

196, 522, 523Associated Pipeline Contractor

WF ‐ Beddingfield, Charles D

Steward ‐ Cazaux, MarkPre Job #: 13563

General Helper Duties 5/17/2018 16 weeks + or ‐

15 1 H neededN/A 6x10$30.43

Install 18.8 mi. 24" in Saginaw, Co. MI

10155 North Genesse Rd.

Mount Morris, MI48458

Consumers 1Welded ConstructionWF ‐ Berry, William OSteward ‐ Birgy, Steve L

Pre Job #: 13541

General Helper Duties 5/17/2018 8 Weeks+ or ‐

16 4 H neededN/A 6x11 $27.40

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

32, 504, 8411 ReRun

Henkels & McCoy IncWF ‐ Hankins, Jamie L

Steward ‐ Rogers, Raymie S

Pre Job #: 13471

General Helper Duties 5/16/2018 24 weeks+ or ‐

17 1 H neededN/A 6x11 $27.40

23 mi. of 36" New‐Lay 

(MXP  Spread 7)

167 Seneca Dr. Suite DRipley, WV

25271

TransCanada/ Columbia Gas

620Henkels & McCoy IncWF ‐ Hankins, Jamie L

Steward ‐ Rogers, Raymie S

Pre Job #: 13471

Bending Mandrel 5/16/2018 24 weeks+ or ‐

JOBS FILLED FOR DISPATCH FRIDAY, MAY 11, 2018

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 W needed

N/A 6x10$53.95

7208 ft of 12" New‐Lay

256 Twp RoadBloomingdale, OH 

49310

MarkWest RerunIntercon Construction Co, Inc.

WF ‐ Thornburg, Joseph CSteward ‐ Rudd, Jason R

Pre Job #: 13540

(1) 12" BH, .375W, 6010B 8010out (2) 12" Branch, .375W, 6010B, 8010out (3) 12",  45,  

inservice sleeve with LH out

5/17/2018 4 weeks+ or ‐

Page 52: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

2 1 W neededN/A 6x10$53.95

30.2 mi. 36" New‐lay

(MXP Spread 6)

10256 pt. Pleasant RdMillwood, WV 25262

Transcanada/ Columbia Gas

236Price Gregory International

WF ‐ Burns Jr, Billy GSteward ‐ Smith, Bradley 

DPre Job #: 13505

(1)1/2 36" 45, .515W, 6010 B, 8010 Out, 3BC (2) 12" Branch, .375W, 

6010 B, 8010 Out

5/14/2018 22 Weeks+ or ‐

3 1 W neededN/A 6x10$53.95

56 mi. of 36" New‐Lay

3729 Commerce St. SW

Canton, OH 44706

Nexus 835Michels PipelineWF ‐ Hawkins, Michael S

Steward ‐ Houston, Robert L

Pre Job #: 13529

(1) 1/2 36" BH, .515W, 6010 B, 8010 Fill & 3BC (2) 12" Branch, .375W, 6010 B, 8010 Fill & 3BC

5/14/2018 16 Weeks + or ‐

4 1 W neededN/A 6x10$53.95

577ft of 30", 329ft of 12",

7.7mi. of 36"  New‐lay

515 Neversink Dr.Port Jervis, NY

12771

Millennium Pipeline / 

Columbia Gas

725Precision Pipeline, LLCWF ‐ Meche, Joseph SSteward ‐ Thomas, Richard L (Rick)Pre Job #: 13510

(1) 12" 45, .250 W, 5/32 B, PC (2) 12" Branch, 

.250 W, 3BC

5/14/2018 8 weeks + or ‐

5 1 W neededN/A 6x10$53.95

install 41.5 miles of 42" for ASR (spread 6)

1752 Heilmandale Lebanon, PA  17042

Williams/  Transco 826Welded ConstructionWF ‐ Loggins, Anthony ESteward ‐ Teague, Justin R

Pre Job #: 11262

(1) 12" 45, .688 W, 6010 B, 8010 out, 3 BC

5/14/2018 6 weeks+ or ‐

6 1 W neededN/A 6x10$53.95

1/2"‐36" Comp. Station Install 

w/prefab from VEC shop

998 US Rte. 11 Factoryville, PA 18419

Williams/Transco 309VEC, Inc.WF ‐ Myers, Larry CraigSteward ‐ Ashby, Peter L

Pre Job #: 11267

(1) 2" Stainless, .218W Heli Arc out

5/14/2018 6 weeks + or ‐

7 1 W neededN/A 6x10$53.95

20 mi of 36" New‐lay 

(MXP Spread 2)

38 Athens LnSt Marys, WV  26170

Columbia Gas/TransCanada

690Snelson Companies, IncWF ‐ Morris, Carroll C

Steward ‐ Head, Justin EPre Job #: 13455

(1) 1/2 36" 45, .515W, 3BC (2) Full penetration repair, dead bottom of pipe 6010 B,  LH out (3) 

Back weld 8" top quarter, LH

5/14/2018 24 weeks + or ‐

Page 53: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

8 2 W neededN/A 6x10$53.95

19 miles of 36" (MXP Spread 1)

1407 Wheeling Ave. Glendale, WV 26041

Columbia Gas/TransCanada

45, 462Welded ConstructionWF ‐ Calvert, Frederick NSteward ‐ Park, Jeffrey J

Pre Job #: 13555

(1) 1/2 36" BH, .515 W, 6010 B, 8010 out, 3BC (2) 12" Branch, .375W, 6010B 8010 out, 3BC

5/16/2018 20 weeks + or ‐

9 1 W neededN/A 6x10$53.95

4 mi. of 16" and 5 TBS Stations

3103 21st Street Camanche, IA 52730

Alliant Energy 786KS Energy Services, Inc.WF ‐ Stephens Jr, George 

ASteward ‐ Mincoff, Mitch 

RPre Job #: 13483

(1) 12" BH, .250W, 6010 B, 7010 out, (2) 12" 

Branch, .250 W, 6010 B, 7010 out, (3) 3/4" BH, 6010 B, 7010 out, (4) 

3/4" on 2" Branch, 6010 B, 7010 out, (5) 4" on 

12" Branch, 7018 all the way

5/17/2018 2‐3 weeks+ or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 H needed

N/A 6x10$28.03

1/2"‐36" Comp. Station Install 

w/prefab from VEC shop

998 US Rte. 11 Factoryville, PA 18419

Williams/Transco 823VEC, Inc.WF ‐ Myers, Larry CraigSteward ‐ Ashby, Peter L

Pre Job #: 11267

General Helper Duties 5/14/2018 6 weeks + or ‐

2 3 H neededN/A 6x10$28.03

8.5 mi. 42" New‐lay

825 Rte. 405 HwyHughesville, PA 17737

Williams/ Transco 94, 462ppc11

Henkels & McCoy IncWF ‐ Mason, Brett H

Steward ‐ Whitten, John W

Pre Job #: 13507

General Helper Duties 5/14/2018 4 Weeks + or ‐

3 1 H neededN/A 6x10$31.75

7208 ft of 12" New‐Lay

256 Twp RoadBloomingdale, OH 

49310

MarkWest 587Intercon Construction Co, Inc.

WF ‐ Thornburg, Joseph CSteward ‐ Rudd, Jason R

Pre Job #: 13540

General Helper Duties 5/17/2018 4 weeks+ or ‐

Page 54: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

4 1 H neededN/A 6x10$26.92

7mi of 8" takeup, 10mi of 12", 3000ft of  16" and fittings, 

6000ft of 16" testing & fab

11528 N US Highway 231

Linden, IN  47955

Vectren 229MeadeWF ‐ McGee, Joshua R

Steward ‐ Skidmore, Tim A

Pre Job #: 13431

General Helper Duties 5/15/2018 12 Weeks + or ‐

5 2 H neededN/A 6x10$27.40

30.2 mi. 36" New‐lay

(MXP Spread 6)

10256 pt. Pleasant RdMillwood, WV 25262

Transcanada/ Columbia Gas

805, 821Price Gregory International

WF ‐ Burns Jr, Billy GSteward ‐ Smith, Bradley 

DPre Job #: 13505

General Helper Duties 5/14/2018 22 Weeks + or ‐

6 1 H neededN/A 6x10$30.63

577ft of 30", 329ft of 12",

7.7mi. of 36"  New‐lay

515 Neversink Dr.Port Jervis, NY

12771

Millennium Pipeline / 

Columbia Gas

621Precision Pipeline, LLCWF ‐ Meche, Joseph SSteward ‐ Thomas, Richard L (Rick)Pre Job #: 13510

General Helper Duties 5/14/2018 8 weeks+ or ‐

7 1 H neededN/A 6x10$28.03

install 41.5 miles of 42" for ASR (spread 6)

1752 Heilmandale Lebanon, PA  17042

Williams/  Transco 806Welded ConstructionWF ‐ Loggins, Anthony ESteward ‐ Teague, Justin R

Pre Job #: 11262

General Helper Duties 5/14/2018 6 weeks+ or ‐

8 1 H neededN/A 6x10$23.75

install & replace valves and piping of 1 

thru 36"

13977 Old Valley Pike Edinburg, VA 22824

Columbia Gas/TransCanada

813VEC, Inc.WF ‐ Mooney, Jeffery B 

(Boucher)Steward ‐ Haynes, Anthony Q (Quinn)Pre Job #: 13463

General Helper Duties 5/14/2018 3 weeks  + or ‐

9 3 H neededN/A 6x10$27.40

19 miles of 36" (MXP Spread 1)

1407 Wheeling Ave. Glendale, WV 26041

Columbia Gas/TransCanada

9, 373, 774Welded ConstructionWF ‐ Calvert, Frederick NSteward ‐ Park, Jeffrey J

Pre Job #: 13555

General Helper Duties 5/16/2018 20 weeks + or ‐

Page 55: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

10 2 H neededN/A 6x10$31.75

80 mi. of 36" New‐Lay

377 Woodland Ave Elyria, OH 44035

Nexus 203, 382Latex Construction Company

WF ‐ Elliott Jr, Mitchell D (Dwayne)

Steward ‐ Seale, Charles W (Chuck)

Pre Job #: 13427

General Helper Duties 5/14/2018 14 weeks + or ‐

11 2 H neededN/A 4x121x10$27.40

15 mi. of 26" take up and relay

 (WB Express, Eastern Build, West Spread)

23172 Mountaineer Dr Seneca Rocks, WV 

26884

Columbia Gas/TransCanada

ppc11ApexWF ‐ Sampson, Brandon 

MSteward ‐ Michaels, Eugene J (Gavin)Pre Job #: 13345

General Helper Duties 5/14/2018 10‐12 Weeks+ or ‐

JOBS FILLED FOR DISPATCH THURSDAY, MAY 10, 2018

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 W needed

N/A 6x10$53.95

20.7 mi. of 36" New‐lay

(MXP Spread 5)

272 Frontage Rd.Mineral Wells, WV 

26150

Columbia Gas/TransCanada

PPC11Price Gregory International

WF ‐ Padgett, Jeremy JSteward ‐ Hartle, Randall 

T (Todd)Pre Job #: 13504

(1) 1/2 36" 45, .515 W, 6010 B, 8010 out, 3BC (2) 12" BH, .375W, 6010 B, 8010 HP, 8018 LH F&C (3) 12" Branch, .375W, 6010 B, 8010 HP,  8018 LH F&C

5/14/2018 25 weeks+ or ‐

2 1 W neededN/A 6x10$53.95

2,600ft of 12", 63,000ft of 20", 

4,300ft of 12" steel pipe

1500 Commercial Ave.Mingo Junction, OH 

43938

Markwest 90Minnesota Limited, IncWF ‐ Simpson Jr, Douglas 

R (Doug)Steward ‐ Kongsjord, 

Keith APre Job #: 13527

(1) 12" 45 .375W 6010B, 8010 Out, PC, (2) 12" Branch, 6010B, 8010 

Out, 3BC

5/14/2018 12‐14 weeks + or ‐

Page 56: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

3 1 W neededN/A 6x10$53.95

Take up and Relay 14 mi. of 20", install 7.6 mi. of 20", abandon 17.5 mi. of 20", 

install 300 feet of 4"

3015 Lithopolis Road Lancaster, OH

43130

Columbia Gas /Transcanada

374Price Gregory International

WF ‐ Yates, Steve KSteward ‐ Shepherd, 

Randy LPre Job #: 13424

(1) 12" BH, .375 W, 6010 B, 8010 out (2) 12" Branch, .375 W, 6010 B, 

8010 out

5/14/2018 16 weeks + or ‐

4 2 W neededN/A 6x10$53.95

station mod, Launcher & Receiver, Filter Seperator, & 

1800ft of 30" New Lay

67447 BansfieldSt. Clairsville, OH

43950

Enbridge 769 PPC11

U.S. Pipeline, Inc.WF ‐ Bennington, Michael 

JSteward ‐ Torres, Joseph P

Pre Job #: 13426

(1) 1/2 30" 45, .375W, PC, (2) 12" Branch, 

.250W, SCWfabrication

5/14/2018 4‐6 weeks + or ‐

5 2 W neededN/A 6x10$53.95

23.4 mi. of 36" (MXP Spread 4)

200 Lamberton RdEllenboro, WV 26346

Columbia Gas / Transcanada

205, 315Associated Pipeline Contractor

WF ‐ McDougal, James (Leroy)

Steward ‐ Davis, David BPre Job #: 13564

(1) 1/2 36" BH, .515W, 6010B 8010 out (2) 12" Branch, .375W, 6010B, 

8010 out

5/14/2018 12 weeks+ or ‐

6 2 W neededN/A 6x10$53.95

4.5 miles or 36" New‐lay

63940 Klee Cross RdBellaire, OH  43940

Enbridge 290, 739Michels PipelineWF ‐ Walker, Johnny DSteward ‐ Morgan, 

Tommy RPre Job #: 13534

(1) 1/2 36", 45, .515 W, 3BC, (2) 12" Branch, 

.250 W, 2BC

5/14/2018 8 weeks+ or ‐

7 1 W neededN/A 6x10$53.95

install 36.5 Miles of 42" for

 (ASR Spread 7)

1425 River Rd.Marietta, PA

17547

Williams/Transco

718Welded ConstructionWF ‐ Kelley, Rodney

Steward ‐ Arnold, Barrett R

Pre Job #: 11263

(1) 12" 45, .500 W, 6010 B, 8010 out

5/12/2018 6 weeks + or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #

Page 57: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

1 1 J neededN/A 6x10$53.95

install 17 mi. of 42" (ASR Spread 5)

7 East Franklin Rd.Tremont, PA

17981

Williams/ Transco PPC11Welded ConstructionWF ‐ Lewis, Mark A 

(Dusty)Steward ‐ Simms, Guy A

Pre Job #: 11261

Stabber, Spacer 5/12/2018 6 weeks+ or ‐

2 1 J neededN/A 6x10$53.95

station mod, Launcher & Receiver, Filter Seperator, & 

1800ft of 30" New Lay

67447 BansfieldSt. Clairsville, OH

43950

Enbridge 12U.S. Pipeline, Inc.WF ‐ Bennington, Michael 

JSteward ‐ Torres, Joseph P

Pre Job #: 13426

Jfabrication 5/14/2018 4‐6 weeks + or ‐

FilledDurationDate

NeededSkillsGas CompanyDescriptionLocationContractorClassJob #1 1 H needed

N/A 6x10$23.75

4 mi. of 16" and 5 TBS Stations

3103 21st Street Camanche, IA 52730

Alliant Energy 21KS Energy Services, Inc.WF ‐ Stephens Jr, George 

ASteward ‐ Mincoff, Mitch 

RPre Job #: 13483

General Helper Duties 5/17/2018 2‐3 weeks+ or ‐

2 3 H neededN/A 6x10$28.03

7.1 mi. of 20", 20.8 mi. of 16" new lay, Tie‐ins HDDs

16310 Croghan PikeShirleysburg, PA

17260

Sunoco 513 2 PPC11

Michels PipelineWF ‐ Anderson, Thomas B 

(Brian)Steward ‐ Roof, Cyrus D

Pre Job #: 13351

General Helper Duties 5/12/2018 3‐4 weeks + or ‐

3 1 H neededN/A 6x10OH‐$31.75 WV‐$27.40

2,600ft of 12", 63,000ft of 20", 

4,300ft of 12" steel pipe

1500 Commercial Ave.Mingo Junction, OH 

43938

Markwest 19Minnesota Limited, IncWF ‐ Simpson Jr, Douglas 

R (Doug)Steward ‐ Kongsjord, 

Keith APre Job #: 13527

General Helper Duties 5/14/2018 12‐14 weeks + or ‐

Page 58: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

4 1 H neededN/A 5x10

PA‐$28.03WV‐$27.40

laterals, and fab in PA and WV 12" and 20" 

new‐lay

1595 Smith Twp State Rd

Atlasburg, PA 15004

Markwest 26Alex E. Paris Contracting Co, Inc.

WF ‐ Bell Jr, Robert LSteward ‐ Lupardus, 

James LPre Job #: 13552

General Helper Duties 5/14/2018 2‐4 weeks + or ‐

5 2 H neededN/A 6x10$28.03

1/2"‐36" Comp. Station Install 

w/prefab from VEC shop

998 US Rte. 11 Factoryville, PA 18419

Williams/Transco 7271 Rerun

VEC, Inc.WF ‐ Myers, Larry CraigSteward ‐ Ashby, Peter L

Pre Job #: 11267

General Helper Duties 5/14/2018 6 weeks + or ‐

6 1 H neededN/A 6x10$36.61

Weld, Inst., Test of 2"‐42", 4 MR's, 2 FS's, 1 

Heater

24 Sky Meadow RdRamapo, NY 10974

Millennium Pipeline

325Bond Brothers, IncWF ‐ Stockwell, Jeffrey MSteward ‐  Dowell, Paul E

Pre Job #: 13512

General Helper Duties 5/15/2018 22 weeks + or ‐

7 1 H neededN/A 6x10$27.40

13.57 mi. of 36", 6.2 mi. of 24"

(MXP Spread 3)

20 Lane DrClarksburg, WV 26301

Columbia Gas/transcanada

818Associated Pipeline Contractor

WF ‐ Beddingfield, Charles D

Steward ‐ Cazaux, MarkPre Job #: 13563

General Helper Duties 5/14/2018 16 weeks + or ‐

8 3 H neededN/A 6x10$31.75

station mod, Launcher & Receiver, Filter Seperator, & 

1800ft of 30" New Lay

67447 BansfieldSt. Clairsville, OH

43950

Enbridge 577, 711PPC11

U.S. Pipeline, Inc.WF ‐ Bennington, Michael 

JSteward ‐ Torres, Joseph P

Pre Job #: 13426

General Helper Duties 5/14/2018 4‐6 weeks + or ‐

9 4 H neededN/A 6x10$27.40

23.4 mi. of 36" (MXP Spread 4)

200 Lamberton RdEllenboro, WV 26346

Columbia Gas / Transcanada

5, 813, 846, 849Associated Pipeline Contractor

WF ‐ McDougal, James (Leroy)

Steward ‐ Davis, David BPre Job #: 13564

General Helper Duties 5/14/2018 12 weeks+ or ‐

Page 59: WE ARE CALLING WELDERS, JOURNEYMEN ...3729 Commerce St. SW Canton, OH 44706 Michels Pipeline Nexus double eye protection WF ‐ Hawkins, Michael S Steward ‐ Houston, Robert L Pre

10 3 H neededN/A 6x10$31.75

4.5 miles or 36" New‐lay

63940 Klee Cross RdBellaire, OH  43940

Enbridge 690, 714, 847Michels PipelineWF ‐ Walker, Johnny DSteward ‐ Morgan, 

Tommy RPre Job #: 13534

General Helpers Duties 5/14/2018 8 weeks+ or ‐

11 2 H neededN/A 6x10$27.40

30.2 mi. 36" New‐lay

(MXP Spread 6)

10256 pt. Pleasant RdMillwood, WV 25262

Transcanada/ Columbia Gas

276, 705Price Gregory International

WF ‐ Burns Jr, Billy GSteward ‐ Smith, Bradley 

DPre Job #: 13505

General Helper Duties 5/12/2018 23 Weeks+ or ‐

12 2 H neededN/A 6x10$28.03

install 36.5 Miles of 42" for 

(ASR Spread 7)

1425 River Rd.Marietta, PA

17547

Williams/Transco

2 PPC11Welded ConstructionWF ‐ Kelley, Rodney

Steward ‐ Arnold, Barrett R

Pre Job #: 11263

General Helper Duties 5/12/2018 6 weeks + or ‐