Welcome to the Arthur Sheridan Enhancement Project Public Information Meeting Three new pedestrian signalized crossings New pedestrian bridge to Starlight Park Dedicated bike path New landscaping For more information go to: www.dot.ny.gov/SouthBronx or contact: The Arthur Sheridan Enhancement Project Team New York State Department of Transportation 47-40 21st Street Long Island City, New York, 11101 [email protected] Monday, July 24, 2017 5 p.m. – 8 p.m.

Upload: others

Post on 10-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Welcome to the Arthur Sheridan Enhancement Project

Public Information Meeting

• Three new pedestriansignalized crossings

• New pedestrian bridge toStarlight Park

• Dedicated bike path• New landscaping

For more information go to:www.dot.ny.gov/SouthBronx or contact:

The Arthur Sheridan Enhancement Project Team New York State Department of Transportation

47-40 21st StreetLong Island City, New York, 11101

[email protected]

Monday, July 24, 2017 5 p.m. – 8 p.m.

1

Arthur Sheridan Enhancement Project From Westchester Avenue to Cross Bronx Expressway PIN X731.49

Existing Conditions

2

Arthur Sheridan Enhancement

From Westchester Avenue to Cross Bronx Expressway PIN X731.49

Project Objectives

The objectives of this project are to:

Provide improved pedestrian access and connections between the

communities to west and the Bronx River Greenway from Starlight

Park to Concrete Plant Park to the east;

Provide streetscape improvements, such as planted medians and

buffers, street trees, lighting, and improved signage;

Introduce geometric changes in the roadway in a manner that

promotes traffic calming and enhances safety for users;

Reduce the vehicular operating speed along the Sheridan corridor

while maintaining vehicular access to the community;

Reduce or alleviate existing traffic congestion on the Westchester

Avenue exit ramp

3

Arthur Sheridan Enhancement Project

From Westchester Avenue to Cross Bronx Expressway PIN X731.49

Scope of Work

Introduce three (3) signalized at-grade intersections for

pedestrian and bicycle crossings

Convert Edgewater Rd. to a one-way street, add a two-

way protected bicycle lane, and provide access to

Southbound Sheridan

Construct a pedestrian bridge over the Bronx River within

Starlight Park

Provide two lane exit ramp at Westchester Ave from

Southbound Sheridan

Improve landscaping, drainage, traffic signals, pavement

and lighting on the Sheridan

Create a Public Space at the entrance to Starlight Park

1 Arthur Sheridan Enhancement Project PIN X731.49

Jennings Street Intersection-Proposed Jennings Street Intersection-Proposed

NEW PEDESTRIAN CROSSING

ONE-WAY TRAFFIC ON EDGEWATER ROAD

BRONX RIVER

WEST FARMS ROAD

ACCESS TO SOUTHBOUND

SHERIDAN FROM EDGEWATER ROAD

WESTCHESTER AVENUE EXIT RAMP

POSSIBLE CONVERSION TO ONE

SOUTHBOUND TRAVEL LANE

2 Arthur Sheridan Enhancement Project PIN X731.49

172nd Street Intersection-Proposed

ENTRANCE TO STARLIGHT PARK

NEW PEDESTRIAN CROSSING

STARLIGHT PARK

BRONX RIVER

WEST FARMS ROAD

ACCESS TO SOUTHBOUND

SHERIDAN FROM EDGEWATER ROAD

POSSIBLE CONVERSION TO

ONE SOUTHBOUND TRAVEL LANE

3 Arthur Sheridan Enhancement Project PIN X731.49

173rd Street Intersection-Proposed

EDGEWATER ROAD ENTRANCE

RAMP

WEST FARMS ROAD

NEW SIDEWALK TO STARLIGHT PARK

E 174TH STREET

NEW PEDESTRIAN CROSSING

POSSIBLE CONVERSION TO

ONE SOUTHBOUND TRAVEL LANE

E 173RD STREET

STARLIGHT PARK

4 Arthur Sheridan Enhancement Project PIN X731.49

Pedestrian Bridge in Starlight Park-Proposed WEST

FARMS ROAD

SHERIDAN BOULEVARD

E 172ND STREET

BRONX RIVER

ENTRANCE TO STARLIGHT PARK

8

Arthur Sheridan Enhancement

From Westchester Avenue to Cross Bronx Expressway PIN X731.49

Schedule & Cost

Design Completion: Spring 2018

Contract Bid and Award: Summer 2018

Construction Start: Fall 2018

(Duration 1 Year)

Substantial Construction Completion: Fall 2019

Construction Cost : $97 Million