weft knitting machine production

2
Weft knitting machine production The weft knitting maching production can be calculated using the below formula. Yards of knitted fabric per hour = (A X B X C) / (60 X D) Production per hour in lb= (A X BX C X E X F) / (G X 50400) To calculate the production of weft knitting machine, please use the below calculator. Calculate Yard of knitted fabric per hr Production in lbs per hr  Number of knitting feeders (A)*  Number of revolution/minute (B) * Efficiency of the machine (C)* %  Number of courses per inch (D)* Stitch length (E)* inches  Number of needles (F)* Yarn number in indirect system(English cotton count) (G)* * Required fields Calculate  Clear all Results: Upto decimal point Yards of knitted fabric per hour  Production per hour lbs þÿ þÿ þÿ þÿ þÿ þÿ þÿ þÿ þÿ þÿ

Upload: ashraf-khan01

Post on 10-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

8/8/2019 Weft Knitting Machine Production

http://slidepdf.com/reader/full/weft-knitting-machine-production 1/1

Weft knitting machine production

The weft knitting maching production can be calculated using the below formula.

Yards of knitted fabric per hour = (A X B X C) / (60 X D)

Production per hour in lb= (A X BX C X E X F) / (G X 50400)

To calculate the production of weft knitting machine, please use the below calculator.

Calculate Yard of knitted fabric per hr Production in

lbs per hr 

 Number of knitting feeders (A)* 

 Number of revolution/minute (B)* 

Efficiency of the machine (C)*  % Number of courses per inch (D)* 

Stitch length (E)*  inches

 Number of needles (F)* 

Yarn number in indirect system(English

cotton count) (G)* 

* Required fields Calculate

 Clear all

Results:

Upto decimal point

Yards of knitted fabric per hour   

Production per hour  lbs

þÿ

þÿ

þÿ

þÿ

þÿ

þÿ

þÿ

þÿ

þÿ

þÿ