well site guard ltd - showcasedirectory.energy filea b b a minimum distance from bridle bottom to...
TRANSCRIPT
StainlessSteelBolts
Powder CoatedAluminum Basin
StainlessSteelValve
Permanently AttachedUrethane Seal
High LevelFloat Switch
Well Site Guard Ltd. Superior Well Head Protection
Patent Pending
a
b b
a
Minimum distance from bridle bottom
To the top of the pumping T (large side)
b
c
360 o
clearance around the pumping T
(distance to nearest obstruction).
Stuffing Box
Bridle
Pumping T
Polished
Rod
Electrical Box
2”
2 1/2”
2 7/8”
3”
or
or
or
EUE of the Pumping Tee (see below)
c
EUE
To order your Well Site Guardyou must provide
Measurement and the EUEa c
BOP
or
Important: specify if you have a BOP above the Pumping T on your unit
To ensure that your product can be easily and properly installed right out ofthe box, please provide the following measurements upon ordering.
Removeprotectivefilm
Parallel to largerside of Flow-T
1a. File down anyprotruding tool
marks
1. ½” Box End or Socket2. Pliers3. Knife4. Level (24”)5. Tape Measure6. De-greaser & Cloth
Important: any service to pumpjacksand Well Heads should be done inaccordance with all safety standars.
Before you begin...
Here is a list of recommendedtools that you will needfor proper installation:
1 Spray, clean & DRY upper portion of Flow T.
2 Wrap 2-way mounting tape around Flow Tleaving 1-2 cm of overlap and removeprotective film.
Steel Drain
Permanently AttachedUrethane Seal
2 Way UrethaneMounting Tape
High LevelFloat Switch
4 Loose Bolts(loosen, but
DO NOT Remove)
2 Hinge Bolts(loosen, but DO NOT Disconnect)
3 Place basin on top of Flow Tkeeping in mind access tofloat switch and drain valve.Hinge bolt side
top view
4 Level basin and join both sides together;be certain to align urethane seal.Tighten all 6 bolts until gap in urethaneseal is completely closed inside and out.
Important: USE A LEVELto ensure the basin is level in all
directions BEFORE sealing.
6 Sealer Bolts(3 each side)
Important: Ensure basin isresting on top of the
LARGE side of the Flow T
Ensure proper alignmentof urethane seal
Side view
Top view
FlushFlush
FlushFlush
Push clasps through adjoining hole
Push 6 levers down to seal clear top
Swell latchassembly
Handle & Shaft sub-assembly
Bushing
Washer
Acorn NutBasin
5 Fit both sides of clear top into thebasin and join together.
If the existing basin has not been pre-cut, and istoo tall to fit between the LOWEST point of
the Carrier Bar and STUFFING BOX proceed toSTEP 5a (next page). If not, skip through to STEP 6
Important: DO NOT unscrew clasps
FloatSwitch
DrainValve
Angle
Grinder
¾”
Clear Basin Top
Me
asu
rem
en
t A
”
Measurement B”
900
3”
or TinSnips
AngleGrinderor TinSnips
CarrierBar
StuffingBox
5a These are instructions to be followed if the clear basin top has NOT BEEN PRE-CUT and istoo tall to fit between the lowest point of the CARRIER BAR and the STUFFING BOX.
TapeMeasure
Level
AttachmentSpring Hole
a
b
c
d
Using a Tape Measure and Level, calculate the desiredheight between Carrier Bar and Stuffing Box to Basin.
Subtract your desired height measurement from 21 inches(standard height) and mark REMAINDER from the bottomof the clear top - CUT using a GRINDER or TIN SNIPS.(21” - Measurement a” = Measurement B”)
For the side tabs, measure 3/4 inch from the base andcut vertically and 90 degrees horizontally.
Drill a small hole for the attachment spring 3 inchesabove the horizontal edge of the tab and 2/3 of the wayto the outside edge.
IMPORTANT: BOTTOM MEASUREMENT NEEDSTO BE MADE FROM INSIDE NIB (3/4 INCH FROM TOP)
a
b
c
d
6 Align top and base seams and installattachment spring using the holesprovided (both sides).
7 Shut valve and connect electricity tostandard Float or Ultra-Sonic switch.
Electrical
Valve
Spring
ThroughHole
www.wellsiteguard.com
Ultra-Sonic switch option available in24 volt or 120 volt
Rain Guard Installation
Well Site Guard Ltd. Superior Well Head Protection
Patent Pending
WSGBasin
ClearBasinTop
RainGuard
Top
RainGuardBase
1 Unclip and remove Clear Basin Top.
2 Holding both sides together, line up and dropinner notches of the Rain Guard base overthe WSG basin knobs; twist to secure.Joined ends of the Rain Guard need to line up with thebolted joints of the WSG Basin.
WSG Basininner notches
Line up openingand slide downover notches
Twist & Lock
Line up Basin& Rain Guard
joints
3 Insert appropriately sized felt insert intoeach side of the Rain Guard Top and clasparound the polished rod.
4 With Clear Basin Top’s clips secured on ONE side, slide it into place on the under-side of the Rain Guard Top. Secure theClear Basin Top’s clips on the other side.
WSGBasin
ClearBasinTop
RainGuard
Top
RainGuardBase
5 Drop joined Basin Top and Rain GuardTop into the slotted base.
6 Re-secure attachment spring from baseto clear top
ScrewClasp
Hinge(keep fastened)
Insert propersized felt
PolishedRod
bTighten Screw
PolishedRod
Clear BasinTop
RainGuard
Top
a