United Nations Development ProgrammeCountry: Samoa
PROJECT DOCUMENT
Project Title: Pacific Islands Greenhouse Gas Abatement through Renewable Energy “PLUS” Project
UNDAF Outcome(s): OUTCOME 1. Improved resilience of PICs, with particular focus on communities, through integrated implementation of sustainable environment management, climate change adaptation/mitigation and disaster risk management
UNDP Strategic Plan Primary Outcome: Environment and Sustainable Development
Expected SRPD Outcome: OUTCOME 4. Improved resilience of PICs, with particular focus on communities, through integrated implementation of sustainable environment management, climate change adaptation/mitigation and disaster risk management
Responsible Party: Secretariat of the Pacific Regional Environment Programme (SPREP)Implementing Partner: United Nations Development Programme (UNDP)
Brief descriptionThe SIDS DOCK Support Program is a joint initiative of the United Nations Development Programme (UNDP) and the World Bank (WB), developed in close consultation with the Alliance of Small Island States (AOSIS). This initiative aims to support Small Island Developing States (SIDS) to transition to low carbon economies through development and deployment of renewable energy (RE) resources and promotion of greater energy efficiency (EE). In the Pacific region, it was decided that on the part of UNDP, the project concepts that were proposed by the Pacific Island Countries (PICs) will comprise a regional project that whose objective is to promote low carbon development for Pacific SIDs through the deployment of renewable energy resources and promotion of enhanced energy efficiency. This project will be implemented as part of the ongoing Secretariat of the Pacific Regional Environment Programme (SPREP)-UNDP- Global Environment Facility (GEF) regional project PIGGAREP (Pacific Islands Greenhouse Gas Abatement through Renewable Energy Project). The selected project concepts will collectively form part of what will be called as the PIGGAREP “Plus”. In October 2011, a number of PICs submitted 11 project concepts for inclusion in said project.As agreed by the PICs, the top 4 ranked project concepts will be considered first during the first phase of the SIDS DOCK Program:
Solomon Islands: Solar PV-Powered Rural Telecommunication Systems Tonga: Solar PV-Powered Well Water Pumping Systems in Haapai Islands Tuvalu: Energy Efficiency Demonstration House North Pacific Region: Sustaining Renewable Energy and Energy Efficiency Measures in Micronesia
(SREEM) – comprised of PIGGAREP+ sub-components in FSM, RMI and Palau
SIDS DOCK Program - Pacific
Programme Period: 2013-2014
Atlas Award ID: 00044633Project ID: 00087102PIMS # 3462
Start date: 1 July 2013End Date 31 December 2014
Management Arrangements NEXPAC Meeting Date 23rd April 2014
SIDS DOCK PIGGAREP “PLUS” PROJECT 2
Agreed by (Government):
Date/Month/Year
Agreed by (Government):
Date/Month/Year
Agreed by (Government):
Date/Month/Year
Agreed by (Responsible Party):
Date/Month/Year
Agreed by (UNDP):
Date/Month/Year
SIDS DOCK Program - Pacific
Total resources required 2,000,000
Total allocated resources:
o GEF TFUS$ 2,000,000 o Other: US$
In-kind contributions
SIDS DOCK PIGGAREP “PLUS” PROJECT 3
SIDS DOCK PROGRAM - PACIFIC
PIGGAREP “PLUS” PROJECT[Addendum to PIGGAREP]
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 4
TABLE OF CONTENTS
BACKGROUND 5PROJECT DESCRIPTION 6ACTIVITIES 10Component 1: Renewable Energy Technology Applications 10Sub-Component 1.1: Solar PV Powered Rural Telecommunication Systems (SPVRTS) 10Sub-Component 1.2: Solar PV Powered Well Water Pumping Systems in Haa’pai Islands (SPWPS) 11Sub-Component 1.3: Solar PV Powered Well Water Pumping System and Storage in Kayangel State (PLW SREEM) 12
Component 2: Energy Efficiency Technology Applications 12Sub-Component 2.1: Demonstration EE House (Tuvalu DEEF) 12Sub-Component 2.2: Sustaining Energy Efficiency Measures in Micronesia 13Sub-Component 2.3: Energy Efficiency Financing Schemes 14BUDGET AND WORK PLAN 16IMPLEMENTATION ARRANGEMENTS 17MONITORING & EVALUATION 20ANNEXESAnnex 1: Project Planning Matrix (PPM) 22Annex 2: Total Budget & Work Plan 25Annex 3: Implementation Requirements 29
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 5
LIST OF ACRONYMS
ACP African, Caribbean and PacificADMIRE Action for the Development of Marshall Islands Renewable Energies [RMI]AOSIS Alliance of Small Island StatesAPR Annual Project ReportAPRC Asia-Pacific Regional Centre [UNDP] CPC Chuuk Public Utility Corporation [FSM]CROP Council of Regional Organizations in the PacificDBT Development Bank of Tuvalu [TUV]DEEF Demonstration Energy Efficiency House (Fale)DRD Department of Resources & Development [FSM]EE Energy EfficiencyEELS EE Loan Scheme [RMI]EERF Energy Efficiency Revolving Fund [TUV]EITT Energy, Infrastructure, Transport and Technology [UNDP]EU European UnionFSM Federated States of MicronesiaFSMDB FSM Development Bank [FSM]GEF Global Environment FacilityGHG Greenhouse GasGWh Gigawatt-hourHELP Home Energy Loan Program [FSM]IUCN-ORO International Union for Conservation of Nature – Oceania Regional OfficeJPO Joint Presence Office [UNDP]KUA Kosrae Utility Authority [FSM]kWh Kilowatt-hourLit LiterMCO Multi-Country OfficeM&E Monitoring and EvaluationMEC Marshalls Energy Company [RMI]MEC-PRP Marshalls Energy Company - Petroleum Reform Program [RMI]MIDB Marshall Islands Development Bank [RMI]MLECCNR Ministry of Lands, Environment Climate Change & Natural Resources [TON]MOE Ministry of Energy [SOI]MPR Multi-Partite ReviewMRD Ministry of Resources and Development [RMI]MRV Monitoring, Verification and ReportingNIM National ImplementationNorth REP North Pacific ACP Renewable Energy & Energy Efficiency ProjectPACRICS Pacific Community Rural Internet Connectivity System [SOI]PEO Palau Energy Office [PLW]PGSP Provincial Governance Strengthening Programme [SOI]PICs Pacific Island CountriesPIGGAREP Pacific Islands Greenhouse Gas Abatement through Renewable Energy ProjectPIR Project Implementation ReviewPLW Palau
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 6
PMO Project Management OfficePPM Project Planning Matrix (Log Frame)PPR Principal Project Representative [UNDP-Samoa MCO]PSWC Palau Sewerage & Water Corporation [PLW]PUC Pohnpei Utility Corporation [FSM]PV PhotovoltaicRE Renewable EnergyRET Renewable Energy TechnologyRMI Republic of the Marshall IslandsSEDREA Sustainable Economic Development through Renewable Energy Applications [PLW]SFC Specific Fuel ConsumptionSIDS Small Island Developing StatesSOI Solomon IslandsSOLGRIP Solomons Government Rural Internet Project [SOI]SPREP Secretariat of the Pacific Regional Environment ProgrammeSPVRTS Solar PV-Powered Rural Telecommunication Systems [SOI]SPWPS Solar PV-Powered Well Water Pumping Systems in Haapai Islands [TON]SREEM Sustaining Renewable Energy and Energy Efficiency Measures in Micronesia TEC Tuvalu Electricity Corporation [TUV]TON TongaTUV TuvaluUNDP United Nations Development ProgrammeUNDP-POPP UNDP Program and Operation Policy and ProceduresUSD United States DollarWB World BankYSPSC Yap State Public Service Corporation [FSM]
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 7
PROJECT DOCUMENT
BACKGROUND
The SIDS DOCK Support Program is a joint initiative of the United Nations Development Programme (UNDP) and the World Bank (WB), developed in close consultation with the Alliance of Small Island States (AOSIS). This initiative aims to support Small Island Developing States (SIDS) to transition to low carbon economies through development and deployment of renewable energy (RE) resources and promotion of greater energy efficiency (EE)1. In early 2011, an initial pipeline of project concepts was facilitated by the WB and UNDP and from this selected projects have been identified for implementation using the funds available from the program. The projects concepts, which were proposed by the various SIDS in the Caribbean, Atlantic, Indian and Pacific regions ranged from regional regulatory frameworks, inter-island grid connectivity, to geothermal and to community based Solar PV and waste-to-energy options.
In the Pacific region, it was decided that on the part of UNDP, the project concepts that were proposed by the Pacific Island Countries (PICs) will comprise a regional project that whose objective is to promote low carbon development for Pacific SIDs through the deployment of renewable energy resources and promotion of enhanced energy efficiency. This project will be implemented as part of the ongoing Secretariat of the Pacific Regional Environment Programme (SPREP)-UNDP- Global Environment Facility (GEF) regional project PIGGAREP (Pacific Islands Greenhouse Gas Abatement through Renewable Energy Project)2. The selected project concepts will collectively form part of what will be called as the PIGGAREP “Plus”3. In October 2011, a number of PICs submitted 11 project concepts for inclusion in said project. A technical evaluation was conducted which ranked the project concepts based on a set of criteria that was set by the SIDS DOCK Program, which are as follows:
SIDS DOCK Eligibility – An AOSIS member country with commitment to low-carbon growth should be a signatory to SIDS DOCK4.
Results Delivery - Proven ability to deliver clear headline results within the program implementation period (2012-2013) using existing human resources so as to attract further funding to the project and/or program.
Innovation and Proposal Quality– Proposed project should be different from typical energy development, production and use (renewable energy, energy efficiency, or global SIDS DOCK platform building) and clearly presented.
1 This is based on a Memorandum of Understanding signed in Cancun in December 2010 by the Alliance of Small Island States (AOSIS) and the Government of Denmark, the United Nations Development Programme (UNDP) and the World Bank. As part of the MOU, Denmark has contributed $14.5 Million and following the signing of an MOU in Durban, Japan will provide a further $15 Million, subject to parliamentary approval. UNDP and the World Bank (ESMAP) are providing, inter-alia, administrative, technical, fiduciary and program support.2 PIGGAREP is an ongoing regional UNDP-GEF project with a specific objective of promoting the productive uses of renewable energy (PURE) to reduce GHG emission by removing the major barriers to the widespread and cost-effective use of commercially viable renewable energy technologies (RETs).3 PIGGAREP+ is an expansion of the current PIGGAREP and should be comprised of feasible projects on the productive uses renewable energy (PURE) and social uses of renewable energy (SURE) that will also contribute to the achievement of the PIGGAREP objective. Nevertheless, in the context of the “plus” aspect – additional activities that will showcase feasible EE technology applications and/or EE design and operation of RET applications are included in PIGGAREP+. The “plus” aspect also is manifested by the inclusion of the three non-PIGGAREP countries, which are the 3 Micronesian countries (Republic of Marshall Islands, Federated States of Micronesia and the Republic of Palau).4 First priority to SIDS DOCK signatories; second priority to regional projects and programs that include SIDS DOCK members; and, third priority to capacity development activities in non-SIDS DOCK members that will facilitate their joining of the SIDS DOCK initiative.
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 8
Country Driven - Is demand-driven and fully integrated with national planning and development priorities and endorsed by SIDS government counterpart of UNDP or WB.
Potential for Up-scaling & Replication - Demonstrated potential for sustainability and /or up-scaling.
In the case of the proposed PIGGAREP “Plus” project concepts, an additional criteria - Project Budget Rationale – was applied.
As agreed by the PICs, the top 4 ranked project concepts will be considered first during the first phase of the SIDS DOCK Program5.
Two missions were conducted by the UNDP in the South Pacific (29 May – 16 June) and the North Pacific (10 – 20 July) to evaluate and verify the 3 national and 1 regional project concepts that were selected for inclusion in the PIGGAREP+ Project that will be funded under the First Phase of the SIDS DOCK Program. The missions involved the conduct of additional appraisalsto validate the feasibility of the proposed project concepts focusing on technical, financial, environmental, and institutional aspects and the preparation of the project profiles. During the missions, consultations were carried with the project proponents and key stakeholders to gather information that will be used in the appraisals, and in the design of the project activities. Moreover, field visits were done to the proposed project sites for more detailed data gathering and discussions with target beneficiaries. The 4 projects and the PICs that proposed them are the following:
Solomon Islands: Solar PV-Powered Rural Telecommunication SystemsTonga: Solar PV-Powered Well Water Pumping Systems in Haapai IslandsTuvalu: Energy Efficiency Demonstration HouseNorth Pacific Region: Sustaining Renewable Energy and Energy Efficiency Measures in Micronesia
(SREEM) – comprised of PIGGAREP+ sub-components in FSM, RMI and Palau
The agreed final project profiles of the 4 projects that were designed by UNDP (based on the mission results and findings) are in Annexes 4 to 9.
PROJECT DESCRIPTION
The specific objective of the SIDS DOCK PIGGAREP+ Project is low carbon development for Pacific SIDS through the deployment of renewable energy (RE) resources and promotion of energy efficiency (EE). To realize this objective, the PIGGAREP+ Project is designed to comprise of two components: (1) Renewable Energy Technology Applications; and, (2) Energy Efficiency Technology Applications.
The first component is comprised of 3 sub-componentson demonstrating cost-effective application of renewable energy technologies that will be carried out in the Solomon Islands, Tonga and Palau. These 3 renewable energy sub-components are:
1. Installation and operation of solar PV systems for powering rural telecommunication systems health centers/hospitals in 10 selected rural sites in the Solomon Islands. See Annex 4 for details.
5 The technical evaluation resulted in the following ranking of the proposed project concepts: (1) Tonga: Solar Water Pumping Phase 1 Project; (2) FSM-RMI-TTP: Sustaining Renewable Energy and Energy Efficiency Measures in Micronesia; (3) SOI: Renewable PV Energy to support Rural Telecommunications project in the SOI; (4) TUV: Energy Efficiency Show Home; (5) Cook Islands: Palmerston Island Solar System; (6) CKI-RMI-TON-TTP: Bicycles for Capitals (B4C); (7) RMI: TUV Building Integrated REE; (8) Vanuatu: Talise 75 kW Hydro – Transmission & Distribution Works; and, (9) Samoa: Samoa GHG Abatement through RE (Biogas Technology – Waste to Energy) Development Project
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 9
2. Installation and operation of solar PV powered water pumping systems in 10 villages in the Haapai group of islands in Tonga. See Annex 5 for details.
3. Installation and operation of solar PV powered water pumping and storage system in Kayangel State in Palau. See Annex 6 for details.
These 3 RE sub-componentswill demonstrate and promote the widespread application of solar PV power generation technology for the provision of social services (telecommunications and water supply), and ultimately for productive activities that will make use of such services (e.g., outer island cottage industries that require water). In this regard, these renewable energy sub-components contribute to the achievement of the PIGGAREP objective.
The RE sub-component in the Solomon Islands is designed to contribute to the reduction of the growth rate of GHG emissions from fossil fuel use in the country through the removal of the barriers to the widespread and cost effective use of feasible RETs, which in this case is solar PV powered telecommunication systems. The specific objective of this PIGGAREP+ sub-component is to supply sustainable RE-based power for telecommunications in the rural areas of Solomon Islands. This sub-component will mainly involve the provision of RE-based power supply (which in this case is solar PV) to telecommunication (VSAT) systems for health centers/hospitals in selected rural sites of the country. This sub-component will be carried out in partnership with the SPC - SOLGRIP/PACRICS6 and UNDP – PGSP7 since the project sites are those covered under these 2 ongoing projects. It is expected that the outcome of this RE sub-componentis reduced energy costs of, and reliance on, fossil fuels in the operation of telecommunication systems in rural areas in the Solomon Islands.
Like in the Solomon Islands, the RE sub-componentin Tonga is aimed at reducing the growth rate of GHG emissions from fossil fuel use in the country through the removal of the barriers to the widespread and cost effective use of feasible RETs, and in particular solar PV water pumping systems. This sub-component will facilitate the use supply of sustainable solar PV power for social uses (and also some productive uses) particularly water supply in the rural areas of the Haa’pai islands group in Tonga. The project will replace the existing diesel and grid electricity-powered pumps of the well water systems in the remote islands/rural communities in Haa’pai with more cost effective, environment-friendly solar PV power units.The expected outcome of this RE sub-component is sustainable, environment friendly and energy cost saving operation of well water pumping systems in rural areas in Tonga.
The third RE sub-component, which is similar to the second one in Tonga, will be carried out in Palau. It is also aimed at contributing to the slowing down of the growth rate of GHG emissions from fossil fuel use in the country through the removal of the barriers to the widespread and cost effective use of solar PV water pumping systems. This sub-component will facilitate the use of sustainable renewable energy (RE)-based power for social uses (and also some productive uses) particularly water supply in the Kayangel state of Palau. It will involve the replacement of the electric motor
6 The Solomons Government Rural Internet Project (SOLGRIP) involves the provision of broadband communications and information and communication technology (ICT) capacity building to 21 provincial government centers in the Solomon Islands, to strengthen government systems and improve government services. The Phase 1 of this project started in 2011 with technical assistance provided by the Secretariat of the Pacific Community (SPC). Under this Solomon Islands Government project, 17 rural hospitals and health centers are provided satellite broadband internet services. This constitutes the roll out of the Pacific Community Rural Internet Connectivity System (PACRICS) in the country, which will provide internet access to provincial hospitals and rural health centers in selected sites in the country.7 SOLGRIP/PACRICS is also supplemented by the Provincial Governance Strengthening Programme (PGSP) of the United Nations Development Programme (UNDP). Under the PGSP, 5 of the 17 rural centers were provided satellite broadband Internet access. These are the first sites where the telecommunication system devices were installed.
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 10
driven pumps of the Kayangel well water system with more cost effective, environment-friendly solar PV power units.The expectedoutcome of this RE sub-component is reduced energy costs of, and reliance on, fossil fuels in the operation of telecommunication systems in rural areas in Palau.
The second component of the PIGGAREP+ project is comprised of 3 sub-componentsshowcasing the application of energy efficiency technologies, techniques and strategies that will be carried out in Tuvalu, Federated States of Micronesia (FSM) and the Republic of the Marshall Islands (RMI). These 3 energy efficiency sub-components are on the:
1. Design, installation and operation of a demonstration energy efficient house (Demo Fale) in Tuvalu2. Conduct of power plant testing and identification of energy efficiency improvements in power
generation units, implementation of feasible energy efficiency improvements and load dispatch optimization in the national power utility in RMI, and in the 4 state power utilities in FSM
3. Design, preparation, promotion and establishment of an energy financing scheme for supporting energy efficiency projects in the residential/commercial sector in FSM, RMI and Tuvalu
The EE sub-component in Tuvalu is on the application in residential houses of sustainable RE-based power generation technologies that will be supplemented with the: (a) application of energy efficient technologies, in the form of energy efficient household appliance; and, (b) energy efficient design and operation of the RET systems that will be installed in the demonstration house (Demo Fale). This major sub-component will be in two complementary parts: (1) Design, construction and operation of the Demo Fale8; and, (2) Design, establishment and launch of an Energy Efficiency Revolving Fund (EERF)9. The Demo Fale will show the citizens of Tuvalu how an energy efficient house looks like, its features and components, and how it operates, and in so doing encourage them to build EE houses and/or retrofit their existing houses to become more energy efficient. The expected outcome from this is an increased application of EE technologies and energy savings in the residential sector of Tuvalu.
The second part of the EE sub-component in Tuvalu, which is the design, promotion and establishment of an EE financing scheme, which is the EERF. The EERF will provide financial assistance to the Tuvaluan households in applying what they see and learn about energy efficient houses from the Demo Fale. The expected outcome from this is the established and operationalEERF.
The EE sub-componentin RMI targets both the supply and demand sides of electricity. It will be in two parts: (a) Supplementary activities for the MEC-PRP10; and, (b) Design, establishment and launch of an energy efficiency revolving fund. The first part will involve the implementation of power plant
8The initial design of the Demo Fale provided by the Tuvalu Electricity Corporation (TEC) will be enhanced to incorporate other demo features that were suggested by an UNDP mission in June 2012 including incorporating more features that will turn the proposed Demo Fale to a sort of a “green home” showcasing the application of some environmentally sensitive concepts and products particularly in its design, construction, and operation.9 The EERF is based on the Green Loan Scheme for Home Energy Efficiency Project concept that TEC (on behalf of the Government of Tuvalu) have prepared and submitted to IUCN. The fund will be managed and operated by the Development Bank of Tuvalu (DBT). The SIDS DOCK project will assist in the design of the financing scheme and mechanics (including loan eligibility criteria, loan terms, etc.), various training and launch of the planned EERF.10 The Ministry of Resources and Development (MRD) in RMI had embarked on a program to make the petroleum and power generation operations of the country’s national energy company - Marshalls Energy Company (MEC) energy efficient, environmentally safe and their operation more economically viable. This is the MRD’s Petroleum Reform Program in the MEC (MEC-PRP), which is in line with the MEC strategic action plan 2012-2017. This program involves the conduct of a survey and study to develop diesel fuel and waste oil-diesel oil blend specifications; installation of the fuel test laboratory for the diesel fuels that will imported, utilized and traded by MEC; and capacity development for MEC staff in the various laboratory test procedures. With the planned activities, it is expected that the fuel utilization efficiency in the MEC power generation units will improve thereby realizing energy savings and GHG emission reductions.
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 11
performance evaluation and load management optimization at the Majuro Power Plant. The expected outcome from this is improved energy utilization performance in power generation and reduced power generation cost in the MEC.This major EE improvement sub-componentwill be carried out in two (2) phases:
Phase 1: Power Plant Testing and Identification of Energy Efficiency Improvements in Power Generation; and Development of Load Management Optimization Model – This will involve theconduct of power plant testing in each power generation unit to establish to determine the energy use performance, identify and quantify energy losses and wastages, wasteful operating practices, and potential energy savings. The findings of the tests will be used in identifying and designing improvement projects that will bring about energy savings, and reduce power generation cost.
Phase 2: Implementation of Feasible Energy Efficiency Improvements and Load Dispatch Optimization–This will entail theimplementation of identified feasible energy efficient improvement projects, as well as the development of computerized system for ensuring optimum load dispatch of power generation units that will result to an optimum generation cost.
The second part of the EE sub-component in RMI is the design of the EE Loan Scheme (EELS)11, which will be a new loan scheme for financing the renovation/repair of existing houses to make them energy efficient or incorporate EE features in them, and for the construction of new and energy efficient houses. The expected outcome from this is the established and operationalEELS.
The EE sub-component in FSM is similarto that in RMI. It will be also in two parts: (1) Improvement of Power Plant Performance; and, (2) Design, establishment and launch of an energy efficiency revolving fund. The first part will involve the implementation of power plant performance evaluation and load dispatch optimization in the 4 state power utilities in FSM. The expected outcome from this is improved energy utilization performance in power generation and reduced power generation cost in the 4 state power utilities in FSM. This will be carried out in two (2) phases:
Phase 1: Power Plant Testing and Identification of Energy Efficiency Improvements in Power Generation; and Development of Load Optimization Model - This will involve only the operational power generation units in the 4 state power utilities.
Phase 2: Implementation of Feasible Energy Efficiency Improvements and Load Dispatch Optimization – This will be applied in the 4 state power utilities.
The second part of the EE sub-component in FSM is the design of the Home Energy Loan Program (HELP)12, which be a new loan scheme for financing the renovation/repair of existing houses to make them energy efficient or incorporate EE features in them, and for the construction of new and energy efficient houses.The expected outcome from this is the established and operationalHELP.
11This will be an expanded version of the existing loan scheme of the Marshall Islands Development Bank (MIDB) for supporting housing programs for raising the standard of living of people in RMI. It will be managed and operated by the MIDB.12This will be an expanded version of the existing loan scheme of the FSMDevelopment Bank (FSMDB) for supporting for energy efficient home construction and renovation and purchase of energy efficient household appliances. It will be managed and operated by the FSMDB.
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 12
Annex 1 shows the Project Planning Matrix (PPM) or logical framework (log fame) of the SIDS DOCK PIGGAREP+ Project. It shows the success indicators, means of verification and relevant critical assumptions for each of the expected outcomes of the project, and that of the project objective. The monitoring and evaluation plan that will be devised for the project will by and large be based on this project log frame.
ACTIVITIES
The various sub-components of the PIGGAREP+ project is comprised of activities that are aimed at delivering the necessary outputs that will contribute to the realization of the expected outcomes described earlier and summarized in the PPM in Annex 1. The following are the key activities to deliver the expected outputs:
A. Component 1: Renewable Energy Technology Applications
1. Sub-Component 1.1: Solar PV Powered Rural Telecommunication Systems (SPVRTS)
The expected outcome of this PIGGAREP+ sub-component is reduced energy costs of, and reliance on, fossil fuels in the operation of telecommunication systems in rural areas in the Solomon Islands. To realize this outcome, the target outputs listed below have to be delivered.
o Completed solar PV-power system installation design/plan for powering telecommunication systems in selected rural sites;
o Competitive procurement undertaken and supplied, installed, commissioned and fully operational solar PV-powered telecommunications systems in selected rural sites;
o Developed and implemented monitoring, evaluation and reporting system for each installed solar PV power system;
o Documentation on the monitored and evaluated operational performance of each installed solar PV power system including impacts (e.g., energy and energy cost savings, GHG emission reductions, system reliability); and,
o Approved sustainability plan for the promotion and widespread application of solar PV-powered rural telecommunication systems
There are 5 sets of activities that will be carried out to deliver the abovementioned outputs. These are the following:
o Preparation of installation design/plan for the solar PV power systemso Purchase of equipment and other necessary components/materials o Installation and operation of solar PV-powered telecommunications systems o Monitoring and evaluation o Preparation of a sustainable follow-up plan for the promotion and widespread application of
solar PV-powered rural telecommunication systems
Please refer to Annex 4 for the description of the activities to be implemented to deliver these outputs of this PIGGAREP+ sub-component in the Solomon Islands.
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 13
2. Sub-Component 1.2: Solar PV Powered Well Water Pumping Systemsin Haa’pai Islands (SPWPS)
The specific objective of this PIGGAREP+ sub-component is the widespread application of solar-PV powered well water pumping systems in the Haa’pai island group in Tonga. The expected outcomes from this sub-component is sustainable, environment friendly and energy cost saving operation of well water pumping systems in rural areas in Tonga. To realize this outcome, the following outputs are required:
o Completed evaluation report on the water piping system flow and pressure drop, total dynamic head, and water pumping energy requirements for each of the selected wells;
o Completed solar water pump and solar PV power system sizing and installation designs/plans for selected wells;
o Installed and operational solar water pump (including the solar PV power system) in selected wells;
o Developed and implemented appropriate management arrangements including monitoring, evaluation and reporting system for each installed solar water pumps (inclusive of solar PV power system) in each selected well;
o Documentation on the monitored and evaluated operational performance of each installed solar water pumping system (inclusive of solar PV power system) including impacts (e.g., water flow, specific energy consumption and energy cost savings, GHG emission reductions, system reliability, economic impacts, etc.); and,
o Documentation on the sustainable follow-up plan for the promotion and widespread application of solar PV-powered well water pumping systems
To deliver the specific outputs of the project, 5 sets of major activities will be carried out:
o Technical evaluation and engineering design of the solar powered water pumping systemso Selection and purchase of required hardware and components to be installed in the selected
wellso Installation, testing, commissioning and operation of the solar power water pumping system o Monitoring and evaluation of the operational performance of each installed solar powered
water pumping system that will be implemented by Water Management Committeeso Preparation of a sustainable follow-up plan for the promotion and widespread application of
solar PV-powered water pumping systems
Please refer Annex 5 for the description of the activities to be implemented to deliver these outputs of this PIGGAREP+ sub-component in Tonga.
3. Sub-Component 1.3: Solar PV Powered Well Water PumpingSystem and Storage inKayangel State (PLW SREEM)
As in sub-component 1.2, the specific objective of this PIGGAREP+ sub-component is the widespread application of solar-PV powered well water pumping systems, but this one is in the Kayangel State in Palau. The expected outcomes from this sub-component are sustainable, environment friendly and energy cost saving operation of well water supply and storage systems in the outer island states of Palau. To realize this outcome, the following outputs are required:
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 14
o Completed evaluation report on the existing Kayangel State water piping system flow and pressure drop, total dynamic head, and water pumping energy requirement
o Completed solar water pump and solar PV power system sizing and installation designs/plans, including that for an overhead water storage tank, and a replacement chlorinator unit.
o Installed and operational solar water pumping (including the solar PV power system) and water chlorinator unit and storage tank
o Developed and implemented appropriate management arrangements including monitoring, evaluation and reporting system for the installed solar water pump (inclusive of solar PV power system).
o Documentation on the monitored and evaluated operational performance of the installed solar water pumping system (inclusive of solar PV power system) including impacts (e.g., water flow, specific energy consumption and energy cost savings, GHG emission reductions, system reliability, economic impacts, etc.)
o Documentation on the sustainable follow-up plan for the promotion and widespread application of solar PV-powered well water pumping systems
To deliver the specific outputs of the project, 5 sets of major activities will be carried out:
o Technical evaluation and engineering design of the solar powered water pumping systems, including the water storage tank
o Selection and purchase of required hardware and components to be installedo Installation, testing, commissioning and operation of the solar power water pumping system o Monitoring and evaluation of the operational performance of the solar powered water
pumping systemo Preparation of a sustainable follow-up plan for the promotion and widespread application of
solar PV-powered water pumping systems
Please refer Annex 6 for the description of the activities to be implemented to deliver these outputs of this PIGGAREP+ sub-component in Palau.
B. Component 2: Energy Efficiency Technology Applications
Sub-Component 2.1: Demonstration EE House (Tuvalu DEEF)
The expected outcome from the outputs of the activities that will be carried out under this sub-component is the increased application of EE technologies and energy savings in the residential sector of Tuvalu. The expected outputs are the following:
Completed detailed design and construction plans of the Demonstration EE House (“Demo Fale”) Constructed, equipped and operational Demo Fale at the TEC compound Developed and implemented monitoring, evaluation and reporting system for Demo Fale
operation and for monitoring the replication projects in the residential sector Documentation on the monitored and evaluated operational performance of the Demo Fale and
the replication projects in Tuvaluan houses (e.g., energy and energy cost savings)
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 15
To deliver the specific outputs of the project, 4 sets of major activities will be carried out:
Preparation and approval of the detailed design of the Demo Fale and the construction plans. Purchase of equipment and other necessary components/materials required for the installation and
operation of the Demo Fale Construction, commissioning and operation of the Demo Fale Monitoring and evaluation of the Demo Fale performance
Please refer Annex 7 for the description of the activities to be implemented to deliver these outputs of this PIGGAREP+ sub-component in Tuvalu.
Sub-Component 2.2:Sustaining Energy Efficiency Measures in Micronesia
Power Plant Performance Improvement (RMI SREEM and FSM SREEM)
This sub-component is comprised of activities that will be deliver outputs that will contribute to the realization of the expected outcome from this sub-component which is the improved energy utilization performance in power generation and reduced power generation cost in the national power utility in RMI, and the 4 state power utilities in FSM13. The expected outputs are the following:
Documented power plant testing results and analyses (MEC, CPUC, KUA, PUC and YSPSC) Established actual energy utilization performance (heat rate or SFC) of each operational
generating units Identified energy efficiency improvement opportunities in the operational power generation units;
and recommended energy efficiency improvements in power plant operations Designed and engineered feasible EE improvement measures for the operational power
generation units recommended for implementation; including the approved implementation plan and schedule for the EE improvement measures.
Completed implementation of selected no cost/low cost energy efficiency improvements in the operational power generation units
Documented results, impact analyses and recommendations of the EE improvement measures Developed and applied load dispatch optimization system for optimum loading of operational
power generation units, including documentation of the results and impact analyses of the load distribution and dispatch optimization system.
Developed monitoring, verification and reporting (MRV) plans for the tracking and documentation of the results and impacts of the EE improvement and load optimization activities
To achieve the abovementioned deliverables the following set of activities focusing on the performance of power plant testing, identification, design and implementation of EE improvement measures, and the design and implementation of a load dispatch optimization systemwill be carried out in the MEC power plants in RMI, and in the 4 state power plants in FSM.
Preparation for the power plant testing Conduct of power plant testing to establish the actual energy utilization performance of the
generating units
13These are the Marshalls Energy Company (MEC) in RMI; and the 4 state power utilities in FSM, which are Chuuk Public Utility Corporation (CPUC), Kosrae Utility Authority (KUA), Pohnpei Utility Corporation (PUC), and Yap State Public Service Corporation (YSPSC)
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 16
Analysis and interpretation of the performance testing of each power generation unit of each generating unit
Identification of EE improvements in the power plant operations and in each power generation unit (no cost or housekeeping measures; low to medium cost measures; capital intensive)
Design of feasible EE improvement measures, including the preparation (for approval) of the implementation plan for these recommended measures.
Implementation of selected no cost or housekeeping measures and low cost measures Development of a computerized load distribution and dispatch optimization system Implementation of the load distribution and dispatch optimization system Monitoring and evaluation of the EE improvement measures and load optimization activities
The above project activities are anticipated to contribute to the improvement of the energy utilization efficiency power generation in the national power utility in RMI and in the 4 state power utilities in FSM. It is expected that the EE improvement measures and load distribution and dispatch optimization will deliver tangible results (i.e., energy savings and the corresponding GHG emission reductions) within a year of implementation. To ensure that tangible benefits will be sustained, the execution of the approved implementation plan and schedule for the EE improvement measures in the MEC power plants in RMI, and in the state power utilities in FSM should be ensured.
Please refer Annexes8 and 9 for the description of the activities to be implemented to deliver these outputs of this PIGGAREP+ sub-component in RMI and FSM, respectively.
Sub-Component 2.3: Energy Efficiency Financing Schemes
Energy Efficiency Financing Schemes (Tuvalu DEEF, RMI SREEM and FSM SREEM)
Operational, effective, and widely accepted energy efficiency lending schemes in Tuvalu, RMI and FSM is the expected outcome from the outputs that will be delivered under this sub-component. The expected outputs are the following:
Completed and approved design of energy efficiency financing schemes in Tuvalu, RMI and FSM including the proposed financing mechanisms and terms, and fund management arrangements14.
Established and launched energy efficiency financing schemes Formulated and recommended sustainable follow-up plan for up-scaling and enhancement of the
current financing schemes for housing of the development banks in Tuvalu, RMI and FSM shall be prepared based on the experience and lessons learnt from this project.
To achieve the abovementioned deliverables the following set of activities, which mainly focus on the design, development and establishment of the appropriate energy efficiency financing schemes in the 3 countries will be carried out under this sub-component:
14 Currently PIGGAREP is funding an IUCN managed consultancy in the Pacific that includes an assessment of the development banks in Tuvalu, RMI and FSM to administer such an energy loan program including a market survey on the appropriateness of the chosen energy efficiency technologies. SIDS DOCK/PIGGAREP+ will build on this initial preparatory work and follow-up support is planned for the detailed design of the EE funding scheme and implementation mechanism, training, promotion and launch of the pilot energy loan program.
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 17
Review of existing financing schemes in the country, as well as the latest international literature and experience on financial mechanisms for EE housing projects (new and retrofit) as well as EE appliance/equipment loan programs.
Design of the appropriate scheme based on the review of financing schemes and the financing requirements and conditions of the development bank in each country, including the definition of the loan terms, loan repayment, borrower eligibility criteria, and fund management arrangements.
Conduct of technical assistance support activities in the preparations for the setting-up, and in the actual establishment, of the financing scheme.
Conduct of promotional campaigns focusing mainly on educating the people not only about the benefits of utilizing EE appliances or incorporating EE features in their houses but also to be more responsible for the loans that they will avail of under the financing scheme.
Formulation and approval of a sustainable follow-up plan for up-scaling and enhancement of the energy efficiency financing schemes based on the experience and lessons learnt from this project. Such plan will be formulated and recommended for funding and implementation.
The planned energy efficiency financing schemes in Tuvalu, RMI and FSM are expected to contribute to reducing the electricity demand in the residential sector in these 3 countries. The sustainable follow-up plan that will be formulated and approved towards the end of the project will help realize this. The follow-up plan shall include definitive targets for the intended deliverables and outcomes; specific activities that are well-defined; and proposed project budget and financing.
Please refer Annexes7, 8 and 9for the description and indicative schedule of activities to be implemented to deliver these outputs of this PIGGAREP+ sub-component in Tuvalu, RMI and FSM, respectively.
The PIGGAREP+ Project is expected to commence in June 2013. While the actual implementation of the design, installation and operation of the renewable energy and energy efficiency systems that will be installed in the 6 participating countries are expected to be completed within a year, the monitoring and evaluation of the results will be carried out till the 4thquarter of 2014 (maybe till year end 2014) to come up with representative sets of results that will be used to evaluate and demonstrate the impacts of the project outputs. In that regard, the actual project duration will practically be 1.5 years. Table 1 shows the schedule of project activities.
Table 1: Schedule of Activities
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 18
JUNE
Project InceptionSystem Design, Engineering, and PlanningEquipment PurchaseSystem Installation/ConstructionSystem OperationMonitoring and Data GatheringScheduled Maintenance ServiceEnergy Efficiency Financing Schemes DesignEE Financing Scheme Mobilization & LaunchingSustainable Follow-up Plan PreparationResults & Impact Evaluation and DocumentationProject ReviewsProject Closure
2013 20143Q 4Q 1Q 2Q 3Q 4QACTIVITIES
Implementation Requirements
Adequate attention to details and due diligence were rendered during the data gathering works that were done to come up with the necessary information to be used in the design of the various components of this SIDS DOCK PIGGAREP+ Project. Nonetheless, there were still some gaps in the data and information that were obtained, and certain pertinent pre-requirements to initiate some of the proposed activities were not confirmed during the data gathering and project scoping missions that were conducted in the 6 PICs that are covered by the project. In that regard, there are a number of critical items/requirements that need to be facilitated and achieved by the project proponents/stakeholders to ensure a successful and effective implementation of the project activities. Annex 3 presents the identified critical items that make the smooth, successful and effective implementation of the PIGGAREP+ activities contingent to the achievement of these requirements.
BUDGET AND WORK PLAN
Annex 2 presents the total budget and work plan for the PIGGAREP+ Project. Bulk of the project budget disbursements are expected to take place during the first 3 quarters of the project. These are mainly for the purchase of the pertinent equipment that will be installed (e.g., solar PV power systems in Solomon Islands, and solar water pumps in Tonga and Palau); for the engagement of consultants to carry out the review, design and engineering, equipment sizing and specification of the planned RE and EE systems to be installed; for the technical services of engineering/consulting firms in carrying out power plant testing of the power generation units in RMI and FSM; for the installation of RE systems (e.g., solar PV power systems in Solomon Islands, solar water pumping systems in Tonga and Palau and water storage system in Palau); and for the construction of the Demo Fale in Tuvalu. There are also expenses for the capacity development activities, and for the scheduled maintenance services of installed systems. Subsequent consultancy expenses are for the monitoring and evaluation the project results; preparation of the sustainable follow-up plans; and the mid-term and final evaluation of the performance of the PIGGAREP+ project.
IMPLEMENTATION ARRANGEMENTS
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 19
The PIGGAREP+ Project is comprised of activities that will contribute to the achievement of the objective of the UNDP-GEF funded PIGGAREP, which is on the productive and social uses of renewable energy. The RE Technology Application activities definitely contribute to Component 1.C (RE Demonstrations Projects) of the PIGGAREP. In the context of the “plus” aspect, the project also includes additional activities that will showcase feasible EE technology applications and/or EE design and operation of RE technology applications. The “plus” aspect is also manifested by the inclusion of the three non-PIGGAREP countries in Micronesia (FSM, RMI and Palau). These EE “plus” projects also contribute to Activities 1.C.6 and 1.C.7 of the PIGGAREP. The former is on the design and implementation of RET application demos that include appropriate energy efficiency measures in both the supply and consumption of RE-based energy sources. The latter is on the monitoring and evaluation of new and existing RE Demonstration Projects, evaluating the maintenance, management, administrative organization, operating and economic performances, energy efficiency opportunities, energy savings and GHG emissions reduction.
Since the PIGGAREP+ activities will be integrated into, and eventually be part and parcel of, the ongoing PIGGAREP, in effect their implementation will be carried out according to the management arrangements, procedures, practices, etc. of the ongoing PIGGAREP15. In this regard, the PIGGAREP+ countries (FSM, Palau, RMI, Solomon Islands, Tonga and Tuvalu) agreed to implement the PIGGAREP+ projects through SPREP16.
SPREP as the Implementing Partner for PIGGAREP will also be accountable to the UNDP Principal Project Representative (PPR), i.e., UNDP Multi-country Office (MCO) Samoa, for the achievement of the PIGGAREP+ project objectives and for all reporting, including thesubmission of work plans, progress reports, audit and financial reports including for this intervention.
National, regional or international experts are expected to be involved in the implementation of the planned activities. The PIGGAREP Project Management Office (PMO)at SPREP shall effectively coordinatewith the PIGGAREP Country Teamsin the Solomon Islands, Tonga and Tuvalu the planning and implementation of all activities, including engaging of experts that will work on the project and in the procurement of necessary goods and services. In this regard, as part of his/her responsibilities, the PIGGAREP National Coordinator will facilitate implementation of the planned inclusive on-the-ground activities, purchase, design/engineering, installation, testing and commissioning of the following installations utilizing national and/or foreign experts and involving local communities:
Solar PV power units for the rural telecommunication systems in the 10 selected project sites in Solomon Islands
Solar PV-powered water pumping units in the 10 selected villages in Tonga (Haa’pai Group) Demonstration EE House (Demo Fale) in Tuvalu Design and promotion of an energy efficiency lending scheme in Tuvalu
15The Project Document and other information on PIGGAREP is available in this URL: http://www.sprep.org/Pacific-Islands-Greenhouse-Gas-Abatement-through-Renewable-Energy-Project/about-piggarep16 This was unanimously agreed in a meeting organized and facilitated by SPC at the SPC Office in Suva, Fiji on 30-31 January. Other PIGGAREP countries (Cook Islands, Kiribati, Samoa and Vanuatu) represented in the meeting also endorsed the decision. To facilitate this, SPREP will create two new positions for the management of PIGGAREP+ activities, one based at SPREP Head Quarters and one based in the North Pacific (probably with the SPC Office). TORs for the new posts will be developed and circulated. As agreed in the meeting, the costs for these new posts will not be deducted from the PIGGAREP+ country allocations.
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 20
This is to ensure maximum impacts and visibility, maximum local participation, particularly of theprivate sector, civil servants, and the local communities.The PIGGAREP+ implementing partners in these 3 countries shall also work in partnership with other entities as shown below:
Country PIGGAREP+ Implementing Partner Additional Implementing Partners
Solomon Islands Ministry of Energy
SPC SOLGRIP/PACRICS PMOSolomon Islands Health Dept.UNDP PGSP PMO/Honiara Office
Tonga Ministry of Lands, Environment Climate Change & Natural Resources
UNDP Fiji MCO/UN Joint Presence Office (Tonga)
Tuvalu Tuvalu Electricity Corporation UNDP Fiji MCO/UN Joint Presence Office (Tuvalu)
As to the 3 Micronesian countries that are not part of the original PIGGAREP, suitable implementing partner in each of these countrieshave been identified to carry out the country PIGGAREP+ activities. The implementing partners in each country will also carry out theUNDP required project management duties and responsibilities and do the reporting to the PIGGAREP PMO.SPREP will deploy one staff member in the North Pacific (to be detailed in the SPC North Pacific Sub-Regional Office in Pohnpei, FSM) to carry outsuch reporting and coordination with the implementing partners the implementation in the 3 countries of the following PIGGAREP+ activities:
Power plant performance improvements in the power generation units of the national and state power utilities in RMI and FSM
Design, engineering and installation of solar PV powered water pumping and storage systems in Palau
Design and promotion of energy efficiency financing schemes in RMI and FSM
The PIGGAREP PMO through its appointed personnel in the North Pacific shall effectively coordinate with the following partners:
Country PIGGAREP+ Implementing Partner Additional Implementing Partners
FSM Department of Resources & DevelopmentSPC/EU North REP Project PMOSPC N. Pacific Sub-Regional OfficeUN Joint Presence Office (FSM)
Palau Palau Energy Office (Ministry of Infrastructure, Industries & Commerce)
UNDP-GEF SEDREA Project PMOPalau Sewerage & Water Corp UN Joint Presence Office (Palau)
RMI Ministry of Resources & DevelopmentUNDP-GEF ADMIRE Project PMOMarshalls Energy CompanyUN Joint Presence Office (RMI)
The PIGGAREP PMO (through the SPREP person detailed in the SPC North Pacific Sub-Regional Office) will coordinate with the implementing partners in these countries the planning and implementation of theirPIGGAREP+ activities, including engaging of experts that will work on the project and in the procurement of necessary goods and services.
SIDS DOCK Program - Pacific
UNDP Samoa MCOUNDP-GEF SPREP
PIGGAREP Project Board
National, Regional and/or International ExpertsTarget Beneficiaries
PIGGAREP+ Project Activities
PIGGAREP+ Project Implementing Partners
PIGGAREPProject Components
PIGGAREP PMO
SIDS DOCK PIGGAREP+Project Components
SIDS DOCK PIGGAREP “PLUS” PROJECT 21
The overall implementation arrangement for PIGGAREP+ is shown in Fig. 1. This is mainly in line with the current overall PIGGAREP implementation arrangements17.
Fig. 1: Overall PIGGAREP+ Implementation Arrangements
MONITORING & EVALUATION
As part and parcel of the ongoing PIGGAREP, the implementation of the PIGGAREP+ activities in the 6 participating countries will be monitored and evaluated periodically in line with the UNDP and UNDP/GEF rules and procedures. The project activities will be subject to a Multipartite Review (MPR), which is a joint review by representatives of participating governments, SPREP, CROP members, and the UNDP) during the time of the PIGGAREP MPR meeting that is organized by the UNDP Samoa MCO. 17 This is in line with the agreed regional implementation arrangements during the PIGGAREP+ meeting in Suva, Fiji on 30-31 Jan 2013. This will be formalized and agreed by all concerned parties (PIGGAREP PMO, designated implementing partners in the 6 countries, SPREP, and UNDP-Samoa MCO) during the project inception.
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 22
The accomplishments of PIGGAREP+ activities will also be reported in the annual GEF Project Implementation Review (PIR) of PIGGAREP. Starting 2013, SPREP will prepare and submit to UNDP MCO Samoa an Annual Project Report (APR) of PIGGAREP that includes the results and status of the PIGGAREP+ activities,two months prior to the MPR meeting. As in PIGGAREP, the UNDPSamoa MCO may request, as necessary, additional monitoring activities during the implementation of the PIGGAREP+ activities. UNDP will also undertake annual monitoring and evaluation (M&E) visits to project sites, as it deems necessary to view project developments in accordance with UNDP procedures for M&E.
The monitoring and evaluation plan for the PIGGAREP+ activities will be prepared (and approved during project inception) based on the PPM shown in Annex 1. The parameters that will be used will be based on the specific indicators of each expected outcome of the project, and that of the project objective. Project monitoring will be provided in accordance with UNDP established procedures and will be provided by the UNDP Samoa MCO with support from UNDP-GEF Energy, Infrastructure, Transport and Technology (EITT) Team at the UNDP Asia-Pacific Regional Centre (APRC) in Bangkok, Thailand.
The designated implementing partners in each country will carry out continuous, self-monitoring using the objectively verifiable indicators (success indicators) specified in the PPM shown in Annex 1. These performance indicators will be assessed continuously by the PIGGAREP PMO in coordination with the designated implementing partners in the 6 countries.
Reporting and Dissemination - The PIGGAREP Project Manager will prepare and submit through SPREP Management quarterly progress reports of the PIGGAREP that includes the results and status of the PIGGAREP+ activities, to the UNDP Samoa MCO. The designated implementing partners in each country will prepare and submit quarterly accomplishment reports of their PIGGAREP+ activities to the PIGGAREP PMO18. The PMO will prepare and submit through SPREP Management to the UNDP Samoa MCO an Annual Project Report (APR) that covers both PIGGAREP and PIGGAREP+ activities. The progress reports shall be concise describing activities undertaken, issues confronting the project and the progress of work with respect to work accomplished and budgets expended.
Financial Monitoring - Financial Reports on the expenditures/disbursements of the PIGGAREP+ Project will be prepared by the PIGGAREP PMO and submitted to the UNDP Samoa MCO on a quarterly basis in accordance with the UNDP Program and Operation Policy and Procedures (UNDP-POPP).
Multipartite Reviews - The PIGGAREP+ Project will be subject to reviews by representatives of the PIGGAREP implementing partner (SPREP), UNDP Samoa MCO and the 6 participating countries. The review will be in conjunction with that of PIGGAREP. During these review meetings, the project performance will be measured against established work plans, expenditures will be reviewed and the overall technical performance will be discussed.
Project Evaluation - The PIGGAREP+ project is subject to two in-depth independent reviews. One will be conducted in the mid-term (3rd Quarter 2013) and the other (final) will be scheduled upon project termination. For each of these evaluations, an independent consultant will be engaged by the UNDP Samoa MCO to do the evaluation. Evaluation reportsdetailing the project achievements (mid-term and
18This will be as follows: SOI SPVRTS – through SOI PIGGAREP National Country Coordinator; TON SPWPS – through TON PIGGAREP National Country Coordinator; TUV DEEF – through TUV PIGGAREP National Country Coordinator; and, North Pacific SREEM (FSM, PLW & RMI) – through SPREP Staff (detailed in SPC North Pacific Office). In RMI, the UNDP-GEF SEDREA PM agreed to provide the reporting inputs to the PIGGAREP PMO.
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 23
final) and lessons learned will be prepared and action plans prepared accordingly to address the evaluation findings and recommendations. In addition monitoring visits by UNDP and/or by SPREP and the implementing partners will also be carried out to find out and addressed any implementation issue that, if not attended to, may impact negatively on the realization of the PIGGAREP+ project outcomes and objective.
SIDS DOCK Program - Pacific
Annex 1: Project Planning Matrix (Log Frame)
StrategyObjectively Verifiable Indicators
Means of Verification Critical AssumptionsIndicator Baseline Target
Objective:Low carbon development for Pacific SIDS through the deployment of renewable energy (RE) resources and promotion of energy efficiency (EE).
% share of RE in the energy mix in the PIGGAREP+ countries by end 2014, %
No. of RE & EE projects implemented in the Pacific SIDS that replicated, or were designed based on, the PIGGAREP+ pilot projects by end 2014
Average specific fuel consumption of the national power utilities in the PIGGAREP+ countries by end 2014, lit diesel/kWh
No. of implemented residential EE projects that were supported by EE financing schemes in PIGGAREP+ countries by end 2014
0.0419
0 EE 0 RE
0.265
0
0.1
5 EE 5 RE
0.252
30
Project activity and progress reports; Project monitoring reports;
Survey of PIC RE projects; Project M&E reports; North-REP project reports
Power utility performance reports; Project activity and progress reports; PPA reports
Survey of PIC RE projects; Project M&E reports
Current RE policy of PICs improves or at least remain the same
PICs can secure own and supplementary funding for their EE/RE projects
Power plant testing & load dispatch optimization is regularly practiced
Established financing schemes are funded by development banks
Component 1: Renewable Energy Technology Applications
Outcome 1.1: Reduced energy costs for telecommunication systems equipment, and reduced reliance on fossil fuels to operate rural telecommunication systems in the Solomon Islands
Average monthly energy cost of the operation of telecom systems in the pilot rural health centers and hospitals by mid-2014, US$
Average monthly electricity usage of telecom systems in the pilot rural health centers and hospitals by mid-2014, kWh
Average monthly no. of hours of operation of telecom systems in all pilot rural health centers and hospitals by mid-2014, hrs.
9,200
11,400
0
0
0
7,200
Project activity and progress reports; Project monitoring reports; PGSP & PACRICS reports
Project activity and progress reports; Project monitoring reports; PGSP & PACRICS reports
Project activity and progress reports; Project monitoring reports; PGSP & PACRICS reports
PACRICS install the required telecom peripheral equipment
Actual daily solar hours =at least equal to the assumed 5 hrs. in the solar PV sizing
Telecom system operation permits are secured
Outcome 1.2: Sustainable, environment friendly
Average monthly energy cost of the operation of well water pumping systems in the pilot rural
1,220 780 Project activity and monitoring reports; Water Management Committee
Water Management Committees charge reasonable water
19 Baseline 2009 figure for the 6 PIGGAREP+ countries (Ref: Regional Indicators 2009 – Economic Development Division, SPC – Suva Regional Office).
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 25
StrategyObjectively Verifiable Indicators
Means of Verification Critical AssumptionsIndicator Baseline Target
and energy cost saving operation of well water pumping systems in rural areas in Tonga
villages by mid-2014, US$ Average monthly energy
consumption of well water pumping systems in the pilot rural villages by mid-2014, kWh
Average monthly no. of hours of operation of RE powered well water pumping systems in pilot rural villages by mid-2014, hrs.
2,175
90
1,080
150
reports Project activity and
monitoring reports; Water Management Committee reports
Project activity and monitoring reports; Water Management Committee reports
tariffs Water Management
Committees manage the operation of installed systems
Actual daily solar hours =at least equal to the assumed 5 hrs. in the solar PV sizing
Outcome 1.3:Sustainable, environment friendly and energy cost saving operation of well water pumping systems in rural areas in Palau
Average monthly energy cost of the operation of the Kayangel water supply system by mid-2014.
Average monthly energy consumption of the Kayangel water supply system by mid-2014
Average monthly no. of hours of operation of RE powered water supply system in Kayangel by mid-2014.
278
2780
0
26
255
150
Project activity and monitoring reports; PWSC water service reports
Project activity and monitoring reports; PWSC water service reports
Project activity and monitoring reports; PWSC water service reports
PWSC charge reasonable water tariffs
PWSC monitors energy consumption
Actual daily solar hours =at least equal to the assumed 5 hrs. in the solar PV sizing
Component 2: Energy Efficiency Technology ApplicationsOutcome 2.1: Increased application of EE technologies and energy savings in the residential sector of Tuvalu
No. of planned EE improvement projects based on EE concepts featured in the Demo Fale by end 2013
No. of implemented EE improvement projects based on EE concepts featured in the Demo Fale by mid-2014.
Cumulative energy savings from implemented new EE improvement projects by mid-2014, kWh
Cumulative energy financing provided by DBT EERF and other
0
0
0
0
1
3
100,000
200,000
Project activity and progress reports; Project monitoring reports
DBT EERF financing reports; Project monitoring reports
Project activity and progress reports; Project monitoring reports
Project activity and progress reports; Project
TEC provide technical assistance to interested clients
EERF of the DBT is operational
EERF of the DBT is operational
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 26
StrategyObjectively Verifiable Indicators
Means of Verification Critical AssumptionsIndicator Baseline Target
commercial banks for EE improvement projects by mid-2014, US$
monitoring reports
Outcome 2.2.A: Improved energy use performance in power generation and reduced power generation cost in the national power utility in RMI
Average specific fuel consumption of the power generation units of MEC by mid-2014, liters diesel oil/kWh
0.265 0.251 Power utility performance reports; Project activity and progress reports; PPA reports
MEC approves and implements the plan for EE improvements in their power plants
MEC-PRP activities are implemented
Outcome 2.2.B: Improved energy use performance in power generation and reduced power generation cost in the 4 state power utilities in FSM
Average specific fuel consumption of the power generation units of the state power utilities by mid-2014, liters diesel oil/kWh CPUC KUA PUC YSPSC
0.263 0.270 0.268 0.274
0.250 0.253 0.252 0.255
Project activity and progress reports; Power utility production reports
CPUC Reports KUA Reports PUC Reports YSPSC Report
4 state power utilities approve and implement the formulated plan for EE improvements in their respective power plants
Outcome 2.3: Operational, effective and widely accepted energy efficiency lending schemes in FSM, RMI and Tuvalu
No. of EE financing schemes established and operational by mid-2014.
No. of EE financing applications approved by mid-2014
0
0
3
10
Project activity and progress reports; Project monitoring reports
Project activity reports; FSMDB, MIDB and DBT reports
IUCN Study endorsed EE financing schemes for FSM, RMI & TUV
Funds for the financing schemes are made available by FSMDB, MIDB and DBT
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 27
Annex 2: Total Budget and Work Plan
Award ID: 00044633Award Title: Pacific Islands Greenhouse Gas Abatement through Renewable Energy Project (PIGGAREP)Business Unit: WSM10Project Title: Pacific Islands Greenhouse Gas Abatement through Renewable Energy Project (PIGGAREP)Project ID: 00087102Implementing Partner (Executing Agency) Secretariat of the Pacific Regional Environmental Programme (SPREP)
Outcome/Atlas Activity
Responsible Party
Fund ID
Donor Name
Atlas Budgetary Account
Code
ATLAS Budget
Description
Amt Qtr 1 (USD)
Amt Qtr 2 (USD)
Amt Qtr 3 (USD)
Amt Qtr 4 (USD)
Amt Qtr 5 (USD)
Amt Qtr 6 (USD) Total (USD)
Component 1: RE Technology ApplicationOutcome 1.1: Reduced energy costs for telecommunication systems equipment, and reduced reliance on fossil fuels to operate rural telecommunication systems in the Solomon Islands
NIM SIDS DOCK
71200 International Consultants 16,000 16,000 9,000 0 0 5,000 46,000
71300 Local Consultants 0 0 0 0 0 6,000 6,000
72100Contractual Services - Companies
0 42,500 37,500 0 0 5,000 85,000
72200 Equipment & Furniture 34,700 104100 34,700 0 0 0 173,500
71600 Travel 3,600 2,300 2,400 0 700 1,000 10,000
75100 GMS20 3,801 11,543 5,852 0 49 1,190 22,435
Sub-Total 58,101 176,443 89,452 0 749 18,190 342,935NIM SIDS
DOCK71200 International
Consultants22,000 25,000 0 0 3,000 5,000 55,000
20General Management Support (GMS) GMS encompasses general oversight and management functions of UNDP at the HQ, Regional and CO levels.
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 28
Outcome/Atlas Activity
Responsible Party
Fund ID
Donor Name
Atlas Budgetary Account
Code
ATLAS Budget
Description
Amt Qtr 1 (USD)
Amt Qtr 2 (USD)
Amt Qtr 3 (USD)
Amt Qtr 4 (USD)
Amt Qtr 5 (USD)
Amt Qtr 6 (USD) Total (USD)
Outcome 1.2: Sustainable, environment friendly and energy cost saving operation of well water pumping systems in rural areas in Tonga
71300 Local Consultants 0 0 0 0 0 5,000 5,000
72100Contractual Services - Companies
0 40,000 39,000 39,000 0 0 118,000
72200 Equipment & Furniture 40,400 121,200 40,400 0 0 0 202,000
71600 Travel 1,500 1,250 1,000 0 0 1,000 4,750
75100 GMS 4,473 13,121 5,628 2,730 210 770 26,932
Sub-Total 68,373 200,571 86,028 41,730 3,210 11,770 411,682Outcome 1.3:Sustainable, environment friendly and energy cost saving operation of well water pumping systems in Kayangel State in Palau
NIM SIDS DOCK
71200 International Consultants 11,800 8,400 0 0 0 4,000 24,200
71300 Local Consultants 0 0 0 0 0 3,000 3,000
72100Contractual Services - Companies
0 17,640 9,760 0 0 0 27,400
72200 Equipment & Furniture 23,180 69,540 23,180 0 0 0 115,900
71600 Travel 2500 250 250 0 0 250 3,250
75100 GMS 2624 6708 2323 0 0 507 12,162
Sub-Total 40,104 102,538 35,513 0 0 7,757 185,912
Sub-Total Outcome 1: 166,578 479,553 210,993 41,730 3,959 37,717 940,530Component 2: EE Technology Application
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 29
Outcome/Atlas Activity
Responsible Party
Fund ID
Donor Name
Atlas Budgetary Account
Code
ATLAS Budget
Description
Amt Qtr 1 (USD)
Amt Qtr 2 (USD)
Amt Qtr 3 (USD)
Amt Qtr 4 (USD)
Amt Qtr 5 (USD)
Amt Qtr 6 (USD) Total (USD)
Outcome 2.1: Increased application of EE technologies and energy savings in the residential sector of Tuvalu
NIM SIDS DOCK
71200 International Consultants 14,800 5,000 0 0 0 5,000 24,800
72100Contractual Services - Companies
0 0 9,600 9,600 9,600 7,200 36,000
72200 Equipment & Furniture 28,680 86,040 28,680 0 0 0 143,400
75100 GMS 3,044 6,373 2,680 672 672 854 14,294
Sub-Total 46,524 97,413 40,960 10,272 10,272 13,054 218,494Outcome 2.2.A: Improved energy use performance in power generation and reduced power generation cost in the national power utility in RMI
NIM SIDS DOCK
71200 International Consultants 8,000 30,000 15,000 12,500 12,500 5,000 83,000
72100Contractual Services - Companies
0 35,500 32,000 10,000 0 0 77,500
72200 Equipment & Furniture 0 0 0 20,000 20,000 0 40,000
75100 GMS 560 4585 3290 2975 2275 350 14,035
Sub-Total 8,560 70,085 50,290 45,475 34,775 5,350 214,535Outcome 2.2.B: Improved energy use performance in power
NIM SIDS DOCK 71200 International
Consultants 28,250 45,000 44,000 33,500 25,000 15,000 190,750
72100 Contractual Services - Companies
0 65,000 68,750 33,500 0 0 167,250
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 30
Outcome/Atlas Activity
Responsible Party
Fund ID
Donor Name
Atlas Budgetary Account
Code
ATLAS Budget
Description
Amt Qtr 1 (USD)
Amt Qtr 2 (USD)
Amt Qtr 3 (USD)
Amt Qtr 4 (USD)
Amt Qtr 5 (USD)
Amt Qtr 6 (USD) Total (USD)
generation and reduced power generation cost in the 4 state power utilities in FSM
72200 Equipment & Furniture 0 0 0 37,720 37,720 0 75,440
75100 GMS 1977 7700 7892 7330 4390 1050 30,341
Sub-Total 30,227 117,700 120,642 112,050 67,110 16,050 463,781Outcome 2.3: Operational, effective and widely accepted energy efficiency lending schemes in FSM, RMI and Tuvalu
NIM SIDS DOCK
71200 International Consultants 0 0 15,000 15,000 0 15,000 45,000
72100Contractual Services - Companies
0 0 39,000 0 0 9,000 48,000
75100 GMS 0 0 3780 1050 0 1680 6,510
Sub-Total 0 0 57,780 16,050 0 25,680 99,510
Sub-Total Outcome 2 85,311 285,198 269,672 183,847 112,157 60,134 996,320Project ManagementOutcome: Successful project implementation and management
NIMSIDS
DOCK
71200 International Consultants 5,115 8,263 12,197 8,263 8,263 16,919 59,020
75100 GMS 358 578 853 578 578 1,184 4,130
Sub-Total Project Management 5,473 8,841 13,050 8,841 8,841 18,103 63,150GRAND TOTAL 257,362 773,592 493,715 234,419 124,958 115,955 2,000,000
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 31
SUMMARY
Source Qtr1 Qtr2 Qtr3 Qtr4 Qtr5 Qtr6 TotalSIDS DOCK 257,362 773,592 493,715 234,419 124,958 115,955 2,000,000Total 257,362 773,592 493,715 234,419 124,958 115,955 2,000,000
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 32
Annex 3: Implementation Requirements
Adequate attention to details and due diligence were rendered during the data gathering works that were done to come up with the necessary information to be used in the design of the various components of this SIDS DOCK PIGGAREP+ Project. Nonetheless, there were still some gaps in the data and information that were obtained, and certain pertinent pre-requirements to initiate some of the proposed activities were not confirmed during the data gathering and project scoping missions that were conducted in the 6 PICs that are covered by the project. In that regard, there are a number of requirements that need to be facilitated and achieved by the project proponents/stakeholders to ensure a successful and effective implementation of the project activities. Hence, the implementation of the PIGGAREP+ activities is contingent to the assurance that the following are done:
Component 1.1 (Solomon Islands SPVRTS)See Annex 4
Securing of the required telecommunications permit from the relevant Government of Solomon Islands entity that is responsible for telecommunications (Telecommunications Commission of Solomon Islands - Ministry of Communication & Aviation). SPC has already initiated work toward the acquisition of the telecommunications permit.
Installation of the required telecommunication equipment at the selected sites (by SOLGRIP-PACRICs) – It is the understanding that these will be provided as soon as the solar PV power systems become available.
Strict compliance by the Government centers with the restrictions on the maximum load that can be supported by the solar PV power system.
Hiring and appointing of the technician that will operate and maintain the installed telecom system including the solar PV power system as well as salary of such post.
Components 1.2 (Tonga SPWPS)and (Palau SREEM)See Annexes 5 & 6
Further assessment and verification of the well water supply system in each selected wells in the Haa’pai group of islands in Tonga and in the well water system of Kayangel State in Palau should be carried out. The important pieces of information to be gathered and calculated from these assessments are necessary for the proper sizing of the solar water pumps, and the solar PV panels/controllers that will be installed in each well21.
Tonga : Hiring and appointment of a person (from the villages) that will be responsible for the upkeep and maintenance of the pump houses inclusive of the installed solar water pump and solar PV power system during and after the project. The project will help facilitate this by the provision of capacity building to the village people (i.e., community water management committees) who will operate, maintain and manage the well water pumping sites.
21 While some of the data about the wells were obtained during the UNDP mission in June 2012, there are still many important system data/information that were not gathered (due to absence of data; corroded nameplates of installed equipment like pumps, diesel engines and electric motors; missing installation drawings, plot plans and elevation drawings of the water system pipeline and distribution system, actual pipe diameters and lengths, pipeline elevations, overhead tank capacities, diesel fuel consumption of pumps, electricity consumption of electric motor-driven pumps, water flow rates, etc.). In coming up with the preliminary sizing of these major equipment/components there were several assumptions used, in particular the water flow rate. The preliminary equipment sizing exercise that was done using gathered data and several assumptions (e.g., water flow rates, pipeline length, etc.) was for the purpose of establishing the budget for this proposed project.
SIDS DOCK Program - Pacific
SIDS DOCK PIGGAREP “PLUS” PROJECT 33
Palau : The Palau Water and Sewerage Company (PWSC) shall ensure the hiring and appointment of a person (from the villages) that will be responsible for the upkeep and maintenance of the water pumping system inclusive of the installed solar water pump and solar PV power system during and after the project, including the supply of chlorine (or hypochlorite solutions) for the water treatment.
Component 2.1 (Tuvalu DEEF)See Annex 7
TEC will manage and operate the Demo Fale. The operational costs of the Demo Fale will be borne by the TEC.
Component 2.2 (RMI SREEM and FSM SREEM)See Annexes 8 & 9
RMI SREEM: The power generator sets at the Majuro Power Plant should be operational. It was noted that Engine
Nos. 2, 3, 4 of the Power Station 1 are not operational due to fire damage. Engine No. 7 of Power Station 2 will soon be undergoing repair and maintenance.
MEC should approve the proposed EE improvement measures (particularly the no cost/good housekeeping and at least some of the low cost measures that will be implemented under the project. The MEC is expected to follow-up on the monitoring and evaluation of the implemented EE improvement measures and load optimization system, preferably investing at least the generated energy savings from the no cost/good housekeeping measures in order to carry out the remaining prioritized measures in the EE improvement implementation plan.
FSM SREEM: Only the operational power generator sets of the 4 state power utilities will be covered by the power
plant testing and EE improvement activities under this project. The state power utilities should approve the proposed EE improvement measures (particularly the no
cost/good housekeeping and at least some of the low cost measures) that will be implemented in their power plants/stations under the project. Each of the 4 state power utilities is expected to follow-up on the monitoring and evaluation of the implemented EE improvement measures and load optimization system, preferably investing at least the generated energy savings from the no cost/good housekeeping measures in order to carry out the remaining prioritized measures in the EE improvement implementation plan.
Component 2.3 (Tuvalu DEEF, RMI SREEM and FSM SREEM)See Annexes 7, 8 & 9
The design of the energy efficiency financing schemes in Tuvalu (EERF), RMI (EELS) and FSM (HELP) is contingent on positive findings from the IUCN managed consultancy in the South Pacific that includes an assessment of the development banks in these 3 PICs (DBT, MIDB and FSMDB) to administer such financing schemes (including a market survey on the appropriateness of the chosen EE technologies).
Subsequent approval and funding of the designed EE financing schemes by the government and development banks of these 3 countries. In the case of Tuvalu, this is also contingent to the expected approval of its proposal to IUCN-ORA for its Green Loan Scheme for Home Energy Efficiency Project.
SIDS DOCK Program - Pacific