· web viewthe tenderer shall show the lump sum cost of each item in the following schedule

1
Concrete - Footpath RFT202003 Contractor………………………………….. Schedule 1 – Composition of Tender The Tenderer shall show the lump sum cost of each item in the following schedule. Item Description Amount ($AUD) 1 Preliminaries $ 2 Concrete Construction $ 3 Concrete Joins and reinforcement $ 4 Miscellaneous $ Tender Lump Sum Amount (excluding GST) $ Tender Provisional Sums (excluding GST) $ TENDER SUM (excluding GST) $ GST $ GROSS TENDER SUM (including GST) $

Upload: others

Post on 27-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · Web viewThe Tenderer shall show the lump sum cost of each item in the following schedule

Concrete - Footpath RFT202003

Contractor…………………………………..

Schedule 1 – Composition of Tender

The Tenderer shall show the lump sum cost of each item in the following schedule.

Item Description Amount ($AUD)

1 Preliminaries $

2 Concrete Construction $

3 Concrete Joins and reinforcement $

4 Miscellaneous $

Tender Lump Sum Amount (excluding GST) $

Tender Provisional Sums (excluding GST) $

TENDER SUM (excluding GST) $

GST $

GROSS TENDER SUM (including GST) $