Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_Welcome.cdr
Welcometo the
First Public Open House
under the
Renewable Energy Approval (REA) Process
for the
Amherst Island Wind Energy Project
Thank you for coming!
! We are happy to share with you information about this clean,
renewable energy project.
! Please take some time to review the display boards and feel
free to ask the Project Team any questions you may have.
! We want to hear from you! If you would like to be added to
the Project mailing list, please sign up at the welcome table.
Please also feel free to take a questionnaire to make sure your
comments and questions are received by the Project Team.
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_ObjectivesOfPOH.cdr
Objectives of this Public Open House
! Provide information about the Project, including the current status.
! Provide an overview of the Renewable Energy Approval (REA) process.
! Share information about the environmental studies which have been completed to
date.
! Answer questions and outline next steps.
! Receive the community's input and feedback for consideration by the Project team.
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_WhoWeAre.cdr
Who Are We
Algonquin Power & Utilities Corp. ("APUC") is a respected and socially responsible
participant in the renewable energy and sustainable infrastructure sectors and with
generating stations across North America including wind energy and hydroelectric
facilities. The Amherst Island Wind Energy Project is being developed by Windlectric
Inc., a subsidiary of Algonquin. Gaia Power Inc. (Kingston, Ontario) is the original
developer of the Amherst Island Wind Energy Project.
Windlectric has retained Stantec Consulting Ltd. to prepare the Renewable Energy
Approval (REA) application, as required under O. Reg. 359/09. For this project, Stantec
is providing professional consulting services in environmental sciences, consultation
and project management.
The entire study team for the Project includes:
Stantec Consulting Ltd. – Renewable Energy Approval Process
HATCH Consulting – Engineering
Intrinsik – Health
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_ProjectOverview.cdr
Amherst Island Wind Energy Project
Project Overview
! 56 – 75 megawatt (MW) Wind Energy Project.! Within Loyalist Township in the County of Lennox and Addington in eastern Ontario.
Lake Ontario
Bath
Stella
Emerald
Amherst Bay(Life Science ANSI)
FERRY ROUTE
TOWNSHIP OFLOYALIST CITY OF
KINGSTON
TOWN OF GREATERNAPANEE
FRONT RD
BATH RD
S SHORE R
D
3RD C
ON R
D
MAIN
ST
2ND CON RD
MCINTYRE RD
HAM R
D
TAYLOR KIDD BLVD
CO
UN
TY
RD
4
DOYLE RD
CO
UN
TY
RD
7
COUNTY RD 22
AMHERST DR
EM
ER
ALD
40 FO
OT R
D
STE
LLA
40 FO
OT R
D
CH
UR
CH
ST
CO
UN
TY
RD
6
TL
INE
RD
WITHERS RD
AR
T M
CG
INN
S R
D
MA
RS
HA
LL F
OR
TY F
OO
T R
D
KILDARE AVE
LO
WE
R 40 F
OO
T R
D
KIDD DR
SH
ER
WO
OD
AV
EP
K C
RE
S
BAYVIEW
DR
PURDY RD
LIN
K R
D
KE
RR
PT R
D
BATH RD
2ND C
ON R
D
Client/Project
Figure No.
Title
PROJECT STUDY AREA
WINDLECTRIC INC.AMHERST ISLAND WIND ENERGY PROJECT
May 2011160960595
Notes
Legend
1.2.
Coordinate System: UTM NAD 83 - Zone 18 (N).Base features produced under license with theOntario Ministry of Natural Resources © Queen'sPrinter for Ontario, 2011.
W:\active\60960595\drawing\GIS\MXD\DisplayMaps\POH1\60960595_PreliminaryProjectLocationMap_20111110.mxd
Revised on: 2011-05-03 By: dharvey
Project Study Area
Road
Railway
Watercourse
Property Boundaries
Municipal Boundary
Wooded Area
Waterbody
Provincially Significant Wetland
Area of Natural and Scientific Interest Boundary
Lake Ontario
KingstonBelleville
U.S.A.
PROJECT LOCATION
ONTARIO
QUEBEC
Ottawa
Toronto
1
W:\active\60960595\drawing\GIS\MXD\DisplayMaps\POH1\60960595_PreliminaryProjectLocationMap_20111110.mxd
0 1 2km
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_ProjectComponents.cdr
Project Components
Basic project components include:
! Approximately 31-37 Siemens SWT-2.3-113 2.3 MW model wind turbine
generators (total installed nameplate capacity of approximately 56 - 75 MW);! A 34.5 kilovolt (kV) electrical power line collector system (will be buried
where possible);! Fibre optic data lines from each turbine and/or wireless technology for the
communication of data;! A submarine cable;! An operations and maintenance building;! A substation (on the island);! A transformer station (on the mainland);! Meteorological tower(s) (met tower);! An access road to the met tower site; and,! Access roads to turbine components and infrastructure.
Temporary components during construction may include a temporary dock, storage
and staging areas at the turbine locations, staging areas along access roads,
delivery truck turnaround areas, central laydown areas, crane paths and associated
watercourse crossings.
The electrical power line collector system would
transport the electricity generated from each
turbine to the substation, along the submarine
cable to the mainland and then to a transformer
station located adjacent to an existing Hydro One
Networks Inc. 115 kV transmission line.
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_SiteSelection.cdr
Site Selection
Why choose Amherst Island?
! Good wind regime;
! Electrical interconnection – the Project has access to connect to existing
transmission capacity on the Hydro One provincial grid;
! Landowner interest;
! Compatible land uses – agricultural land requiring a small footprint for Project
components;
! Flat topography for the Project Study Area; and
! Site access – good existing road infrastructure.
Notes
Legend
1.2.
3.
4.
Coordinate System: UTM NAD 83 - Zone 18 (N).Base features produced under license with theOntario Ministry of Natural Resources © Queen'sPrinter for Ontario, 2011.Imagery Source: First Base Solutions ©, 2011.Imagery Date: 2008The Location of Project Components on theMainland is Perliminary and Suject to Change
Project Study Area
Project Components
Turbine
Operation and Maintenance Building(Potential Location)
Laydown and Storage Area (Potential Location)
Substation (Potential Location)
Potential Cable Landing Areaand Temporary Dock
Existing Features
Road
Railway
Watercourse
Waterbody
Property Boundaries
The preliminary location of project componentson the mainland and the location of the submarinecable crossing have not been finalized at this time. The preliminary location of these components willbe provided in the draft REA reports and duringthe Final Public Open House. The draft REAdocuments will be made available in draft form forreview and comment a minimum of 60 days beforethe Final Public Open House, online at www.amherstislandwindproject.com and inpublic venues. The Final Public Open House isplanned for August 2012.
Mapbook Page
Study Area - Overview
Client/Project
Figure No.
Title
Preliminary Draft Layout-Overview
WINDLECTRIC INC.AMHERST ISLAND WIND ENERGY PROJECT
November 2011160960595
1
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_StudyAreaMAP.cdr
Amherst Island Wind Energy Project
Study Area - Western Portion
Client/Project
Figure No.
Title
Preliminary Draft Layout-Western Portion
WINDLECTRIC INC.AMHERST ISLAND WIND ENERGY PROJECT
November 2011160960595
1A
Notes
Legend
1.2.
3.
4.
Coordinate System: UTM NAD 83 - Zone 18 (N).Base features produced under license with theOntario Ministry of Natural Resources © Queen'sPrinter for Ontario, 2011.Imagery Source: First Base Solutions ©, 2011.Imagery Date: 2008The Location of Project Components on theMainland is Perliminary and Suject to Change
Project Study Area
Project Components
Turbine
Access Road
Collector Lines
Turn Around Path
Laydown Area and Crane Pad
Existing Features
Road
Railway
Watercourse
Waterbody
Property Boundaries
The preliminary location of project componentson the mainland and the location of the submarinecable crossing have not been finalized at this time. The preliminary location of these components willbe provided in the draft REA reports and duringthe Final Public Open House. The draft REAdocuments will be made available in draft form forreview and comment a minimum of 60 days beforethe Final Public Open House, online at www.amherstislandwindproject.com and inpublic venues. The Final Public Open House isplanned for August 2012.
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_StudyArea-WesternMAP.cdr
Amherst Island Wind Energy Project
Notes
Legend
1.2.
3.
4.
Coordinate System: UTM NAD 83 - Zone 18 (N).Base features produced under license with theOntario Ministry of Natural Resources © Queen'sPrinter for Ontario, 2011.Imagery Source: First Base Solutions ©, 2011.Imagery Date: 2008The Location of Project Components on theMainland is Perliminary and Suject to Change
Project Study Area
Project Components
Turbine
Access Road
Collector Lines
Turn Around Path
Laydown Area and Crane Pad
Potential Laydown and Storage Area
Operation and Maintenance Building(Potential Location)
Substation (Potential Location)
Potential Cable Landing Areaand Temporary Dock
Existing Features
Road
Railway
Watercourse
Waterbody
Property Boundaries
The preliminary location of project componentson the mainland and the location of the submarinecable crossing have not been finalized at this time. The preliminary location of these components willbe provided in the draft REA reports and duringthe Final Public Open House. The draft REAdocuments will be made available in draft form forreview and comment a minimum of 60 days beforethe Final Public Open House, online at www.amherstislandwindproject.com and inpublic venues. The Final Public Open House isplanned for August 2012.
Study Area - Central Portion
Client/Project
Figure No.
Title
Preliminary Draft Layout-Central Portion
WINDLECTRIC INC.AMHERST ISLAND WIND ENERGY PROJECT
November 2011160960595
1B
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_StudyArea-CentralMAP.cdr
Amherst Island Wind Energy Project
Operation and Maintenance Building
Study Area - Eastern Portion
Client/Project
Figure No.
Title
Preliminary Draft Layout-Eastern Portion
WINDLECTRIC INC.AMHERST ISLAND WIND ENERGY PROJECT
November 2011160960595
1C
Notes
Legend
1.2.
3.
4.
Coordinate System: UTM NAD 83 - Zone 18 (N).Base features produced under license with theOntario Ministry of Natural Resources © Queen'sPrinter for Ontario, 2011.Imagery Source: First Base Solutions ©, 2011.Imagery Date: 2008The Location of Project Components on theMainland is Perliminary and Suject to Change
Project Study Area
Project Components
Turbine
Access Road
Collector Lines
Turn Around Path
Laydown Area and Crane Pad
(Potential Location)
Existing Features
Road
Railway
Watercourse
Waterbody
Property Boundaries
The preliminary location of project componentson the mainland and the location of the submarinecable crossing have not been finalized at this time. The preliminary location of these components willbe provided in the draft REA reports and duringthe Final Public Open House. The draft REAdocuments will be made available in draft form forreview and comment a minimum of 60 days beforethe Final Public Open House, online at www.amherstislandwindproject.com and inpublic venues. The Final Public Open House isplanned for August 2012.
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_StudyArea-EasternMAP.cdr
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_WindTurbineDetails.cdr
Amherst Island Wind Energy Project
Wind Turbine Details
Wind Sensors
Rotor Blades
Tower
Electric Generator
NacelleHub
Note: not to scale
Approximate Dimensions
Rotor Diameter~113m
TowerHeight99.5m
Base Diameter~4-5m
Typical Spreadfoot Foundation(for illustrative purposes only anddoes not represent the actual design).
Minimum from ground
~46m
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_REA-Process.cdr
Renewable Energy Approval Process
- An Overview
! The Green Energy and Green
Economy Act (GEA), and related
amendments to other provincial
legislation, received Royal Assent
in the Ontario Legislature on May
14, 2009.
! The Project will require a REA
according to Ontario Regulation
359/09 (Renewable Energy
Approvals under Part V0.1 of the
Act) under the Environmental
Protection Act. This regulation
became law on September 24,
2009, was amended on January
1, 2011, and replaces the
previous Ontario Environmental
Assessment Act process for wind
projects.
! REA is a stringent environmental
approval process that Windlectric
Inc. needs to satisfy before
construction.
! The REA application for the
Amherst Island Wind Energy
Project will include a
comprehensive assessment and
plan related to Project design,
construction, operation,
maintenance and
decommissioning.
Proponent's Project Concept
Site Selection, Land Acquisition
Environmental Studies and Consultation, including 60 day public review of reports
Ministry of Natural Resources and Ministry of Tourism and Culture review and confirmation
Submit REA application to MOE
MOE determines 'completeness' and places on Environmental Registry f or 30 day public review
6 month MOE review
MOE decision notice - operated and decommissioned, considering the
local community and environment
how the Project will be built,
Appeals Process/Environmental Review Tribunal
Pu
blic
, Mu
nic
ipa
l an
d A
bo
rig
ina
l Co
ns
ulta
tion
We Are Here
Complete
Complete
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_REA-ProcessSetbacks.cdr
Renewable Energy Aproval Process
- Setback Distances
A key component of the Renewable Energy Approval (REA) process is the
establishment of common setbacks for all renewable energy facilities in the Province.
Within the regulation, there are some setbacks for which studies that identify
potential adverse environmental effects and mitigation measures can be conducted if
it is not possible to meet the setback requirements.
For example, in some instances, development and site alteration may be possible
within a setback area if an Environmental Impact Study (EIS) is completed to assess
potential impacts and mitigation measures.
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_KeySetbacks.cdr
Key Setbacks
Key setbacks which will be applied throughout the design of
the Project are as follows:
Feature Setback Distance Study Alternative When Within Setback
Non-participating receptor 550 m (from turbine
base)
An Environmental Noise Impact Assessment will be
completed for the Project according to MOE Noise
Guidelines.
Public road right-of
railway right-of-way
-way and Turbine blade length
+ 10 m (from turbine
base)
N/A
Property line Turbine height
(excluding blades)
(from turbine base)
Does not apply to parcels of land if the abutting parcel
of land is a participant in the Project or if it is
demonstrated that the wind turbine will not result in
adverse impacts on nearby business, infrastructure,
properties or land use activities.
Provincially significant southern
wetland
120 m Development not permitted within feature.
Development and site alteration may be possible within
setback area; Environmental Impact Study required.
Provincially significant Area of Natural
and Scientific Interest (EarthScience)
50 m Development and site alteration may be possible within
natural feature and setback area; Environmental Impact
Study required. Provincially significant
(Life Science)
Area of Natural
and Scientific Interest
120 m
Significant valleyland 120 m
Significant woodland 120 m
Significant wildlife habitat 120 m
Lake 120 m from the
average annual high
water mark
Development and site alteration may be possible within
setback area; additional report required. No turbine or
transformer located within a lake or within 30 m of the
average annual high water mark.
Permanent or intermittent stream 120 m from the
average annual high
water mark
Development and site alteration may be possible within
setback area; additional report required. No turbine or
transformer located within a permanent or intermittent
stream or within 30 m of the average annual high
water mark.
Seepage area 120 m Development and site alteration may be possible within
setback area; additional report required. No turbine or
transformer located within 30 m of a seepage area.
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_REA-Reports.cdr
Renewable Energy Approval Reports
! Draft Project Description Report (available)
! Construction Plan Report
! Design & Operations Report
! Property Line Setback Assessment Report! Noise Assessment Report
! Decommissioning Plan Report
! Consultation Report
! Natural Heritage Assessment (and Environmental Impact Study, if required)
! Environmental Effects Monitoring Plan
! Water Assessment Report (and Water Body Report, if required)
! Protected Properties and Heritage Assessment
! Archaeological Assessment (Stage 1 and 2, Marine)
! Wind Turbine Specifications Report
All reports, with the exception of the Consultation Report, will be made available in
draft form for review and comment a minimum of 60 days before the Final Public
Open House online at www.amherstislandwindproject.com and in public venues.
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_TechnicalStudies.cdr
Technical Studies
Environmental studies are being completed to fully understand the local environment
and assist with the development of the Project Layout.
The technical studies have included, to date, the analysis of:
! Wildlife and wildlife habitat, including Species at Risk and Significant Wildlife
Habitat;! Bird breeding and migration areas;! Waterbodies and aquatic resources;! Woodlands, vegetation, and other significant natural features (e.g. wetlands and
Areas of Natural and Scientific Interest);
and! Archaeological Features, Built Heritage Features and Protected Properties.
The Natural Heritage Assessment (NHA), Water Assessment, Stage 1 and 2
Archaeological Assessments, and Protected Properties and Heritage Assessment
reports, with more information on the natural environment in the Study Area, will be
provided in draft form for public review and comment a minimum of 60 days before
the Final Public Open House.
! Preliminary Noise Analysis;
Natural Heritage and Water Body Assessments
Our natural environmental assessments:
! Commenced spring 2011.
! Included site assessments of the vegetation communities and associated wetlands,
wildlife monitoring surveys (e.g., mammals, amphibians, reptiles and birds).
! Field survey for bat hibernacula and maternity roost.
! Field work specific to avian wildlife have included:
! Spring waterfowl – Staging and foraging.! Spring Landbird – Staging.! Spring shorebirds.! Species at risk such as Short-eared Owl,
Bobolink, Least Bittern and Whip-poor-will.! Staging swallows.! Summer breeding birds.! Fall waterfowl.! Fall landbird - Staging.! Fall staging raptors.! Wintering raptors and owls.
! Water body assessment to date includes a review of surface water features as well
as near shore fisheries community and habitat assessments for fish and mussels
along the north shore of Amherst Island and the mainland.
! Additional natural environment survey work will continue into 2012.
! The results of the studies will be documented in the Natural Heritage Assessment
(and Environmental Impact Study, if required) as well as the Water Assessment
Report (and Water Body Report, if required). The documents outlining the findings
will be made available 60 days before the second Open House.
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_NaturalHeritage-WaterBodyAssess.cdr
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_NHA-WaterBodyMAP.cdr
Amherst Island Wind Energy Project
NHA and Water Body Assessment
Bath
Stella
Emerald
Amherst Bay(Life Science ANSI)
FERRY ROUTE
Lake Ontario
FRONT RD
BATH RD
S SHORE R
D
3RD C
ON R
D
MAIN
ST
2ND CON RD
HAM RD
TAYLOR KIDD BLVD
DOYLE RD
MCINTYRE RD
CO
UN
TY
RD
4
CO
UN
TY
RD
7
AMHERST DR
EM
ER
ALD
40 FO
OT R
D
COUNTY RD 22
STE
LLA
40 FO
OT R
D
CH
UR
CH
ST
CO
UN
TY
RD
6HWY 33
AR
T M
CG
INN
S R
D
MA
RS
HA
LL F
OR
TY
FO
OT R
D
KILDARE AVE
LO
WE
R 40 F
OO
T R
D
JIM
SN
OW
DR
KIDD DR
SH
ER
WO
OD
AV
EP
K C
RE
S
BAYVIEW
DR
PURDY RD
LIN
K R
D
KE
RR
PT R
D
BATH RD
2ND C
ON R
D
Client/Project
Figure No.
Title
Natural FeaturesMap
WINDLECTRIC INC.AMHERST ISLAND WIND ENERGY PROJECT
November 2011160960595
Notes
Legend
1.2.
Coordinate System: UTM NAD 83 - Zone 18 (N).Base features produced under license with theOntario Ministry of Natural Resources © Queen'sPrinter for Ontario, 2011.
W:\active\60960595\drawing\GIS\MXD\DisplayMaps\POH1\60960595_NaturalFeatures_20111110.mxd
Revised on: 2011-05-03 By: dharvey
Project Study Area
Road
Railway
Watercourse
Property Boundaries
Wooded Area
Waterbody
Provincially Significant Wetland
Area of Natural and Scientific Interest Boundary
Waterbody Setbacks (120m)
Waterbody Status
REA Waterbody
Not a REA Waterbody
1
W:\active\60960595\drawing\GIS\MXD\DisplayMaps\POH1\60960595_NaturalFeatures_20111110.mxd
0 1 2km
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_ArchaeologicalAssessment.cdr
Built Heritage, Protected Properties and
Archaeological Assessment
! Stage 1 and 2 Archaeological Assessments
! Marine Archaeology
! Heritage Impact Assessment
! Protected Properties Assessment
Heritage, Protected Properties, and Archaeological Assessments include a review of
heritage and archaeological resources.
! These studies are underway with completion anticipated for mid-2012
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_EnvironmentalNoise.cdr
! There are two potential sources of sound typically associated with wind turbines:
! Aerodynamic: Blades pass through the air and create a “swishing” sound! Mechanical: Originates from the gearbox and generator that are often housed in the
nacelle. The turbines selected for this project are direct drive and do not have gearboxes.
! An Environmental Noise Impact Assessment will be completed to ensure compliance with
the Ministry of the Environment (MOE)'s regulatory requirements. The report will be
included in the Design and Operations Report.
! Ontario use an internationally accepted sound model, which is supported by experiences in
the province and in other jurisdictions.
! Current regulatory requirements are intended to limit sound levels outside the nearest
dwelling to 40 dBA. This sound level is equal to the World Health Organization Europe
(2009) night-time noise guideline that is a health-based value designed to allow good
conditions for sleeping.
! The assessment will also take into consideration other operational and proposed wind
facilities within a 3 km radius of noise receptors. This will help to ensure a conservative
(cautious) approach is being used which considers cumulative noise effects.
Environmental Noise!
!
!
!
!
!!
!!
!
!!!
!!
!!
!!
!!
! !
!
!
!
!
!
!
!
!
!
)
FRONT ROAD
SO
UTH
SHO
RE
RO
AD
MAIN
STR
EE
T
3RD
CO
NCES
SION
RO
AD
2ND
CONCESSION
ROAD
EM
ER
ALD
40
FO
OT
RO
AD
STELL
A
40
FO
OT
RO
AD
CH
UR
CH
STR
EE
T
AR
T
MC
GIN
NS
RO
AD
LOW
ER
40FO
OT
RO
AD
ACADEMY STREET
ABBEY DAWN DRIVE PURDY ROADWESTBURY AVENUE
KER
R
PO
INT R
OA
D
HE
RIT
AG
ED
RIV
E
MCDONALDS
LANE
1ST
STR
EE
T
GLENORA DRIVE
PRUYN CRESCENT
BATHROAD
2ND
CONCESSIO
N
ROAD
QUEENSTREET
Lake Ontario
NorthChannel
R285
R039
R354
R224
R352
R179
R509
R356
R051
R218
R501
R471
R003
R010
R211R569
R008
R467
R213
R052
R122
R427
R121
R017
R287
R468
R226
R579
R567
R359
R577
R363
R460
R571
R469
R220
R436
R235
R401
R151
R428
R395
R391
R437
R537
R573
R214
R086
R143
R113
R212
R037
R495
R225
R148
R260
R215
R330
R291R388
R182
R184R321
R284
R084
R047
R228
R258
R050
R580
R463
R541
R248
R357
R259
R329
R439
R283
R470
R574
R116
R181
R358
R042
R497
R189
R367R222
R142
R255
R566
R192
R572
R332
R531
R282
R013
R424
R048
R183
R507
R502
R326
R054
R568
R045
R249
R361
R461
R075
R187
R353
R323
R433
R532
R389 R432
R216
R146
R392
R398
R006
R079
R351
R320
R289
R318
R319
R149
R188
R046
R498R393
R111
R043
R217
R191
R144R316
R044
R362
R546
R434
R506
R251
R458
R250
R190
R545
R575
R317
R257
R544
R426
R529
R327
R038
R466
R176
R089
R499
R325
R147
R435
R076
R473
R543
R081R041
R288
R535
R534
R290
R397
R533
R399
R219
R465
R464
R256
R083
R223
R112
R170
R503
R366R394
R077
R505
R123
R504
R331
R425R016
R440
R088
R152
R004
R119
R324
R390
R080
R253
R293
R295
R431
R082
R154
R286
R494
R281
R156
R115
R186
R360
R423
R040
R438
R462
R117
R153
R500
R155
R110
R203
R131
R058
R364
R404
R441
R590
R125
R159
R374R459
R520
R304
R209
R386
R373
R031
R493
R227
R310
R194
R272
R479
R411
R024
R414
R196
R277
R490
R169
R105
R305
R128
R350
R477
R527
R586
R375
R063
R195
R302
R098
R516
R308
R557
R349
R383
R488
R415R271
R487
R175
R347
R565
R456
R200
R261
R556
R519
R238
R233
R416
R164
R269
R262
R280
R141
R014
R417
R555
R561
R587
R296
R405
R382
R410
R303
R025
R526
R109
R278
R101
R265
R443R095
R333
R245
R517
R092
R206
R002
R372
R445
R005
R384
R483
R387
R231
R107
R270
R582
R099
R476
R103
R338
R094
R102
R475
R313
R145
R525
R369
R127
R197
R171
R315
R396
R481
R236
R482
R413
R513
R370
R450
R243
R337
R268
R240
R241
R300
R339
R420
R138
R026
R342
R168
R576
R422
R100
R129
R242
R166
R068
R056
R412
R239
R306
R266
R091
R454
R570
R314
R202
R097
R030
R377
R376
R173
R019
R057
R160
R322
R029
R234
R210R108
R012
R163
R457
R254
R297
R134
R055
R018
R140
R446
R135
R592
R521
R062
R552
R518
R096
R267
R585R035
R299
R584R583
R020
R204
R139
R207
R589
R419
R453
S10
S37
S36
S35
S34
S33
S32
S31
S30
S29
S28
S27
S26
S25
S24
S23
S22
S21
S20
S19
S18
S17
S16
S15
S14
S13
S12
S11
S09
S08
S07
S06
S05
S04
S03
S02
S01
SUBS
356000
356000
359000
359000
362000
362000
365000
365000
368000
368000
48
8400
0
48
8400
0
48
8600
0
48
8600
0
48
8800
0
48
8800
0
48
9000
0
48
9000
0
48
9200
0
48
9200
0
48
9400
0
48
9400
0
!
!
! Highway 401
Highway 33
Highway 7
Hig
hw
ay
15
Hig
hw
ay
37
High
way
62
High
way
41
Highway 62
Highway 7
Hig
hw
ay
62
Kingston
BellevilleQuinte West
Lake Ontario
Bobs LakeLower Rideau Lake
Big Rideau Lake
East Lake
Rice Lake
Sturgeon Lake
Project Area
KEY MAP
Legend
Noise Receptor - Existing
Noise Receptor - Vacant
) Substation
Turbine
Ferry Connection
Road
Watercourse
Parcel
Waterbody
Evaluated Wetland
Wetland
Woodland
Notes:1. Produced by Hatch under licence from Ontario Ministry of Natural Resources, Copyright (c) Queens Printer 2011.2. Spatial referencing UTM NAD 83.
Windelectric Inc.
Preliminary Draft Layoutfor Wind Turbine Pads
and Noise Contours
Amherst Island Wind Project
N
S #
0 500 1,000 1,500250Metres
Approximately 77% of existingreceptors are at 750 m or greaterdistance from wind turbines.
Sound Pressure Level (dBA)
40.0
- 41.0
41.1
- 44.0
44.1
- 47.0
47.1
- 49.0
49.1
- 52.0
52.1
- 55.0
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_Health-WindPower.cdr
Health and Wind Power
Public health and safety will be considered during all stages of the Project.
! Many studies have been conducted world-wide to examine the relationship between
wind turbines and possible human health effects.
! In Ontario
! “Ontario doctors, nurses, and other health professionals support energy
conservation combined with wind and solar power – to help us move away from
coal”
! In “The Potential Health Impact of Wind Turbines” (May 2010), Ontario's Chief Medical
Officer of Health recently examined the scientific literature related to wind turbines
and public health, considering potential effects, such as dizziness, headaches, and
sleep disturbance. The report concluded that:
! “…the scientific evidence available to date does not demonstrate a direct causal
link between wind turbine noise and adverse health effects. The sound level from
wind turbines at common residential setbacks is not sufficient to cause hearing
impairment or other direct health effects, although some people may find it
annoying.”
! The report also concluded that low frequency sound and infrasound from current
generation upwind model turbines are well below the pressure sound levels at
which known health effects occur. Further, the report states that there is no
scientific evidence to date that vibration from low frequency wind turbine noise
causes adverse health effects.
! Overall, health and medical agencies agree that sound from wind turbines is not loud
enough to cause hearing impairment and is not causally related to adverse effects*.
! Scientists and medical experts around the world continue to publish research in this
area. Through our health consultants, Windlectric is committed to keeping informed
on the most recent findings.
*e.g., Chatham-Kent Public Health Unit, 2008; Minnesota Department of Health, 2009; Australian Government, National Health and Medical Research Council, 2010; Australian Government, 2011. (all referenced documents can be found on the project website at: www.amherstislandwindproject.com).
Ontario College of Family Physicians, Registered Nurses Association of Ontario, Canadian Association of Physicians for the Environment, Physicians for Global Survival, the Asthma Society of Canada, and the Lung Association
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_CommunityBenefits.cdr
Benefits of the Project
! Helps to meet forecasted energy demand while reducing greenhouse gas levels;
! New supply of safe and clean energy; and
! Helps to meet Ontario's commitment to renewable energy and phasing out of
coal-fired power plants.
Windlectric will be a good neighbour in your community. The Project would also be a
positive benefit to the community:
! Potential employment opportunities for local residents (during pre-
construction, construction and operations);
! Tax payments to Loyalist Township. Calculated at $40,000/MW x an assessed
mill rate. Estimate, at this time, from $300,000 to $400,000 per year;
! Supplemental income for participating
landowners; and
! Improvement to some local roadways.
Community Benefits
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_PropertyValues.cdr
Property Values
Windlectric acknowledges public comments and concerns related to potential
property value impacts. Recent studies have shown that neither the view of the
turbines nor the proximity of turbines has any consistent measurable or statistically
significant effect on property values.
! Canadian Wind Energy Association (CanWEA) hired independent consultants to
review property values in Chatham Kent and the study also indicated that in some
cases, local impacts of increased tourism and economic stimulus from wind farms
can actually drive up property values in host communities (February 2010).
! A publicly funded study on this subject conducted in the U.S. by Ben Hoen and
Ryan Wiser of the Lawrence Berkeley National Laboratory (December 2009) found:
! No evidence that homes near wind facilities are stigmatized by those facilities
as compared to other homes in the region.! No statistical evidence that homes with a view of wind turbines have different
values than homes without such views.! No statistical evidence that homes within ¼, ½ and 1 mile of turbines sell for
different values than those further away.
All documents can be found on the project website at:
www.amherstislandwindproject.com
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_LiaisonCommittee.cdr
Liaison Committee
Windlectric has established an Amherst Island Wind Energy Project Liaison
Committee. The purpose of this Committee is: “To serve a role in providing
two-way communications between the local community,
Windlectric/Algonquin Power (the project owner/developer). “
This Committee, comprised of four interested Amherst Island residents, has
met three times, and will continue to meet at key milestones during the REA
process.
Terms of Reference, meeting notes and meeting agendas are posted on the
Project website.
Decommissioning
At the end of the Project's life, Windlectric Inc. will repower or decommission
the Project.
! Decommissioning would include the dismantling and removal of facility
components, and restoring the land.
! Components would be recycled or reused wherever possible.
! A site restoration plan would be developed based on the standards and
best practices at the time of decommissioning.
A Decommissioning Plan Report is required as part of the Renewable Energy
Approval application package, and will be made available for public review a
minimum of 60 days prior to the final open house for the Project.
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_ProjectSchedule.cdr
Project Schedule
Initiate Public Renewable Energy Approval
Process – May 2011
REA Technical Studies
Draft REA Reports to Public – June 2012
Public Open House #2 - August 2012
REA Approval (estimated) - December 2012
Start of Construction - January 2013
Commercial Operation Date (COD)
Repowering/Decommissioning
2034 (approximately 20 years after COD)
2011
2013
2014
We AreHere
On
go
ing
co
nsu
ltati
on
wit
h g
ove
rnm
en
t ag
en
cies
an
d lo
cal c
om
mu
nit
y m
em
bers
,
Ab
ori
gin
al c
om
mu
nit
ies,
Lo
yalis
t T o
wn
ship
(in
th
e C
ou
nty
of
Len
no
x an
d A
dd
ing
ton
).
If p
roje
ct a
pp
rove
d.
2012
Tasks and Proposed Dates
- approximately February 2014
- ongoing through to December 2011
Public Open House #1 - December 2011
Amherst Island Wind Energy Project
Filepath: W:\active\60960595\drawing\Corel\DisplayPanels\POH-1_2011-12\60960595_POH-1_2011-12_WeWantToHearFromYou.cdr
We Want To Hear From You!
Copies of the display boards from this Public Open House will be available on the
Project website (www.amherstislandwindproject.com) following the Open House.
Opportunities for feedback:
! Sign up at the front table to be added to the Project notification list.
! Pick up and fill out a questionnaire. You can return it to the front table tonight
or mail it in at a later date with a postage paid envelope.
! Call the Project Team to share your comments, toll-free at 1-855-466-8068.
! Email your thoughts to [email protected].
! Visit us at the final Public Open House for the Renewable Energy Approval
anticipated for August 2012.
! Visit us on the web at www.amherstislandwindproject.com for additional
project details.