welcome [portal.ct.gov]...project 102-269 - city of norwalk march 18, 2008 improvements to the...
TRANSCRIPT
Welcome
Public Information & Scoping Meeting
Welcome
Public Information & Scoping Meeting
Improvements to the
Merritt Parkway / Route 7 Interchange&
Merritt Parkway / Main Ave. Interchange
Project 102-269 - City of Norwalk
March 18, 2008
Improvements to the
Merritt Parkway / Route 7 Interchange&
Merritt Parkway / Main Ave. Interchange
Project 102-269 - City of Norwalk
March 18, 2008
2
Tonight’s PresentersTonight’s Presenters
• Richard Armstrong – CTDOT, Principal Engineer
• Stephen Ulman – Purcell Assoc., Senior Traffic
Engineer
• Richard Armstrong – CTDOT, Principal Engineer
• Stephen Ulman – Purcell Assoc., Senior Traffic
Engineer
3
Purpose of Tonight’s MeetingPurpose of Tonight’s Meeting
• “Scoping Meeting” - CEPA
• Public Input
• Presentation of Project Information
4
BackgroundBackground
• Re-evaluation of alternatives
• Coordination with Merritt Parkway Conservancy
• Re-evaluation of alternatives
• Coordination with Merritt Parkway Conservancy
• Lawsuit• Lawsuit
5
N
6
Principal Arterials Southwest Connecticut
7
N
8
N
Stop & ShopShopping Center
Interchange 39
Interchange 40
9
15
N.B.S.B.
N.B.S.B.
15
N
Stop & ShopShopping Center
Interchange 39
Interchange 40
10
15
N.B.S.B.
N.B.S.B.
15
N
Stop & ShopShopping Center
Interchange 39
Interchange 40
11
15
N.B.S.B.
N.B.S.B.
15
7
7
N.B
.S.
B.
N.B
.S.
B.
N
Stop & ShopShopping Center
Interchange 39
Interchange 40
12
15
N.B.S.B.
N.B.S.B.
15
7
7
S.B
.
N.B
.S.
B.
N
N.B
.
Stop & ShopShopping Center
Interchange 39
Interchange 40
13
15
N.B.S.B.
N.B.S.B.
15
7
7
S.B
.
N.B
.S.
B.
N
N.B
.
Stop & ShopShopping Center
Interchange 39
Interchange 40
Main Avenue
14
15
N.B.S.B.
N.B.S.B.
15
7
7
S.B
.
N.B
.S.
B.
N
N.B
.
Stop & ShopShopping Center
Interchange 39
Interchange 40
Main Avenue
15
15
N.B.S.B.
N.B.S.B.
15
N
7
7
S.B
.
N.B
.S.
B.
N.B
.
16
N
17
N.B.S.B.
N.B.S.B.
15
N
Main Avenue
Glover Ave.
Stop & ShopShopping Center
18
N
15
N.B.
N N.B
.S.
B.
7
15
7
N.B
.S.
B.
S.B.
N.B.S.B.
19
20
N
15 N.B.
N
N.B
.S.
B.
7
15
7
N.B
.S.
B.
S.B.
N.B.S.B.
21
N
Stop & ShopShopping Center
Historic StructuresHistoric Structures
Parkway Over Metro North Railroad
7
15
N.B.
N.B
.S.
B.
7
15
7
N.B
.S.
B.
S.B.
N.B.S.B.
Interchange 39
Interchange 40
22
23
N
Stop & ShopShopping Center
Historic StructuresHistoric Structures
Parkway Over Norwalk River
15
N.B.
N.B
.S.
B.
7
15
7
N.B
.S.
B.
S.B.
N.B.S.B.
24
25
N
Stop & ShopShopping Center
Historic StructuresHistoric Structures
Glover Avenue Over Norwalk
River
15
N.B.
N.B
.S.
B.
7
15
7
N.B
.S.
B.
S.B.
N.B.S.B.
26
27
N
Stop & ShopShopping Center
Historic StructuresHistoric Structures
Parkway Over Main Avenue
15
N.B.
N.B
.S.
B.
7
15
7
N.B
.S.
B.
S.B.
N.B.S.B.
28
29
Alternatives AnalysisAlternatives Analysis
• Re-evaluated Original Alternatives • Re-evaluated Original Alternatives
• Developed and evaluated new alternatives
• Coordinated with Merritt Parkway Conservancy – Cloverleaf
• Developed and evaluated new alternatives
• Coordinated with Merritt Parkway Conservancy – Cloverleaf
30
Alternatives ShortlistAlternatives ShortlistOriginal DesignOriginal Design
Alternate 12AAlternate 12AAlternate 12AMPC “Ultimate Option” (Cloverleaf)MPC “Ultimate Option” (Cloverleaf)
Modified CloverleafModified Cloverleaf
Modified Cloverleaf w/ Option D1Modified Cloverleaf w/ Option D1
Modified Cloverleaf w/ Option D2Modified Cloverleaf w/ Option D2Modified Cloverleaf w/ Option D2
31
Original DesignOriginal Design
15N.B.
S.B.
N.B.S.B.
15
7
7
S.B
.
N.B.S.
B.
N
N.B
.
Stop & ShopShopping Center
Main Avenue
32
Alternate 12AAlternate 12A
15N.B.
S.B.
N.B.S.B.
15
7
7
S.B
.
N.B.S.
B.
N
N.B
.
Stop & ShopShopping Center
Main Avenue
33
Alt. 12A - Lowered RampsAlt. 12A - Lowered Ramps
Original DesignOriginal Design
34
35
Modified Cloverleaf w/ Option D2
Modified Cloverleaf w/ Option D2
15N.B.
S.B.
N.B.S.B.
15
7
7
S.B
.
N.B.S.
B.
N
N.B
.
Stop & ShopShopping Center
Modified Cloverleaf w/ Option D2
Modified Cloverleaf w/ Option D2
Main Avenue
36
Modified Cloverleaf w/ Option D2
Modified Cloverleaf w/ Option D2
15N.B.S.B.N.B.
S.B.15
7
7
S.B
.
N.B
.S.
B.
N
N.B
.
Stop & ShopShopping Center
Main Avenue
37
Existing Site
38
Other Cloverleafs I-91/Rt. 190 - Enfield Other Cloverleafs I-91/Rt. 190 - Enfield
39
I-95/Milford ConnectorI-95/Milford Connector
40
I-95/Milford ConnectorI-95/Milford Connector
41
I-395/Rts. 2 & 32 - NorwichI-395/Rts. 2 & 32 - Norwich
42
I-95/Rt. 1 - MilfordI-95/Rt. 1 - Milford
43
Comparison of Primary AlternativesComparison of Primary AlternativesCost
escalated to 2012 (million)
Wetlands Impacts (acres)
Historic Bridges Affected
Indirect Parkway Impacts (visual)
Original Project * $139-175 0.60 4 -
Alt. 12A $134-169 0.40 4 Less
Modified Cloverleaf w/ D2
$98-124 1.25 4 Least
*original cost ~ $109 million
44
Stop & ShopShopping Center
Main Avenue
NModified Cloverleaf w/ D2
Main Avenue Lane Arrangements
45
Opportunities for Public InputOpportunities for Public Input
• Tonight’s Meeting• Tonight’s Meeting
• “Notice of Scoping” – Written comments accepted until the close of business on March 31, 2008
• Further Public Involvement After Determination of Preferred Alternative
• “Notice of Scoping” – Written comments accepted until the close of business on March 31, 2008
• Further Public Involvement After Determination of Preferred Alternative
46
Opportunities for Public Input (cont’d)Opportunities for Public Input (cont’d)
• FOI - Public Access to technical and policy information
• For additional information anytime, Contact ConnDOT as shown on handout
• FOI - Public Access to technical and policy information
• For additional information anytime, Contact ConnDOT as shown on handout
Next Steps / Time FrameNext Steps / Time Frame
• Next Public MeetingFall 2008 thru Fall 2009
• Engineering of Selected DesignSpring 2008 thru Fall 2011
• Environmental PermitsFall 2009 thru Fall 2011
• Construction2012 thru 2014
• Next Public MeetingFall 2008 thru Fall 2009
• Engineering of Selected DesignSpring 2008 thru Fall 2011
• Environmental PermitsFall 2009 thru Fall 2011
• Construction2012 thru 2014
• Environmental Document PhaseSpring 2008 thru Fall 2009
• Environmental Document PhaseSpring 2008 thru Fall 2009
Contact Information Written Comments should be sent to:
Mr. Thomas A Harley Manager of Consultant Design Department of Transportation
P.O. Box 317546 Newington, CT 06131-7546
FAX: 860-594-3373 email: [email protected]
Written Comments must be sent / postmarked by:
March 31, 2008
Contact Information Written Comments should be sent to:
Mr. Thomas A Harley Manager of Consultant Design Department of Transportation
P.O. Box 317546 Newington, CT 06131-7546
FAX: 860-594-3373 email: [email protected]
Written Comments must be sent / postmarked by:
March 31, 2008