Welcome to Supplier Day Stockholm County Council October 26th 2017 Photo: Henrik Trygg/mediabank.visitstockholm.com

Upload: others

Post on 25-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Welcome to Supplier Day om - Nya tunnelbanan

Welcome to Supplier Day Stockholm County Council October 26th 2017

Ph

oto

: H

enri

k T

ryg

g/m

edia

ba

nk

.vis

itst

ock

ho

lm.c

om

Page 2: Welcome to Supplier Day om - Nya tunnelbanan

Photo: Henrik Trygg/mediabank.visitstockholm.com

Caroline Ottosson Public Transport Administration Director Stockholm County Council

Mårten Frumerie Head of Extended Metro Administration

Page 3: Welcome to Supplier Day om - Nya tunnelbanan

Stockholm Europe’s fastest-growing

metropolitan region

Ph

oto

: H

enri

k T

ryg

g/m

edia

ba

nk

.vis

itst

ock

ho

lm.c

om

Page 4: Welcome to Supplier Day om - Nya tunnelbanan

”An attractive,

sustainable, expanding

Stockholm region with

freedom for residents to

shape their own lives and

make crucial decisions.”

Ph

oto

: T

rafi

kfö

rva

ltn

ing

en

Page 5: Welcome to Supplier Day om - Nya tunnelbanan

Page 5

Metro

Light rail

Trams

Depots

Station renovations

Infrastructural projects within public transport

Page 6: Welcome to Supplier Day om - Nya tunnelbanan

Page 6

Page 7: Welcome to Supplier Day om - Nya tunnelbanan

Andreas Burghauser, Gunilla Wesström, Anna Sandahl

Metro to Nacka, Södermalm and Söderort

Photo: Henrik Trygg/mediabank.visitstockholm.com

Page 8: Welcome to Supplier Day om - Nya tunnelbanan

Page 8

A new Metro line to Nacka.

Increased capacity throughout Söderort.

Will facilitate commuting.

Six new stations and a new platform under Gullmarsplan.

Enables construction of 56 500 new residences.

Will bring the Stockholm region closer together.

Metro to Södermalm, Nacka and Söderort

Page 9: Welcome to Supplier Day om - Nya tunnelbanan

Page 9

Illustrations: Sweco

Page 10: Welcome to Supplier Day om - Nya tunnelbanan

Page 10

Access tunnels

Civil engineering works

Building and installation

Track, electricity, signals and tele communications

Three projects

Page 11: Welcome to Supplier Day om - Nya tunnelbanan

Page 11

Figures

Track length: 4.5 km

2 new stations

2 access tunnels

Rock: 930,000 m³

Concrete: 20,000 m³

4 contracts

Estimated production cost: SEK 2.5 billion

Södermalm

Södermalm

Page 12: Welcome to Supplier Day om - Nya tunnelbanan

Sofia station

Platform 100 metres below ground.

Eight high-speed lifts with 30 second travel time.

Evacuation classed lifts.

Page 12

Page 13: Welcome to Supplier Day om - Nya tunnelbanan

Sidan 13

Page 14: Welcome to Supplier Day om - Nya tunnelbanan

Page 14

Nacka

Track length: 4.1 km

3 new stations

3 access tunnels

Rock: 750,500 m³

Concrete: 30,000 m³

3 contracts

Estimated production cost: SEK 2.5 billion

Figures

Page 15: Welcome to Supplier Day om - Nya tunnelbanan

Page 15

Metro to Nacka

Enables construction of new residential areas.

Coordination between various projects, mainly at the Sickla and Nacka Centrum stations.

Sickla – tvärbanan tram, Saltsjöbanan light rail’s elevation, development projects.

Sickla station

Illustrations: Sweco

Page 16: Welcome to Supplier Day om - Nya tunnelbanan

Page 16

Illustration: Nacka stad

Page 17: Welcome to Supplier Day om - Nya tunnelbanan

Page 17

Underground bus terminal, development project.

Nacka Centrum station

Illu

stra

tio

ns:

Na

cka

sta

d

Page 18: Welcome to Supplier Day om - Nya tunnelbanan

Page 18

Track length: 2.7 km

1 new station

1 new platform below the existing station.

2 access tunnels

Rock: 500,000 m³

Concrete: 7,000 m³

4 contracts

Estimated production cost: SEK 2.5 billion

Figures Söderort

Page 19: Welcome to Supplier Day om - Nya tunnelbanan

Gullmarsplan

Illustration: Sweco

Photo: Stockholms läns landsting

Page 20: Welcome to Supplier Day om - Nya tunnelbanan

Gullmarsplan

Four levels

1. 4. Bus terminal

2. 3. Station building

3. 2. Metro: Green Line, tram

4. 1. Metro: Blue Line

Page 20

Page 21: Welcome to Supplier Day om - Nya tunnelbanan

New station in the Slakthus area A part of the new Söderstaden.

Page 21

Illustration: Sweco

Photo: Stockholm County Council

Page 22: Welcome to Supplier Day om - Nya tunnelbanan

Be part of building the future Public Transport in Stockholm!