we are cleveland bridge group. -...

11

Upload: trandan

Post on 24-Apr-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: We are Cleveland Bridge Group. - media.brintex.commedia.brintex.com/Occurrence/201/Brochure/5686/brochure.pdf · in India 1964 Forth Road Bridge completed ... We provide a vital difference
Page 2: We are Cleveland Bridge Group. - media.brintex.commedia.brintex.com/Occurrence/201/Brochure/5686/brochure.pdf · in India 1964 Forth Road Bridge completed ... We provide a vital difference

2

Our bridges cross some of the world’s great rivers and waterways, connecting countries and continents and bringing communities together.

Our structural achievements are architectural icons that have transformed the skylines of great cities. From the majestic Jumeirah Emirates Towers in Abu Dhabi, to Hong Kong’s spectacular Tsing Ma Bridge.

Our experience is global, and our expertise is unsurpassed. We are internationally renowned for design, quality, fabrication, construction and installation.

A global leader changing the world around us. Developing infrastructures, connecting communities, bringing prosperity, having a positive social impact on people’s lives.

We are Cleveland Bridge Group.

We are building the future.

Our heritage spans over 150 years.

3

Page 3: We are Cleveland Bridge Group. - media.brintex.commedia.brintex.com/Occurrence/201/Brochure/5686/brochure.pdf · in India 1964 Forth Road Bridge completed ... We provide a vital difference

4

Cleveland Bridge Group has a proud heritage, with a formidable record of achievements that includes the famous Victoria Falls and Sydney Harbour Bridges.

We have been at the forefront of the huge global development in construction, which began in the 20th century, creating iconic bridges and buildings all over the world.

More recently, we havecreated striking new structures that are powerful symbols of our age. Icons such as the Burj Al Arab, the Wembley Stadium Arch, Canary Wharf Towers and the Thames Flood Barrier.

1905

1943

1967

Victoria Falls Bridge completed1906

Edward VII Bridge

completed in Newcastle

1932Sydney

Harbour Bridge completed in Australia

Howrah Bridge

constructed in India

1964Forth Road Bridge completed in Edinburgh

Cleveland Bridge acquired by

Cementation Company

1909Blue Nile Bridge constructed in Sudan

1933Chiswick Bridge completed in UK

1970Cleveland Bridge acquired by Trafalgar House

1974

1980

1982

Rio Niteroi Bridge constructed in Brazil

Dover Harbour bridges constructed

New engineering works opened

in Darlington

4 5

19821988

19901991

19971997

1996

Thames Flood Barrier completed

Canary Wharf Towers construction

Merger of Cleveland with Redpath Dorman Long to create Cleveland Structural Engineering

Queen Elizabeth II bridge constructed

in Dartford

Acquisition by Kvaerner to create Kvaerner Cleveland Bridge

Tsing Ma Bridge constructed in

Hong KongJiangyin Bridge constructed in China

Purchase by Al Rashid Investment Group

Emirates Towerscompleted

2006

20092011

2005Wembley Stadium arch constructed

Twickenham Rugby Stadium

- south stand and hotel

constructed

2016Forth Replacement

crossing constructed

2016Sri Lanka rural bridges constructed

Infinity Bridgecompleted

Zayed Universityconstructed

2014London Underground station extensions

2000 2000

1973Bosphorus

Bridge constructed

in Turkey

20032004 Carquinez Bridge

constructed in California

Rion Antirion Bridge constructed in

Greece

2012

2012The Shard

completed

Poole Harbour Twin Sails bridge completed

1875Dorman Long & Co was formed in UK1877

Cleveland Bridge UK was

formed in UK

1976Cleveland

Bridge Middle East established

in Dubai

2008Cleveland Bridge Saudi established in Saudi Arabia

Page 4: We are Cleveland Bridge Group. - media.brintex.commedia.brintex.com/Occurrence/201/Brochure/5686/brochure.pdf · in India 1964 Forth Road Bridge completed ... We provide a vital difference

6 7

Wherever excellence is demanded, you’ll find Cleveland Bridge Group.

We operate across all five continents, with the capability and reputation for creating iconic landmarks.

Our highly experienced teams, which include designers, fabricators, engineers and project managers, have an unrivalled track record of delivering bridges, buildings and structures, across a broad range of scale and complexity.

6

Page 5: We are Cleveland Bridge Group. - media.brintex.commedia.brintex.com/Occurrence/201/Brochure/5686/brochure.pdf · in India 1964 Forth Road Bridge completed ... We provide a vital difference

Established 2008, based in Saudi Arabia Large facility, employing 250 staff Fabrication capacity: 50,000 tonnes per annum in 46,000 m² factory Located in industrial city of Al Jubail, well connected to majorroad networks

Extensive resources and equipment

Key sectors and services:

Petrochemicals, oil and gas industrial infrastructure Road and rail superstructures (plate girder bridges, flyovers, over-passes)

Complex bridges (arched, cable-stayed, moving) Industrial and commercial buildings

Established 1977, based in Dubai, UAE Two facilities, five separate fabrication workshops, employing 500+ staff

Fabrication capacity: 70,000 tonnes per annum in 270,000 m² factory Located in Jebel Ali Industrial zone, with deepwater quayside access Equipped with overhead cranes, heavy plate press and rolls andautomated welding equipment

Key sectors and services:

Medium to large scale commercial and retail developments Petrochemicals, oil and gas industrial infrastructure Industrial buildings, public sector and private sector buildings and structures

Airports and transportation hubs

Established 1877, based in the north-east of the UK Extensive facilities, employing 300+ staff Fabrication capacity: 50,000 tonnes per annum in 27,000 m² covered facility Heavy lift capacity plus specialist deck panel and plate girder fabrication and assembly

Manual and automated manufacturing techniques Highly-skilled specialist engineering teams to manage design, valueengineering, construction and installation

Key sectors and services:

Road and rail superstructures (plate girder bridges, flyovers, over-passes) Complex bridges (arched, cable-stayed, bascule) Pedestrian footbridges, walkways, bridleways and platforms Heavy plate fabrications (box girders, deep beams) for buildings andpower stations

Complex steelwork for transfer structures and nuclear plants Complex form box girders for buildings

Cleveland Bridge UK, Darlington

Cleveland Bridge and Engineering Middle East (Private) Limited, Dubai

Cleveland Bridge Saudi Arabia

We have sites strategically located in the UK, Dubai, Saudi Arabia, China and India, with experience and capacity to service and operate worldwide.

Our position as an international leader is solidly maintained by a workforce of over 2,000 people, and a combined manufacturing capacity of 170,000 tonnes per annum.

9

Established 1875, based in Northamptonshire, UK Sales offices in India and China Broad range of specialist design and constructionengineering services

Provision of heavy lifting and skidding equipment Supply of Jacking and lifting equipment including Strand jacks Highly-specialist gantries for complex bridge installation

Key sectors and services:

Design and erection of long span suspension and cable-stayed bridges

Engineering of specialist modular construction operations Experience in petrochemical vessels and offshore structures Construction consultancy services Specialist temporary construction works

Dorman Long Technology, Northampton

8

Page 6: We are Cleveland Bridge Group. - media.brintex.commedia.brintex.com/Occurrence/201/Brochure/5686/brochure.pdf · in India 1964 Forth Road Bridge completed ... We provide a vital difference

10

Throughout our entire operations, our specialist planning, design, engineering and construction knowledge ensures that every project is completed to the highest standard.

Our engineering expertise begins with our in-house team of highly-experienced consultants, who undertake the planning, design and detailing for the wide variety of schemes undertaken by the Cleveland Bridge Group. They work alongside our teams of value engineers, construction and installation engineers, creating a seamless process for delivery of even the most challenging project.

Construction EngineeringWith our experience and vast knowledge of construction engineering, we have the ability to think ‘outside the box’ and offer bespoke responses to a diverse array of challenges.

This can then be delivered through ourin-house expertise in design and manufacture, or our knowlegde and capacity in heavy lifting, launching, strand jacking and specialist movement of large fabricated components.

Delivery and Installation With extensive capabilities crucial to the erection of largescale steelwork construction, we have a distinct competitive advantage. This includes expertise that covers onsite erection, launching and float-in erection techniques.

Our engineering teams are able to recommend the most appropriate launch and installation approach, based on the nature and size of the project and anysite-specific conditions.

The specialist engineering equipment, skills and capabilities of Dorman Long Technology provide the resources to deal with even the most complex of erection situations.

11

Value EngineeringWe provide a vital difference to our clients by working closely with them from the very earliest stages of their projects ensuring we provide tangible value throughout.

Together with our knowledge of materials and fabrication expertise, this can lead to significant savings in both time and money. Through a greater understanding and clear view of our clients’ objectives, we are able to offer more cost-effective outcomes.

Using building information modelling (BIM) with advanced TEKLA 3D software, we can generate complete digital representations of steel bridges and structures.

Therefore, our in-house designers and engineers can assess and confirm all aspects of general arrangement, fabrication, component drawings and Strumis CNC files for material handling and automatic cutting/drilling.

This service is an important part of the procurement process for our international client base in the UK and throughout the Middle East, Far East, India and China.

BIM / TEKLA 3D Modelling

Page 7: We are Cleveland Bridge Group. - media.brintex.commedia.brintex.com/Occurrence/201/Brochure/5686/brochure.pdf · in India 1964 Forth Road Bridge completed ... We provide a vital difference

13

The companies within Cleveland Bridge Group have over 300 years’ combined experience in delivering structural steelwork projects in a broad range of sectors, from local to international, from single to multiple and from basic to highly complex schemes.

With a highly-trained workforce, our global operating facilities cover a total area of almost a square kilometre - and have the capacity to produce 170,000 tonnes per year usingadvanced tooling and fabrication techniques, from the traditional to the most sophisticated.

These manufacturing capabilities enable us to adopt a flexible response, refining our offer according to the needs and specifications of each individual client.

We also enforce a rigorous commitment to quality processes at all stages of fabrication. This includes all the relevant and recognised standards - such as Quality Assurance, Lean, FPC and EXC 4.

121313

Page 8: We are Cleveland Bridge Group. - media.brintex.commedia.brintex.com/Occurrence/201/Brochure/5686/brochure.pdf · in India 1964 Forth Road Bridge completed ... We provide a vital difference

14 15

Cleveland Bridge Group share a commitment to delivering to the highest quality, through every aspect of our products and services. The proof of this focus is evidenced by the numerous accreditations, certifications and awards we have secured and which provide reassurance to our clients. The health and safety of our employees is a major priority, as is consideration of the environmental impact and sustainability of our operations.

A selection of our key accreditations include:

TWI CL

UKAS

Barbour ABI

EEF

ECIA

Ciras

bsi

Achilles

Construction Line

BCSA

LRQA

Building Confidence

Railway Industry

Saudi Aramco

Sabic Saudi ElectricCompany

Health and safety is our primary focus throughout all areas of Cleveland Bridge Group’s operations around the world.

At our manufacturing facilities and onsite of every project, we are dedicated to safeguarding the wellbeing of our own employees - and the workforces of our clients and contractors.

We pride ourselves on our safety record and are committed to achieving zero-harm to our people.

To reach this goal, we have an extensive programme of training, coaching, information and supervision to ensure all activities are carried out safely and efficiently.

The success and reputation of our business depends on the highest standards of safety as much as it does on quality.

RQSC

Page 9: We are Cleveland Bridge Group. - media.brintex.commedia.brintex.com/Occurrence/201/Brochure/5686/brochure.pdf · in India 1964 Forth Road Bridge completed ... We provide a vital difference

16

Cleveland Bridge Group take Corporate Social Responsibility (CSR) very seriously and are committed to good practice in all our social activities. This means we work beyond compliance to consider, how we can have a positive impact on communities, minimise risk in our operations and ensure the best health and safety performance standards.

As an environmentally-conscious company, we are fully aware of the implications that our activities may have on the environments in which we operate. Wherever possible, we not only meet, but often exceed the environmental requirements laid down.

To help us achieve this, we have an established EHS (Environment, Health, Safety) system, which addresses a wide range of issues, and this is incorporated within the company management system.

17

The highly-skilled and experienced people who work throughout our business are the foundations of our success. Therefore, we continue to build on these foundations by recruiting high-calibre graduates and apprentices, and continue supporting their development throughout their careers.

We provide study opportunities for all those wishing to further their academic qualifications and encourage our engineers to aim higher and achieve Chartered or Professionally Certified status.

This approach helps us to create the right workplace culture in which all teams feel valued, respected, empowered and inspired.

We also apply the same ethos in the communities where we operate, wherever they are in the world. We’re always conscious of the social impact we have on these communities and our duty to create skilled jobs for local people and enhance the local economy.

Our strongly held belief is that a high level of investment in people is the most effective way to leave a lasting legacy in communities, and ensure the sustainability and growth of our global business.

Sustainability is also a key part of our environmental policy. We subscribe to the objectives and recommendations of the Steel Construction Sustainability Charter, and are committed to performance monitoring to track and understand our carbon footprint.

We are a company with a proud past, and one that cares deeply about the future of the environments in which we operate.

Our three pathways to developing full potential

01

02

03

We invest in our people

We embrace diversity and inclusion

We connect globally as one team

17

Page 10: We are Cleveland Bridge Group. - media.brintex.commedia.brintex.com/Occurrence/201/Brochure/5686/brochure.pdf · in India 1964 Forth Road Bridge completed ... We provide a vital difference

The Cleveland Bridge Group has delivered a sound financial performance, showing significant growth in both turnover and profit over recent years.

19

Group financial progress

Gross Margin

Gross Margin as a percentage of sales has risen steadily from 15% to 20%

Operating Profit Margin

Operating Margin as % of sales reached 9% in 2015.

2012 20122013 20132014 20142015 2015

25%

20%

15%

10%

5%

0%

10%

5%

0%

-5%

-10%

-15%

-20%

Gross Profit £ m Operating Profit £ m

Group margins

The Group has made solid progress in doubling Sales Revenue from £52m in 2012 to £109m in 2015

Turnover

Rising sales volume and reduction incontractual claims has enabled the group to move from a position of loss in 2012 to an operating profit of £9.5m in 2015.

Operating Profit

120

100

80

60

40

20

02012 20122013 20132014 20142015 2015

15

10

5

0

-5

-10

Group Turnover £ m Operating Profit £ m

51.5

4.6

9.5

-7.7

81.773.0

108.8

This document has been prepared in good faith on the basis of information available at the date of publication. Cleveland Bridge Group (CBG) does not guarantee or warrant the accuracy, reliability, completeness or currency of the information in this publication nor its usefulness in achieving any purpose. Readers are responsible for assessing the relevance and accuracy of the content of this publication. CBG will not be liable for any loss, damage, cost or expense incurred or arising by reason of any person using or relying on information in this publication.

18

Page 11: We are Cleveland Bridge Group. - media.brintex.commedia.brintex.com/Occurrence/201/Brochure/5686/brochure.pdf · in India 1964 Forth Road Bridge completed ... We provide a vital difference

clevelandbridgegroup.com

Contacts:Chris DrooganManaging Director

Cleveland Bridge UK LtdCleveland House, Yarm Road, Darlington, County Durham, DL1 4DE, UK

Tel +44 (0)1325 381188 Fax +44 (0)1325 [email protected]

Contacts:Ahmed Abu AmaraGeneral Manager

Cleveland Bridge & Engineering Middle East Private LtdJebel Ali Free Zone, PO Box 16765, Dubai, UAE

Tel +971 (4) 883 5551 Fax +971 (4) [email protected]

Contacts:David DyerManaging Director

Dorman Long TechnologyThe Charles Parker BuildingMidland Road, Higham Ferrers, Northamptonshire,NN10 8DN, UK

Tel +44 (0)1933 319133 [email protected]

Contacts:Abdul Malik Al-RajhiGeneral Manager

Cleveland Bridge & Engineering Saudia Arabia Private LtdRoad 106, Jubail, PO Box 10017, Saudi Arabia, UAE

Tel +966 550402501 (013) 340 8701Fax +966 (013) 340 [email protected]

Part of the Al Rushaid Petroleum Investment Company