Wednesday. 08h00: PS back. Injection and setup with beam . 09h00 : LBDS Test. Injection protection check . Switching off LBDS for beam 1. Correct dump. Switching off LBDS for beam 2. Correct dump. System dumped by the LBDS slow control via the BIS loop. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/1.jpg)
LHC planning
Wednesday
08h00: PS back. Injection and setup with beam. 09h00: LBDS Test. Injection protection check.
Switching off LBDS for beam 1. Correct dump. Switching off LBDS for beam 2. Correct dump. System dumped by the LBDS slow control via the BIS loop. Checking TDI for beam 1: Sensor calibration seems OK.
10h00: Check of new MQW functions with beam (during PS intervention). Tunes went off and most of beam lost. Not usable for ramp and beta beat measurements.
11-05-10
![Page 2: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/2.jpg)
LHC planning
LBDS OFF test: Beam 1
11-05-10
![Page 3: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/3.jpg)
LHC planning
TDI test: Sensor readings at full gap
11-05-10
![Page 4: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/4.jpg)
LHC planning
Wednesday 13h30: RF synchronization test for LBDS. Collimation
ramp without beam. Both channels are properly connected: trims on B1 were
properly recorded on LBDS for B1 and the same for B2. We had nevertheless to trim by 1 kHz to see any change.
Collimators ramped OK. No interlock. 16h00: Beam setup at injection. 17h00: Ramp with collimators closing and orbit
feedback. Ramp down and cycle. Beam 2 heavily jumping (“dancing beam”). Orbit feedback
driving orbit correctors. Beam 2 dumped due to beam position interlock. Beam 1 up without losses and with closing collimators (primary
collimators staying at 6 sigma. No collimator interlocks. Position + gap thresholds around
closing jaw positions.
11-05-10
![Page 5: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/5.jpg)
LHC planning
Collimator Ramp Test w/o Beam
11-05-10
![Page 6: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/6.jpg)
LHC planning
Collimator Ramp Test w/o Beam: TCDQ
11-05-10
![Page 7: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/7.jpg)
LHC planning
Ramp with Collimators & Orbit Feedback
11-05-10
![Page 8: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/8.jpg)
LHC planning
Ramp with Collimators & Orbit Feedback
11-05-10
![Page 9: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/9.jpg)
LHC planning
Ramp with Collimators & Orbit Feedback
11-05-10
![Page 10: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/10.jpg)
LHC planning
Ramp with Collimators & Orbit Feedback
11-05-10
![Page 11: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/11.jpg)
LHC planning
Ramp with Collimators & Orbit Feedback
11-05-10
Parasitic beta beat measurement (R. Steinhagen)
![Page 12: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/12.jpg)
LHC planning
Wednesday
21h00: Beam setup at injection. 01h40: Start of ramp for beta beat studies.
Beam 1 dumped due to new energy-dependent gap threshold on four primary collimators.
Collimators saw energy ramping and ran out of allowed gap. Involuntary MPS test.
Not foreseen to change between two setups rapidly. Forgotten thresholds.
02h47: Beam dump 3.5 TeV. Ramp down and cycle. 05h47: Start of ramp for beta beat studies. 07h20: Start of RF studies at 3.5 TeV.
11-05-10
![Page 13: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/13.jpg)
LHC planning
Ramps for beta beat
11-05-10
![Page 14: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/14.jpg)
LHC planning
Ramps for beta beat
11-05-10
![Page 15: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/15.jpg)
LHC planning
Ramps for beta beat
11-05-10
![Page 16: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/16.jpg)
LHC planning
Ramps for beta beat: B1
11-05-10
![Page 17: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/17.jpg)
LHC planning
Ramps for beta beat: B1
11-05-10
![Page 18: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/18.jpg)
LHC planning
Ramps for beta beat: B2
11-05-10
![Page 19: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/19.jpg)
LHC planning
Ramps for beta beat: B2
11-05-10
![Page 20: Wednesday](https://reader035.vdocument.in/reader035/viewer/2022081604/568161da550346895dd1e33a/html5/thumbnails/20.jpg)
LHC planning
Ahead
11-05-10