west african power industry convention(wapic) and metring,billing and crm/cis conference abuja
DESCRIPTION
WEST AFRICAN POWER INDUSTRY CONVENTION(WAPIC) AND METRING,BILLING AND CRM/CIS CONFERENCE ABUJA JUNE 2004 The Reform Relay. TRANSFORMATION TIME LINE. Phase I. Phase II. BACK GROUND. 3 YEAR RCM CONTRACT ( Focus On Marketing). FUTURE PICTURE (Focus On Engineering). - PowerPoint PPT PresentationTRANSCRIPT
WEST AFRICAN POWER INDUSTRY WEST AFRICAN POWER INDUSTRY CONVENTION(WAPIC) CONVENTION(WAPIC)
AND AND METRING,BILLING AND CRM/CIS CONFERENCE METRING,BILLING AND CRM/CIS CONFERENCE
ABUJAABUJAJUNE 2004JUNE 2004
The Reform RelayThe Reform Relay
TRANSFORMATION TIME TRANSFORMATION TIME LINELINE
BACK GROUND
•Big PictureVisionExperienceConstraintsChallenges
FUTURE PICTURE(Focus On Engineering)
NEW APPROACH
CONCLUSION•Potential in Industry.•Processes•IT•Metering
Suggestions
2002 2005 2007
Why RCM ?
End of RCM Contract
Elections3 YEAR RCM CONTRACT( Focus On Marketing)
Phase I Phase II
Decision to Maintain status quoor privatize basedon 5 year performance
Why RCM ? Why RCM ? • To improve Marketing efficiency and To improve Marketing efficiency and
boost internally generated Revenue of boost internally generated Revenue of the Authority. the Authority.
• Improve Customer Services.Improve Customer Services.
• Introduce Best Practices. Introduce Best Practices.
BACKGROUNDBACKGROUND
3 YEAR RCM CONTRACT3 YEAR RCM CONTRACT
BIG PICTURE VISION
To become the leading Districts in To become the leading Districts in the provision of professional and the provision of professional and outstanding services to win loyal outstanding services to win loyal and committed customers for the and committed customers for the benefit of all stakeholders.benefit of all stakeholders.
3 YEAR RCM CONTRACT3 YEAR RCM CONTRACT(Cont.)(Cont.)
EXPIERENCE– Processing of applications for new Processing of applications for new
customerscustomers– Selection of appropriate meter technologySelection of appropriate meter technology– Capturing of new consumer applications.Capturing of new consumer applications.– Implement penalty on defaulters and Implement penalty on defaulters and
interest on overdue accounts.interest on overdue accounts.– Sales of electricity & debt collection mgtSales of electricity & debt collection mgt– Reduction of non-technical loss Reduction of non-technical loss
3 YEAR RCM CONTRACT3 YEAR RCM CONTRACT(Cont.)(Cont.)
EXPERIENCE EXPERIENCE (Cont.)(Cont.)– Customer services deliveryCustomer services delivery– Managing of billing systemManaging of billing system– Management Structure – Level of trust.Management Structure – Level of trust.– Meter supply and Demand gapMeter supply and Demand gap– Reliability of meter readings. Reliability of meter readings.
3 YEAR RCM CONTRACT3 YEAR RCM CONTRACT(Cont.)(Cont.)
CONSTRAINTS CONSTRAINTS • TrainingTraining
• IT SystemsIT Systems
• Generate additional Operational Funding Generate additional Operational Funding through the implementation of innovative through the implementation of innovative business approaches.business approaches.
• Procedures and Processes Procedures and Processes
• Metering.Metering.
3 YEAR RCM CONTRACT3 YEAR RCM CONTRACT(Cont.)(Cont.)
CHALLENGESCHALLENGES• Rural Electrification in IKORODU Rural Electrification in IKORODU
District.District.• Improvement of the quality and Improvement of the quality and
quantity of supply to meet the demand quantity of supply to meet the demand occasioned by the Industrial expansion. occasioned by the Industrial expansion. The implementation of reliable and The implementation of reliable and tamper proof metering system.tamper proof metering system.
• High level of illegal consumption.High level of illegal consumption.
3 YEAR RCM CONTRACT3 YEAR RCM CONTRACT(Cont.)(Cont.)
CHALLENGES (Cont)CHALLENGES (Cont)• Implement Field Billing (eg Hand Implement Field Billing (eg Hand
billing)billing)• Remote meteringRemote metering• Installing HT Meter panels for all Installing HT Meter panels for all
MD customersMD customers• Invest in operational tools and Invest in operational tools and
equipmentequipment
FUTURE PICTUREFUTURE PICTURE
• Potential in Industry.• Regain the gas and diesel market (Quality
and Quantity)
• ISO 2000• Become ISO 2000 compliant
• IT• Online Real time systems
• Metering• MD Remote metering
FUTURE PICTUREFUTURE PICTURE
SUGGESTIONS• Implement bulk metering to Non-
Maximum Demand customers in enclosed communities
• Install statistical meters on all 415 V transformers
TRANSFORMATION TIME TRANSFORMATION TIME LINELINE
BACK GROUND
•Big PictureVisionExperienceConstraintsChallenges
FUTURE PICTURE(Focus On Engineering)
NEW APPROACH
CONCLUSION•Potential in Industry.•Processes•IT•Metering
Suggestions
2002 2005 2007
Why RCM ?
End of RCM Contract
Elections3 YEAR RCM CONTRACT( Focus On Marketing)
Phase I Phase II
Decision to Maintain status quoor privatize basedon 5 year performance
NEW APPROACHNEW APPROACH
CONCLUSION After 5 years: Decision to Maintain status quo (NEPA) with the
extension of one of the options below:
1. Further Extension of RCM Contract 2. Concessions only in Identified
Selected areas 3. Franchise the Marketing section of Distribution
or
Full Privatization of the Distribution Business
Thank You.Thank You.QUESTIONSQUESTIONS
JAN VAN VREDENJAN VAN VREDENGLOBAL UTILITIES MANAGEMENT GLOBAL UTILITIES MANAGEMENT
COMPANYCOMPANY