Welcome to the Teedon Pit Extension Aggregate Resources Act Public Meeting All technical reports and information presented at the Community Liaison Committee are available online at: https://www.dufferinaggregates.com/ Please refer to the Document Library under the Resource Centre tab.

Upload: others

Post on 20-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

Welcome to the Teedon Pit ExtensionAggregate Resources Act

Public Meeting

All technical reports and information presented at the Community Liaison Committee are available online at:

https://www.dufferinaggregates.com/

Please refer to the Document Library under the Resource Centre tab.

Page 2: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

CRH Canada Group Inc. is one of the country’s largest vertically integrated building materials and construction

companies.

+ 4,000 employees in Canada, of which + 3,000 are inOntario.

CRH manufactures cement, aggregates and ready mix concrete and provide construction services to many of

Ontario’s largest infrastructure projects.

CRH is a member of CRH plc, a global building materials company which employs more than 90,000 people in 31

countries around the world.

In 2017, CRH acquired the existing Teedon Pit and assumed responsibility of the proposed Teedon Pit

Extension application on behalf of Cedarhurst Quarries and Crushing Limited.

CRH Canada Group Inc. & Dufferin AggregatesCRH Canada Group Inc. & Dufferin Aggregates

Page 3: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

120m

120m

750m

o0 200 400

Metres

Legend

Teedon Pit Extension -Proposed LicensedBoundaryNotification Requiredby Registered Mail

CRH Expanded theNotice byRegistered Mail

CRH VoluntarilyProvided Noticeby Regular Mail

NOTIFICATION OF AGGREGATERESOURCES ACT APPLICATION

IN ADDITION TO MAIL OUTS:

1. There is a sign postedat the site.

2. Notice was provided in theMidland Mirror andLe Goût de vivre.

Page 4: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

WYVALE

HW

Y 93

WO

OD

RD

CO

UN

TY R

D 6

S

FLOS ROAD 10 E

COUNTY RD 27

BA

SELI

NE

RD

S

VASEY RD

LIN

E 2

NR

ON

JO

NES

RD

MA

RSH

ALL

RD

CONC 2 E

DAW

SON

S SI

DER

D

BA

SELI

NE

RD

SCA

RLE

TT L

INE

OLD

2N

D NFLOS ROAD 11 E

EBENEZER SIDERDCONC 4 E

FORGETS RD

DA

RB

Y R

D

MERTZ CORNER RD

STAMP SIDERD

MCDONALD RD

ELLIOTT SIDERD

CONC 3 E

MCMANN SIDERD

OLD

PEN

ETA

NG

UIS

HEN

E R

D

PETER ST W

FREN

CH

RD

CONC 4 E

FREN

CH

RD

CARPENTERSIDERD

PEN

ETA

NG

UIS

HEN

E R

D

o

LegendLicensed Boundary

Existing ARA Licensed Site

SITE LOCATION

Page 5: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

Teedon Pit applications submitted to Township of Tiny and Ministry of Natural Resources and Forestry.

Township of Tiny commissioned peer reviews for natural environment, noise and water resources reports.

Revisions made to application to address agency comments.

7 additional monitoring wells were installed at the Teedon Pit in 2018 to better characterize the subsurface hydrogeological conditions and to allow additional monitoring of the water table. Currently there are a total of 11 wells that are monitored on the Teedon Pit and Extension properties.Dufferin significantly reduced the proposed licensed area by 64% and extraction area by 65% from the original 2011 proposal.

Natural environment and noise peer reviewers satisfied with revised application and new extraction footprint. Water resources peer reviewer satisfied with the new extraction footprint and confirmed that the 1.5 m buffer above the water table will serve to protect groundwater resources. The water resources peer reviewer also requested additional monitoring wells.

The County of Simcoe, Ministry of Natural Resources and Forestry and Township of Tiny (including their peer reviewers for water noise and natural environment) are in the process of reviewing the revised application with the 2018 footprint.

Teedon Pit Extension Application Process

2013

2012

2011

2014

2018

2019

Teedon Pit Extension Application Process

Page 6: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

CRH TEEDON PIT EXTENSION

Legend

PROPOSED TEEDON PITEXTENSION LICENSED BOUNDARY

PROPOSED TEEDON PITEXTENSION EXTRACTION AREA

EXISTING TEEDON PIT

ADDITIONAL LANDS OWNED BY CRH- ENVIRONMENTAL BUFFER (NO EXTRACTION)

Highway 93D

arby

Roa

d

2011 ORIGINAL PROPOSAL

µ

Highway 93D

arby

Roa

d

µ

Highway 93D

arby

Roa

d

2018 CURRENT PROPOSAL

µ

0 100 200 300 400 500

Metres

0 100 200 300 400 500

Metres

0 100 200 300 400 500

Metres

2013 REVISED PROPOSAL

2011

LICENSED AREA EXTRACTION AREA

42.6 ha 39.0 ha

2013 42.6 ha 30.0 ha

2018 15.3 ha 13.5 ha

SINCE 2011 APPLICATION:

64% REDUCTION IN LICENSED AREA65% REDUCTION IN EXTRACTION AREA

SINCE 2011 APPLICATION:

64% REDUCTION IN LICENSED AREA65% REDUCTION IN EXTRACTION AREA

HISTORY OF APPLICATION

Page 7: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

PROVINCIAL SAND & GRAVELRESOURCE MAPPING

Page 8: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

COUNTY OF SIMCOEHIGH POTENTIAL MINERAL AGGREGATE RESOURCES (SCHEDULE 5.2.1.)

COUNTY OF SIMCOE OFFICIAL PLAN

High potential mineral aggregate resource areas shallbe protected for potential long-term use. As much of themineral aggregate resources as is realistically possibleshall be made available as close to markets as possible.Demonstration of need for mineral aggregate resources,including any type of supply/demand analysis, shall notbe required, notwithstanding the availability, designationor licensing for extraction of mineral aggregate resourceslocally or elsewhere. (Policy 4.4.2.)

Legend

Page 9: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

MA

RSH

ALL

RD

FREN

CH

RD

HIG

HW

AY 9

3

MCMANNSIDEROAD

DA

RB

Y R

D

Schedule A - Land Use

TOWNSHIP OF TINYOFFICIAL PLAN

o

December 2018

Document Path: N:\Brian\9061CZ -Teedon Pit

Contains information licensed under the Open Government Licence - OntarioService Layer Credits:

SOURCES

DATE

SCALE0 100 200 300

Metres

LegendLicensed Boundary

Extraction LimitSchedule A - Land Use

TEEDON PIT EXTENSION2 Darby Road,North ½ of Lot 80, Concession 1 W.P.R.& Part of original road allowancebetween lots 80 & 81,Concession 1, W.P.R.Geographic Township of TinyCounty of Simcoe

TOWNSHIP OF TINY OFFICIAL PLAN (2001)LAND USE

Extension Lands are mappedas Mineral Aggregate area in

the Township O�cial Plan

Legend

MINERAL AGGREGATE RESOURCES TWO

To protect known mineral aggregate deposits andareas of potential mineral aggregate resources forfuture resource use.

To ensure that new extractive activities are carriedout with minimal environmental and social costs.(Policy B.14.1.)

Page 10: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

HW

Y 93

BA

SELI

NE

RD

S

MA

RSH

ALL

RD

DA

RB

Y R

D

MERTZ CORNER RD

STAMP SIDERD

MCMANN SIDERD

FREN

CH

RD

CARPENTERSIDERD

HW

Y 93

DA

RB

Y R

D

STAMP SIDERDM

AR

SHA

LL R

DFR

ENC

H R

D

MCMANN SIDERDCARPENTER SIDERD

o

LegendLicensed Boundary

120m Buffer from LicensedBoundary

1954 AERIAL PHOTOGRAPH

Page 11: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

Primary Woodland

Primary Woodland

o

LegendLicensed Boundary

120m Buffer from LicensedBoundaryPrimary WoodlandBoundarySignificant Wildlife Habitatfor Woodland AreaSensitive Bird Species andSpecial Concern BirdSpeciesRecommended SignificantWoodland Boundary (GEC)

SIGNIFICANT FEATURES

Page 12: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

2.7ha Other land to be extracted andthen rehabilitated and reforested.

9.2ha Significant Woodland to be extractedand then rehabilitated and reforested.

2.1ha Land to be Extractedthen Rehabilitated to Agriculture

o

REFORESTATION AREAS -WOODLAND AREA INCREASED BY 2.7 ha

Page 13: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

HWY 93

DARB

Y RD

MARS

HALL

RD

o0 200 400

Metres

SARGEANT WAVERLY PIT

EXISTINGTEEDON PIT

PROPOSED TEEDONPIT EXTENSION

TEEDON PITENTRANCE/EXIT

SITE & SURROUNDING LANDS

Page 14: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

Applications to the Township of Tiny and the Ministry of Natural Resources & Forestry filed in 2011 included a hydrogeology report by Alpha Environmental Services Inc.

The report by Alpha confirmed the proposed pit extension would not have any impact on water levels or water quality.

The Township of Tiny retained R.J. Burnside & Associates Ltd. to peer review the Alpha report.

Burnside’s review resulted in the application being revised to address Burnside’s comments and in November 2014 Burnside confirmed their comments have been satisfactorily addressed.

Dufferin retained GHD to install 7 additional ground water monitors at the Teedon Pit and on the proposed extension lands. The site now has 11 monitoring wells. The production well and 3 domestic wells are also monitored.

GHD also reviewed the Dufferin proposal and prepared a hydrogeology report, which concluded the proposed pit extension will not have impacts on water levels or water quality.

Water level measurements are collected both manually and using pressure transducers/data loggers in all monitoring wells.

The Ministry of Environment, Conservation and Parks (MECP) has been to the site several times and observed the installation of new monitoring wells.

Geological information from the new wells and boreholes was provided to the Ontario Geologic Survey (OGS). OGS was invited to observe the installation of the new monitoring wells.

GHD completed a neighbour well survey for wells within a 1 km radius of the Teedon Pit boundary. (The Ministry of Environment, Conservation and Parks well survey requirement is 0.5 km from the point of taking.)

Dufferin retained a licensed well contractor to assess neighbour wells where concerns of sediment in their wells was expressed.

PROPOSED TEEDON PIT EXTENSION - HYDROGEOLOGY

Page 15: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

AGGREGATE WASHING RECIRCULATION SYSTEM

Page 16: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

250.0

249.9

249.4

248.2

249.6

248.2

250.0

303.0

294.3

289.3

291.0

278.6

277.0

279.0

280.5

274.7

276.8

255.9

255.5

255.1

249.0

292.0

304.5

290.5

283.5 27

2.0

254.5

254.5

259.0

276.0

280.5

278.0

290

285

280

270

265260

255

255

255

260

260

26527027

5

280

28027

5270

265260

260

265

27029

0

275

28028

5

290

290

285

280

275

27026

5

26025

5

250

250

245

245

250

250

250

275270

265

260

255

280 28

5

290

295

300

300

295

290

295

295

255.

2

256.

7258.

2

261.2

262.8264.3

259.

8265.

8270.

4275.0

276.5

267.4

268.9

270.4

271.

9273.

5

275.

0

278.0

276.

5

278.

0

259.8265.8

270.4

275.0

279.6281.1

282.6284.1285.7

279.6

275.

0

270.

4

270.4

275.0

279.6285.7

290.2

253.

7

252.1

250.6

250.6

250.6

249.

1

247.

6

275290295

250

285 26

5

275

270

265 260

280

XXXX XXXX 268.9

T.B.M.

RESIDENTIAL

RESIDENTIAL

LOT 79CONC 1, EPR

LOT 80CONC 1, EPR

RURALRESIDENTIAL

RESIDENTIALWOODLOT

PASTURE

LOT 80CONCESSION 1, WPR

LOT 80CONCESSION 1, WPR

WOODLOT

RO

AD

ALL

OW

AN

CE

BE

TWE

EN

CO

NC

ES

SIO

NS

1 &

2 (N

OT

OP

EN

)

LOT 80CONC 2, WPR

LOT 79CONC 2, WPR

WOODLOT

WOODLOT

CROPSCROPS

LOT 79CONCESSION 1, WPR CROPS

RO

AD

ALL

OW

AN

CE

BE

TWE

EN

TO

WN

SH

IPS

OF

TIN

Y A

ND

TA

Y

150m

150m

150m

150m

14596

4467

10791

9481

13905

15868

9931

25425

10842

50632

A'

A

16439

16440

PW1-09 MW4-10

17709

MW5-18

260.7 26

0.2

X

X

X

265.8

267.4

259.

8

265.8

264.

3

262.

8

261.2

SUMP POND

SILT PONDSBH1-18

BH4-18

MW7-18

MW1-09MW8-18

MW9-18

MW10S-18MW10D-18

SW1

MW6-18MW1

BH3-18

BH2-18

MW6R-18

LICENCED BOUNDARY, TEEDON PIT

FENCELINE

WATER COURSE

GROUND ELEVATION CONTOUR

WATER WELL

DOMESTIC WELL USED AS

296.3

X X

14596

17709

LEGEND

MONITORING WELL

LIMIT OF EXTRACTION, TEEDON PIT

MONITORING WELL LOCATIONMW4-10ON-SITE WATER SUPPLY WELLPW1-09

SW1 SURFACE WATER LEVELMONITORING LOCATION

ACROSS-SECTION LOCATION

BOREHOLE BY GHD

MW6-18 MONITORING WELL BY GHD

BH1-18

ADDITIONAL LANDS OWNED BY CRH (NO EXTRACTION)

LICENCE AREA BOUNDARY, TEEDON PIT EXTENSION

LIMIT OF EXTRACTION, TEEDON PIT EXTENSION

16439 AGGREGATE TEST HOLE

Source: Microsoft Product Screen shot Reprinted with permission from Microsoft Corporation, Aquisition Date 2018, Accessed April, 2018

0 70 140 210m 7000.0000 1:7000

CAD File: P:\drawings\11155000s\11155365\11155365-PRES\11155365-10(PRES016)\11155365-10(PRES016)GN\11155365-10(PRES016)GN-WA003.DWG

Feb 28, 2019

11155365-10TEEDON PIT EXTENSIONTOWNSHIP OF TINY, COUNTY OF SIMCOE, ONTARIO

MONITORING WELL ANDHYDROGEOLOGIC CROSS-SECTION LOCATIONS

THE GROUNDWATER TABLE WILL BE MONITORED TO CONFIRM WATER LEVELSAND WATER QUALITY HAVE NOT BEEN IMPACTED.

REPORTS ARE MADE AVAILABLE TO ALL AGENCIES AND THE PUBLIC.

Page 17: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

300 300

290

280

270

260

250

240

230

220

210

170

290

280

270

260

250

240

230

220

210

1700 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200

MW

1-09

1644

0 (O

/S 3

1m S

)

MW

1

PW

1-09

(O/S

32m

N)

MW

4-10

(O/S

42m

N)

190

200

180 180

190

200

GRAVEL

SAND

MEDIUM SANDSILT

MEDIUM SAND

SANDBROWN CLAY

CLAY

CLAY

FINE SAND

FINE SAND

COARSE SAND

SAND

EXISTINGGRADE

DISTANCE metresHORIZONTAL TO VERTICAL EXAGGERATION 5 : 1

ELE

VA

TIO

N (m

AM

SL)

ELE

VA

TIO

N (m

AM

SL)

A A'

SANDFINE GRAVELFINE GRAVEL

SAND

SAND

GRAVEL

GRAVEL

LEGEND

WEST EAST

2300

MW

6-18

MW

7-18

(O/S

17m

S)

MW

5-18

(O/S

43m

N)

1770

9

TOPSOIL

CLAY

CLAY

SAND

CLAY

SAND

SAND

SILTSAND

SILT

CLAY

SAND

SAND &GRAVEL

SILTY SANDSILTTOPSOIL

SILTY SAND

SILTY SAND

SAND (FILL)SILTY SANDSILTSILTY SANDSILTSILTY SANDSILT

SILT

SILTY SAND

SILT

SILTY CLAY

SAND

SILTSAND

SILT

SAND

SILTY SAND (FILL)SUMP POND

LOCAL AQUITARDUPPER AQUIFER

UPPER THORNCLIFFE(AFD1)

NEWMARKET TILL(ATC1)

GLACIAL LAKE SAND/GRAVEL(AFB1)

THORNCLIFFE(AFD1-4) MIDDLE THORNCLIFFE

(AFD2)

THORNCLIFFESILT AND CLAY

(ATD1)

NEWMARKET TILL(ATC1)

LOCAL STRATIGRAPHY AND HYDROSTRATIGRAPHY OBTAINED BY GHD ON BEHALF OF DUFFERIN WAS CORRELATED WITH THE 2017 WORK BYRILEY P. M. MULLIGAN AND ANDY F. BAJC. "QUATERNARY SEDIMENT ARCHITECTURE OF SIMCOE COUNTY, SOUTHERN ONTARIO"SUMP POND TOPOGRAPHY BY DELPH & JENKINS LIMITED, MAY 2018.

MW

8-18

(O/S

2m

N)

SANDGRAVEL

SANDSAND

SAND

SAND

MW

9-18

(O/S

27m

N)

COARSE GRAINED DEPOSITS

FINE GRAINED DEPOSITS

GREY CLAY

MW

6R-1

8

252.66 SHALLOW GROUNDWATER ELEVATION OCTOBER 10, 2018

234.10 DEEP GROUNDWATER ELEVATION, OCTOBER 10, 2018

238.22234.10 235.23236.86

259.27

237.67237.96

259.81252.66

234.61

235.25

237.12

259.68260.06

238.38

238.35 MAXIMUM OBSERVED GROUNDWATER ELEVATION

237.74238.38

253.19

PROPOSED WESTERN LIMIT OF EXTRACTIONTEEDON PIT EXTENSION

PROPOSED SOUTHERN LIMIT OF EXTRACTIONTEEDON PIT EXTENSION

253.19 MAXIMUM OBSERVED SHALLOW AQUITARDGROUNDWATER ELEVATION

CAD File: P:\drawings\11155000s\11155365\11155365-PRES\11155365-10(PRES016)\11155365-10(PRES016)GN\11155365-10(PRES016)GN-WA001.DWG

Feb 28, 2019TEEDON PIT EXTENSIONTOWNSHIP OF TINY, COUNTY OF SIMCOE, ONTARIO

SITE HYDROGEOLOGIC CROSS-SECTION A-A'

HYDROGEOLOGICAL CROSS-SECTIONFOR THE TEEDON PIT AND THE PROPOSED EXTENSION

Page 18: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

250.0

249.9

249.4

248.2

249.6

248.2

250.0

303.0

294.3

289.3

291.0

278.6

277.0

279.0

280.5

274.7

276.8

255.9

255.5

255.1

249.0

292.0

304.5

290.5

283.5 27

2.0

254.5

254.5

259.0

276.0

280.5

278.0

290

285

280

270

265260

255

255

255

260

260

26527027

5

280

28027

5270

265260

260

265

27029

0

275

28028

5

290

290

285

280

275

27026

5

26025

5

250

250

245

245

250

250

250

275270

265

260

255

280 28

5

290

295

300

300

295

290

295

295

255.

2

256.

7258.

2

261.2

262.8264.3

259.

8265.

8270.

4275.0

276.5

267.4

268.9

270.4

271.

9273.

5

275.

0

278.0

276.

5

278.

0

259.8265.8

270.4

275.0

279.6281.1

282.6284.1285.7

279.6

275.

0

270.

4

270.4

275.0

279.6285.7

290.2

253.

7

252.1

250.6

250.6

250.6

249.

1

247.

6

275290295

250

285 26

5

275

270

265 260

280

268.9

T.B.M.

RESIDENTIAL

RESIDENTIAL

LOT 79CONC 1, EPR

LOT 80CONC 1, EPR

RURALRESIDENTIAL

RESIDENTIALWOODLOT

PASTURE

LOT 80CONCESSION 1, WPR

LOT 80CONCESSION 1, WPR

WOODLOT

RO

AD

ALL

OW

AN

CE

BE

TWE

EN

CO

NC

ES

SIO

NS

1 &

2 (N

OT

OP

EN

)

LOT 80CONC 2, WPR

LOT 79CONC 2, WPR

WOODLOT

WOODLOT

CROPSCROPS

LOT 79CONCESSION 1, WPR CROPS

X X X X X X X X X

X

X X X X X X X X X X X X X X X

X

X

X

X X X X X X X X X

X XX

XX

XX

X

X

X

X

X

XX

X

XXXX

XX

XX

XX

XX

X

XX

X

XXXX

XX

X

X

XX

X

X X X X X X X X X X X X

X

X

RO

AD

ALL

OW

AN

CE

BE

TWE

EN

TO

WN

SH

IPS

OF

TIN

Y A

ND

TA

Y

150m

150m

150m

150m

14596

10791

9481

15868

99311084226

0.7 260.2

265.8

267.4

259.

8

265.8

264.

3

262.

8

261.2

SUMP POND

SILT PONDS

4467

13905

MW8-18

MW1-09

234.

223

4.4

234.

6

234.

8

235.

0

237.8

238.2

238.

2236.8

237.0

237.4

238.0

237.8

237.6

237.2

234.4234.6

235.0

235.4

235.6

236.2

236.6

235.8

236.0

234.8 235.2

234.2

238.0

SW1

BH1-18

MW7-18BH2-18

BH4-18BH3-18

MW1MW6-18 MW6R-18

MW10D-18 MW10S-18

50632

17709

MW5-18(238.22)

MW4-10PW1-09

25425

(234.10)

(237.96)(237.67)

(238.15)

MW9-18(236.86)

236.

6

236.

8

237.

4

237.0

237.2

237.

6

235.

2

235.

6

235.

4

236.

0

236.

2

235.

8

236.

4

236.4

16439

16440

LICENCED BOUNDARY, TEEDON PIT

FENCELINE

WATER COURSE

GROUND ELEVATION CONTOUR

WATER WELL

DOMESTIC WELL USED AS

296.3

X

14596

17709

LEGEND

MONITORING WELL

LIMIT OF EXTRACTION, TEEDON PIT

MONITORING WELL LOCATIONMW4-10ON-SITE WATER SUPPLY WELLPW1-09

SW1 SURFACE WATER LEVELMONITORING LOCATION

BOREHOLE BY GHD

MW6-18 MONITORING WELL BY GHD

BH1-18

GROUNDWATER ELEVATION CONTOUR (mAMSL)250NOTES

THE SHALLOW GROUNDWATER ELEVATIONS WERE NOTUSED TO GENERATE THE GROUNDWATER CONTOURS.

THE GROUNDWATER ELEVATION FOR PW1-09 WAS NOTUSED TO GENERATE THE GROUNDWATER CONTOURS.

GROUNDWATER ELEVATION, OCTOBER 10, 2018 (mAMSL)

THE DOMESTIC GROUNDWATER ELEVATIONS WERE NOTUSED TO GENERATE THE GROUNDWATER CONTOURS.

(238.15)

ADDITIONAL LANDS OWNED BY CRH (NO EXTRACTION)

LICENCE AREA BOUNDARY, TEEDON PIT EXTENSION

LIMIT OF EXTRACTION, TEEDON PIT EXTENSION 16439 AGGREGATE TEST HOLE

Source: Microsoft Product Screen shot Reprinted with permission from Microsoft Corporation, Aquisition Date 2018, Accessed April, 2018

0 70 140 210m 7000.0000 1:7000

CAD File: P:\drawings\11155000s\11155365\11155365-PRES\11155365-10(PRES016)\11155365-10(PRES016)GN\11155365-10(PRES016)GN-WA002.DWG

Feb 28, 2019

11155365-10TEEDON PIT EXTENSIONTOWNSHIP OF TINY, COUNTY OF SIMCOE, ONTARIO

GROUNDWATER ELEVATION CONTOURS (mAMSL)

GROUNDWATER ELEVATION CONTOURSAT THE TEEDON PIT AND THE PROPOSED EXTENSION

Page 19: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

#*

SIMCOEUPLANDS

SIMCOELOWLANDS

(Elmvale Clay Plain)

Orr Lake

Mud

Lake

Wye MarshNational

Wildlife Area

ELMVALE

WYEVALE

VASEY

WAVERLEY

11

6

614 14

1414

6

6

1414

6

14

6

14

12

14

6

14

17

14

8

14

6

4

1714

12

1414

ShotykSampleLocation

GIS File: Q:\GIS\PROJECTS\11155000s\11155365\Layouts\PRES001\11155365-00(PRES001)GIS-WA001.mxd

Source: MNRF NRVIS, 2018. Produced by GHD under licence from Ontario Ministry of Natural Resources and Forestry, © Queen's Printer 2019; Chapman, L.J. and Putnam, D.F. 2007. Physiography of southern Ontario; Ontario Geological Survey, Miscellaneous Release—Data 228.

Coordinate System:NAD 1983 UTM Zone 17N

Legend

Teedon Pit

Additional Lands Owned by CRH (no extraction)

License Area Boundary Teedon Pit Extension

#* Shotyk Sample Location

Physiographic Regions Boundary

Physiography17: Peat And Muck

14: Beaches

12: Clay Plains

11: Sand Plains

8: Bevelled Till Plains

6: Till Plains (Drumlinized)

4: Kame Moraines

11155365-10 Feb 28, 2019

TEEDON PIT

DUFFERIN TEEDON PITAND TEEDON PIT EXTENSIONTOWNSHIP OF TINYCOUNTY OF SIMCOE, ONTARIO

PHYSIOGRAPHY AND PHYSIOGRAPHIC REGIONS

0 1 2 3

Kilometers

TEEDON PIT EXTENSIONLICENSE AREA BOUNDARY

4,720 m

PHYSIOGRAPHIC REGIONS

Physiography and Physiographic Regions

Page 20: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

WILL THE TEEDON PIT EXTENSION HAVE AN IMPACT ON WATER TABLE LEVELS OR GROUNDWATER QUALITY?The Teedon Pit Extension will not have an impact on water levels as shown by the hydrographs (water level data collected continuously with pressure transducers/data loggers).The Teedon Pit Extension will not have an impact on groundwater quality.No chemicals are used in the production of aggregate products.

DOES REMOVING AGGREGATE TAKE AWAY THE NATURAL FILTER?Scientists rely on the Source + Pathway + Receptor model to evaluate the risk of groundwater pollution.A pit may reduce the amount of sand and gravel above the water table, but it doesn’t stop the filtration process.Most filter beds made of sand in water treatment plants are only a few centimetres or a couple of metres thick.Mandatory setbacks from the edge of a pit to property boundary alone are at least 15 metres. This allows plenty of opportunity for filtration and other physical, chemical, and biological processes to occur.A world-wide literature review for the Ontario Ministry of Natural Resources confirmed that not a single instance of contamination could be found to be caused by a pit or quarry.

IS MORE MONITORING NEEDED? IS THERE AN IMPACT ON THE ALLISTON AQUIFER?Dufferin currently conducts significant monitoring at the Teedon Pit and Teedon Pit Extension. Monitoring results demonstrate that there is no change in water levels from operating the Teedon Pit and there will not be impacts from operating the Teedon Pit Extension. As such, there is no impact to the Alliston aquifer based on this data.Monitoring at the Teedon Pit and Teedon Pit Extension is in line with monitoring at other pits in Ontario.Currently there are 11 monitoring wells, 3 domestic wells, a production well, and sump pond equipped with pressure transducers/data loggers being monitored. This network provides sufficient coverage.

WHY IS THERE SILT IN NEIGHBOUR’S WELLS? CAUSE OF ORANGE WATER?There are numerous reasons that silt could be in the neighbours wells:

Cause of orange water is very common well problem

WHY DOES THE SITE NOT MEASURE TURBIDITY?Turbidity is a measure of the relative clarity or cloudiness of water.Turbidity data would be collected for the following purposes:

The Dufferin monitoring wells were constructed and designed tomeasure groundwater levels and not turbidity.

Given the above, turbidity measurements would not be beneficial.

Well design and construction is the solution to avoid silt issues

Silt vs. scale from hard water (two separate issues)

Improper well design or construction (slot size might be too large and a sandpack might not be part of well construction)

Insufficient well development after construction

Corrosion of well casing, liner or screen causing holes

Failure of the annular or casing seal

Scaling of the well screen (iron bacteria)

Improper or lack of well maintenance

From naturally occurring iron bacteria in the well or iron accumulations around well screenGenerally fixed with water softener, filters or combination.

Effectiveness of well design

Stabilization parameter/indicator of steady state conditions prior to the collection of groundwater samples.

Determine optimum groundwater withdrawal rates.

Maintenance of a well.

HYDROGEOLOGY

Page 21: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

30 METRESETBACK

20 METRESETBACK

OPEN FIELD EXISTINGENTRANCE/EXIT

5 METRESETBACK

5 METRESETBACK

0 METRESETBACK

289

280

285

290

290290

290

280

285

275

270

265

290

295

275

276

270

265

266

295

280

290280

288

290

291

292

293

294

295

296

297

289

292 290285

280

275

270

298

POND

AREA SUBJECTTO SEPARATE

SITE PLANAMENDMENTTO REDUCE

SETBACK TO 0m

EXISTING LICENSED PROPERTY (TEEDON PIT)AGGREGATE LICENCE #3670

0

30

20

684.1

23.8

45.6

37.140.2

60.6

722.3

215.4

26.7

1. THIS SITE PLAN IS PREPARED UNDER THE AGGREGATE RESOURCES ACT FORA CLASS A LICENCE, CATEGORY 3.

2. PROPERTY BOUNDARY INFORMATION OBTAINED FROM VARIOUS SOURCESAND FILES FROM THE LAND REGISTRY OFFICE FOR THE COUNTY OF SIMCOE.

3. TOPOGRAPHIC INFORMATION OBTAINED FROM NORTHWAY PHOTOMAPINC. AERIAL PHOTOGRAPHY DATED APRIL 2008.

4. ZONING INFORMATION OBTAINED FROM THE TOWNSHIP OF TINY ZONINGBY-LAW 06-001 CONSOLIDATED JULY 19, 2018.

5. LAND USE INFORMATION COMPILED FROM SITE INSPECTIONS IN 2018.

6. AREA TO BE LICENSED: 15.3 HA

7. AREA TO BE EXTRACTED: 13.5 HA

8. THE ELEVATION OF THE ESTABLISHED WATER TABLE IS OBTAINED FROMGHD HYDROGEOLOGICAL ASSESSMENT DATED DECEMBER 2018. THE FINALDEPTH OF EXTRACTION WILL BE A MAXIMUM OF 1.5m ABOVE THEESTABLISHED WATER TABLE. NO EXTRACTION WILL OCCUR BELOW THEWATER TABLE.

9. REFER TO SHEET 4 OF 4 FOR CROSS-SECTIONS.

328

LICENSED AREA BOUNDARY

LIMIT OF EXTRACTION

LICENSED AREA BOUNDARY(LICENCE # 3670 - TEEDON PIT)

LIMIT OF EXTRACTION(LICENCE #3670 - TEEDON PIT)

INTERNAL ROAD

CROSS-SECTION

CONTOUR LINE

ADDITIONAL LANDS OWNED BYCRH CANADA GROUP INC.

LIMIT OF 120m INFORMATION ZONE

EXISTING FENCE

LOT LINE

EXISTING TRAIL

ZONING

EXISTING VEGETATION

EXISTING ENTRANCE/EXIT TO PIT

BOREHOLE

MONITORING WELL

DIRECTION OF SURFACE DRAINAGE

POND

EXISTING FEATURESFile Name

1 OF 4Drawing No.

Project

9061CZDrawn By

B.Z.L.H.

Checked By

File No.

Plan Scale 1:1500

Metres

0 10 25 50 75

N:\\9061CZ - Teedon Pit Extension\Drawings\ARA Site Plans\2019 - January

CEDARHURST QUARRIES & CRUSHING LIMITEDC/O CRH CANADA GROUP INC.2300 Steeles Avenue W. Suite 400Concord, Ontario L4K 5X6

KEY MAP - nts

TEEDON PIT EXTENSION2 Darby Road, Tiny, ON L0K 2E1North ½ of Lot 80, Concession 1, W.P.R. &Part of original road allowance between lots 80 & 81, Concession 1, W.P.R.,Geographic Township of Tiny, County of Simcoe

DateJanuary 2019

ByDate DescriptionNo.

Site Plan Amendments

MNRF Approval Stamp Stamp

PLANNINGURBAN DESIGN& LANDSCAPEARCHITECTUREMHBC

113 COLLIER STREET BARRIE, ON, L4M 1H2 | P: 705 728 0045 F: 705 728 2010 | WWW.MHBCPLAN.COM

1

23

All distances on this plan are shown in metres unless otherwise stated.

AutoCAD SHX Text
ORIGINAL ROAD ALLOWANCE BETWEEN LOTS 80 & 81
AutoCAD SHX Text
L O T 8 1
AutoCAD SHX Text
L O T 8 0
AutoCAD SHX Text
(CLOSED BY UNREGISTERED BYLAW No. 217, DATED JULY 7, 1887) (NOT TRAVELLED)
AutoCAD SHX Text
P I N 5 8 3 8 7 - 0 0 5 5
AutoCAD SHX Text
P I N 5 8 3 8 7 - 0 1 3 5 ( L T )
AutoCAD SHX Text
P I N 5 8 3 8 7 - 0 1 3 4
AutoCAD SHX Text
MAR (MINERAL AGGREGATE)
AutoCAD SHX Text
RU (RURAL)
AutoCAD SHX Text
RU (RURAL)
AutoCAD SHX Text
RU (RURAL)
AutoCAD SHX Text
RU (RURAL)
AutoCAD SHX Text
IB
AutoCAD SHX Text
IB
AutoCAD SHX Text
IB
AutoCAD SHX Text
SSIB
AutoCAD SHX Text
SSIB
AutoCAD SHX Text
IB
AutoCAD SHX Text
IB
AutoCAD SHX Text
CENTRELINE OF ORIGINAL ROAD ALLOWANCE AS FENCED
AutoCAD SHX Text
MW1
AutoCAD SHX Text
MW
AutoCAD SHX Text
RU (RURAL)
AutoCAD SHX Text
MW9-18
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW6-18
AutoCAD SHX Text
MW6R-18
AutoCAD SHX Text
BH
AutoCAD SHX Text
BH13-18
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
N58°12'10"E
AutoCAD SHX Text
283.416
AutoCAD SHX Text
N57°47'50"E
AutoCAD SHX Text
89.274
AutoCAD SHX Text
N58°35'30"E
AutoCAD SHX Text
298.595
AutoCAD SHX Text
N58°05'30"E
AutoCAD SHX Text
296.072
AutoCAD SHX Text
N58°22'40"E
AutoCAD SHX Text
N58°17'00"E
AutoCAD SHX Text
293.885
AutoCAD SHX Text
N58°22'50"E
AutoCAD SHX Text
258.500
AutoCAD SHX Text
N58°23'00"E
AutoCAD SHX Text
264.225
AutoCAD SHX Text
N58°22'40"E
AutoCAD SHX Text
265.120
AutoCAD SHX Text
'A'
AutoCAD SHX Text
'A'
AutoCAD SHX Text
'B'
AutoCAD SHX Text
'B'
AutoCAD SHX Text
RU (RURAL)
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
'A'
AutoCAD SHX Text
'A'
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
PERKINSFIELD
AutoCAD SHX Text
BALM BEACH RD
AutoCAD SHX Text
WYEBRIDGE
AutoCAD SHX Text
WAVERLEY
AutoCAD SHX Text
WYEVALE
AutoCAD SHX Text
ELMVALE
AutoCAD SHX Text
ORR LAKE
AutoCAD SHX Text
HILLSDALE
AutoCAD SHX Text
ORR
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
GEOGRAPHIC
AutoCAD SHX Text
TOWNSHIP
AutoCAD SHX Text
OF TINY
AutoCAD SHX Text
GEOGRAPHIC
AutoCAD SHX Text
TOWNSHIP
AutoCAD SHX Text
OF TAY
AutoCAD SHX Text
TOWNSHIP
AutoCAD SHX Text
OF SPRINGWATER
AutoCAD SHX Text
TINY / FLOS TOWNLINE
AutoCAD SHX Text
XI
AutoCAD SHX Text
X
AutoCAD SHX Text
IX
AutoCAD SHX Text
IV
AutoCAD SHX Text
III
AutoCAD SHX Text
II
AutoCAD SHX Text
I
AutoCAD SHX Text
BASELINE RD.
AutoCAD SHX Text
HWY. 93
AutoCAD SHX Text
MERTZ
AutoCAD SHX Text
CORNER RD.
AutoCAD SHX Text
CARPENTER
AutoCAD SHX Text
SIDEROAD
AutoCAD SHX Text
HWY. 27
AutoCAD SHX Text
VASEY
AutoCAD SHX Text
RD.
AutoCAD SHX Text
VASEY
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
RD.
AutoCAD SHX Text
23
AutoCAD SHX Text
II
AutoCAD SHX Text
III
AutoCAD SHX Text
IV
AutoCAD SHX Text
V
AutoCAD SHX Text
VI
AutoCAD SHX Text
I
AutoCAD SHX Text
II
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
RD.
AutoCAD SHX Text
19
AutoCAD SHX Text
VIII
AutoCAD SHX Text
X
AutoCAD SHX Text
WYE LAKE
AutoCAD SHX Text
II
AutoCAD SHX Text
III
AutoCAD SHX Text
IV
AutoCAD SHX Text
V
AutoCAD SHX Text
VI
AutoCAD SHX Text
I
AutoCAD SHX Text
VII
AutoCAD SHX Text
VIII
AutoCAD SHX Text
IX
AutoCAD SHX Text
OLD SECOND N
AutoCAD SHX Text
PENETANGUISHINE ROD.
AutoCAD SHX Text
DARBY RD.
AutoCAD SHX Text
II
AutoCAD SHX Text
CON I
AutoCAD SHX Text
PROPERY LOCATION (TEEDON PIT EXTENSION)
AutoCAD SHX Text
MARSHALL RD
AutoCAD SHX Text
MW
AutoCAD SHX Text
BH
Page 22: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

0 METRESETBACK

AREA SUBJECTTO SEPARATE

SITE PLANAMENDMENTTO REDUCE

SETBACK TO 0mEXISTING TEEDON PIT SUBJECT TO SITE PLAN AMENDMENT TO REVISE PIT

FLOOR TO REFLECT GROUNDWATER ELEVATION

EXISTING LICENSED PROPERTY (TEEDON PIT)AGGREGATE LICENCE #3670

30

20

30 METRESETBACK

20 METRESETBACK

5 METRESETBACK

5 METRESETBACK

EXISTINGENTRANCE/EXIT

5

5

GATES TO BE INSTALLED TOPROVIDE ACCESS TO FORESTEDGE MANAGEMENT ZONE

OPERATIONAL PLANFile Name

2 OF 4Drawing No.

Project

Drawn By

B.Z.L.H.

Checked By

File No.

238.0 m

LICENSED AREA BOUNDARY

LIMIT OF EXTRACTION

LICENSED AREA BOUNDARY(LICENCE # 3670 - TEEDON PIT)

LIMIT OF EXTRACTION(LICENCE #3670 - TEEDON PIT)

INTERNAL ROAD

CROSS-SECTION

ADDITIONAL LANDS OWNED BYCRH CANADA GROUP INC.

LIMIT OF 120m INFORMATION ZONE

EXISTING FENCE

PROPOSED 1.2m FENCE

EXISTING TRAIL

ENTRANCE/EXIT (Location may varyalong common boundary)

FINAL PIT FLOOR ELEVATION

GENERAL DIRECTION OFEXTRACTION

BOREHOLE

MONITORING WELL

GATE

ADDITIONAL LANDSOWNED BY LICENSEE

LICENSED AREA(TEEDON PIT EXTENSION)

ADDITIONAL LANDSOWNED BY LICENSEE

EXISTING LICENSED PROPERTY (TEEDON PIT)AGGREGATE LICENCE #3670

MW8-18

MW1-09MW9-18

MW5-18

MONITORING WELL LOCATION

MONITORING WELL SCHEMATIC

LEGEND

HIGHWAY 93

DARBY ROAD

Plan Scale 1:2000

Metres

0 10 25 50 75 100

SITE AREA CALCULATIONS1. AREA TO BE LICENSED: 15.3 HA2. AREA TO BE EXTRACTED: 13.5 HA

MAXIMUM TONNAGE OF MATERIAL TO BE REMOVED FROM THE LICENSED PROPERTY3. THE MAXIMUM ANNUAL TONNAGE TO BE REMOVED FROM THIS SITE IS 600,000

TONNES PER ANNUM IN COMBINATION WITH THE ADJACENT TEEDON PIT (LICENCE#3670).

HOURS OF OPERATION

4. THE HOURS OF OPERATION SHALL BE:

A) SHIPPING - MONDAY TO FRIDAY 5AM TO 7PM AND SATURDAY 5AM TO 4PMB) SITE PREPARATION, EXTRACTION, PROCESSING, AND REHABILITATION -

MONDAY TO FRIDAY 7AM TO 7PMC) EXTRACTION AND PROCESSING - SATURDAY 9AM TO 4PMD) THERE WILL BE NO OPERATIONS ON SUNDAYS OR STATUTORY HOLIDAYSE) MAINTENANCE/ SERVICING EQUIPMENT - NO RESTRICTIONS

LICENSED AREA BOUNDARY - FENCING

5. PRIOR TO THE INSTALLATION OF FENCING TREE CLEARING SHALL OCCUR ALONGTHE BOUNDARY OF THE SITE IN ACCORDANCE WITH THE TREE REMOVAL NOTES ONTHIS PAGE.

6. AFTER TREE CLEARING ALONG THE BOUNDARY OF THE SITE AND PRIOR TOSTRIPPING OF TOPSOIL/SUBSOIL A 1.2m FENCE SHALL BE INSTALLED ALONG THEEAST AND WEST LICENSED BOUNDARY AND 5m NORTH OF THE NORTHERNEXTRACTION LIMIT. FENCING WILL NOT BE REQUIRED FOR THE SOUTHERNCOMMON BOUNDARY WITH THE EXISTING TEEDON PIT (LICENSE # 3670). MARKERPOSTS SHALL BE PLACED ALONG UNFENCED BOUNDARIES AT 30m +/- INTERVALSTO IDENTIFY THE LICENCE BOUNDARY LIMITS. SEE OPERATIONS SCHEMATIC FORFENCING DETAILS AND SITE PLAN OVERRIDE 5.1.

TREE REMOVAL

7. WITHIN THREE (3) YEARS OF LICENCE ISSUANCE AND PRIOR TO EXTRACTIONCOMMENCING THE FOLLOWING 20m WIDE STRIP OF TREES SHALL BE REMOVED TOPRE-STRESS THE NEW FOREST EDGE THAT WILL BE CREATED:

A) TREES 5m BEYOND THE EXTRACTION AREA (E.G. WITHIN SETBACK AREA) SHALLBE CLEARED OF TREES (BUT NOT GRUBBED). PRIOR TO TREE CLEARING IN THENORTH SETBACK AREA A QUALIFIED ECOLOGIST OR FORESTER SHALL WALKTHE ALIGNMENT OF THE PROPOSED FENCE LOCATED 5m NORTH OF THEEXTRACTION LIMIT AND MARK TREES THAT SHOULD BE REMOVED TOACCOMMODATE THE INSTALLATION OF THE FENCE. TREES TO BE CUT SHALLBE MARKED WITH YELLOW OR ORANGE MARKING PAINT. TREES ALONG THEFENCE ALIGNMENT SHOULD BE FELLED TOWARDS THE EXTRACTION AREA.ALSO SEE NOTE 41, THIS PAGE, FOR EROSION/SEDIMENT CONTROL.

B) WITHIN THE EXTRACTION AREA A 15m WIDE AREA OF TREES ALONG THE WEST,NORTH AND EAST LIMITS OF EXTRACTION SHALL BE REMOVED.

8. ALL REMAINING TREES WITHIN THE EXTRACTION AREA WILL BE GRADUALLY CUT /CLEARED AHEAD OF EXTRACTIVE OPERATIONS. TREE CLEARING SHALL OCCUR ASREQUIRED TO ADVANCE EXTRACTION AND MINIMIZE THE DISTURBED AREA.

9. TREE CUTTING IN TREE CLEARING ZONE '1' SHALL OCCUR BETWEEN NOVEMBER1ST AND MARCH 31ST INCLUSIVE.

10. TREE CUTTING IN TREE CLEARING ZONE '2' SHALL OCCUR BETWEEN NOVEMBER1ST AND JANUARY 31ST INCLUSIVE.

11. SUITABLE TREES WILL BE HARVESTED FOR SAW LOGS AND OR FUEL WOOD.STUMPS AND OTHER WOOD REFUSE (WASTE WOOD, LIMBS & BRUSH) MAY BE USEDFOR PIT REHABILITATION PURPOSES, REMOVED FROM THE SITE OR PILED ON THESITE TO BE CHIPPED OR BURIED IN THE SIDE SLOPE.

12. SEE TREE CLEARING SCHEMATIC, THIS PAGE FOR TREE REMOVAL LOCATIONS TOPRE-STRESS THE NEW FOREST EDGE AND TIMING RESTRICTIONS.

TREE CLEARING WITHIN 3 YEARSOF LICENCE ISSUANCE - 20m(INCLUDES 5m OF SETBACKBEYOND EXTRACTION AREA AND15m OF EXTRACTION AREA) SEESCHEMATIC FOR LOCATION

TREE CLEARING SCHEMATIC

LEGEND

MW10D-18

ADDITIONAL LANDSOWNED BY LICENSEE

ADDITIONAL LANDSOWNED BY LICENSEE

1. WITHIN THREE (3) YEARS OF LICENCE ISSUANCE, TREES5m BEYOND THE EXTRACTION AREA SHALL BE CLEARED(BUT NOT GRUBBED).

2. WITHIN THREE (3) YEARS OF LICENCE ISSUANCE, ANADDITIONAL 15m WIDE AREA SHALL BE CLEARED OFTREES ALONG THE WEST, NORTH AND EAST EDGES OFTHE EXTRACTION AREA.

3. AS EXTRACTION PROGRESSES NORTH TREE CLEARINGSHALL OCCUR AS REQUIRED TO ADVANCE EXTRACTIONAND MINIMIZE THE DISTURBED AREA.

20m

20m

20m

20m

FOREST EDGE MANAGEMENT

13. FOLLOWING TREE CUTTING ALONG THE BOUNDARY OF THE SITE, A QUALIFIEDECOLOGIST OR FORESTER WILL WALK THE NEW FOREST EDGE AND MARKDEFECTIVE TREES FOR REMOVAL. TREES TO BE CUT SHALL BE MARKED WITHYELLOW OR ORANGE MARKING PAINT.

14. FOLLOWING TREE CUTTING ALONG THE BOUNDARY OF THE SITE A FOREST EDGEMANAGEMENT PLAN SHALL BE IMPLEMENTED IN ACCORDANCE WITH THE FORESTEDGE MANAGEMENT SCHEMATIC THIS PAGE.

15. FOLLOWING COMPLETION OF THE EDGE MANAGEMENT PLAN A QUALIFIEDECOLOGIST OR FORESTER SHALL PREPARE A REPORT DOCUMENTING THEIMPLEMENTATION OF THE FOREST EDGE MANAGEMENT PLAN. THE REPORT SHALLBE SUBMITTED TO THE MINISTRY OF NATURAL RESOURCES AND FORESTRY (MNRF).

STRIPPING OF TOPSOIL / OVERBURDEN

16. TOPSOIL AND OVERBURDEN SHALL BE STRIPPED AND STORED SEPARATELY.TOPSOIL AND OVERBURDEN MAY BE STORED IN STOCKPILES WITHIN THE AREA TOBE EXTRACTED TO A MAXIMUM HEIGHT OF 15m; OR TO COMPLETE PROGRESSIVEREHABILITATION.

ACCESS TO THE PIT

17. ACCESS TO THE PIT WILL BE THROUGH THE ADJACENT TEEDON PIT (LICENCE #3670)FROM THE ENTRANCE ONTO DARBY ROAD. THE ENTRANCE TO DARBY ROAD SHALLBE GATED AND LOCKED WHEN THE PIT PROPERTIES ARE NOT IN USE.

18. EQUIPMENT AND TRUCKS MAY ACCESS THE SITE ALONG THE COMMONEXTRACTION BOUNDARY OF THE ADJACENT TEEDON PIT (LICENCE # 3670).

19. AGGREGATE FROM THE PIT MAY ALSO BE TRANSFERRED TO THE ADJACENTTEEDON PIT (LICENCE # 3670) FOR PROCESSING AND WASHING.

EXTRACTION

20. THE ELEVATION OF THE ESTABLISHED WATERTABLE RANGES ON-SITE FROM +/-236.5mASL TO + / - 237.5mASL. THE MAXIMUM DEPTH OF EXTRACTION IS TO REMAIN1.5m ABOVE THE ESTABLISHED WATERTABLE BASED ON ON-GOING MONITORING.

21. DUE TO SIZE OF THE PIT AND THE DEPTH OF EXTRACTION THE PIT WILL BEEXCAVATED IN ONE PHASE.

22. EXTRACTION WILL ADVANCE GENERALLY IN A SOUTH TO NORTH DIRECTION FROMTHE ADJACENT TEEDON PIT (LICENCE # 3670).

23. THE PIT WILL BE EXTRACTED IN UP TO 5-6 LIFTS. SEE PAGE 4 OF 4. PIT FACESSHALL NOT EXCEED THE REGULATIONS DETERMINED BY THE MINISTRY OF LABOUR.

24. AS EXTRACTION PROCEEDS NORTH, FACE RIDGES ON EACH LIFT (APPROXIMATELY10m IN HEIGHT) SHALL BE MAINTAINED AT THE EAST AND WEST LIMITS AND MAY BEREMOVED AS PART OF THE FINAL EXTRACTION OF EACH LIFT AFTER THEPROCESSING PLANT IS RELOCATED TO THE NEXT LOWER LIFT.

EQUIPMENT TO BE USED ON SITE AND NOISE / AIR MITIGATION

25. GENERAL TYPES OF EQUIPMENT TO BE USED IN THE OPERATION OF THE PIT WILLINCLUDE BUT NOT BE LIMITED TO BULLDOZERS, EXCAVATORS, FRONT-ENDLOADERS, DUMP TRUCKS AND PORTABLE CRUSHING / SCREENING PLANTS ANDCONVEYORS.

26. ANY CONSTRUCTION EQUIPMENT USED TO PREPARE THE SITE, SUCH AS DOZERS,MUST COMPLY WITH MINISTRY OF ENVIRONMENT, CONSERVATION AND PARKSPUBLICATION NPC-115.

27. THE PORTABLE CRUSHING PLANT IS TO BE SITUATED WITHIN 30m OF THE WESTERNWORKING FACE DURING THE FIRST LIFT, WHEN WITHIN 200m OF THE WESTERNLIMIT OF EXTRACTION, IN ORDER TO MAXIMIZE SOUND ATTENUATION.

28. IF REQUIRED, THE PORTABLE PROCESSING PLANT SHALL HAVE ANENVIRONMENTAL COMPLIANCE APPROVAL FROM THE MINISTRY OF ENVIRONMENT,CONSERVATION AND PARKS.

29. THE GENSET TRAILER FOR THE PROCESSING PLANT NEEDS TO BE ORIENTATEDWITH THE EXHAUST DISCHARGE POINTED AWAY FROM THE SENSITIVE RECEPTORAT 80 DARBY ROAD (APPROXIMATELY DUE EAST).

TEEDON PIT EXTENSION2 Darby Road, Tiny, ON L0K 2E1North ½ of Lot 80, Concession 1, W.P.R. &Part of original road allowance between lots 80 & 81, Concession 1, W.P.R.,Geographic Township of Tiny, County of Simcoe

LICENSED AREA(TEEDON PIT EXTENSION)

TREE CLEARING ZONE '1'(NOV 1ST - JAN 31ST)

TREE CLEARING ZONE '2'(NOV 1ST - MAR 31ST)

SITE PLAN OVERRIDESTHE FOLLOWING CONDITIONS ILLUSTRATED ON THIS PLAN VARY FROMTHE REQUIREMENTS OF THE PROVINCIAL STANDARDS THAT APPLY TO

LICENSED PITS IN ONTARIO.

STANDARD OVERRIDE DESCRIPTION

5.1 A PORTION OF THE LICENSED BOUNDARY IS NOT REQUIRED TOBE FENCED. SEE NOTES 5 & 6 THIS PAGE.

5.2

THE ENTRANCE ONTO THE LICENSED PROPERTY FROM THETEEDON PIT PROPERTY (LICENCE # 3670) WILL NOT BE GATED.THE ENTRANCE TO THE TEEDON PIT PROPERTY FROM DARBYROAD IS GATED.

5.10

NO EXCAVATION SETBACK WILL EXIST ALONG THE SOUTHLICENSED BOUNDARY ADJACENT TO THE TEEDON PIT (LICENCE# 3670).THE EXCAVATION SETBACK ALONG THE WEST AND EASTBOUNDARY IS 5m FROM THE LICENSED BOUNDARY.

5.13

OVERBURDEN, TOPSOIL AND AGGREGATE CAN BE STOCKPILEDWITHIN 30m OF THE SOUTHERN BOUNDARY ADJACENT TOTHE TEEDON PIT (LICENCE # 3670).THE PORTABLE PROCESSING PLANT MAY BE LOCATED WITHIN30m OF THE SOUTHERN BOUNDARY ADJACENT TO THETEEDON PIT (LICENCE # 3670).

5.16 / 5.17TOPSOIL AND OVERBURDEN MAY BE MOVED BETWEEN THISSITE AND THE ADJACENT TEEDON PIT (LICENCE # 3670) TOPROVIDE TIMELY AND EFFECTIVE REHABILITATION OF BOTHPITS.

5.22THE AGGREGATE RESOURCES ACT SIGN FOR THE SITE WILL BELOCATED AT THE DARBY ROAD ENTRANCE OF THE ADJACENTTEEDON PIT (LICENCE # 3670) SINCE THE LICENSED BOUNDARYDOES NOT HAVE FRONTAGE ONTO ANY PUBLIC ROADS.

200m

160m

20m

225m

FOREST EDGE MANAGEMENT SCHEMATIC

ADDITIONAL LANDSOWNED BY LICENSEE

ADDITIONAL LANDSOWNED BY LICENSEE

LICENSED AREA(TEEDON PIT EXTENSION)

ZONE 'A'ZONE 'A'

ZONE 'B'ZONE 'B'

FOREST EDGEMANAGEMENT ZONE 'A'(EAST AND WEST SIDE)

FOREST EDGEMANAGEMENT ZONE 'B'

(NORTH SIDE)

FENC

ED LI

CENS

ED B

OUND

ARY

LIMIT

OF

EXTR

ACTI

ON

CUT 10m OFDEFECTIVE TREES

AUGMENT NEWFOREST EDGEWITH RED OAKAND WHITE PINE

LICENSED BOUNDARY

LIMIT OF EXTRACTION

SOUTH SIDE OFTRAIL WHEREFEASIBLE PLANTWITH 1-2 ROWS OFWHITE CEDAR ANDWHITE SPRUCE

REMOVEDEFECTIVETREES

AUGMENT NEW FORESTEDGE WITH RED OAKAND WHITE PINE

1. WITHIN 10m OF THE NEW FOREST EDGE MARKDEFECTIVE TREES FOR CUTTING. CUT UPSTEMS/TRUNKS INTO 1 TO 2 METRE LENGTHSAND PLACE ON FOREST FLOOR. CUT UP TOPSINTO BRUSH PILES FOR WILDLIFE.

2. IN THE 5m AREA BETWEEN THE FENCE ANDTHE EXTRACTION LIMIT THE NEW FOREST EDGEWILL BE AUGMENTED BY PLANTING RED OAK(67%) AND WHITE PINE (33%) IN GAPS. SPACING WILL VARY ACCORDING TO EDGECONDITIONS AT THE TIME OF PLANTING, BUTSHALL BE AT LEAST 3m APART.

3. TREE PLANTING WITHIN FOREST EDGEMANAGEMENT AREA SHALL BE 1 OR 2 GALLONCONTAINER STOCK.

4. TREE PLANTING SHOULD OCCUR DURING THESPRING PERIOD, I.E. APRIL OR EARLY MAY,DEPENDING ON SEASONAL CONDITIONS. IFNECESSARY, FALL PLANTING MAY OCCURAFTER SEPTEMBER 20TH.

1. RETAIN THE EXISTING 4.5m WIDE TRAIL WITHIN THEFORMER ROAD ALLOWANCE AS A PRIVATE ACCESS FOR THEOPERATOR TO IMPLEMENT FOREST EDGE MANAGEMENT.

2. BETWEEN THE EXISTING TRAIL AND THE FENCE MARKDEFECTIVE TREES FOR CUTTING. CUT UP STEMS/TRUNKSINTO 1 TO 2 METRE LENGTHS AND PLACE ON FORESTFLOOR. CUT UP TOPS INTO BRUSH PILES FOR WILDLIFE OR,ALTERNATIVELY, CHIPPED AND PLACED ON THE 4.5m WIDETRAIL.

3. ALONG THE SOUTH SIDE OF TRAIL, WHERE FEASIBLE THEFORESTED AREA WILL BE AUGMENTED BY PLANTING ONE (1)OR TWO (2) ROWS OF WHITE CEDAR AND WHITE SPRUCEON 2m SPACING OR GREATER.

4. IN THE 5m AREA BETWEEN THE FENCE AND THEEXTRACTION LIMIT THE NEW FOREST EDGE WILL BEAUGMENTED BY PLANTING RED OAK (67%) AND WHITE PINE(33%) IN GAPS. SPACING WILL VARY ACCORDING TO EDGECONDITIONS AT THE TIME OF PLANTING, BUT SHALL BE ATLEAST 3m APART.

5. TREE PLANTING WITHIN FOREST EDGE MANAGEMENT AREASHALL BE 1 OR 2 GALLON CONTAINER STOCK.

6. TREE PLANTING SHOULD OCCUR DURING THE SPRINGPERIOD, I.E. APRIL OR EARLY MAY, DEPENDING ONSEASONAL CONDITIONS. IF NECESSARY, FALL PLANTINGMAY OCCUR AFTER SEPTEMBER 20TH.

30. BETWEEN THE HOURS OF 5:00 TO 7:00 AM ONLY SHIPPING IS PERMITTED AND MAYINCLUDE A MAXIMUM OF 15 HIGHWAYS TRUCKS PER HOUR (30 TRUCK TRIPS) AND AMAXIMUM OF 1 SHIPPING LOADER IN COMBINATION WITH THE EXISTING TEEDONPIT (LICENCE #3670).

31. BETWEEN THE HOURS OF 7:00AM AND 7:00PM HIGHWAY TRUCKS ARE LIMITED TO 20TRUCKS PER HOUR (40 PASSES PER HOUR) IN COMBINATION WITH THE EXISTINGTEEDON PIT (LICENCE # 3670).

32. DUST SHALL BE MITIGATED ON-SITE.

33. WATER OR ANOTHER PROVINCIALLY APPROVED DUST SUPPRESSANT WILL BEAPPLIED TO INTERNAL HAUL ROADS AND PROCESSING AREAS AS OFTEN ASREQUIRED TO MITIGATE DUST.

34. PROCESSING EQUIPMENT WILL BE EQUIPPED WITH DUST SUPPRESSING ORCOLLECTION DEVICES, WHERE THE EQUIPMENT CREATES DUST AND IS BEINGOPERATED WITHIN 300m OF A SENSITIVE RECEPTOR.

35. THE OPERATOR SHALL RESPOND TO OBJECTIONS / CONCERNS FROM THERESIDENTS OR THE MINISTRY OF THE ENVIRONMENT, CONSERVATION AND PARKSRELATING TO NOISE AND AIR QUALITY. IF DEEMED APPROPRIATE BY THE MINISTRYOF THE ENVIRONMENT, CONSERVATION AND PARKS FURTHER MITIGATIONMEASURES AND MONITORING SHALL BE IMPLEMENTED.

36. SHOULD IT BE DETERMINED THAT NOISE OR AIR VIOLATIONS UNDER THEENVIRONMENTAL PROTECTION ACT ARE OCCURRING FROM PIT OPERATIONS, THEPORTION OF THE OPERATION RELATING TO THE IMPACT SHALL CEASE AND THEOPERATOR SHALL IMPLEMENT FURTHER MITIGATION MEASURES AS DETERMINEDBY MINISTRY OF ENVIRONMENT, CONSERVATION AND PARKS. OPERATIONSRELATING TO THE IMPACT MAY AGAIN COMMENCE UPON WRITTEN CLEARANCEFROM THE MINISTRY OF ENVIRONMENT, CONSERVATION AND PARKS.

FUEL HANDLING / STORAGE AND SERVICING

37. FUEL STORAGE WILL BE IN ABOVE GROUND TANKS CERTIFIED IN ACCORDANCEWITH APPROVED STANDARDS. FUEL STORAGE WILL BE LOCATED PROXIMITY TOTHE PROCESSING AREA. REFUELLING BY FUEL TRUCKS IS ALSO PERMITTED.

BUILDINGS / STRUCTURES

38. NO BUILDINGS OR OTHER STRUCTURES (I.E. WEIGH SCALES) WILL BE PLACED ONTHE LICENSED PROPERTY.

SCRAP

39. NO SCRAP SHALL BE STORED ON SITE.

STOCKPILING OF AGGREGATE

40. STOCKPILES OF AGGREGATE SHALL BE LOCATED ON THE ACTIVE PIT FLOOR. THEMAXIMUM HEIGHT OF AGGREGATE STOCKPILES IS 15m.

EROSION / SEDIMENT CONTROL

41. SILT FENCING WILL BE INSTALLED 5m BEYOND THE WEST, NORTH AND EASTEXTRACTION LIMIT AND MAINTAINED WHILE TREE CLEARING IS OCCURRING.

WATER MONITORING

42. MW1-09, MW8-18, MW10D-18, MW5-18 SHALL BE MONITORED QUARTERLY FORWATER LEVELS. SEE LOCATION OF MONITORING WELLS ON MONITORING WELLSCHEMATIC THIS PAGE.

43. MW9-18 SHALL BE MONITORED QUARTERLY FOR WATER LEVELS UNTIL IT ISREMOVED FOR EXTRACTION.

44. EXTRACTION SHALL REMAIN 1.5 METRES ABOVE THE ESTABLISHED WATER TABLE.IN THE EVENT THE WATER LEVEL DATA INDICATES THE MAXIMUM DEPTH OFEXTRACTION IS LESS THAN 1.5 METRES ABOVE THE ESTABLISHED WATER TABLE,THE MAXIMUM DEPTH OF EXTRACTION SHALL BE ADJUSTED ACCORDINGLY TOMAINTAIN THE 1.5 METRE DEPTH.

45. THE OPERATOR SHALL MAINTAIN A RECORD OF THE MONITORING RESULTS TOVERIFY THAT EXTRACTION REMAINS 1.5m ABOVE THE ESTABLISHED WATER TABLE.

ARCHAEOLOGICAL

46. SHOULD PREVIOUSLY UNDOCUMENTED ARCHAEOLOGICALRESOURCES BE DISCOVERED, THEY ARE A NEWARCHAEOLOGICAL SITE AND THEREFORE SUBJECT TO SECTION48 (1) OF THE ONTARIO HERITAGE ACT. THE PERSONDISCOVERING THE ARCHAEOLOGICAL RESOURCES MUSTCEASE ALTERATION OF THE AFFECTED AREA IMMEDIATELYAND ENGAGE A LICENSED CONSULTANT ARCHAEOLOGIST TOCARRY OUT ARCHAEOLOGICAL FIELDWORK, IN COMPLIANCEWITH SECTION 48 (1) OF THE ONTARIO HERITAGE ACT.

47. THE CEMETERIES ACT REQUIRES THAT ANY PERSONDISCOVERING HUMAN REMAINS MUST NOTIFY THE POLICE ORCORONER AND THE REGISTRAR OF CEMETERIES, MINISTRY OFGOVERNMENT AND CONSUMER SERVICES.

IMPORTED MATERIALS

48. AGGREGATE MAY BE IMPORTED ONTO THE LICENSEDPROPERTY FOR PROCESSING AND BLENDING WITH ON-SITEAGGREGATE.

49. CLEAN INERT FILL MAY BE IMPORTED TO FACILITATE THEESTABLISHMENT OF 3:1 (HORIZONTAL:VERTICAL) SLOPES ONTHE FINAL PIT FACES. SEE PAGE 4 OF 4. THE OPERATOR MUSTENSURE THAT THE MATERIAL IS TESTED AT THE SOURCE,BEFORE IT IS DEPOSITED ON SITE, TO ENSURE THAT THEMATERIAL MEETS THE MINISTRY OF ENVIRONMENT,CONSERVATION AND PARK'S CRITERIA UNDER TABLE 1 OF THEMINISTRY OF ENVIRONMENT, CONSERVATION AND PARK'SSOILS, GROUND WATER AND SEDIMENT STANDARDS FOR USEUNDER PART XV.1 OF THE ENVIRONMENTAL PROTECTION ACT.SAMPLING RESULTS WILL BE PROVIDED TO THE MINISTRY OFNATURAL RESOURCES AND FORESTRY OR THE MINISTRY OFTHE ENVIRONMENT, CONSERVATION AND PARKS UPONREQUEST.

50. NOTWITHSTANDING THE ABOVE, WHERE THE IMPORTEDMATERIAL IS NOT BEING PLACED WITHIN 1.5 METERS OF THESURFACE, THE CRITERIA UNDER TABLE 1 FOR SODIUMABSORPTION RATIO AND ELECTRICAL CONDUCTIVITY DO NOTHAVE TO BE MET.

SPILLS RESPONSE PLAN

51. ALL EMPLOYEES AND CONTRACTORS MUST OBEY THEFOLLOWING INSTRUCTIONS WHEN HANDLING POTENTIALCONTAMINANTS ON THE LICENSED PROPERTY.

52. ALL EMPLOYEES AND CONTRACTORS HANDLING FUEL AND / ORPOTENTIAL CONTAMINANTS WILL BE INSTRUCTED AS TO THEPROPER, SAFE HANDLING OF SUCH FUELS / CONTAMINANTS.

53. POTENTIAL CONTAMINANTS, I.E. FUEL, WILL BE STORED ANDHANDLED AS REQUIRED BY PROVINCIAL LEGISLATION.

54. ALL REPORTABLE SPILLS OR RELEASE OF CONTAMINANTSMUST BE CLEANED UP IMMEDIATELY AND TRANSPORTED TO ANAPPROVED WASTE DISPOSAL SITE BY A LICENSED HAULER.ANY SPILL MUST BE IMMEDIATELY CONTAINED TO PREVENTFURTHER SPREAD (I.E. EXCAVATE AND CONTAIN OIL SOAKEDMATERIAL IN A LOADER BUCKET UNTIL DISPOSAL CAN BEARRANGED).

55. ALL SPILLS OR RELEASE OF CONTAMINANTS MUST BEIMMEDIATELY REPORTED TO THE MINISTRY OF THEENVIRONMENT, CONSERVATION AND PARKS SPILLS ACTIONCENTRE BY TELEPHONE AT 1-800-268-6060.

56. EMPLOYEES AND CONTRACTORS WORKING ON SITE WILL BEINFORMED OF THE SPILLS RESPONSE PLAN AND REQUIRED TOCOMPLY WITH THESE REQUIREMENTS.

EXISTINGTRAIL

FENCE

EXISTING TRAIL

9061CZDate

CEDARHURST QUARRIES & CRUSHING LIMITEDC/O CRH CANADA GROUP INC.2300 Steeles Avenue W. Suite 400Concord, Ontario L4K 5X6

N:\\9061CZ - Teedon Pit Extension\Drawings\ARA Site Plans\2019 - January

January 2019

ByDate DescriptionNo.

Site Plan Amendments

MNRF Approval Stamp Stamp

PLANNINGURBAN DESIGN& LANDSCAPEARCHITECTUREMHBC

113 COLLIER STREET BARRIE, ON, L4M 1H2 | P: 705 728 0045 F: 705 728 2010 | WWW.MHBCPLAN.COM

1

23

All distances on this plan are shown in metres unless otherwise stated.

AutoCAD SHX Text
N58°12'10"E
AutoCAD SHX Text
283.416
AutoCAD SHX Text
N57°47'50"E
AutoCAD SHX Text
89.274
AutoCAD SHX Text
N58°35'30"E
AutoCAD SHX Text
298.595
AutoCAD SHX Text
N58°05'30"E
AutoCAD SHX Text
296.072
AutoCAD SHX Text
N58°22'40"E
AutoCAD SHX Text
N58°17'00"E
AutoCAD SHX Text
293.885
AutoCAD SHX Text
N58°22'50"E
AutoCAD SHX Text
258.500
AutoCAD SHX Text
N58°23'00"E
AutoCAD SHX Text
264.225
AutoCAD SHX Text
N58°22'40"E
AutoCAD SHX Text
265.120
AutoCAD SHX Text
IB
AutoCAD SHX Text
IB
AutoCAD SHX Text
IB
AutoCAD SHX Text
SSIB
AutoCAD SHX Text
SSIB
AutoCAD SHX Text
IB
AutoCAD SHX Text
IB
AutoCAD SHX Text
238.5 m
AutoCAD SHX Text
239.0 m
AutoCAD SHX Text
MW1
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW9-18
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW6-18
AutoCAD SHX Text
MW6R-18
AutoCAD SHX Text
BH
AutoCAD SHX Text
BH13-18
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
238.5 m
AutoCAD SHX Text
238.5 m
AutoCAD SHX Text
239.0 m
AutoCAD SHX Text
239.0 m
AutoCAD SHX Text
'A'
AutoCAD SHX Text
'A'
AutoCAD SHX Text
'B'
AutoCAD SHX Text
'B'
AutoCAD SHX Text
238.0 m
AutoCAD SHX Text
238.0 m
AutoCAD SHX Text
238.0 m
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
'A'
AutoCAD SHX Text
'A'
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
MW
AutoCAD SHX Text
BH
Page 23: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

POND

280

285

270

265

270

265

266

238.5

240

260

255

265

285

280

275

270265

275

270

285 28

0 275 27

0 265 26

0 255 25

0 245

242

241

240

239

238.5

239

245

250

255

265

270

275

280

285

292

245

250

260

265

270

275

280

285

290

239

240

245

250

255

260

265

270

275

280

285

240

250

255

260

AREA SUBJECTTO SEPARATE

SITE PLANAMENDMENTTO REDUCE

SETBACK TO 0m

270

265

260

255250

245

255

260

265

270

275

280

265

27027528028

5

PROPOSED AGRICULTURAL LAND

EXISTING TEEDON PIT SUBJECT TO SITE PLAN AMENDMENT TO REVISE PITFLOOR TO REFLECT GROUNDWATER ELEVATION

EXISTING LICENSED PROPERTY (TEEDON PIT)AGGREGATE LICENCE #3670

25 30

15 20

30 METRESETBACK

20 METRESETBACK

5 METRESETBACK

5 METRESETBACK

REHABILITATION PLANFile Name

3 OF 4Drawing No.

Project

Drawn By

B.Z.L.H.

Checked By

File No.

1. AREA TO BE REHABILITATED: 14.0 HA (EXTRACTION AREA AND 5m OF EXTRACTION SETBACK).

2. THE ELEVATION OF THE ESTABLISHED WATER TABLE RANGES ON SITE FROM ±236.5mASL TO ± 237.5mASL.

3. PROGRESSIVE AND FINAL REHABILITATION OF THE DISTURBED AREA WILL BE COMPLETED AS EXTRACTIONREACHES FINAL LIMITS AND DEPTHS.

4. FINAL PIT FACES WILL BE SLOPED AT 3:1 TO 5:1. FINAL SLOPES WILL BE CREATED USING A COMBINATIONOF CUT & FILL AND/ OR BACKFILLING. AVAILABLE OVERBURDEN AND TOPSOIL FROM ON SITE WILL BEAPPLIED ON THE SLOPES AND FINAL PIT FLOOR. SEE PAGE 4 OF 4. CLEAN INERT FILL MAY ALSO BEIMPORTED FOR THE PURPOSES OF ESTABLISHING FINAL SLOPES IN ACCORDANCE WITH THEREQUIREMENTS ON PAGE 2 OF 4.

5. THE OBJECTIVE OF THE REHABILITATION PLAN IS TO REFOREST THE SETBACK AREAS AND THE SIDE SLOPESAND THE PIT FLOOR SHALL BE REHABILITATED TO AGRICULTURAL. SEE TREE PLANTING SCHEMATIC THISPAGE FOR TREE PLANTING DETAILS.

6. THE PIT FLOOR SHALL BE GRADED AND CONTOURED AS SHOWN ON THIS PAGE AND TOPSOIL REAPPLIEDAND PLANTED WITH SEED CONDUCIVE TO FORM CROPLAND THEREAFTER.

7. THE SIDE SLOPE PLANTING AREAS SHALL BE MONITORED FOR SURVIVAL IN THE FIRST AND SECOND YEARSAFTER PLANTING. REPLACEMENT PLANTING SHOULD BE UNDERTAKEN IF SURVIVAL IS LESS THAN 60%. IFHERBACEOUS COMPETITION IS PREVENTING TREE GROWTH / TREE SURVIVAL, A TENDING TREATMENTMAY BE NECESSARY (E.G. HERBICIDE APPLICATION BY A LICENSED PESTICIDE APPLICATOR).

8. PRIOR TO SURRENDER OF THE LICENCE A QUALIFIED ECOLOGIST OR FORESTER SHALL PREPARE A REPORTDOCUMENTING:

A) THE IMPLEMENTATION OF THE REFORESTATION PLAN;

B) TO ASSESS THE NEED FOR ANY STAND THINNING TO PROMOTE FURTHER NATIVE HARDWOODREGENERATION; AND

C) TO IDENTIFY OTHER MANAGEMENT OPPORTUNITIES IF APPROPRIATE.

IF REQUIRED ANY FURTHER WORK SHALL BE COMPLETED PRIOR TO THE SURRENDER OF THE LICENCE. THEREPORT SHALL BE SUBMITTED TO THE MINISTRY OF NATURAL RESOURCES AND FORESTRY (MNRF).

LICENSED AREA BOUNDARY

LIMIT OF EXTRACTION

LICENSED AREA BOUNDARY(LICENCE # 3670 - TEEDON PIT)

LIMIT OF EXTRACTION(LICENCE #3670 - TEEDON PIT)

CROSS-SECTION

ADDITIONAL LANDS OWNED BYCRH CANADA GROUP INC.

LIMIT OF 120m INFORMATION ZONE

EXISTING TRAIL

CONTOUR LINE

EXISTING FENCE

1.2m FENCE

BOREHOLE

MONITORING WELL

GATE

EXISTING VEGETATION

PROPOSED FORESTED AREA (SEETREE PLANTING SCHEMATIC ONTHIS PAGE)

PROPOSED AGRICULTURAL LAND

328

Plan Scale 1:1500

Metres

0 10 25 50 75

TEEDON PIT EXTENSION2 Darby Road, Tiny, ON L0K 2E1North ½ of Lot 80, Concession 1, W.P.R. &Part of original road allowance between lots 80 & 81, Concession 1, W.P.R.,Geographic Township of Tiny, County of Simcoe

MINIMUM 3:1 SLOPE

REFORESTATIONOF 5m SETBACK

LICE

NSE

D BO

UN

DARY

LIM

IT O

F EX

TRAC

TIO

N

PROPOSED AGRICULTURAL LAND

TREE PLANTING SCHEMATIC

REFORESTATION OF 5m SETBACK

1. A FEW YEARS PRIOR TO TREE PLANTING COMMENCING ON THEREHABILITATED SIDE SLOPES, A QUALIFIED ECOLOGIST WILL WALK THE 5mSETBACK AND ASSESS EXISTING TREE REGENERATION ESTABLISHEDTHROUGH THE FOREST EDGE MANAGEMENT PLAN.

2. EXISTING TREE REGENERATION WILL BE AUGMENTED BY PLANTING REDOAK (67%) AND WHITE PINE (33%) IN GAPS APPROXIMATELY 2m FROMTHE FENCE.

3. TREE PLANTING SHALL BE 1 OR 2 GALLON CONTAINER STOCK.

4. TREE PLANTING SHOULD OCCUR DURING THE SPRING PERIOD, I.E. APRIL OR EARLY MAY, DEPENDINGON SEASONAL CONDITIONS. IF NECESSARY, FALL PLANTING MAY OCCUR AFTER SEPTEMBER 20.

5. SPACING OF TREES WILL VARY ACCORDING TO EXISTING REGENERATION, BUT SHALL BE AT LEAST 3mAPART.

REFORESTATION OF SIDE SLOPES

1. TREE PLANTING OF SIDE SLOPES SHALL NOT OCCUR UNTIL THE SLOPES HAVEBEEN SUCCESSFULLY STABILIZED AND RE-VEGETATED WITH HERBACEOUSCOVER (GRASS AND LEGUME MIXTURE).

2. SOME STUMPS, LOGS AND ROCK PILES SHALL BE INCORPORATED INTO SIDESLOPES, TO PROVIDE SOME HABITAT STRUCTURE AND VARIABILITY.

3. SINCE THE SOIL CONDITIONS ON THE REHABILITATION SLOPES WILL BEVARIABLE, A QUALIFIED ECOLOGIST OR FORESTER SHOULD EXAMINE THESOIL CONDITIONS PRIOR TO TREE PLANTING AND THE SOIL WILL BEAMENDED AS RECOMMENDED BY A QUALIFIED ECOLOGIST OR FORESTER.

4. CONIFERS ARE RECOMMENDED AS THE INITIAL PLANTINGS ON THE SIDESLOPES DUE TO THEIR ABILITY TO GROW IN EXPOSED, HOT, DRY ANDNUTRIENT-POOR ENVIRONMENTS. RED PINE AND JACK PINE ARE THEPREFERRED CONIFERS FOR THE INITIAL TREE PLANTING AT THE SITE. REDOAK AND WHITE PINE ARE SECONDARY SPECIES THAT WILL BE PLANTED. AFTER THE SECONDARY SPECIES ARE PLANTED THE SIDE SLOPES SHOULDCONTAIN APPROXIMATELY THE FOLLOWING PROPORTIONS OF TREES:RED PINE 45%, JACK PINE 35%, RED OAK 10% AND WHITE PINE 10%.

5. WIDER-THAN-NORMAL TREE SPACING IS RECOMMENDED. A TARGETSPACING OF 2.4m BETWEEN ROWS AND 2.1 TO 2.4m WITHIN ROWS ISSUITABLE, WHICH TOTALS APPROXIMATELY 1,600 TO 1,900 TREES PERHECTARE.

6. TREE PLANTING SHALL OCCUR DURING THE SPRING PERIOD, I.E. APRIL OREARLY MAY DEPENDING ON SEASONAL CONDITIONS. IF NECESSARY, FALLPLANTING MAY OCCUR AFTER SEPTEMBER 20TH.

7. LARGE BAREROOT STOCK SHALL BE USED AND PLANTING SHALL BE DEEP. FOR RED PINE AND JACK PINE 3-0 BAREROOT STOCK IS SUITABLE. TREESSHALL BE PLANTED DEEPER THAN THE NATURAL ROOT COLLAR BUT WITHTHE FIRST WHORL OF BRANCHES SHOWING ABOVE GROUND. THEPLANTING MAY BE DONE BY HAND OR MACHINE, DEPENDING ON THE SIZEOF THE AREA TO BE PLANTED AND THE STONE CONTENT IN THE SOIL.

EXISTING FOREST

REFORESTATIONOF SIDE SLOPES

SITE PLAN OVERRIDESTHE FOLLOWING CONDITIONS ILLUSTRATED ON THIS PLAN VARY FROMTHE REQUIREMENTS OF THE PROVINCIAL STANDARDS THAT APPLY TO

LICENSED PITS IN ONTARIO.

STANDARD OVERRIDE DESCRIPTION

5.1 A PORTION OF THE LICENSED BOUNDARY IS NOT REQUIRED TOBE FENCED. SEE NOTES 5 & 6 THIS PAGE.

5.2

THE ENTRANCE ONTO THE LICENSED PROPERTY FROM THETEEDON PIT PROPERTY (LICENCE # 3670) WILL NOT BE GATED.THE ENTRANCE TO THE TEEDON PIT PROPERTY FROM DARBYROAD IS GATED.

5.10

NO EXCAVATION SETBACK WILL EXIST ALONG THE SOUTHLICENSED BOUNDARY ADJACENT TO THE TEEDON PIT (LICENCE# 3670).THE EXCAVATION SETBACK ALONG THE WEST AND EASTBOUNDARY IS 5m FROM THE LICENSED BOUNDARY.

5.13

OVERBURDEN, TOPSOIL AND AGGREGATE CAN BE STOCKPILEDWITHIN 30m OF THE SOUTHERN BOUNDARY ADJACENT TOTHE TEEDON PIT (LICENCE # 3670).THE PORTABLE PROCESSING PLANT MAY BE LOCATED WITHIN30m OF THE SOUTHERN BOUNDARY ADJACENT TO THETEEDON PIT (LICENCE # 3670).

5.16 / 5.17TOPSOIL AND OVERBURDEN MAY BE MOVED BETWEEN THISSITE AND THE ADJACENT TEEDON PIT (LICENCE # 3670) TOPROVIDE TIMELY AND EFFECTIVE REHABILITATION OF BOTHPITS.

5.22THE AGGREGATE RESOURCES ACT SIGN FOR THE SITE WILL BELOCATED AT THE DARBY ROAD ENTRANCE OF THE ADJACENTTEEDON PIT (LICENCE # 3670) SINCE THE LICENSED BOUNDARYDOES NOT HAVE FRONTAGE ONTO ANY PUBLIC ROADS.

9061CZDate

CEDARHURST QUARRIES & CRUSHING LIMITEDC/O CRH CANADA GROUP INC.2300 Steeles Avenue W. Suite 400Concord, Ontario L4K 5X6

N:\\9061CZ - Teedon Pit Extension\Drawings\ARA Site Plans\2019 - January

January 2019

ByDate DescriptionNo.

Site Plan Amendments

MNRF Approval Stamp Stamp

PLANNINGURBAN DESIGN& LANDSCAPEARCHITECTUREMHBC

113 COLLIER STREET BARRIE, ON, L4M 1H2 | P: 705 728 0045 F: 705 728 2010 | WWW.MHBCPLAN.COM

1

23

All distances on this plan are shown in metres unless otherwise stated.

AutoCAD SHX Text
L O T 8 1
AutoCAD SHX Text
L O T 8 0
AutoCAD SHX Text
N58°12'10"E
AutoCAD SHX Text
283.416
AutoCAD SHX Text
N57°47'50"E
AutoCAD SHX Text
89.274
AutoCAD SHX Text
N58°35'30"E
AutoCAD SHX Text
298.595
AutoCAD SHX Text
N58°05'30"E
AutoCAD SHX Text
296.072
AutoCAD SHX Text
N58°22'40"E
AutoCAD SHX Text
N58°17'00"E
AutoCAD SHX Text
293.885
AutoCAD SHX Text
N58°22'50"E
AutoCAD SHX Text
258.500
AutoCAD SHX Text
N58°23'00"E
AutoCAD SHX Text
264.225
AutoCAD SHX Text
N58°22'40"E
AutoCAD SHX Text
265.120
AutoCAD SHX Text
IB
AutoCAD SHX Text
IB
AutoCAD SHX Text
IB
AutoCAD SHX Text
SSIB
AutoCAD SHX Text
SSIB
AutoCAD SHX Text
IB
AutoCAD SHX Text
IB
AutoCAD SHX Text
'A'
AutoCAD SHX Text
'A'
AutoCAD SHX Text
'B'
AutoCAD SHX Text
'B'
AutoCAD SHX Text
0 METRE SETBACK
AutoCAD SHX Text
MW1
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW9-18
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW6-18
AutoCAD SHX Text
MW6R-18
AutoCAD SHX Text
BH
AutoCAD SHX Text
BH13-18
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
x
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
'A'
AutoCAD SHX Text
'A'
AutoCAD SHX Text
MW
AutoCAD SHX Text
BH
AutoCAD SHX Text
x
AutoCAD SHX Text
x
Page 24: Welcometo the Teedon Pit Extension Act Public Meeting · 2020-02-24 · 2012 2011 2014 2018 2019 Teedon Pit Extension Application Process. CRH TEEDON PIT EXTENSION ... The Township

CROSS-SECTION A-A'Vertical Exaggeration 10x

3:1 SLOPE

3:1 SLOPE

REHABILITATED TO A MINIMUM 3:1 SLOPEREHABILITATED TO A MINIMUM 3:1 SLOPE

CROSS-SECTION B-B'WEST EAST B'BNORTH A'A

SOUTH

ELEV

ATIO

N (m

ASL)

ELEV

ATIO

N (m

ASL)

DISTANCE (m) DISTANCE (m)

Vertical Exaggeration 10x

EXTR

ACTI

ON

LIM

IT

EXISTING GROUND

FINAL PITFLOORELEV 239 mASL

GROUNDWATER ELEVATION

NO

RTH

LICE

NSE

D AR

EA B

OU

NDA

RY

SOU

TH L

ICEN

SED

AREA

BO

UN

DARY

& E

XTRA

CTIO

N L

IMIT

WES

T LI

CEN

SED

AREA

BO

UN

DARY

EAST

LIC

ENSE

D AR

EA B

OU

NDA

RYEA

ST L

IMIT

OF

EXTR

ACTI

ON

FINAL PIT FLOOR ELEVATION 237.5-339.5mASL

EXISTING GROUND

234236238240242244246248250252254256258260262264266268270272274276278280282284286288290292294296298300302

234236238240242244246248250252254256258260262264266268270272274276278280282284286288290292294296298300302

234236238240242244246248250252254256258260262264266268270272274276278280282284286288290292294296298300302

WES

T LI

MIT

OF

EXTR

ACTI

ON

234236238240242244246248250252254256258260262264266268270272274276278280282284286288290292294296298300302

GROUNDWATER ELEVATION

0 50 100 200 300 400 0 50 100 200 300 400 500 600 700 800 900 1000

ADDITIONAL LANDSOWNED BY LICENSEE

ADDITIONAL LANDSOWNED BY LICENSEEEX

ISTI

NG

TEED

ON

PIT

LIC

ENCE

ID #

3670

BACKFILL TO CREATE MINIMUM 3:1 SLOPE BACKFILL TOCREATE MINIMUM3:1 SLOPE

BACKFILL TO CREATE MINIMUM 3:1 SLOPE

EXISTING TEEDON PITSUBJECT TO SITE PLANAMENDMENT TOREDUCE SETBACK TO0m AND REVISE PITFLOOR TO REFLECTGROUNDWATERELEVATION

NO

RTH

PRO

PERT

Y BO

UN

DARY

REHABILITATED TO AMINIMUM 3:1 SLOPE

SEE PAGE 3 OF 4 FOR TREEPLANTING REQUIREMENTS

ON SIDE SLOPES

SEE PAGE 3 OF4 FOR TREEPLANTING

REQUIREMENTSON SIDESLOPES

LICENSED AREA BOUNDARY

LIMIT OF EXTRACTION

LICENSED AREA BOUNDARY(LICENCE # 3670 - TEEDON PIT)

ADDITIONAL LANDS OWNED BYCRH CANADA GROUP INC.

AREA TO BE BACKFILLED

ByDate DescriptionNo.

Site Plan Amendments

CROSS - SECTIONSFile Name

4 OF 4Drawing No.

Project

Drawn By

B.Z.L.H.

Checked By

File No.

MNRF Approval Stamp Stamp

PLANNINGURBAN DESIGN& LANDSCAPEARCHITECTUREMHBC

113 COLLIER STREET BARRIE, ON, L4M 1H2 | P: 705 728 0045 F: 705 728 2010 | WWW.MHBCPLAN.COM

1

23

All distances on this plan are shown in metres unless otherwise stated.

Metres

0 50 100

TEEDON PIT EXTENSION2 Darby Road, Tiny, ON L0K 2E1North ½ of Lot 80, Concession 1, W.P.R. &Part of original road allowance between lots 80 & 81, Concession 1, W.P.R.,Geographic Township of Tiny, County of Simcoe

9061CZDate

CEDARHURST QUARRIES & CRUSHING LIMITEDC/O CRH CANADA GROUP INC.2300 Steeles Avenue W. Suite 400Concord, Ontario L4K 5X6

N:\\9061CZ - Teedon Pit Extension\Drawings\ARA Site Plans\2019 - January

January 2019

AutoCAD SHX Text
30.0 m SETBACK
AutoCAD SHX Text
LEGEND