Welcome to Tonight’s Louisiana DOTD Public Information Open House. Multimedia Presentation. Initial Strategy (1 of 2). U.S. 90 from South of Ambassador Caffery Parkway to North of the BNSF Railway overpass. Initial Strategy (2 of 2). U.S. 90 from the BNSF Railway overpass to - PowerPoint PPT PresentationTRANSCRIPT
Welcome to Tonight’s Louisiana DOTD
Public Information Open House
MultimediaPresentation
Initial Strategy (1 of 2)
U.S. 90 from South of Ambassador Caffery Parkway to North of the BNSF Railway overpass
Initial Strategy (2 of 2)
U.S. 90 from the BNSF Railway overpass toNorth of Albertson Parkway
Refinement of Initial Strategy (1 of 2)
U.S. 90 from North of Ambassador Caffery Parkway to North of the BNSF Railway overpass
Refinement of Initial Strategy (2 of 2)
U.S. 90 from North of the BNSF Railway overpass toNorth of Albertson Parkway
Advantages of Refined Strategy
• Increases capacity.• Delivers transportation safety and mobility benefits.• Accommodates current and future commercial development.
• Reduces negative impacts for drivers and adjacent properties.
• Minimizes construction costs.
Phase One of Construction (1 of 2)
U.S. 90 from North of Ambassador Caffery Parkway toNorth of the BNSF Railway overpass
Phase One of Construction (2 of 2)
.
U.S. 90 from North of the BNSF Railway overpass toNorth of Albertson Parkway
Phase One Features
•Widens U.S. 90 from four to six lanes.•Elevates U.S. 90 travel lanes above Albertson’s Parkway.•Replaces/widens bridges over BNSF Railway.•Constructs new North and Southbound service roads.•Eliminates J-Turns.•Optimizes access to adjacent properties.
Design/Construction Timeline
•Design activities begin in February 2014.•Construction work begins in mid-2014.•Estimated completion in mid-2017.
Access to private properties will be maintained throughout the construction effort.
Routine lane closures will be limited to off-peak travel times.
For More Information
Ms. Peggy Jo Paine, P.E.DOTD Construction Project Manager
1201 Capitol Access RoadBaton Rouge, LA 70802
E-mail: [email protected]