welcome his excellency mr. sahban f. mahjoob minister of power government of iraq & the...

47
WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Upload: crystal-parsons

Post on 17-Jan-2016

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

WELCOME

HIS EXCELLENCY

Mr. SAHBAN F. MAHJOOBMinister of Power

GOVERNMENT OF IRAQ

&

The Delegation

Page 2: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Indian Power Grid – its Evolution• Phenomenal expansion since Independence

Generation : 1349 MW 101,866 MW (in 1947) (in 2001)

Grid :

Local grid – at the time of Independence.

State Grids – emerged in 1960s.

Regional Grids – in 1970s.

Five Regional Grids – Northern, Western, Southern,

Eastern & North-eastern

National Grid – under progress.

Page 3: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

DEVELOPMENT OF NATIONAL GRID

NER

ER

NR

WR

SR

EXISTING

500MW

MW1000

MW500

GAZUWAKA

CHANDRAPUR

VINDHYACHAL

SASARAM

UNDERCONST.

EXISTING

400 kV

220 kV

BONGAIGAONBIRPARA

MALDA

KORBA BUDHIPADAR

KOLHAPUR

BELGAUM

U.SILERU

BALIMELA

DEHRISAHUPURI

MALANPUR

AURAIYA

PHASE-I(By 2002)

Back

Page 4: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Indian Power Scenario – at a GlanceExisting• Installed capacity - 101,866 MW Coal – 71%

Hydro – 25% Nuclear &

others – 4%

• Peak demand Peak power - 78,000 MW

Energy (average) - 1395 MU/day

• Availability Peak power - 68,000 MW

Energy (average) - 1288 MU/day

• Shortage Peak power - 10,000 MW (12.8%)

Energy - 107 MU/day (7.7%)

Page 5: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Indian Power Scenario – at a Glance All figs. are in MW

Region Peak Installed Peak Demand Capacity

Surplus/Deficit

Northern 21,000 27, 000- 2,100Western 25,000 30,800 - 4,500Southern 20,400 24,800 - 2,600Eastern 7,800 15,700 +

2,000North-eastern 950 1,800 - 25

• Limited exchange of power between Regions --- Main Reasons:– Inadequate interconnectors, especially from Eastern Region– Lack of proper Commercial and administrative mechanisms

Page 6: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation
Page 7: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

ROURKELA

RAIPUR HIRMA

TALCHER

JAIPUR

NER

ERWR

NR

SR

B'SHARIF

ALLAHABAD

SIPAT

GAZUWAKA

JEYPORECHANDRAPUR

SINGRAULI

VINDHYA-

1000MW

500MW

LUCKNOW

CHICKEN NECK

KRISHNA

TEESTA

MISA

KATHAL-GURI

LEGEND

765 KV LINES

400 KV LINES

HVDC B/B

HVDC BIPOLE

EXISTING/ X PLAN

ZERDA

HISSAR

BONGAIGAON

DEVELOPMENT OF NATIONAL GRID

KOLHAPUR

NARENDRA

KAIGA

MANGALORE

PONDA

IX PLAN

MARIANI

N.K.

KAHALGAON

RANGANADI

SEONI

CHEGAON

BHANDARA

DEHGAM

KARAD

LONIKAND

VAPI

GANDHAR/

TALA

BANGLA

BALLABGARH A'PUR(DELHI RING)

BANGALORE

KOZHIKODE

COCHIN

KAYAMKULAM

TRIVANDRUM

PUGALUR

KAYATHAR

KARAIKUDI

CUDDALORE

SOUTH CHENNAI

KRISHNAPATNAM

CHITTOOR

VIJAYAWADA

SINGARPET

PIPAVAV

LIMBDI

KISHENPUR

DULHASTI

WAGOORA

MOGA

URI

BHUTAN

RAMAGUNDAM

RAVI

JULLANDHAR

DESH

NAGAR

VARANASI

/UNNAO

M'BAD

PURNEA

KORBA

NAGDA

SILIGURI/BIRPARA

TEHRI

MEERUT

BHIWADI

BINA SATNA

MALANPURSHIROHI

KAWAS

PHASE - II(By 2007)

SIRSI

CHAL

JETPURAMRELI

BOISARPADGHE

DHABOL

KOYNA

/BARH

G'PUR

HOSUR

Back

Page 8: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

ROURKELA

RAIPUR HIRMA

TALCHER

JAIPUR

NER

ERWR

NR

SR

B'SHARIF

ALLAHABAD

SIPAT

GAZUWAKA

JEYPORECHANDRAPUR

SINGRAULI

VINDHYA-

1000MW

500MW

LUCKNOW

DIHANG

CHICKEN NECK

KRISHNA

TEESTA

TIPAIMUKH

BADARPUR

MISA

DAMWE

KATHAL-GURI

LEGEND

765 KV LINES

400 KV LINES

HVDC B/B

HVDC BIPOLE

EXISTING/ X PLAN XI PLAN

ZERDA

HISSAR

BONGAIGAON

DEVELOPMENT OF NATIONAL GRID

KOLHAPUR

NARENDRA

KAIGA

MANGALORE

PONDA

IX PLAN

MARIANI

N.K.

KAHALGAON

RANGANADI

SEONI

CHEGAON

BHANDARA

DEHGAM

KARAD

LONIKAND

VAPI

GANDHAR/

TALAARUN

BANGLA

BALLABGARH A'PUR(DELHI RING)

BANGALORE

KOZHIKODE

COCHIN

KAYAMKULAM

TRIVANDRUM

PUGALUR

KAYATHAR

KARAIKUDI

CUDDALORE

SOUTH CHENNAI

KRISHNAPATNAM

CHITTOOR

VIJAYAWADA

SINGARPET

PIPAVAV

LIMBDI

KISHENPUR

DULHASTI

WAGOORA

MOGA

URI

BHUTAN

RAMAGUNDAM

SATLUJRAVI

JULLANDHAR

DESH

NAGAR

VARANASI

/UNNAO

M'BAD

PURNEA

KORBA

NAGDA

SILIGURI/BIRPARA

PHASE - III

TEHRI

MEERUT

BHIWADI

BINA SATNA

MALANPURSHIROHI

KAWAS

AMRAVATI

AKOLA

(By 2012)

AGRA

SIRSI

CHAL

JETPURAMRELI

BOISARTARAPUR

PADGHE

DHABOL

KOYNA

/BARH

G'PUR

HOSUR

Page 9: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Power Transfer Envisaged from ER and NER by 2012

Table

Page 10: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation
Page 11: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

NORTHERN REGIONAL POWER SYSTEMSalient features

Largest in geographical area amongst the five regions covering 30.7% of the area and 28% of the country’s population.

Maximum variation in weather conditions from severe cold to peak summer.

Large distances between generation centers and load centers and power is transmitted over long distances.

Availability of Hydro generation reduces drastically in winter months.

Largest number of constituents (8 states/UT’s, 3 Central Generating Companies, one Central Transmission Utility and Bhakra Beas Management Board).

Page 12: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

NORTHERN REGIONAL POWER SYSTEMSalient features

Establishment of the first super thermal power station (Singrauli STPS) and 400 kV transmission system in the country.

Establishment of the first High Voltage Direct Current (HVDC) long distance transmission system in the country (2x750 MW, + 500 kV Rihand-Dadri HVDC bipole).

First HVDC back-to-back interconnection with Western Region (2x250 MW back-to-back HVDC station at Vindhyachal).

First 400 kV Static Var Compensators (SVC’s) in the country (2x + 140 MVAR SVC at Kanpur).

Largest capacity of combined cycle gas power stations amongst the five regions (2480.47 MW) located along the 700 Kms. long Hazira-Bijaipur-Jagdishpur (HBJ) natural gas pipeline of GAIL.

Page 13: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation
Page 14: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation
Page 15: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Grid Operation by POWERGRID• Earlier performed by personnel from Central

Electricity Authority on the platform of REB• Transferred to POWERGRID in stages

-SRLDC 1994-ERLDC 1995-WRLDC 1996-NRLDC 1996

• Overall improvement in grid operation since takeover by POWERGRID

Page 16: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Overall Improvements by POWERGRIDOverall Improvements by POWERGRID

o Better hydro-thermal mix through objective & rational Scheduling.

o Better merit order operation enhancing the overall efficiency.

o Effective use of transmission lines and enhanced utilisation of their capabilities, retaining stability margins.

o Better commercial practices.

o Improvement in grid parameters (e.g. voltage, frequency profiles).

o Better utilization of Inter-regional links.

o Infused the grid discipline.

o Lower backing down of Power plants.

Page 17: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

% INCREASE IN DEMAND MET vis-a-vis % INCREASE IN CAPACITY

4.01

2.47

5.64

4.37

0.00

1.00

2.00

3.00

4.00

5.00

6.00

1991-1996 1996-2001

YEAR

PE

RC

EN

TAG

E I

NC

RE

AS

E

% INCREASE IN CAPACITY % INCREASE IN DEMAND MET

Page 18: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

HIGH FREQUENCY UNIT OUTAGES / REACTOR POISONING OUT AT NARORA

34.00

5.804.661.40

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

40.00

1993-1996 1996-2001

YEAR

YE

AR

LY A

VE

RA

GE

YEARLY AVERAGE HIGH FREQUENCY TRIPPPINGS ATNARORA

YEARLY AVERAGE INSTANCES OF POISIONING OUT OFREACTOR AT NARORA

Page 19: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Overall Improvements by Overall Improvements by POWERGRIDPOWERGRID

o Optimum capacity utilisation

o Better co-ordination among constituents.

o Transparency in grid operation.

o Documentation of Grid Code, Regional operating Procedures, Black Start Procedures etc.

o Introduction of modern State-of-the-art technology in grid operation.

o Better communication facilities

o Introduction of modern SCADA & EMS scheme (ULDC)

Page 20: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

MODERNISATION OF MODERNISATION OF POWER SYSTEM OPERATIONPOWER SYSTEM OPERATION

ULDC SCHEMEsULDC SCHEMEs

Page 21: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

POWERGRID IS IMPLEMENTING ULDC SCHEMES

IN ALL THE FIVE REGIONS WITH STATE OF THE ART

SCADAENERGY MANAGEMENT SYSTEM

ANDDEDICATED COMMUNICATION SYSTEM

UNIFIED LOAD DESPATCH & COMMUNICATION(ULDC) SCHEMES

Page 22: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

OBJECTIVESOBJECTIVES• REAL TIME MONITORING & CONTROL OF POWER SYSTEM REAL TIME MONITORING & CONTROL OF POWER SYSTEM

OPERATION OPERATION

• REAL TIME ENERGY MANAGEMENT SYSTEMREAL TIME ENERGY MANAGEMENT SYSTEM* OPERATION SCHEDULING* OPERATION SCHEDULING* POWER SYSTEM ANALYSIS* POWER SYSTEM ANALYSIS* OPTIMUM LOAD GENERATION BALANCE* OPTIMUM LOAD GENERATION BALANCE

• DYNAMIC PLANNING FOR RELIABLE SYSTEM OPERATIONDYNAMIC PLANNING FOR RELIABLE SYSTEM OPERATION

• REAL TIME EVALUATION OF IMPACT OF POSSIBLE REAL TIME EVALUATION OF IMPACT OF POSSIBLE CONTINGENCIES ON THE SYSTEMCONTINGENCIES ON THE SYSTEM

• PREVENTIVE ACTION TO ENSURE SYSTEM STABILITYPREVENTIVE ACTION TO ENSURE SYSTEM STABILITY

Page 23: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

• QUICK RESTORATION OFQUICK RESTORATION OF GRID IN CASE OF GRID IN CASE OF DISTURBANCEDISTURBANCE

• COORDINATED CONTROL OF MVAR & LOAD FLOW TO COORDINATED CONTROL OF MVAR & LOAD FLOW TO MAINTAIN OPTIMUM VOLTAGE & FREQ. PROFILES MAINTAIN OPTIMUM VOLTAGE & FREQ. PROFILES

• OPERATION OF SYSTEM AT IT’S FULL CAPACITY OPERATION OF SYSTEM AT IT’S FULL CAPACITY THROUGH CONTINUOUS CONTINGENCY ANALYSISTHROUGH CONTINUOUS CONTINGENCY ANALYSIS

• EFFICIENT, RELIABLE & SECURED OPERATION OF EFFICIENT, RELIABLE & SECURED OPERATION OF GRID WITH ALL SYSTEM PARAMETERS & NETWORK GRID WITH ALL SYSTEM PARAMETERS & NETWORK CONDITIONS UPDATED EVERY 4 TO 15 SECCONDITIONS UPDATED EVERY 4 TO 15 SEC

• REAL TIME ENVIRONMENT FOR TRAINING REAL TIME ENVIRONMENT FOR TRAINING DESPATCHERS TO COPE WITH CONTINGENCIES DESPATCHERS TO COPE WITH CONTINGENCIES

Page 24: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

SYSTEM CO-ORDINATION & CONTROL PROJECT

(NORTHERN REGION)

Chandigarh,BBMB

DESU

Lucknow

Panipat(HSEB)

Jutog

Patiala

Panipat (BBMB)

Dadri (B)

Dadri (H)

Sultanpur

Moradabad

Varanasi

Rishikesh

Bhilwara

Kota

Ratangarh

Narwana

Hamirpur

Kunihar

Laltonkalan

Jallandhar (P)

Jallandhar (B)

Ganguwal (B)

Heerapura

Pakistan

N e pa l

ChinaJammu & Kashmir

HimachalPradesh

Punjab

Har

y

UttarPradesh

Rajasthan

Delhi

Gujarat

MadhyaPradesh

Bemina

J&K SEB

• 1 SLDC • 1 Sub-LDC• 13 RTUs

PSEB

• 1 SLDC • 2 Sub-LDC• 19 RTUs

HVPNL

• 1 SLDC • 2 Sub-LDC• 40 RTUs

RVPN

• 1 SLDC • 3 Sub-LDC• 21 RTUs

HPSEB

• 1 SLDC •2 Sub-LDC• 16 RTUs

BBMB

• 1 SLDC • 4 Sub-LDC• 21 RTUs

DVB

• 1 SLDC • 4 Sub-LDC• 31 RTUs

UPPCL

• 1 SLDC•5 Sub-LDC• 82 RTUs

RLDC•NEW DELHI• 38 RTUs

CPCCKANPUR4 RTUs

SLDCSub - LDC

Gladni

Panki

ana

Page 25: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Control System Hierarchy For Northern Region

SLDC UPSEB

SLDC HVPNL

SLDCPSEB

SLDC RVPNL

SLDCJ&K

SLDCBBMB

SLDC HPSEB

SLDCDVB

CPCCKanpur

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Sub-LDC (RTUs)

Moradabad (17)

Panki (13)

Rishikesh (27)

Sultanpur (8)

Varanasi (16)

(RTU-L) Lucknow

Bhilwara (29)

Ratangarh (12)

Kota (11)

Panipat (12)

Narwana (15)

Dadri (14)

Patiala (12)

Jalandhar II (20)

Lalton Kalan (8)

Gladini (8)

Bemina (8)

Hamirpur (8)

Kunihar (8)

Dadri (5)

Ganguwal (6)

Jalandhar I (4)

Panipat (5)

Bawana (5)

Bamanauli (12)

Gazipur (8)

Gopalpur (5)

RTUs - 6

(RTU-L) Panipat

(RTU-L) Chandigarh

(RTU-L) Minto Road

RSCC Delhi RTUs - 36

Heerapura ( 12)

Page 26: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation
Page 27: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Unique Features of Northern Region ULDC Scheme

•Three Level Hierarchical Control centres

•More than ten electrical utilities involved

•Highly Complex system First Time attempted in the world as a Single Project

•Dedicated communication Infrastructure

•Live Line Fibre Optic Cable Stringing

•More than 30 control centres and 400 RTUs

•Advance Despatcher training Simulator

Page 28: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

TYPICAL HIERARCHICAL REGIONAL CONTROL CENTRE SETUP

RTU RTU RTU

SUB LDC SUB LDC SUB LDC

SLDC SLDC SLDC

ERLDC WRLDC NRLDC SRLDC NERLDCREGIONAL

LOAD DESPATCH

CENTRE

STATE LOAD DESPATCH

CENTRE

AREA LOAD DESPATCH

CENTRE

REMOTE TERMINAL

UNIT(AT SUB-

STATIONS &GENERATIN

G STNS)

Page 29: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

IMPLEMENTATION STATUS OF REGIONAL ULDC SCHEMES IN VARIOUS REGIONS

REGION EST. COST (M US $ .)

STATUS COMPLETION ANTICIPATED

NORTHERN 141 COMMISSIONING OF MAJOR SYSTEMS COMMENCED

JUNE 2002

SOUTHERN 151 COMMISSIONING OF MAJOR SYSTEMS COMMENCED

JUNE 2002

NORTH EASTERN 57 UNDER CONSTRUCTION JUNE 2003

EASTERN 62 UNDER CONSTRUCTION SEP 2003

WESTERN 56 PROCUREMENT ACTION INITIATED

FEB 2005

Page 30: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation
Page 31: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

POWERGRID’s

Strategic Plan

for

Diversification

into

Telecom Business

Page 32: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

• Convergence - merging and overlapping of traditionally unrelated industries to provide essential services – provides opportunity to add value to the business

• Power Transmission utilities can provide alternative broadband network at incremental cost– Valuable Right-of-Way readily available– Optimal utilisation of infrastructure– Sturdy and stable infrastructure– Less prone to vandalism and rodent menace– Proven technology

CONVERGENCE

Page 33: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

WRAP AROUND

ADSS

FIBRE OPTIC CABLE INSTALLATION

OPGW

Page 34: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

OPGW ADSS WRAP AROUND

AERIAL OPTICAL FIBRE CABLES

FIBRESTRENGTH MEMBERS

LOOSE TUBEALUMINIUM TUBEACSR STRANDS

FIBRE

Page 35: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

FIBRE PAIRS TO BEUSED BY POWERGRID

LDCA

TAX

DARK FIBRE PAIRS

SDH / DWDM

Transport Module

Capacity Eq. voice channels

STM - 1 155 Mbps 1920

STM - 4 622 Mbps 7500 STM - 16 2.5 Gbps 30000

STM - 64 10.0 Gbps 120000

DWDMN * 2.5 N*2.5 Gbps N*30000N *10 N*10 Gbps N*120000For example32*2.5 80 Gbps 96000032*10 320 Gbps 3840000

Single pair of fibres

LDCA

TAX

Page 36: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

WORLDWIDE DIVERSIFICATION IN TELECOM

World wide utilities like electric, gas, railways, water and roads have

successfully diversified into telecom business

Electric - 63% , Gas - 18%, Railways - 12%, Water - 7% and Roads - 2%

Majority of these utilities are Transmission Utilities

Out of about major 50 utilities, 30 are Transmission Utilities in UK,

Germany, Italy, Spain, Japan , USA etc.

New entrants have been successful in penetrating long distance market

Page 37: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Optimal point

Business Reward

Business Risk

DoNothing

LeaseWayleave

LeaseDarkFibre

SelectiveCommercial

Service

FullNetworkService

BUSINESS RISK / REWARD ASSESSMENT

Page 38: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Phased Scheme of Implementation POWERGRID plans to enter Telecom business in a

phased mannerPhase-I (Selective Commercial Services)

– Utilise the spare/ excess capacity already available under modernisation of load despatch and communication facilities

– Enter Telecom business as IP-II & introduce value added services • Internet Data Centers and Managed Network Services to be

introduced in 1-2 year time

• International Connectivity

Phase-II (NLDO Participation) To enter into NLDO segment with a strategic partner

by forming a Joint Venture Company

Page 39: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Telecom Road Map

• POWERGRID Builds and operates Capacity Business and Value Added Services on a focused network ( ~14,000 Km)

– Delhi - Mumbai progressively by Mid, 2002

– Hyderabad – Bangalore – Chennai by October 2002

– Delhi – Hyderabad by October 2002

– Hyderabad – Calcutta by December 2002

– Delhi – Calcutta by December 2002

– Network to be completed by December 2003

Telecom Network – Map (Audio Visual)

Page 40: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Technology• State-of-the-art Technology adopted • Transmission Equipment

– Synchronous Digital Hierarchy (SDH) and Dense Wave Division Multiplexing (DWDM)

• Optical Ground Wire (OPGW)– Mostly Live line installation without disturbing the

power system– Capable of carrying SDH & DWDM

• Network Management System (NMS)– Network to have a dedicated NMS for monitoring &

maintenance of the telecom network from central location

– Four remote independent Regional NMS

• Future Proof

Page 41: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Kopili

Khandong

*

**

(Ambala)

POWERGRID Transmission Lines

NEWDELHI

Lucknow

CALCUTTA

MUMBAI

HYDERABAD

CHENNAIBANGALORE

****

***

**

*

*

BadarpurBallabhgarh Dadri

MuradnagarMoradabad

Singrauli

JabalpurItarsiIndore

Dehgam(Ahmedabad)

Asoj

Gandhar

Padghe

*

*

N’Sagar

Nellore* Gooty

**

*

RamagundamChandrapur

Bhilai

Korba *

* Vindhyachal

***

*

*

**

Kanpur

Allahabad

Sasaram

BiharsariffKhalgoan Farakka

Jeerat

*

*

Panipat

DhulekotChandigarh

**Panchkula

KuniharJutogh(Shimla)

Jaipur

*

*

**

*

*

*

*

Khamam

Vijayawada

Gazuwaka(Vishakapatnam)

JeyporeIndravati

Rengali Talcher

Jam’pur

Rourkela

Durgapur

*

* Lonikhand(Pune)

VadodaraBaruchKawas

(Surat)

* Raipur

Mysore*

*

*

*

*

Madurai

Trichy

NeyveliSalem

*CoimbatoreUdumalpet

* Agra

***

**

Ludhiana

Moga

JallandharKishenpur

Udhampur

Glandi(Jammu)

*Varanasi

Patna

*Koradi(Nagpur)

Bhopal

*

*Kozikode

Trichur

Kalamassery (Eranakulum)

Trivandrum

Fibre To Be Installed

Existing/Under Construction Fibre UNDERGROUND FIBRE CABLE

POWERGRID ULDC ProjectPOWERGRID Transmission Line Project

* DhuleNasik

**

Hamirpur IIGagal

Access Link.

Dimapur

Misa

*

*Badarpur*Kumarohat

*Agartala GPPAgartala

*Khleihriat

*

Shillong* * *Nehu

Umium I

Umium III

***

Kahelipara *

*

*

BaliparaBongaigaon

Malda

Imphal

Kohima

Tezpur

*

Guwahati

*

*

*

*

Bhubaneswar**

*

Page 42: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

POWERGRIDTelecom

SERVICES

Virtual

Private Networks

(VPN)

Internet Data Centre (IDC)–Web Hosting

–Co-location services

–Dedicated Server Products

–Application Service Provision

NLD

Services

End-to-End Bandwidth

SERVICES

International Connectivity

Page 43: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

City 3

NEW MILLENNIUM INFOCOM NETWORK

Town 4

KOLKATTATown 3Town 2Town 1

City1

City 2

NATIONAL LONG DISTANCE NETWORK(POWERGRID)

State Network

Access Network Within City/Townusing LT distribution Network

HOMES EDUCATIONALINSTITUTES HOSPITALS

MARKETS BANK DEPARTMENTALSTORES

PCO FACTORY GOVT. OFFICES

MUMBAIDELHI

EHV NETWORK

DISTRIBUTION NETWORK

LT DISTRIBUTION NETWORK

Page 44: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

POWERGRID Strength is from Concept to Commissioning• Trained Manpower

> 70 Engineers for Planning, Design and Engineering

> 150 Engineers in field Implementation

• Telecom, SCADA, DMS, EMS Consultancy for

- BSES

- NDMC

- PONDICHERRY

- DVB

• Acknowledging strength of POWERGRID M/S KEMA (Consultants of International Repute) Signed MOU for providing consultancy in International Market

Page 45: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

SCADA/EMS/DMS Consultancy

SCADA/EMS Consultancy

Feasibility Studies

System Design & Engineering

Turnkey Execution

ProjectImplementation

• Ready to extend Consultancy in other countriesMOU With KEMA

Page 46: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Telecom Business Consultancy

TelecomBusiness

Consultancy

Feasibility Studies

FinancialManagement

Design ofNetwork

ProjectImplementation

Regulatory andMarket Assessment

Turnkey Execution

O & MBusiness Option Evaluation

• Ready to extend arm in other countriesJoint VenturesEquity stakes

Page 47: WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

Thank You