welcome to supplier day om - nya tunnelbanan
TRANSCRIPT
Welcome to Supplier Day Stockholm County Council October 26th 2017
Ph
oto
: H
enri
k T
ryg
g/m
edia
ba
nk
.vis
itst
ock
ho
lm.c
om
Photo: Henrik Trygg/mediabank.visitstockholm.com
Caroline Ottosson Public Transport Administration Director Stockholm County Council
Mårten Frumerie Head of Extended Metro Administration
Stockholm Europe’s fastest-growing
metropolitan region
Ph
oto
: H
enri
k T
ryg
g/m
edia
ba
nk
.vis
itst
ock
ho
lm.c
om
”An attractive,
sustainable, expanding
Stockholm region with
freedom for residents to
shape their own lives and
make crucial decisions.”
Ph
oto
: T
rafi
kfö
rva
ltn
ing
en
Page 5
Metro
Light rail
Trams
Depots
Station renovations
Infrastructural projects within public transport
Page 6
Andreas Burghauser, Gunilla Wesström, Anna Sandahl
Metro to Nacka, Södermalm and Söderort
Photo: Henrik Trygg/mediabank.visitstockholm.com
Page 8
A new Metro line to Nacka.
Increased capacity throughout Söderort.
Will facilitate commuting.
Six new stations and a new platform under Gullmarsplan.
Enables construction of 56 500 new residences.
Will bring the Stockholm region closer together.
Metro to Södermalm, Nacka and Söderort
Page 9
Illustrations: Sweco
Page 10
Access tunnels
Civil engineering works
Building and installation
Track, electricity, signals and tele communications
Three projects
Page 11
Figures
Track length: 4.5 km
2 new stations
2 access tunnels
Rock: 930,000 m³
Concrete: 20,000 m³
4 contracts
Estimated production cost: SEK 2.5 billion
Södermalm
Södermalm
Sofia station
Platform 100 metres below ground.
Eight high-speed lifts with 30 second travel time.
Evacuation classed lifts.
Page 12
Sidan 13
Page 14
Nacka
Track length: 4.1 km
3 new stations
3 access tunnels
Rock: 750,500 m³
Concrete: 30,000 m³
3 contracts
Estimated production cost: SEK 2.5 billion
Figures
Page 15
Metro to Nacka
Enables construction of new residential areas.
Coordination between various projects, mainly at the Sickla and Nacka Centrum stations.
Sickla – tvärbanan tram, Saltsjöbanan light rail’s elevation, development projects.
Sickla station
Illustrations: Sweco
Page 16
Illustration: Nacka stad
Page 17
Underground bus terminal, development project.
Nacka Centrum station
Illu
stra
tio
ns:
Na
cka
sta
d
Page 18
Track length: 2.7 km
1 new station
1 new platform below the existing station.
2 access tunnels
Rock: 500,000 m³
Concrete: 7,000 m³
4 contracts
Estimated production cost: SEK 2.5 billion
Figures Söderort
Gullmarsplan
Illustration: Sweco
Photo: Stockholms läns landsting
Gullmarsplan
Four levels
1. 4. Bus terminal
2. 3. Station building
3. 2. Metro: Green Line, tram
4. 1. Metro: Blue Line
Page 20
New station in the Slakthus area A part of the new Söderstaden.
Page 21
Illustration: Sweco
Photo: Stockholm County Council
Be part of building the future Public Transport in Stockholm!