welcome [nflroads.com]nflroads.com/projectfiles/5034/starke ph handout-final.pdfstarke railroad...

2
www.nflroads.com/StarkeRROverpass PUBLIC HEARING Tuesday, June 28, 2016 Bradford County Fairgrounds, Building 1 2300 N. Temple Avenue Starke, FL 32091 AGENDA 4:30 - 6:30 Open House | View Displays | Discuss Project with FDOT Staff 6:30 Presentation followed by Public Comments Financial Management Number: 436558-1 From US 301 to East of CSX Railroad STARKE RAILROAD OVERPASS STUDY PROJECT SCHEDULE: PD&E Study: Underway Design: Upon selection of the preferred alternative Right-of-Way: Fiscal Year 2018 Construction: Fiscal Year 2020 WELCOME QUESTIONS/COMMENTS FDOT remains committed to working with all project stakeholders. No final decisions will be made until we hear your comments. There are many ways to provide comments: 1) State your comments/ask questions during tonight’s comment period; 2) Complete a comment form and drop it in the comment box provided; or 3) Mail, call, or email comments by July 8, 2016, to: Stephen Browning, P.E., Project Manager Florida Department of Transportation 1109 South Marion Avenue, MS 2007 Lake City, FL 32025-5874 (386) 961-7455 (800) 749-2967 [email protected].fl.us Follow us on Facebook, Twitter, and YouTube or the project website, at: @MyFDOT www.youtube.com/MyFDOT Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. ABOUT THE PROJECT DISTRICT TWO In April 2015, the first public meeting was held to present alternatives for the proposed transportation improvement. Following that meeting, concepts were revised and re-presented to the public at a meeting on August 17, 2015. Comments from that meeting were evaluated and further revisions were made. A third public meeting was held on January 4, 2016 where further information was presented on the alternatives including utilizing information from previous meetings to determine the most viable option for Starke. Based on public input received at those meetings, the Department is recommending construction of a railroad overpass at the State Road 100 location; the railroad crossings at South Street and Adkins Street will be closed as part of this project. The purpose of the public hearing is to provide information on the study’s findings, discuss the recommended alternative and once again receive your input. The Florida Department of Transportation (FDOT) is conducting a Project Development and Environment (PD&E) Study to evaluate the feasibility for constructing a railroad overpass in Starke. A PD&E Study is the process that helps FDOT determine the location and design features of a proposed transportation improvement. During the PD&E Study, design options are developed and evaluated with regard to social, economic, and environmental concerns. Safety needs and public input are also important elements of this study. The City of Starke is currently divided by the CSX railroad that runs parallel to US 301. There are approximately 29 trains per day that utilize the tracks and this number is expected to grow. This results in longer wait times throughout the day for emergency vehicles and other motorists. Although there are numerous locations to cross the tracks, there are no raised crossings over the railroad in Starke. An overpass would improve emergency response times and allow traffic to flow more freely. The goal of the study is to identify a preferred alternative which could be either a suitable location for an overpass within Starke or the No Build Option. PROJECT COSTS (IN MILLIONS): www.facebook.com/FLDOT ENGINEERING SR 100 EXISTING NO-BUILD $4.8 $10.3 $17.0 $32.1 $0.0 $0.0 $0.0 $0.0 RIGHT-OF-WAY CONSTRUCTION TOTAL

Upload: others

Post on 07-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WELCOME [nflroads.com]nflroads.com/ProjectFiles/5034/Starke PH Handout-Final.pdfSTARKE RAILROAD OVERPASS STUDY From US 301 to East of CSX Railroad Financial Management Number: 436558-1

ww

w.n

flroa

ds.c

om/S

tark

eRRO

verp

ass

PUBL

IC H

EARI

NG

Tu

esd

ay,

Ju

ne

28

, 20

16

Bra

dfo

rd C

ou

nty

Fa

irg

rou

nd

s, B

uild

ing

1

23

00

N. T

em

ple

Av

en

ue

Sta

rke

, FL

32

09

1

AGEN

DA

4:30

- 6:

30 O

pen

Ho

use

| V

iew

Dis

pla

ys |

Dis

cuss

Pro

ject

wit

h F

DO

T St

aff

6:30

Pre

sen

tati

on

follo

wed

by

Pu

blic

Co

mm

ents

Fin

an

cia

l Ma

na

ge

me

nt

Nu

mb

er:

43

65

58

-1

Fro

m U

S 3

01

to

Ea

st o

f C

SX

Ra

ilro

ad

STA

RK

E R

AIL

RO

AD

OV

ERP

ASS

STU

DY

PRO

JECT

SCH

EDU

LE:

PD

&E

Stu

dy:

Un

de

rwa

y

De

sig

n: U

po

n s

ele

ctio

n o

f th

e p

refe

rre

d a

lte

rna

tiv

e

Rig

ht-

of-

Wa

y: F

isca

l Ye

ar

20

18

Co

nst

ruct

ion

: Fis

cal Y

ea

r 2

02

0

WEL

COM

E

QU

ESTI

ON

S/CO

MM

ENTS

FD

OT

re

ma

ins

com

mit

ted

to

wo

rkin

g w

ith

all

pro

ject

sta

keh

old

ers

.

No

fin

al d

eci

sio

ns

will

be

ma

de

un

til w

e h

ea

r yo

ur

com

me

nts

.

Th

ere

are

ma

ny

wa

ys t

o p

rov

ide

co

mm

en

ts:

1)

Sta

te y

ou

r co

mm

en

ts/a

sk q

ue

stio

ns

du

rin

g t

on

igh

t’s

com

me

nt

pe

rio

d;

2)

Co

mp

lete

a c

om

me

nt

form

an

d d

rop

it in

th

e c

om

me

nt

bo

x p

rov

ide

d; o

r

3)

Ma

il, c

all,

or

em

ail

com

me

nts

by

July

8, 2

01

6, t

o:

Ste

ph

en

Bro

wn

ing

, P.E

., P

roje

ct M

an

ag

er

Flo

rid

a D

ep

art

me

nt

of

Tra

nsp

ort

ati

on

11

09

So

uth

Ma

rio

n A

ve

nu

e, M

S 2

00

7

Lake

Cit

y, F

L 3

20

25

-58

74

(38

6)

96

1-7

45

5

(80

0)

74

9-2

96

7

ste

ph

en

.bro

wn

ing

@d

ot.

sta

te.fl

.us

Fo

llow

us

on

Fa

ceb

oo

k, T

wit

ter,

an

d Y

ou

Tu

be

or

the

pro

ject

we

bsi

te, a

t:

@M

yFD

OT

ww

w.y

ou

tub

e.c

om

/MyF

DO

T

Pu

blic

pa

rtic

ipa

tio

n is

so

licit

ed

wit

ho

ut

reg

ard

to

ra

ce, c

olo

r,

na

tio

na

l ori

gin

, ag

e, s

ex,

re

ligio

n, d

isa

bili

ty o

r fa

mily

sta

tus.

ABO

UT

THE

PRO

JECT

DIS

TRIC

T TW

O

In A

pril

201

5, t

he

first

pu

blic

mee

ting

was

hel

d t

o p

rese

nt

alte

rnat

ives

for

the

pro

po

sed

tra

nsp

ort

atio

n im

pro

vem

ent.

Fo

llow

ing

th

at m

eetin

g, c

on

cep

ts w

ere

revi

sed

an

d r

e-p

rese

nte

d t

o t

he

pu

blic

at

a m

eetin

g o

n A

ug

ust

17,

201

5.

Co

mm

ents

fro

m t

hat

mee

ting

wer

e ev

alu

ated

an

d fu

rth

er r

evis

ion

s w

ere

mad

e. A

th

ird p

ub

lic m

eetin

g w

as h

eld

on

Ja

nu

ary

4, 2

016

wh

ere

furt

her

in

form

atio

n w

as p

rese

nte

d o

n t

he

alte

rnat

ives

in

clu

din

g u

tiliz

ing

in

form

atio

n f

rom

p

revi

ou

s m

eetin

gs

to d

eter

min

e th

e m

ost

via

ble

op

tion

for

Star

ke. B

ased

on

pu

blic

inp

ut

rece

ived

at

tho

se m

eetin

gs,

th

e D

epar

tmen

t is

rec

om

men

din

g c

on

stru

ctio

n o

f a

railr

oad

ove

rpas

s at

th

e St

ate

Ro

ad 1

00 l

oca

tion

; th

e ra

ilro

ad

cro

ssin

gs

at S

ou

th S

tree

t an

d A

dki

ns

Stre

et w

ill b

e cl

ose

d a

s p

art o

f th

is p

roje

ct. T

he

pu

rpo

se o

f th

e p

ub

lic h

earin

g is

to

pro

vid

e in

form

atio

n o

n th

e st

ud

y’s

find

ing

s, d

iscu

ss th

e re

com

men

ded

alte

rnat

ive

and

on

ce a

gai

n re

ceiv

e yo

ur i

np

ut.

The

Flo

rida

Dep

artm

ent o

f Tra

nsp

ort

atio

n (F

DO

T) is

co

nd

uct

ing

a P

roje

ct D

evel

op

men

t an

d E

nvi

ron

men

t (P

D&

E) S

tud

y to

eva

luat

e th

e fe

asib

ility

for

con

stru

ctin

g a

rai

lroad

ove

rpas

s in

Sta

rke.

A P

D&

E St

ud

y is

th

e p

roce

ss t

hat

hel

ps

FDO

T d

eter

min

e th

e lo

catio

n a

nd

des

ign

feat

ure

s o

f a p

rop

ose

d tr

ansp

ort

atio

n im

pro

vem

ent.

Du

ring

the

PD

&E

Stu

dy,

des

ign

o

ptio

ns

are

dev

elo

ped

an

d e

valu

ated

with

reg

ard

to s

oci

al, e

con

om

ic, a

nd

en

viro

nm

enta

l co

nce

rns.

Saf

ety

nee

ds

and

p

ub

lic in

pu

t are

als

o im

po

rtan

t ele

men

ts o

f th

is s

tud

y.

The

City

of S

tark

e is

cu

rren

tly d

ivid

ed b

y th

e C

SX ra

ilro

ad th

at ru

ns

par

alle

l to

US

301.

Th

ere

are

app

roxi

mat

ely

29 tr

ain

s p

er d

ay th

at u

tiliz

e th

e tr

acks

an

d th

is n

um

ber

is e

xpec

ted

to g

row

. Th

is re

sults

in lo

ng

er w

ait t

imes

thro

ug

ho

ut t

he

day

fo

r em

erg

ency

veh

icle

s an

d o

ther

mo

toris

ts. A

ltho

ug

h t

her

e ar

e n

um

ero

us

loca

tion

s to

cro

ss t

he

trac

ks, t

her

e ar

e n

o

rais

ed c

ross

ing

s o

ver t

he

railr

oad

in S

tark

e. A

n o

verp

ass

wo

uld

imp

rove

em

erg

ency

resp

on

se ti

mes

an

d a

llow

traffi

c to

flo

w m

ore

free

ly. T

he

go

al o

f th

e st

ud

y is

to id

entif

y a

pre

ferr

ed a

ltern

ativ

e w

hic

h c

ou

ld b

e ei

ther

a s

uita

ble

loca

tion

for

an o

verp

ass

with

in S

tark

e o

r th

e N

o B

uild

Op

tion

.

PRO

JECT

CO

STS

(IN M

ILLI

ON

S):

ww

w.f

ace

bo

ok.

com

/FLD

OT

ENG

INEE

RIN

GSR

100

EXI

STIN

GN

O-B

UIL

D$4

.8$1

0.3

$17.

0$3

2.1

$0.0

$0.0

$0.0

$0.0

RIG

HT-

OF-

WAY

CON

STRU

CTIO

NTO

TAL

Page 2: WELCOME [nflroads.com]nflroads.com/ProjectFiles/5034/Starke PH Handout-Final.pdfSTARKE RAILROAD OVERPASS STUDY From US 301 to East of CSX Railroad Financial Management Number: 436558-1

RECOMMENDED ALTERNATIVESR 100 Existing Alignment Concept

Aesthetic Opportunities

The recommended alternative is located in downtown Starke. The proposed railroad overpass would be located on SR 100

from approximately Adams Street to South Street. The majority of the bridge would be open underneath and would allow the use of that space for various activities. One-way frontage roads would be provided on both the north and south side of the bridge to

allow local traffic to access Thompson, Cherry and Church streets. Walnut Street would no longer connect through the SR 100 intersection. Traffic utilizing Walnut Street would have to travel one block to the east to Thompson Street. Traffic would be

maintained during construction primarily through the use of frontage roads. Measures will be taken to minimize disruptions to

local traffic during construction. The railroad crossings at South Street and Adkins Street will be closed as part of this project.

Looking around Starke, a lot of the railroad features are still intact and again show the history of Starke, including the old rail depot.

The character of Starke is prominent in the architectural features including the brick and arches. The historic City plan and timeless

architecture created the opportunity to tie urban features found within downtown to the proposed roadway improvements.

From an aesthetic perspective, the new overpass will add a major visual impact to the corridor and downtown Starke by emphasizing and highlighting aesthetic treatments to the retaining walls, barrier rails, beams and piers. Planning consistency was considered.

PEDESTRIANSAFETY FENCE

OVERPASSTIE-DOWN

OVERPASSTIE-DOWN

SOUTH ST.RAILROADCROSSING

CLOSED