Harry Styles 027 123 4567 29 Feb 2018 All FH utes on site At Harrys ute week Homes Chapel Rd link (see attached) N/A Harry / Niall / Camille in all FH utes on site on all FH utes on site Simon Cowell 027 123 4666 Camille Rowe No# 54678 10030 In Harry’s ute City Med 44 Main Rd 09 1234567 7 March 18 14 March 18 N/A N/A N/A resource consent ________ ________ N/A N/A TBC N/A F72/67 CCC NOC 44M060 Monday 29 Feb initial team briefing - review Life Saving Rules - site risk review focusing on critical risks and controls - site walkover - review consent - check plant and supplies - review close approach permit - mark out job - complete digging & excavating permit requirements - start on pits A&B - monitor controls Tuesday 1st March daily team briefing including reviewing yesterdays work - risk review and controls update - check plant - complete pits A&B and do quality checks - continually monitor controls Thursday 3rd March same as above plus - complete pits C&D and do quality checks - close permits Wednesday 2nd March same as above plus - start pits C&D - continually monitor controls Install four pits in four days Pass all quality checks and note any variations (council to inspect prior to back fill) Monitor consent conditions (full copy in the crew hut) Control all discharges - wet cement - concrete dust and slurry - noise No subcontractors expected - concrete mixed on site stormwater catch pits x4 drainage team work area for the week 29 Feb - 6 March BBQ Thursday 4.00pm it’s Nialls birthday his shout!! weather forecast is not great for the week so please have your wet weather gear and warm PPE Remember to stop if something goes wrong or you don't feel safe pit A parking pit B pit C pit D . . . . Install 4 stormwater catchpits (average one per day) as marked on attached plan - no live services Basic plan for the week below - Make sure the site and equipment is secure each night Note public holiday on Friday cheers Harry check out the new Life Saving Rules on the notice board sample

Upload: others

Post on 04-Feb-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

  • Harry Styles

    027 123 4567

    29 Feb 2018

    All FH utes on site

    At Harrys ute

    week

    Homes Chapel Rd link (see attached)

    N/A

    Harry / Niall / Camille

    in all FH utes on site

    on all FH utes on site

    Simon Cowell 027 123 4666

    Camille Rowe No# 54678

    10030

    In Harry’s ute

    City Med 44 Main Rd 09 1234567

    7 March 18

    14 March 18

    N/A

    N/A

    N/A resource consent________

    ________N/A

    N/A

    TBC

    N/A

    F72/67 CCC NOC

    44M060

    Monday 29 Feb

    initial team briefing - review Life Saving Rules - site risk review focusing on critical risks and controls

    - site walkover - review consent - check plant and supplies - review close approach permit

    - mark out job - complete digging & excavating permit requirements - start on pits A&B

    - monitor controls

    Tuesday 1st March

    daily team briefing including reviewing yesterdays work - risk review and controls update

    - check plant - complete pits A&B and do quality checks - continually monitor controls

    Thursday 3rd March

    same as above plus - complete pits C&D and do quality checks - close permits

    Wednesday 2nd March

    same as above plus - start pits C&D - continually monitor controls

    Install four pits in four days

    Pass all quality checks and note any variations (council to inspect prior to back fill)

    Monitor consent conditions (full copy in the crew hut)

    Control all discharges - wet cement - concrete dust and slurry - noise

    No subcontractors expected - concrete mixed on site

    stormwater

    catch pits x4

    drainage team work area for the week

    29 Feb - 6 March

    BBQ Thursday

    4.00pm

    it’s Nialls bir

    thday

    his shout!!

    weather forec

    ast is not gre

    at

    for the week

    so please have

    your wet wea

    ther gear

    and warm PP

    E

    Remember to stop if

    something goes wrongor you don't feel safe

    pit A

    parkin

    g

    pit B

    pit C

    pit D

    ....

    Install 4 stormwater catchpits (average one per day) as marked on attached plan - no live services

    Basic plan for the week below - Make sure the site and equipment is secure each night

    Note public holiday on Friday

    cheers Harry

    check out the new

    Life Saving Rules

    on the notice board

    sample

  • Harry Styles

    Niall Horan

    Camille Rowe

    Camille Rowe

    Zayn Malik

    Cheryl Cole

    Louis Tomlinson

    Gigi Hadid

    yes yes yes yes yes

    YES YES YES YES YES

    y y y y y

    yes yes yes yes yes

    YES YES YES YES YES

    yesyes yes yes yes

    YES YES YES YES YES

    y y y y y

    Site setup - Managing traffic (public and site)

    - Unloading and loading plant and equipment

    - Site security (including after hours)

    Activities - Lifting (manual handing)

    - Handling wet cement

    - Cutting concrete

    - Working near underground services

    - Digging and excavating (planned depth 750mm)

    - small excavator and light truck operation

    - small tools use

    S

    S

    S

    S

    S

    S

    S

    S

    S

    S

    M 9

    L 5

    M 9

    M 14

    M 9

    L 5

    L 5

    M 10

    L 5

    L 5

    E

    E

    When cutting concrete use PPE as detailed

    on HowTo guide. Full cover and hard hat is a site requirement

    HJS

    HJS

    NH

    LJP

    Cammie

    ZDM

    CCC

    LMT

    GIH

    29 Feb 2018

    29 21Holiday

    3 4

    29 Feb 2018

    29 Feb 2018

    29th Feb

    29/2/18

    29/2/18

    29/02/18

    29/02/2018

    Fulton Hogan drainage

    Fulton Hogan EC

    FH drainage

    FH traffic

    FH drainage

    FHFulton Hogan

    Fulton Hogan Gizzy

    Install 4 stormwater catchpits (average one per day)

    struck and injured by public or moving plant

    personal injury - damage or loss of property effective barriers and fencing checked regularly - use spotters at busy times

    struck or caught between - plant rollover exclusion zones - eye contact with operators - spotters

    falling into hole - trench collapse - engulfment

    electrocution or burns from hitting cables - bio risk from sewer

    electrocution - cuts sprains strains - eyes hearing breathing damage

    body strain, sprains, cuts and abrasions multi person lifts - used lifting equipment - wear gloves - change methods

    edge barriers - follow digging / excavating permit requirements

    follow digging / excavating permit requirements (and use your locator)

    skin burns from lime / cement - water pollution

    rollovers - struck by or caught between plant seatbelts on - spotters keep clear - plant checks - certified strops etc

    avoid contact use correct PPE - change into dry gear when finished

    plant checks - tag and tested - use correct PPE - trained operators

    slurry run off - dust is breathed in - large cuts, eye, hearing damage bund runoff - suppress dust with water - follow concrete saw HowTo guide

    monitor TMP - use spotters - keep separation from workers

    sample