1st Partner Meeting January 2018
Welcome to the 1st Partner MeetingLet’s #BEACTIVE
17 – 18 January 2018
Avenue des Arts / Kunstlaan 43 Brussels B-1040
#BEACTIVE
1st Partner Meeting January 2018
AGENDA – DAY 1
1. Welcome and adoption of the agenda- Round table
- The ALCIS and PAHA Projects
- The Let’s #BEACTIVE contribution to European Week of Sport 2018
2. The perspective of the European Commission – Florence
Mondin
3. Presentation of the intellectual outputs and work packages - Overview of the project objectives and structure
- Partners general/specific tasks and responsibilities
- The role of Work Packages Leaders
- Review of the intellectual outputs
- Q/A about partner tasks and expected outcomes
4. Development and evaluation of the Let’s #BEACTIVE training
programme – Xian Mayo, King Juan Carlos University
5. Concluding remarks
List of Participants
Organisation Name
AGAP Fabio Lopes
ANIF Angelo Desidera
Berkley Associates John Stringer
CKF Karel Jarušek
European Commission Florence Mondin
Fundacion Espana Activa/ National Observatory
for Active & Healthy LivingXian Mayo
Ireland Active Conn McCluskey
LSKA Maciukas Aurimas
LSKA Simona Pajaujiene
Xian Mayo
SKY Hannamari Viitanen
ukactive Will Smithard
ukactive Sinead McCafferty
EuropeActive Cliff Collins
EuropeActive Francesco Capuani
EuropeActive Lukas Declercq
1st Partner Meeting January 2018
Tour de Table
Let’s get to know each other ..
Each partner can briefly explain the principle objectives of their own organisation, and what they expect to gain and contribute to the project.
1st Partner Meeting January 2018 1st Partner Meeting January 2018
The ALCIS and PAHA project
1st Partner Meeting January 2018
ALCIS
The ALCIS and PAHA project
1st Partner Meeting January 2018
PAHA
The 1st Let’s #BEACTIVE video
1st Partner Meeting January 2018
The first promotional video in MAY
Ideas?
1st Partner Meeting January 2018
1st Partner Meeting January 2018
• 13 main events in 11 different countries ***
• Thousands of fitness clubs involved and millions of people participated or were reached by
the NFD message
• The actions were coordinated EuropeActive but were organised by our partners, sponsors
and National Fitness Association members.
• The National Fitness Days were the opportunity to present the economic and social
potential of fitness, to raise the profile of the sector in Europe, and eventually show how
fitness makes the difference in making more people, more active, more often. The events
were to help spread the reach and marketing of the #BeActive concept for the EWoS.
The National Fitness Days
1st Partner Meeting January 2018
The Let’s #BEACTIVE contribution to the European Week of Sport 2018
1. Supporting the Fitness Focus theme
2. Collaborating with the National Coordinator Bodies in order to pursue common actions
for the promotion of the Week
3. LBA Partners participated to the previous edition of the European Week of Sports with
different kind of initiatives (e.g. UKACTIVE and CKF are National Coordinators
4. Engaging fitness professionals and clubs to take part in the Week. Indeed, all partners are
national health and fitness associations who are well experienced in implementing
targeted European recruitment campaigns in the field of HEPA (e.g. National Fitness Days)
5. Recruiting thousands of inactive Europeans to have an active and healthy lifestyle
1st Partner Meeting January 2018
The Let’s #BEACTIVE contribution to the European Week of Sport 2018
8. Let’s #BEACTIVE partners will be invited to promote the European Week of Sport by using
the visual/communication materials of the BEACTIVE campaign: logos, banners, videos,
posters, website…
9. The EuropeActive National Fitness Days 2018* campaign will be the occasion for fitness
clubs involved in LET’S #BEACTIVE project to organise special activities with the intention
to recruit people for the trials but at the same time promote the BEACTIVE message and
the Let’s #BEACTIVE method. In this regards, the NFD campaign will be the starting point
for the first two LBA trials and the end of the last one.
1st Partner Meeting January 2018
The perspective of the European Commission
Florence Mondin - Sport Unit DG EAC
Sport
Health-enhancing physical activity (HEPA) developments under the
Sport Policy
Florence MondinPolicy Officer, Sport Policy UnitDG Education, Youth, Sport and CultureEuropean Commission
Let's #BEACTIVE kick off meetingBrussels, 17 January 2018
COUNCIL RECOMMENDATION ON HEPA
First report (2014-2016) adopted by COM in Dec 2016
(COM/2016/0768 final)
Country factsheets on HEPA (Sept 2015):
http://www.euro.who.int/en/health-topics/disease-prevention
/physical-activity/country-work
Sport
Erasmus+ Funding Programme – Sport chapter
- Website: http://eacea.ec.europa.eu/home/erasmus-plus/actions/sport
- Projects database: http://ec.europa.eu/programmes/erasmus-plus/projects/
- Results of selection in 2017: https://eacea.ec.europa.eu/erasmus-
plus/selection-results/erasmus-plus-sport-call-for-proposals-eaca032016_en
Sport
EUROPEAN WEEK OF SPORT
- #BEACTIVE AWARDS- #BeActive EDUCATION AWARD: Colegio publico
Miguel De Cervantes Spain- #BeActive WORKPLACE AWARD: UAB Eugesta - Lithuania- #BeActive LOCAL HERO AWARD: Jorge Pina - Portugal
TARTU CALL FOR A HEALTHY LIFESTYLE
STRENGHTENING
CROSS-SECTOR COOPERATION
Sport
Further information- European Commission's Sport Unit website: http://ec.europa.eu/sport/
- Contact: Sport Unit:- [email protected] [email protected] [email protected]
- #Followus:- #ErasmusPlus: Erasmus+, @EUErasmusPlus- #EUSport #BeActive: @EUSport
EUROBAROMETER ON SPORT AND
PHYSICAL ACTIVITY
NEW EUROBAROMETER IN MAY 2018 !
Let’s #BEACTIVE 3-year project
Objectives:
1. To convert inactive European adults to become more physically active and to support them to adopt a healthy lifestyle for life.
2. To track levels of PA to create an evidence base (during the trial sessions, and at 3 and 6 months after trial sessions have been completed) for further research and to support policy development for future actions in the promotion of HEPA
3. To promote the European Week of Sport with strong support of fitness the focus theme during the week at national and local community levels.
1st Partner Meeting January 2018
Overview of the project objectives and structure
1st Partner Meeting January 2018
Overview of the project objectives and structure
Objective 1
convert inactive European
adults to become more
physically activity and to
support them to adopt a
healthy lifestyle for life.
Anticipation: - 75% of the participants
are expected to
complete the trails,
- 55% will be still
exercising after 3
months after trail
completion,
- 25% is expected to still
exercise and being
active at levels which
are beneficial to their
health
to engage 60,000+ self-perceived currently inactive
individuals in a 6-week intervention of structured
exercise, exercise counselling and behavioural
change support in fitness clubs
to develop and deliver an effective and targeted
European recruitment campaign for inactive adults
taking into account the Council Recommendations
on HEPA and WHO Health 2020,
to increase the awareness for the importance of
physical activity and the adoption of a healthy
lifestyle,
to encourage individuals to make a long term
commitment to regular physical activity
World Health Organisation: Physical Activity
Strategy for the WHO European Region 2016–2025,
Copenhagen 2015.
1st Partner Meeting January 2018
Overview of the project objectives and structure
Objective 2
Track levels of PA to create
an evidence base (during
the trial sessions, and at 3
and 6 months after trial
sessions have been
completed) for further
research and to support
policy development for
future actions in the
promotion of HEPA
to provide measurable outcomes of the
project, and especially that the structured 6-
week exercise intervention positively changes
behaviour and personal commitment to
maintaining physical activity,
to create a source for future evident-based
projects for future policy development.
1st Partner Meeting January 2018
Overview of the project objectives and structure
Objective 3
promote the European
Week of Sport with
strong support of
fitness the focus
theme during the
week at national and
local community
levels.
to take into account the recommendations of the 2016
EWoS evaluation report: to redirect events from
Brussels to a local level. In addition, the promotion of
the focus theme on fitness as it has been the least
promoted among the five topics in the Member States,
to support the national and local promotion of the
EWoS, Let’s #BEACTIVE will coordinate its actions (start
and finish of the 6-weeks trials) in line with national
and European interventions in this field,
Let’s #BEACTIVE will reach out to the national
coordinators of the EWoS to assure a coordinated
action and to maximise the messaging of the EWoS,
to establish close cooperation between participating
fitness clubs, project partners and the national
coordinators of the EWoS to support the fitness focus
theme,
to reduce the “distance” between citizens and the
policy-makers of the EU institutions by spreading the
#BEACTIVE message at the grassroots level (top-down
approach)
1st Partner Meeting January 2018
Overview of the project objectives and structure
1st Partner Meeting January 2018
Stage I: Physical
Activity
highly structured 6-week
exercise programme in a
fitness gym setting for self-
perceived inactive people
Stage II: Participant
Guide
Educational material on the
importance of maintaining a
healthy lifestyle.
Stage III: Pledging
physical activity “for
life”
commitment to stay fit and
physical active for the long
term.
Three Stages to more physical activity
Overview of the project objectives and structure
1st Partner Meeting January 2018
Creating the evidence-base
Gathering (big) data about the activity levels of participants, not only during 6 week trials but also afterwards -> Mobile phone application
The collected data will be analysed and the findings will be used to further improve the trials and the intervention methodology.
The data collection and analysis will contribute to further research within the field and will be useful to assist in wider policy debates and support future planning of interventions at national and EU level.
1st Partner Meeting January 2018
Intellectual outputs and work packages
1st Partner Meeting January 2018
Partners general/specific tasks and
responsibilities
WP Work package title Leader Active Partners
WP 1
Project management, quality
control, external evaluation, contact
and reporting to EACEA
EuropeActive (P1) EuropeActive + management
group (P1, P2 and P5)
WP 2Communication, dissemination and
project website
SKY (P4) All partners
WP 3
Development of the Let’s
#BEACTIVE handbooks and
Participant Guide
ukactive (P2) All partners
WP 4Delivery of the Let’s #BEACTIVE
programme
EuropeActive (P1) All partners + their fitness
clubs
WP 5
Development and evaluation of the
training programme
Fundacion Vida Activa y
Saludable (P5)
All partners + Pr. Alfonso
Jimenez
Intellectual outputs and work packages
1st Partner Meeting January 2018
The role of Work Packages Leaders
Intellectual outputs and work packages
1st Partner Meeting January 2018
Review of the intellectual outputs
1. Let’s #BEACTIVE handbook for the participating National Associations (partners)
2. Let’s #BEACTIVE handbook for the fitness clubs
3. Let’s #BEACTIVE handbook for the Personal trainers
4. Additional training for PTs (based on e-learning)
5. Let’s #BEACTIVE Participant Guide (i.e. fundamental information of active and healthy
lifestyle, physical activity guidelines, activity diary, example of daily physical activity).
6. Let’s #BEACTIVE Research: data collection and analysis of Physical activity levels of trailed
participants
7. Let’s #BEACTIVE Policy recommendation paper
8. Let’s #BEACTIVE app: set up and run
9. Joint promotion of the European Week of sport and Let’s #BEACTIVE project
Intellectual outputs and work packages
1st Partner Meeting January 2018
Questions?
Development and evaluation of the Let’s #BEACTIVE training programme
Xian Mayo King Juan Carlos University
1st Partner Meeting January 2018
Research and evaluation plan
2018 Erasmus+ Collaborative Partnerships
Let’s #BEACTIVE
Brussels, 17th January 2018
Sample
Self-perceived physically inactive adults
18-55 years old
Gender and geography balance
Project structure
Large sample trialRecruitment in 3 years
Total Per country (8) Per Fitness center
Fitness centers ~500 ~60
Participants per year ~20,000 ~2,400 ~40
Participants in total 60,000+ ~7,200 ~120
Delivery of the program
Delivery during the three years
J F M A M Jn Jl A S O N D
1st
2nd
3rd
Recruitment
6-week trial
Commit to #BEACTIVE
Delivery of the program
Training and testing delivery
Weeks Months
1 2 3 4 5 6 … 3 … 6 … 12
Training
Testing
Pledge signing(25% expected)
RetestingRetestingAll partners
Subsample
Training delivery
3 exercise sessions per week, gently progression
18 visits in total, 6 1-to-1 with their Personal Trainer
Testing deliveryWhole sample (all partners)
Weeks Months
1 2 3 4 5 6 … 3 … 6 … 12
Testing
Pledge signing(25% expected)
All partners
Subsample (5%)
Assessment of risk PAR-Q+
Physical activity reported IPAQ
Physical activity measured Trackers (accelerometry)Optional, depends on technology available for the end-user (participant)
Mood-related/wellbeing SF-36 or AQoL-6D
Behavior change analysis and improvement
Social support, self-efficacy, decisional balance, assistance
Testing deliveryAd hoc app to download based on training gym technology
Testing delivery
Just supervised by the Personal Trainer
Data is automatically stored in the cloud
Participants (end user)
Personal Trainers
Fitness Clubs
Partners
Behavioural change intervention
1. Implementing behavioural change support training by Personal Trainings (12-15 h. – Using URJC technology)
2. On-line assessment of the behavior change using bostechnology, addressing social support, self-efficacy, decisional balance and assistance
Behaviour change wheel
Michie et al. Implementation Science 2011, 6:42
Behavioural change intervention
Behaviour change techniques to be implemented by Personal Trainers6 one-to-one sessions with their Personal Trainer addressing social support, self-efficacy, decisional balance and assistance
Michie et al. Psychology and Health 2011, 26:11
Behavioural change intervention
Testing delivery - Subsample
Weeks Months
1 2 3 4 5 6 … 3 … 6 … 12
Testing
+ Research Quality Control Group (TEG: SP, EI, FI)
Subsample (5%)
Assessment of risk PAR-Q+
Physical activity reported IPAQ
Physical activity measured Trackers (accelerometry)Optional, depends on technology available for the end-user (participant)
1-week accelorometry
Mood-related/wellbeing SF-36 or AQoL-6D
Behaviour change analysis and implementation
Social support, self-efficacy, decisional balance, assistance
Cardiorrespiratory fitness Submaximal test (Cosmed FitMate)
Control group
Technical Expert Group (TEG)
Meeting at Madrid
31st January or 1st of February - TBC
Partners will received a detailed Guide of the Research and Evaluation Plan after the TEG meeting.
This R&E Guide will inform a number of core documents and Intervention Guides for the whole project.
Thank [email protected]
Concluding remarks
1st Partner Meeting January 2018
Questions?
Arrangements for tonight
Dinner at 19.00 at Le Clan des Belges
Rue de la paix, 20
1050 Bruxelles
http://leclandesbelges.com/
1st Partner Meeting January 2018
AGENDA – DAY 2
1. The work plan - The timeline for Intellectual Outputs
- Schedule of Meetings
2. The Project Administration- Administration handbook
- Partner Agreements
- Contractual arrangements with EACEA
3. The Financial Administration- Staff costs: timesheets form
- Travel and subsistence form
- Currency converter
- Payments
4. The Project Dissemination - Work Package 2
- Dissemination tools
- Use of logos, visibility and hashtags
1st Partner Meeting January 2018
5. Schedule next meetings
6. Bringing it altogether – agree on actions and outcomes
7. Any other business
1st Partner Meeting January 2018
The work plan
1st Partner Meeting January 2018
The timeline for Intellectual Outputs
1st Partner Meeting January 2018
Intellectual output (IO) Timing
Handbook for the partnersFebruary 2018 – April 2018
(& annual updates April 2019 & November 2020)
Handbook for the fitness clubsMarch 2018 – May 2018
(& annual updates April 2019 & November 2020)
Handbook for PT’s March 2018 – May 2018
(& annual updates April 2019 & November 2020)
Additional training for PTs (e-learning)March 2018 – June 2018
(& annual updates April 2019 & November 2020)
Participant GuideMarch 2018 – June 2018
(& annual updates April 2019 & November 2020)
Research: data collection and analysis of
Physical activity levels of trailed participantsSeptember 2018 – October 2020
Policy recommendation paper October 2020 – December 2020
App: set up and run February 2018 – December 2020
Joint promotion of the EWoS and LBA March 2018 – December 2020
Schedule of meetings
1st Partner Meeting January 2018
5 Full partner meetings January 2018 (2 days meeting) – Brussels, BENovember 2018 (2 days meeting) – Brussels, BEMay 2019 (2 days meeting) – Prague, CZJanuary 2020 (2 days meeting) – Madrid, ESOctober 2020 (2 days meeting) – Brussels, BE
4 Research team meetings (same date & place as full partner meetings, but
not on November 2018)
3 TEG meetings ( TEG 1&2) March 2018 – London,April 2019 & March 2020 (Virtual)
Regular Management Group
meetings
March 2018, October 2018, April 2019, October
2019, March 2020 & October 2020 (Virtual)
The Project Administration
1st Partner Meeting January 2018
Key Document: the administration handbook
Is developed and distributed by EuropeActive (annex to Partner Agreements)
Contractual arrangements with EACEA
EuropeActive is the contract holder
8 partners – are co-beneficiaries and 2 subcontractors
EuropeActive has the legal responsibility for the delivery of the
action – and will complete all reporting
Each partner/sub-contractor has a separate agreement which
describes their obligations and payments
The Financial Administration
1st Partner Meeting January 2018
All the costs should be between 1st January 2018 to 31st December 2020
Costs claimed after this period aren’t eligible
2 types of expenses
Staff costs = Through timesheets (or invoice for subcontractors)
Travel and Subsistence expenses Through Expense form record
Keep financial records for 5 years in case you do not send original copies
1st Partner Meeting January 2018
Staff Costs –Timesheet Template
Timesheets are for Let’s #BEACTIVE partners only (not subcontractors)
Objective of timesheets:
• To keep an accurate record of time spent – by everyone who is
involved in your organisation working on the project
• It’s a record to confirm why we make a grant payment
Please complete timesheets every 3 months!
Your timesheets should be in EURO
1st Partner Meeting January 2018
How:
Select country
Select position
Indicate number of WD for each IO
If different positions for different IOs =>different time sheet !!
1st Partner Meeting January 2018
Travel and subsistence form record
Travel & subsistence costs are limited Be Sensitive!
Take the lowest cost form of travel and to use public transport wherever
possible;
Only for journeys directly linked to the project or specific and clearly identifiable
project-related activities
Please follows the rules indicated in the Travel and Subsistence Form
Original tickets, receipts, boarding passes should be sent by post, in a
maximum of 15 days after the meeting/event:
Lukas Declercq
House of Sport
Avenue des Arts 43
1040 Bruxelles
1st Partner Meeting January 2018
Travel and subsistence form
1st Partner Meeting January 2018
Convert currency procedure
Payments from the Coordinator to the Partners will be made in Euros
If other currencies are use:This converter website should be used: http://ec.europa.eu/budget/contracts_grants/info_contracts/inforeuro/index_en.cfm
For the full duration of the project the exchange rate of December 2017 will apply !!
1st Partner Meeting January 2018
Payments
There are three stage payments
1st pre-financing (beginning of the project) - 30%(after the submission of signed partner agreements)
2nd pre-financing (midterm) - 30%(After the successful delivery and acceptance of the interim report by the
Commission. * the interim report will be submitted once the 70% of the 1st pre-financing will be spent
Final payment (balance payment) – 40%After the successful delivery and acceptance of the final report and when the
balance payment has been received by EuropeActive
1st Partner Meeting January 2018
Remember!
You must inform us if you have a problem
If you are unsure about whether something can be paid for out of this project
grant, please contact EuropeActive
Any expenditure to be eligible must be supported by appropriate evidence.
Documents must be sent to EuropeActive to support any claim for expenses,
staff costs, etc.
Partners need to keep copies for five years after the end of the project.
EuropeActive will not be able to accept any claims if we do not receive the
supporting documents, so it is vitally important that you send to EuropeActive
all evidence … for everything you spend on the project … including your time.
The Project Dissemination
WP 2 – SKY LeadingCommunication and Dissemination
Let’s #BEACTIVE partners will have to promote the project concept and outcomes through their network, media, attended events.
In the short term, an effective project dissemination is important to encourage
people to take part in the trials, in promotion of the European Week of Sport,
and the bigger messaging around HEPA.
In the long term, the dissemination tasks consist in the promotion of the results
of the LBA method to encourage new clubs to continue to implement the action
yearly, or to take part of it.
1st Partner Meeting January 2018
Dissemination Tools
Dissemination Handbook – will be developed as annex to the project handbook and circulated by March 2018It will contain the detailed LBA dissemination strategy, the target audience and the dissemination means.
Website - a project website will be created by March 2018, linked to EuropeActive EU Affairs website. It will be updated on regular basis and it will represent a platform for gathering and sharing information on the project itself but also make on open access all materials developed.
PR Materials - such as flyers, posters, roll up to be translated into all project
languages (7) and to be distributed at relevant events.
2 promotional videos – the first one (May 2018) will be used in the
recruitment period to encourage people to take part in the trials. The second one
will present the project outcomes (January 2022).
1st Partner Meeting January 2018
Drafted Logos
HASHTAG
ideas to share?
1st Partner Meeting January 2018
Use of Logos, visibility and Hashtag
Publications disclaimer:“The European Commission support for the production of this publication does not constitute an endorsement of the contents which reflects the views only of the authors, and the Commission cannot be held responsible for any use which may be made of the information contained therein”.
1st Partner Meeting January 2018
Schedule of next meetings
1st Partner Meeting January 2018
TEG 1 : March 2018 in London
TEG 2 : March 2018 in London
DOODLE TO PICK UP DATES
Bringing it all together
1st Partner Meeting January 2018
Questions?
Any other Business
1st Partner Meeting January 2018
Thank you for your attendanceHave a safe journey home