Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored by Center Accelerated Bridge Construction (ABC Center) at Florida International University Website: abc.fiu.edu Email: [email protected] November 14, 2013 – 1:00 p.m. to 2:00 p.m. Eastern

Upload: marsha-gaines

Post on 23-Dec-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

Welcome to Webinar onAccelerated Bridge Construction

ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley

Cedar Street Bridge

Sponsored by

Center Accelerated Bridge Construction(ABC Center) at

Florida International University

Website: abc.fiu.eduEmail: [email protected]

November 14, 2013 – 1:00 p.m. to 2:00 p.m. Eastern

Page 2: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

Webinar Agenda

ABC Announcements (10 minutes)

Featured Presentation (35 minutes)

ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley

Cedar Street Bridge

Joseph P. Gill, P.E., President,Gill Engineering, Needham, MA

Question and Answer (15 minutes)

Please post your questions in the chat box

Page 3: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

ABC University Transportation Center (ABC-UTC)*

Consortium:• Florida International University (Lead)• University of Nevada at Reno• Iowa State University

Focus areas:• Research• Education and Workforce Development• Technology Transfer

Your Suggestions: [email protected]

* funded by USDOT’s Research and Innovative Technology Administration (RITA)

Page 4: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

2014 ABC-UTC Accelerated Bridge Construction Conference

Start Date: Wed., Dec. 3, 2014 – 1:00 pmEnd Date: Fri., Dec. 5, 2014 – 3:30 pm

Miami, FLCall for abstracts will be sent out soon

Conference will include exhibits

Mark your calendars!

Page 5: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored
Page 6: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

Upcoming ABC Events

1st International PCI Symposium on Precast Concrete – Dubai World Trade CenterDecember 3-5, 2013Sponsored by Precast/Prestressed Concrete Institute (PCI)http://www.pci.org/

ABC-related presentations:• Recent NCHRP Research on Precast Concrete Bridges• Accelerated Bridge Construction• Innovative use of Precast Concrete in Curved Bridges

For more information: http://www.pciconference.com/program

Page 7: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

Upcoming ABC Activities atTRB Annual Meeting

January 12-16, 2014 – Washington, DC

Workshop 183: PBES for ABC Sponsored by TRB AFF10(3) ABC Subcommittee; AFF10; AFF20; AFF30; AFH40 – Sunday, January 12, 1:30 pm - 4:30 pm

Agency Implementation of ABC in a Programmatic MannerWayne Symonds, Vermont Agency of Transportation 

Full-Depth Deck Panels with UHPCRichard Marchione, New York Department of Transportation 

Massena Lateral Bridge Slide ProjectAhmad Abu-Hawash, Iowa Department of Transportation

Rawson Bridge Move using Self-Propelled Modular Transporters William Olivia, Wisconsin Department of Transportation

Challenges and Unusual Construction Techniques to Replace Moveable Bridge Spans using ABC Methods  Kamal Elnahal & Arvind Patel, United States Coast Guard

Page 8: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

Upcoming ABC Activities atTRB Annual Meeting

January 12-16, 2014 – Washington, DC

Session 344: Advancements in ABC Sponsored by TRB AFF10(3) ABC Subcommittee; AFF10; AFF20; AFF30; AFH40 – Monday, January 13, 1:30 - 3:15 pm- A Decision Support Framework for ABC- Design of UHPC Waffle Deck for ABC- Precast Paving Notch System for ABC Repair

- Concrete-Filled Steel Tubes for ABC 

ABC Subcommittee Meeting, AFF10(3) Tuesday, January 14, 7:30 – 10:00 pm

For more information, contact Ben Beerman: [email protected]

Page 9: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

Upcoming 2014 Events

2014 Structures Congress – Boston, MAApril 3-5, 2014Sponsored by ASCE/Structural Engineering Institute (SEI)http://www.seinstitute.org/

Online registration now open:http://content.asce.org/conferences/structures2014/

Page 10: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

Upcoming 2014 Events

31st Annual International Bridge Conference – Pittsburgh, PAJune 8-12, 2014Sponsored by Engineers’ Society of Western PA (ESWP)http://www.eswp.com/bridge/Suggested topics include Accelerated Bridge Construction

Call for WorkshopsDeadline for submission: December 6, 2013http://www.eswp.com/bridge/workshopCallForm.htmCall for Project Award NominationsDeadline for submission: January 17, 2014http://www.eswp.com/bridge/awards.htm

Page 11: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

Links on ABC Center Home Page

http://www.abc.fiu.edu/

Archive of Past Events

Upcoming Events & Activities

Related News & Publications

Page 12: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

Industry Resources

For resources related to concrete bridges, visit:http://www.nationalconcretebridge.org/

For resources related to steel bridges, visit:http://www.steelbridges.org

For resources related to composite bridges, visit:http://www.acmanet.org/dac/tsc.cfm

Page 13: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

Next Webinar

Thursday, December 19, 2013 (1:00 – 2:00 p.m. Eastern)

Featured Presentation

New York State’s I-84 / Dingle Ridge Road Lateral Bridge Slide

by

Jerry A. DiMaggio, PE, D.GE, SHRP2 Implementation Coordinator, Transportation Research Board &

Bala Sivakumar, PE, Vice President, Director-Special Bridge Projects, HNTB Corporation

To register, visit: www.abc.fiu.edu

Page 14: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

If you wish to receive one-hour PDH

Send an email to

[email protected]

State that you attended the November 14, 2013 webinar

Give first and last name of everyone at your site who wishes to receive PDHs

Please do not send request to any other email account

Page 15: Welcome to Webinar on Accelerated Bridge Construction ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley Cedar Street Bridge Sponsored

Webinar Agenda

ABC Announcements (10 minutes)

Featured Presentation (35 minutes)

ABC using Self-Propelled Modular Transporters – MassDOT’s Wellesley

Cedar Street Bridge

Joseph P. Gill, P.E., President,Gill Engineering, Needham, MA

Question and Answer (15 minutes)

Please post your questions in the chat box