High Pressure Technology • Testing Equipment Hydraulics • Pneumatics
Maximum Pressure.
Wellhead Control Panel
Industry: Oil and GasMarket: ProductionApplication: Hydraulic operation of BOP, DHSV, MV
Requirements: - Frame Work Design Geman Loyd certified according DNV NO.2.7-1 - Hose Reels for each function - Emergency Shut Down - Special 3-Layer, 200 Micron Dry Film thickness Offshore Paint Coding System
The Wellhead Control Panel is designed for the operation of three BOP´s (Blow Out Preventer) at 3.000 PSI, one DHSV (Down Hole Safety Valve) at 10.000 PSI and one MV (Master Valve) at 10.000 PSI.
This Unit offers a special air operated remote control unit (ESD-Panel) for safety reasons. The visual and acoustic safety system ensures, that the operator can react as quick as possible in case of any emergency situation.
MAXIMATOR GmbH, Lange Strasse 6, 99734 Nordhausen, Telephone +49 3631 9533 – 0, Telefax +49 3631 9533 – 5010, www.maximator.de, [email protected]
High Pressure Technology • Testing Equipment Hydraulics • Pneumatics
Maximum Pressure.
Standards and Regulations:
3.1 Material Certification main frame components
3.2 Material Certification
for Pad Eye and Pad Eye Base Plate consisting of:• Chemical Analysis (AES)• Impact Test according EN 10045• Tensile Test according DIN EN 10002-1
API RP 520Recommended Practice for Design and Operation of Sub sea Production Systems
Inspection Report Ger-man Lloyd
• EN 12079-1:2006 - Lifting Test 8.4.1• EN 970• EN 1290• EN 1291
Framework Calculation• Pad Eye strenght calculation according DNV 2.7-1• Filled weld calculation• FEA (Finite Element Analysis)
Framework Test• 2-Point and 4-Point Load Test• Ultra Sonic Welding Test• Ultra Sonic Z-Performance Test
ATEX electronic equipment
MAXIMATOR GmbH, Lange Strasse 6, 99734 Nordhausen, Telephone +49 3631 9533 – 0, Telefax +49 3631 9533 – 5010, www.maximator.de, [email protected]
High Pressure Technology • Testing Equipment Hydraulics • Pneumatics
Maximum Pressure.
Fig.: Wellhead Control Panel front view
Fig.: Wellhead Control Panel right view
Fig.: Wellhead Control Panel rear view
Fig.: Wellhead Control Panel fron view