Page 1: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

WELCOME YOU ALL

Page 2: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

SAFETY DURING BLASTING OPERATION

Page 3: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

GUIDELINES FOR BLASTING AND SAFE USE OF EXPLOSIVES

Page 4: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

Among all of the professions on earth, there is none that

demands a stricter commitment to safety,

proper training, product education, and respect for the rights of others than

that of the Blasting Engineer and Explosive engineer. 

Page 5: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

THE GUIDE LINES MAY DIVIDE INTO FOUR GROUPS:

- BEFORE DRILLING

- DURING DRILLING AND CHARGING

- DURING BLASTING

- AFTER BLASTING

Page 6: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

THE DRILLING AND BLASTING WORK PROCESS

Page 7: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

THE FRONT ROW CHARGE SHOULD BE ADEQUATELY DESIGNED TO MOVE THE FRONT ROW BURDEN. BACK ROW HOLES SHOULD BE DRILLED AT AN OPTIMUM DISTANCE FROM THE FINAL DIGLINE TO PERMIT FREE DIGGING AND YET MINIMISE DAMAGE TO THE WALL. THE MAIN CHARGE AND BLAST HOLE PATTERNS SHOULD BE OPTIMIZED TO GIVE THE BEST-POSSIBLE FRAGMENTATION AND DIGGING CONDITIONS FOR MINIMIM ‘PF’.

MINIMUM TWO FREE FACES SHOLD BE AVAILABLE FOR BLASTING.

BASIC DESIGN PRINCIPLES

ADEQUATE DELAY SHOULD BE USED TO ENSURE GOOD MOVEMENT TOWARDS FREE FACES AND CREATION OF NEW FREE FACES FOR FOLLOWING ROWS.

Page 8: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

 

DURING DESIGN THE FOLLOWING POINTS SHOULD KEEP IN MIND:

IS IT A CONTROLLED BLASTING

ARE THERE ANY CRITICAL STRUCTURES TO TAKE CARE

ARE THERE ANY HISTORICAL STRUCTURES

PERMISSIBLE LIMITS FOR THOSE CRITICAL STRUCTURES

THE MAXIMUM CHARGE MAY EXPLODE TO RESTRICT THE DAMAGE TO STRUCTURES AND ADJACENT ROCK MASS.

THE MAXIMUM SIZE OF FRAGMENTATION

.

Page 9: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

CONTROLLED BLASTING CONTROLLED BLASTING TECHNIQUETECHNIQUE

Used to reduce overbreak and Used to reduce overbreak and minimise the fracturing of the rock of minimise the fracturing of the rock of the boundary of an excavationthe boundary of an excavation

Basic controlled blasting techniques Basic controlled blasting techniques areare

1) Line Drilling 1) Line Drilling Dia of hole - 50 to 75mmDia of hole - 50 to 75mm Spacing – 2 to 4 diaSpacing – 2 to 4 dia No explosivesNo explosives Depth upto 9.0mDepth upto 9.0m

Page 10: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

2)Presplitting2)Presplitting Dia of hole - 50 to 100mmDia of hole - 50 to 100mm Spacing – 6 to 12 diaSpacing – 6 to 12 dia Explosives- spring loaded on detonating Explosives- spring loaded on detonating

chordchord Depth upto 15.0mDepth upto 15.0m

3)Cushion blast3)Cushion blast Dia of hole - 50 to 150mmDia of hole - 50 to 150mm Depth upto 30.0mDepth upto 30.0m

4)Smooth blast4)Smooth blast

CONTROLLED BLASTING CONTROLLED BLASTING TECHNIQUETECHNIQUE

Page 11: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

DRILLING-THE DESIGN SHOULD BE EXPALINED CLEARLY TO DRILLING TEAM.

- THE DESIGN SHOULD BE MARKED BEFORE DRILLING STARTS. NO OF HOLES AND DIRECTION OF HOLES IN EACH ROUND.

- PROPER CARE SHOULD BE TAKEN TO MAINTAIN THE DRILL HOLE ANGLE.

- THE DEPTH OF EACH HOLE SHOULD MAINTAIN AS PER DESIGN.

- THE NO OF HOLES SHOULD BE CHECKED AFTER DRILLING.

Page 12: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

DURING CHARGING

TRANSPORT OF EXPLOSIVES:

TRANSPORT OF EXPLOSIVES FROM THE MAGAZINE TO TEMPORARY STORAGE SHALL BE DONE IN DAYLIGHT .

THE MECHANICAL VEHICLE USED FOR TRANSPORT SHOULD BE APPROVED MY ‘DGMS’.

EVERY VEHICLE USED FOR EXPLOSIVE SHALL BE MARKED WITH WORDS ‘ EXPLOSIVE’ IN RED LETTERS ATLEAST 15 cm HIGH ON WHITE BACKGROUND.

EXPLOSIVES AND DETONATORS SHALL BE TRANSPORTED IN SEPARATE VEHICLES / TRIPS

Page 13: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

VAN CONSTRUCTION

DIESEL

Page 14: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION
Page 15: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

MAIN MAGAZINE

Page 16: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

ATLEAST TWO FIREEXTINGUISHERS SHALL BE THERE IN VEHICLE USED FOR TRANSPORT OF EXPLOSIVE.

IN SHAFTS, EXPLOSIVES SHALL NOT BE CONVEYED DURING THE MAN WINDING HOURS, AND NOT MORE THAN MAN WINDING SPEEDS.

THE WINDING ENGINE DRIVER, BANKSMAN SHALL BE INFORMED BEFOREHAND.

THE QUANTITY OF EXLPOSIVE AND NO OF DETONATORS SHOULD BE CHECKED BEFORE CARRYING TO UNDER GROUND/ SHAFT

Page 17: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

THE CHARGE AND THE DETONATOR NUMBER TO PUT INTO EACH HOLE SHOULD BE CHECKED.

THE DETONATOR SHOULD BE CHECKED FOR BREAKAGE OF LEADS AND ANY DEFECT.

IN EACH HOLE STEMMING SHOULD BE DONE AS PER DESIGN AND THE MATERIAL SHOULD BE PRESCRIBED ONLY.

AFTER CHARGING IN ALL THE HOLES, THE CONNCTIONS SHOULD BE MADE BY SHOT FIRER WITH HELP OF BLASTING INCHARGE.

ALL THE CONNECTIONS SHOULG BE CHECKED ONCE AGAIN BY SHOTFIRER AND BLASTING INCHARGE BEFRE CONNECTING TO MAIN CABLE.

Page 18: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

Loading Explosives:Loading Explosives: No operating equipment within 50 feet No operating equipment within 50 feet

of loaded holesof loaded holes Load only those holes intended to be Load only those holes intended to be

fired in the next roundfired in the next round Warning signs postedWarning signs posted Check all holes forCheck all holes for

depth prior to loadingdepth prior to loading

Page 19: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

APPARATUS

ALL THE BLASTING APPARATUS AND THE APPARATUS USE NEAR BY SHOULD BE EITHER INTRINSICALLY SAFE OR FLAMEPROOF AND APPROVED BY DGMS

INTRINSICALY SAFE OPERATUS ARE LOW POWER EQUIPMENTS LIKE

-BELLS

-RELAYS

-TELEPHONES

-SIGNALLING

-REMOTE CONTROL

-EXPLODERS

.

Page 20: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

AFTER BLASTING

THERE IS CHANCE OF ‘MISFIRES’ AND ‘BLOWN OUTSHOTS’. SO, MEN SHOULD NOT BE ALLOWED TO RETURN TO THE PLACE UNLESS THERE IS CLEARENCE SIGNAL FROM THE SHOTFIRER OR BLASTING INCHARGE.

MINIMUM TIME GAP OF 5 min FOR ELECTRIC BLASTING AND 30 min FOR NON-ELECTRIC BLASTING SHOULD BE GIVEN BEFORE ENTERING THE BLASTING ZONE.

EXPLOSIVES THEORETICALLY CONTAIN SUFFICIENT OXYGEN TO COMPLETE COMBUSTION, BUT COMBUSTION IS SELDOM PERFECT AND ‘CO’ IS LIABLE TO PRESENT IN THE BLASTING FUMES.

Page 21: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

IN ADDITION POST DETONATION FUMES CONTAIN NITOROUS FUMES.

SO, MEN SHOULD NOT BE ALLOWED TO RETURN TO THE PLACE UNTIL THE FUMES HAVE BEEN CLEARED BY THE VENTILATION.

AFTER THE STIPULATED TIME GAP THE SHOT FIRER/BLASTING INCHARGE SHOULD CHECK FOR ANY MISFIRES OR BLOWN OUT SHOTS.

IF BLAST IS ALL RIGHT THE FINAL SIREN MAY GIVEN FOR CLEARANCE .

Page 22: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

MISFIRESMISFIRE- IS ONE WHICH THE DETONATOR FAILS TO EXPLODE OR HAVING EXPLODED, FAILS TO IGNITE THE CHARGE.

REASONS-

DEFECTIVE SHOTFIRING EXPLODER BY WHICH REQUIRED VOLTAGE IS NOT GENERATED.

BAD CONNECTION BETWEEN EXPLODER AND SHOTFIRING CABLE, BETWEEN CABLES AND DETONATOR LEADS.

DEFECTIVE SHOT FIRING CABLE, BROKEN WIRES INTERRUPTING THE CIRCUIT OR DAMAGED INSULATION CAUSING A SHOT CIRCUIT.

BROKEN DETONATOR LEADS

BAD EXPLOSIVE (EITHER DUE TO BAD MANUFACTURE OR DUE TO DETERIORATION DURING STORAGE).

Page 23: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

DEALING WITH MIS-FIRES DISCONNECT THE CABLE AND WAIT FOR PRESCRIBED PERIOD.

CHECK MAIN CABLE AND DETONATOR IF ALL THE SHOTS ARE FAILED

CHECK SUB CONNECTIONS, AND PARTICULAR DETONATOR LEADS, IF SOME HOLES ARE FIALED.

RECONNECT,IF ANY DEFECT CONNECTIONS FOUND AND CONNECT THE CABLE AND FIRE ONCE AGAIN.

IF AGAIN FIALED, FENCE THE ENTRANCES TO THE PLACE.

DRILL A FRESH HOLE ATLEAST 30 cm AWAY FROM THE MISFIRED HOLE AND AS FAR AS POSSIBLE PARALLEL TO MISFIRED HOLE.

CHARGE THE NEW HOLE WITH PROPER STEMMING IN THE USUAL MANNER.

FIRE THE NEW HOLE IN THE USUAL MANNER.

SEARCH FOR THE UNFIRED DETONATOR AND CHARGE. IF THEY ARE NOT FOUND LAOD THE MATERIAL BY MANUAL IN A SEPARATE BUCKET DISTINCTLY MARKED AND SEND IT TO THE SURFEACE FOR FURTHER SEARCH.

Page 24: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

• DESTROY THE MISFIRED EXPLOSIVE (CHARGE) AND DETONATOR ON THE SURFACE, IF TRACED OUT.

• IF NOT FOUND, REPORT THE CIRCUMSTANCES FULLY TO THE SHOT FIRER OF THE NEXT SHIFT.

Page 25: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

ENVIRONMENTENVIRONMENT The detonation of three different ammonium The detonation of three different ammonium

nitrate-fuel oil (ANFO) mixture illustrates the nitrate-fuel oil (ANFO) mixture illustrates the principle of oxygen balance.principle of oxygen balance.

1) 94.5% AN-5.5% FO( Oxygen balanced)1) 94.5% AN-5.5% FO( Oxygen balanced) 3NH3NH44NONO33 + CH + CH22 = 7H = 7H22O+COO+CO22+3N+3N22+ 930Kcal/Kg + 930Kcal/Kg

2) 92% AN-8.0% FO( Fuel excess)2) 92% AN-8.0% FO( Fuel excess) 2NH2NH44NONO33 + CH + CH22 = 5H = 5H22O+CO+2NO+CO+2N22+ 810Kcal/Kg+ 810Kcal/Kg

3) 96.6% AN-3.4% FO( Fuel shortage)3) 96.6% AN-3.4% FO( Fuel shortage) 5NH5NH44NONO33 + CH + CH22 = 11H = 11H22O+COO+CO22+4N+4N22+2NO+ 600Kcal/Kg+2NO+ 600Kcal/Kg

Page 26: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

FIRST AIDFIRST AID

HIT INJURY BY PROJECTILESHIT INJURY BY PROJECTILES

INHALATION OF EXPLOSIVESINHALATION OF EXPLOSIVES

INHALATION OF BLASTING FUMESINHALATION OF BLASTING FUMES

Page 27: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION
Page 28: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

WARNINGWARNING

NOT TO USE NOT TO USE MOBILE / CELL PHONEMOBILE / CELL PHONE HAND SETS &HAND SETS & WELDINGWELDING

Page 29: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

Emergency Response

Fire

Thunder storm

Explosive van accident

Any un-attended explosive materials

Page 30: WELCOME YOU ALL. SAFETY DURING BLASTING OPERATION

Thank U

Any Questions please