StainlessSteelBolts

Powder CoatedAluminum Basin

StainlessSteelValve

Permanently AttachedUrethane Seal

High LevelFloat Switch

Well Site Guard Ltd. Superior Well Head Protection

Patent Pending

a

b b

a

Minimum distance from bridle bottom

To the top of the pumping T (large side)

b

c

360 o

clearance around the pumping T

(distance to nearest obstruction).

Stuffing Box

Bridle

Pumping T

Polished

Rod

Electrical Box

2”

2 1/2”

2 7/8”

3”

or

or

or

EUE of the Pumping Tee (see below)

c

EUE

To order your Well Site Guardyou must provide

Measurement and the EUEa c

BOP

or

Important: specify if you have a BOP above the Pumping T on your unit

To ensure that your product can be easily and properly installed right out ofthe box, please provide the following measurements upon ordering.

Removeprotectivefilm

Parallel to largerside of Flow-T

1a. File down anyprotruding tool

marks

1. ½” Box End or Socket2. Pliers3. Knife4. Level (24”)5. Tape Measure6. De-greaser & Cloth

Important: any service to pumpjacksand Well Heads should be done inaccordance with all safety standars.

Before you begin...

Here is a list of recommendedtools that you will needfor proper installation:

1 Spray, clean & DRY upper portion of Flow T.

2 Wrap 2-way mounting tape around Flow Tleaving 1-2 cm of overlap and removeprotective film.

Steel Drain

Permanently AttachedUrethane Seal

2 Way UrethaneMounting Tape

High LevelFloat Switch

4 Loose Bolts(loosen, but

DO NOT Remove)

2 Hinge Bolts(loosen, but DO NOT Disconnect)

3 Place basin on top of Flow Tkeeping in mind access tofloat switch and drain valve.Hinge bolt side

top view

4 Level basin and join both sides together;be certain to align urethane seal.Tighten all 6 bolts until gap in urethaneseal is completely closed inside and out.

Important: USE A LEVELto ensure the basin is level in all

directions BEFORE sealing.

6 Sealer Bolts(3 each side)

Important: Ensure basin isresting on top of the

LARGE side of the Flow T

Ensure proper alignmentof urethane seal

Side view

Top view

FlushFlush

FlushFlush

Push clasps through adjoining hole

Push 6 levers down to seal clear top

Swell latchassembly

Handle & Shaft sub-assembly

Bushing

Washer

Acorn NutBasin

5 Fit both sides of clear top into thebasin and join together.

If the existing basin has not been pre-cut, and istoo tall to fit between the LOWEST point of

the Carrier Bar and STUFFING BOX proceed toSTEP 5a (next page). If not, skip through to STEP 6

Important: DO NOT unscrew clasps

FloatSwitch

DrainValve

Angle

Grinder

¾”

Clear Basin Top

Me

asu

rem

en

t A

Measurement B”

900

3”

or TinSnips

AngleGrinderor TinSnips

CarrierBar

StuffingBox

5a These are instructions to be followed if the clear basin top has NOT BEEN PRE-CUT and istoo tall to fit between the lowest point of the CARRIER BAR and the STUFFING BOX.

TapeMeasure

Level

AttachmentSpring Hole

a

b

c

d

Using a Tape Measure and Level, calculate the desiredheight between Carrier Bar and Stuffing Box to Basin.

Subtract your desired height measurement from 21 inches(standard height) and mark REMAINDER from the bottomof the clear top - CUT using a GRINDER or TIN SNIPS.(21” - Measurement a” = Measurement B”)

For the side tabs, measure 3/4 inch from the base andcut vertically and 90 degrees horizontally.

Drill a small hole for the attachment spring 3 inchesabove the horizontal edge of the tab and 2/3 of the wayto the outside edge.

IMPORTANT: BOTTOM MEASUREMENT NEEDSTO BE MADE FROM INSIDE NIB (3/4 INCH FROM TOP)

a

b

c

d

6 Align top and base seams and installattachment spring using the holesprovided (both sides).

7 Shut valve and connect electricity tostandard Float or Ultra-Sonic switch.

Electrical

Valve

Spring

ThroughHole

www.wellsiteguard.com

Ultra-Sonic switch option available in24 volt or 120 volt

Rain Guard Installation

Well Site Guard Ltd. Superior Well Head Protection

Patent Pending

WSGBasin

ClearBasinTop

RainGuard

Top

RainGuardBase

1 Unclip and remove Clear Basin Top.

2 Holding both sides together, line up and dropinner notches of the Rain Guard base overthe WSG basin knobs; twist to secure.Joined ends of the Rain Guard need to line up with thebolted joints of the WSG Basin.

WSG Basininner notches

Line up openingand slide downover notches

Twist & Lock

Line up Basin& Rain Guard

joints

3 Insert appropriately sized felt insert intoeach side of the Rain Guard Top and clasparound the polished rod.

4 With Clear Basin Top’s clips secured on ONE side, slide it into place on the under-side of the Rain Guard Top. Secure theClear Basin Top’s clips on the other side.

WSGBasin

ClearBasinTop

RainGuard

Top

RainGuardBase

5 Drop joined Basin Top and Rain GuardTop into the slotted base.

6 Re-secure attachment spring from baseto clear top

ScrewClasp

Hinge(keep fastened)

Insert propersized felt

PolishedRod

bTighten Screw

PolishedRod

Clear BasinTop

RainGuard

Top