Air Traffic Analysis, Inc Weather Forecast Accuracy: Study of Impact on Airport Capacity And Estimation of Avoidable Costs Alexander Klein, Air Traffic Analysis, Inc Sadegh Kavoussi and Robert S. Lee, AvMet Applications, Inc 8 th US-Europe ATM R&D Seminar, Napa, CA, July 2009

Upload: others

Post on 27-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

Air Traffic Analysis, Inc

Weather Forecast Accuracy: Study of Impact on Airport Capacity And

Estimation of Avoidable Costs

Alexander Klein, Air Traffic Analysis, Inc

Sadegh Kavoussi and Robert S. Lee, AvMet Applications, Inc

8th US-Europe ATM R&D Seminar, Napa, CA, July 2009

Page 2: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

2

Avoidable Delays and Costs

Delays (and more broadly, costs) can be notionally divided into avoidable and unavoidable

Avoidable delays/costs can be attributed to:

• airspace design and traffic flow management inefficiencies;

• over-scheduling by airlines at key-market airports;

• conservatism and risk aversion in operational responses;

• accuracy of terminal and en-route weather forecast products;

• also, variability in the accuracy of weather forecast

Initial focus on Terminal Wx Forecast Accuracy and Arrival Delays

“Wx” = Weather

Page 3: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

3

Accuracy of Terminal Wx Forecast ProductsEffect of Over- and Under-forecast

An over-forecast may lead to excessive cancellations, GDPs and reroutes that, in hindsight, wouldn’t have been necessary.

An under-forecast may cause last-minute TFM actions as the players scramble to mitigate unforeseen Wx impact:

• Unplanned delays and reroutes

• Ripple effects through the NAS

• Planners err widely on the side of caution, apply yesterday’s strategies to today’s traffic / weather situation, i.e. add to system inefficiencies

Page 4: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

4

Estimating Avoidable Delays and Costs Attributable to Weather Forecast Inaccuracy

Research Methodology (focus on Terminal Wx)

• Quantify impact of actual (historically recorded) inclement Wx

• Quantify impact of forecast Wx

• Build nomenclature of cases of airport Wx impact under- and over-forecast. For each case:

•Consider Wx impact on delays and cancellations;

•Develop a method for computing the avoidable portion of delays and cancellations attributable to [lack of] Wx forecast accuracy

• Process an entire year’s data for OEP34 airports

• Estimate benefit pool of improving Wx forecast accuracy

Page 5: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

5

Queuing Delay Modeled by Wx Index Software, PHL, Dec 14, 2006

0

30

60

90

120

150

FOGFOGFOGFOGFOGRAINFOGFOGRAINRAINRAINRAINNONENONE

LGT_RAIN

FOGRAINFOGFOGFOGFOGFOGFOGFOG

0600Z Dec 14 - 0600Z Dec 15, Hourly Wx Observations

Hour

ly D

eman

d, E

stim

ated

Cap

acity

, and

Del

ay

Dep+Arr demandDep+Arr capacityQueuing Delay, Hrs

Actual queuing delays at PHL on 12/14/06 were significant (223 flights delayed > 15 min) and there were approx. 100 cancellations (so the resulting queuing delay was less than it could have been if there were no cancellations)

Optimum capacity in good Wx

– En-route Component

WITI is a weighted sum of three components:

Weather Impacted Traffic Index (WITI)A Metric and a Model of Wx Impact on Airports

reflecting impact of convective weather on routes to/from major airports

– Terminal Component

5

Used by the FAA on a regular basis:•Measure system performance in an objective manner •Compare different seasons’ Wx/traffic impact with outcomes (e.g. delays)

– Linear part: capacity degradation due to surface weather impact, proportional to number of ops

– Non-linear (Queuing Delay) part reflecting excess traffic demand vs. capacity

Page 6: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

6

Method: Use Airport Arrival RatesCompute Arrival Rate Deficit

Four different hourly arrival rates are compared:

•Scheduled arrival rates from ASPM database

•Actual arrival rates, also from ASPM

•WITI model-generated arrival rates based on METARs (i.e., actual weather data)

•WITI model-generated rates based on TAFs (i.e., forecast weather data)

• Computed using a parametric model of airport capacity under different Wx conditions

• Use FAA’s airport capacity benchmarks and historical data on actual airport throughput

Any arrival rate deficit (“possible minus actual”) may be an indication of avoidable delays / cancellations

Page 7: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

7

Using Airport Arrival Rates: Example 1Over-forecast (Wx impact overestimated)

0

5

10

15

20

25

30

35

40

45

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4 5

AAR

Hour, Z

LGA, Apr 3, 2009 Arrival Rates

Actual arrivals

Arr rate based on METAR

Arr rate based on 4hr TAF

Scheduled arrivals

Forecast called for rain, low ceilings and strong winds from the southwest which would have forced LGA into a single-runway operation with low arrival rate.

Actual winds were much weaker. Ceilings lifted earlier than forecast.

Page 8: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

8

Using Airport Arrival Rates: Example 2Under-forecast (Wx impact underestimated)

ORD had very low ceilings through most of the day.

TAF for midday and early afternoon (1600-1800Z) was accurate.

Later in the day the forecast called for improved conditions (1900-2000Z). Arrival rates began to increase but the weather did notimprove as hoped (an under-forecast).

This may have been the reason behind the high number of flight cancellations

0

20

40

60

80

100

120

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4 5

AAR

Hour, Z

ORD, June 3, 2008 Arrival Rates

Actual arrivals

Arr rate based on METAR

Arr rate based on 4hr TAF

Scheduled arrivals

It could be argued that a portion of this under-forecast has contributed to avoidable cancellations/costs.

Page 9: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

9

Nomenclature of “Arrival Rate Deficit” CasesRelationships Between 4 Arrival Rates

24 possible permutations

•Only half, 12, (actual rates < scheduled) need to be examined

•Of these, 3 cases where METAR-based rates < all other rates can be dropped (avoidable portion of delay/cost due to Wx = 0).

•Of remaining 9 cases, 6 correspond to over-forecast and 3 deal with under-forecast

Resulting list: 9 meaningful combinations of arrival rate relationships

Next, develop a method to translate arrival rate “deficit” (actual < scheduled) into avoidable-delay and -cancellation estimates.

20 21 22 23 0 1 2 3 4 5

2008 Arrival Rates

Actual arrivals

Arr rate based on METAR

Arr rate based on 4hr TAF

Scheduled arrivals

Consider all possible relationships between four different arrival rates (Actual/Scheduled/METAR-based/TAF-based)

Page 10: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

10

Examples of Arrival Rate “Deficit” Calculation Example 1: Over-forecast, A

Total avoidable arrival rate deficit is:

DTotal = RMETAR - RActual

The portion of total deficit attributable to forecast accuracy (“FA”), is in this case the same:

DFA = RMETAR - RActual

Here, we assume that actual arrival rates could not go higher than justified by actual weather (METAR).

20

30

40

50

60

70

80

90

100

17 18 19 20 21 22 23 0

AAR

Hour, Z

ORD, Mar 18, 2008 Arrival Rates

Actual arrivals

Arr rate based on METAR

Arr rate based on 4hr TAF

Scheduled arrivals

Total avoidable arrival rate deficit

Avoidable arrival rate deficitattributed to forecast accuracy(RMETAR ‐ RActual )

Over‐forecast

Page 11: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

11

Examples of Arrival Rate “Deficit” Calculation Example 2: Over-forecast, B

Total avoidable arrival rate deficit is

DTotal = RScheduled – Ractual

while the portion of that total deficit attributable to forecast accuracy (“FA”) is:

DFA = (RScheduled - RActual) / (RMETAR – RTAF) / RTAF

Here, we attribute only a portion of the total arrival rate deficit to forecast accuracy. We assume that avoidable costs are proportional to relative forecast error

20

30

40

50

60

70

80

90

100

110

17 18 19 20 21 22 23 0

AAR

Hour, Z

ORD, Mar XX, 2008 Arrival Rates

Actual arrivals

Arr rate based on METAR

Arr rate based on 4hr TAF

Scheduled arrivals

Total avoidable arrival rate deficit

Avoidable arrival rate deficitattributed to forecast accuracy

Over‐forecast

(RSched ‐ RActual ) * (RMETAR ‐ RTAF ) / RTAF

Scheduled arrival rates < METAR- and TAF-model based rates.

In principle, airport capacity should not have depended on Wx.

But if actual rates are < scheduled, we do have a deficit. This may be an over-reaction to the inclement-Wx forecast.

Page 12: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

12

Examples of Arrival Rate “Deficit” Calculation Example 3: Under-forecast

Total avoidable arrival rate deficit is now

DTotal = RMETAR - RActual

(rather than RScheduled –RActual because actual arrival rates could not go higher than justified by actual Wx (METAR)).

The portion of that total deficit attributable to forecast accuracy (“FA”) is:

DFA = (RMETAR - RActual) / (RTAF – RMETAR) / RMETAR

i.e., avoidable costs are proportional to relative forecast error

Actual weather was much worse than predicted and the operators’ subsequent attitude may have been to reject the forecast.

20

30

40

50

60

70

80

90

100

110

17 18 19 20 21 22 23 0

AAR

Hour, Z

ORD, Mar ZZ, 2008 Arrival Rates

Actual arrivals

Arr rate based on METAR

Arr rate based on 4hr TAF

Scheduled arrivals

Total avoidable arrival rate deficit

Avoidable arrival rate deficitattributed to forecast accuracy

Under‐forecast

(RMETAR ‐ RActual ) * (RTAF ‐ RMETAR ) / RMETAR

Page 13: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

13

Computing Avoidable Delays and CancellationsA Simple Queuing Model

From formulas on previous slides, estimate avoidable arrival rate deficit for each of 9 cases

Compute cumulative queuing delays:

Every hour, a deficit of 1 translates into 1-hr arrival delay

Delays >= 3 hrs are converted to cancellations

0

20

40

60

80

100

120

6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 0 1 2 3 4 5

Hour, Z

ORD, 06/03/2008

Max_Avoid_QD_FA

Sched_arr

Actual_arr

METAR_cap

TAF4_cap

Max_Avoid_Cnx_FA

Page 14: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

14

Computing Avoidable Delays and CancellationsAvoidable Delay due to FA vs. Total Avoidable Delay

0

50

100

150

200

250

300

350

400

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

80108

80508

80908

81308

81708

82108

82508

82908

90208

90608

91008

91408

91808

92208

92608

93008

100408

100808

101208

101608

102008

102408

102808

110108

110508

110908

111308

111708

112108

112508

112908

120308

120708

121108

121508

121908

122308

122708

WITIDelay, Hrs

Date

Avoidable Arrival Delay (Terminal Weather) Estimates and WITI, OEP‐35 Airports, Aug‐Dec 2008

Avoidable Arr Delay Total

Avoidable Arr Delay due to FA

NAS Wx Index (WITI)

Page 15: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

15

Estimating Potential Benefit Pool

Assuming $53/min average delay cost and $10,000 per cancellation cost:

Total benefit pool for avoidable costs attributable to terminal Wx forecast inaccuracy: approx. $330M per year

This is a lower bound on benefit estimate:• Only direct operating costs of passenger carriers calculated• Adding departure delays would increase estimate• So would using ASPM-75 airports instead of OEP-35• Value of passenger time can be added also

Hours 81,429 Cancellations 7,308Cost $258,944,220 Cost $73,080,000

Percent total 12.2% Percent total 6.9%

Max Avoid.QD‐FA Max Avoid Cnx‐FA

Page 16: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

16

Biggest Contributing Factors to Avoidable Delay due to Terminal Wx Forecast Inaccuracy

Inaccurate forecast of IMC (low ceilings/visibility, heavy rain) is the largest contributor, followed by wind (speed or gusts > 15 Kt) and winter precip.

“Other” category includes minor weather impacts e.g. wind < 15 Kt (causing airports to use less-than-optimal runway configurations), light rain or drizzle, etc.

1.6%

27.2%

6.0%

33.1%

32.0%

Avoidable Arrival Queuing Delays Attributable to Terminal Weather Forecast Inaccuracy, OEP‐35 Airports, 2008, 

Percentage by Weather Factor

Local Thunderstorms

Wind

Snow / Winter Precip

IMC

Other

En-route convective Wx not reflected, only airport surface Wx reports (METARs)

Page 17: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

17

Reality Check

Our hypothetical total for avoidable arrival delays due to terminal Wx in 2008 was 40,000,000 minutes

Actual total number of arrival delay minutes for the NAS in 2008was 102,000,000 minutes

That is, our estimate for avoidable portion of delays due to terminal Wx only is 40%

• of that, approx. 12.2% is due to terminal Wx forecast accuracy

This is not an unreasonable estimate

• Compare to tentative estimates for convective Wx (60% avoidable)

• Dealing with terminal Wx: less flexibility = less avoidable delay

Page 18: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

18

Back-up Slides

Page 19: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

19

WITI: Measuring Weather / Traffic Demand Impact “The Hand the NAS Is Dealt Every Day”

Traffic Demand

ATM, Airline Response Strategies

Local Airport Weather

En-route Convective Weather

WITI expresses severity of weather impact on the NAS, weighted by air transportation service demands

National Airspace System (NAS)

Operational Outcomes

Capacity, Safety constraints

Page 20: Weather Forecast Accuracy: Study of Impact ... - ATM Seminar · 8th US-Europe ATM R&D Seminar, Napa, CA, July 2009. 2 Avoidable Delays and Costs Delays (and more broadly, costs) can

20

Analysis for selected airports/daysLGA, Friday, Apr 3, 2009

Hr, Z IFR Dominant Wx Wind Ceilings SIGWX RWYs IFR Dominant Wx Wind Ceilings SIGWX RWYs6 METAR VSB_0.5 RAIN 050/11G00 3200 'BR' 04_13 4hr_TAF CLG_0700 RAIN 090/08G‐01 700 'BR' 04_137 METAR CLG_0100 RAIN 060/12G00 100 'BR' 04_13 4hr_TAF CLG_0700 RAIN 090/08G‐01 700 'BR' 04_138 METAR CLG_2800 LW_050/09 050/09G00 2800 'none' 04_13 4hr_TAF CLG_0700 RAIN 090/08G‐01 700 'BR' 04_139 METAR VSB_3.0 RAIN 050/11G00 3200 '‐RABR' 04_13 4hr_TAF CLG_0100 RAIN 060/08G‐01 100 'BR' 04_1310 METAR CLG_1100 RAIN 050/14G00 1100 '‐RABR' 04_13 4hr_TAF CLG_0200 RAIN 060/14G‐01 200 '‐RABR' 04_1311 METAR CLG_1100 LW_060/13 060/13G00 1100 'none' 04_13 4hr_TAF CLG_0200 RAIN 060/14G‐01 200 '‐RABR' 04_1312 METAR CLG_0700 RAIN 060/15G00 700 '‐RABR' 04_13 4hr_TAF CLG_0200 RAIN 060/14G‐01 200 '‐RABR' 04_1313 METAR CLG_0500 RAIN 040/11G00 500 '‐RABR' 04_13 4hr_TAF CLG_0200 RAIN 060/14G‐01 200 '‐RABR' 04_1314 METAR CLG_0300 RAIN 050/13G00 300 '‐RABR' 04_13 4hr_TAF CLG_0200 RAIN 060/14G‐01 200 '‐RABR' 04_1315 METAR CLG_0300 RAIN 050/11G00 300 '‐RABR' 04_13 4hr_TAF CLG_1500 RAIN 050/15G21 1500 '‐RABR' 04_1316 METAR CLG_0300 RAIN 050/13G00 300 '‐RABR' 04_13 4hr_TAF CLG_0200 RAIN 060/15G21 200 '‐RABR' 04_1317 METAR CLG_0100 TSTORM 030/15G00 100 'TSRABR' 04_13 4hr_TAF CLG_0200 RAIN 060/15G21 200 '‐RABR' 04_1318 METAR CLG_0300 RAIN 180/16G22 300 'BR' 13_22 4hr_TAF CLG_0200 RAIN 060/15G21 200 '‐RABR' 04_1319 METAR CLG_0300 RAIN 180/14G00 300 'BR' 13_22 4hr_TAF CLG_0500 RAIN 140/13G‐01 500 '‐SHRABR' 13_2220 METAR NONE NONE 000/‐01G00 72200 'none' 13_22 4hr_TAF CLG_0500 RAIN 140/13G‐01 500 '‐SHRABR' 13_2221 METAR CLG_0300 RAIN 170/08G00 300 'BR' 13_22 4hr_TAF CLG_0300 RAIN 060/12G‐01 300 '‐RABR' 04_1322 METAR CLG_0300 RAIN 170/12G00 300 'BR' 13_22 4hr_TAF CLG_0500 RAIN 200/18G25 500 'BR' 2223 METAR CLG_0300 RAIN 180/07G00 300 'BR' 13_22 4hr_TAF CLG_0500 RAIN 200/18G25 500 'BR' 220 METAR VSB_3.0 LW_210/10 210/10G00 7000 '‐RABR' 13_22 4hr_TAF CLG_0500 RAIN 200/18G25 500 'BR' 221 METAR NONE W_240/19G23 240/19G23 9500 'none' 31_22 4hr_TAF CLG_0500 RAIN 200/18G25 500 'BR' 222 METAR NONE HW_270/24G34 270/24G34 4500 'none' 31 4hr_TAF CLG_0500 RAIN 200/18G25 500 'BR' 223 METAR NONE W_260/18G23 260/18G23 4300 'none' 31_22 4hr_TAF CLG_1200 RAIN 180/13G‐01 1200 'BR' 13_224 METAR NONE NONE 000/‐01G00 72200 'none' 13_22 4hr_TAF NONE W_260/18G25 260/18G25 4000 'none' 31_225 METAR NONE NONE 000/‐01G00 72200 'none' 13_22 4hr_TAF NONE W_260/18G25 260/18G25 4000 'none' 31_22

METAR Based WITI Data TAF Based WITI Data