Page 1: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____
Page 2: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

WEST ISLAY TIDAL ENERGY PARK

VOLUME 2 ENVIRONMENTAL STATEMENT

CONTENTS

SECTION 1: INTRODUCTION, POLICY, CONTEXT, EIA & DESCRIPTION

1. Introduction

2. Legislative & Policy Context

3. Site Selection Process and Alternatives Considered

4. The Environmental Impact Assessment, Environmental Statement & Consultation

5. Project Description

6. Physical Environment

SECTION 2: BIOLOGICAL ENVIRONMENT

7. Mammals

8. Benthic Ecology

9. Otters

10. Birds

11. Natural Fish

SECTION 3: HUMAN ENVIRONMENT

12. Commercial Fish

13. Archaeology

14. Shipping & Navigation

15. Landscape & Seascape Visual

16. Traffic & Transport

17. Recreation and Amenity

18. Socio-economic

19. Noise

20. EMF

SECTION 4: SUMMARY CONCLUSIONS, MITIGATION & MONITORING

21. Summary of Impacts, Mitigation and Monitoring

Page 3: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement ________________________________________________________________

Preface 1 July 2013

Preface This Environmental Statement (ES) is prepared, by DP Marine Energy Ltd (DPME), in support of an application for statutory consents for West Islay Tidal Energy Park (the Project). The Project is being developed jointly by DPME and DEME Blue Energy (DBE) on the behalf of West Islay Tidal Energy Park Limited a special purpose Scottish Company which has been incorporated to build and operate the Project. The Project consists of the installation of 30MW of Tidal Energy Converters and associated infrastructure including the export cables to landfall on Islay The proposed array of tidal energy devices will be located approximately 6km (at its closest point) from the south west tip of the island of Islay in Argyll and Bute, Scotland. The proposed landfall for the associated electricity export cable will be located adjacent to Kintra Farm on the west coast of Islay. The Regulatory Authority responsible for assessing the application for consent is Marine Scotland. They will be supported in the assessment process by a number of environmental bodies including Scottish Natural Heritage (SNH). The Environmental Statement can be viewed during the statutory consultation period at the following locations: Islay Energy Trust, Custom House, Bowmore, Isle of Islay, PA43 7JJ Tel: 01496 810873

Portnahaven Post Office Portnahaven Isle of Islay PA47 7SH Tel: 01496 860264

Bowmore Post Office, Main Street, Bowmore, Isle of Islay, PA43 7JH Tel: 01496 810366

Port Ellen Post Office, 66 Fredrick Crescent Port Ellen, Isle of Islay, PA42 7BD Tel: 01496 30238

DP Marine Energy Ltd Mill House Buttevant County Cork Tel: +353 22 23955

Scottish Government Library, Victoria Quay, Edinburgh, EH6 6QQ

During the consultation period copies of the Environmental Statement can be purchased from DPME either on CD for a charge of £15 or in hard copy form for £400. Copies of the Non-Technical Summary are available free of charge and a downloadable version is also be available on the West Islay Tidal website: www.westislaytidal.com. Requests for CD and or hard copies of the ES can be made to the DPME address above or by email [email protected]

Page 4: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement ________________________________________________________________

Preface 2 July 2013

Responsibility Job Title Name Date Signature

EIA Chapters

EIA Manager Clodagh McGrath

Monday, 22nd July 2013

Non EIA Chapters

Project Manager

Blair Marnie Monday, 22nd July 2013

Checked

Project Development Engineer

Damian Bettles

Monday, 22nd July 2013

Approved

Director (DPME)

Simon De Pietro

Monday, 22nd July 2013

Copyright: DPME © Document Reference:

West Islay Tidal Energy Park Environmental Statement

It should be noted that the NTS and ES has been prepared by DPME supported by DBE with significant input from external sub-consultants on specialist chapters. A review process for Quality Assurance was conducted on all chapters, whether produced by external consultants or internally by DPME. The ES has been prepared by DPME with all reasonable skill and care and whilst every effort has been made to ensure the accuracy of the material published in this and associated documents, West Islay Tidal Energy Park Ltd, DPME or DBE will not be liable for any inaccuracies. These documents remain the sole property of DPME. They are submitted to the Regulators and Local Authorities solely for their use in evaluating the Environmental Impact Assessment for the West Islay Tidal Energy Project. No part of this publication (hardcopy or CD-ROM) or any attachments, addenda and/or technical reports may be reproduced or copied in any form or by any means or otherwise disclosed to third parties without the express written permission of DPME, except that permission is hereby granted to the Regulators to evaluate this Environmental Statement in accordance with their normal procedures, which may necessitate the reproduction of this response to provide additional copies strictly for internal use. DPME would like to acknowledge the technical support provided by Siemens/MCT, Alstom/TGL and Bluewater/BlueTEC for their considerable assistance in enabling the design envelope to be defined. The licence numbers for proprietary data referenced in diagrams and maps can be found on individual figures. Copyright ©2013 DP Marine Energy Limited All rights reserved.

Page 5: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

- - i

Glossary of Terms: Agreement for Lease Agreement entered into between West Islay Tidal Ltd and The Crown Estate

for the rights to development on the seabed, named as West Islay Tidal, shown in Figure 5.1.

Dynamic positioning vessel

A Dynamic Positioning Vessel (DP) can safely maintain its position and heading in a tidal flow using a system of thrusters. DP vessels are able to work safely and efficiently in waters deeper than vessels using anchors.

Export cables Cables used to export power generated by the tidal turbines to the onshore infrastructure.

Gravity based structure (GBS)

A structure which uses ballast to sit securely on the seabed without needing to be stabilized by piles or anchors. The GBS is used to support a tidal turbine.

Monopile A single large diameter steel tube that is grouted into a hole bored into the seabed. The monopile is used to support a tidal turbine.

Nacelle The enclosure of the tidal turbine’s mechanical and electrical equipment. Pin pile The use of multiple small diameter steel tubes that are grouted into a hole bored

into the seabed. The pin piles are used to support a tidal turbine. Project For the purpose of this ES, the Project refers to the West Islay Tidal Energy Project. Remotely operated vehicle (ROV)

A Remotely Operated Vehicle (ROV) is an underwater vehicle able to undertake multiple subsea operations. ROVs are highly manoeuvrable and are controlled by operators on-board the DP vessel.

Tidal turbine A device that converts hydrodynamic energy in the tidal flow into electrical energy. Tidal turbine array Term used to describe a group of tidal turbines. Turbine support structure (TSS)

A turbine support structure is the structure placed on the seabed onto which a tidal turbine is installed.

Wet mate connector A device used to connect electrical and data cables underwater.

Page 6: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West

Isl

ay T

idal Energ

y P

ark

Envi

ronm

enta

l Sta

tem

ent

- -

i

Lis

t o

f A

cro

nym

s

AA

Ap

pro

pri

ate

Ass

ess

me

nt

AAD

T A

nn

ual

Ave

rage

Dai

ly T

raff

ic

ABR

A A

rgyl

l & B

ute

Re

new

able

s A

llian

ce

AC A

lter

nat

ing

Cu

rren

t AD

An

no

Do

min

i AD

CP

Aco

ust

ic D

op

ple

r C

urr

ent

Pro

file

r Af

L A

gree

me

nt

for

Leas

e

AFT

Arg

yll F

ish

eri

es T

rust

A

GLV

Are

as o

f G

reat

Lan

dsc

ape

Val

ue

AH

C A

ctiv

e H

eave

Co

mp

ensa

tio

n

AIS

Au

tom

atic

Ide

nti

fica

tio

n S

yste

m

ALAR

P A

s Lo

w a

s R

eas

on

ably

Pra

ctic

able

AM

AA

An

cien

t M

on

um

en

ts &

Arc

hae

olo

gica

l Are

as A

ct

AO

D A

bo

ve O

rdn

ance

Dat

um

AR

4 Fo

rth

Ass

essm

ent

Rep

ort

AS

CO

BAN

S A

gree

men

t o

n t

he

Co

nse

rvat

ion

of

Smal

l Cet

ace

ans

of

the

Bal

tic,

No

rth

Ea

st A

tlan

tic,

Iris

h &

No

rth

Se

as

ASFB

Ass

oci

atio

n o

f Sa

lmo

n F

ish

erie

s B

oar

d

AST

Atl

anti

c Sa

lmo

n T

rust

AW

AC A

cou

stic

Wav

e an

d C

urr

en

t B

ADC

Bri

tish

Atm

osp

he

ric

Dat

a C

entr

e

BAP

Bio

div

ersi

ty A

ctio

n P

lan

B

AT B

est

Ava

ilab

le T

ech

niq

ue

B

ERR

Dep

artm

ent

of

Bu

sin

ess

, En

terp

rise

& R

egu

lato

ry R

efo

rm

BG

S B

riti

sh G

eo

logi

cal S

urv

ey

BO

CC

Bir

ds

of

Co

nse

rvat

ion

Co

nce

rn

BO

DC

Bri

tish

Oce

ano

grap

hic

Dat

a C

entr

e

BS

Bri

tish

Sta

nd

ard

B

SI B

riti

sh S

tan

dar

ds

Inst

itu

tio

n

CA

A C

ivil

Avi

atio

n A

uth

ori

ty

CEF

AS C

en

tre

for

Envi

ron

me

nt,

Fis

he

ries

& A

qu

acu

ltu

re S

cie

nce

C

FA C

lyd

e Fi

she

rmen

’s A

sso

ciat

ion

CD

Ch

art

Dat

um

C

IA C

um

ula

tive

Imp

act

Ass

ess

men

t C

IRIA

Co

nst

ruct

ion

Ind

ust

ry R

ese

arch

& In

form

atio

n A

sso

ciat

ion

C

MAC

S C

entr

e fo

r M

arin

e an

d C

oas

tal S

tud

ies

CM

S C

on

stru

ctio

n M

eth

od

Sta

tem

ent

CO

WR

IE C

olla

bo

rati

ve O

ffsh

ore

Win

d R

esea

rch

into

th

e En

viro

nm

en

t.

CPA

Co

ast

Pro

tect

ion

Act

C

PT C

ore

Pe

ne

trat

ion

Te

sts.

C

RM

Co

llisi

on

Ris

k M

od

ellin

g dB

Dec

ibel

D

BE

DEM

E B

lue

Ene

rgy

DD

V D

rop

Do

wn

Vid

eo

DEC

C D

epar

tmen

t o

f En

ergy

& C

limat

e C

han

ge

DEF

RA

De

par

tmen

t fo

r En

viro

nm

en

t, F

oo

d &

Ru

ral A

ffai

rs

DEM

E D

red

gin

g, E

nvi

ron

men

tal &

Mar

ine

Engi

nee

rin

g

DFO

Dis

tric

t Fi

she

ries

Off

ice

dGPS

Dif

fere

nti

ally

co

rrec

ted

GP

S D

OE

MD

Dep

artm

en

t o

f En

viro

nm

ent,

Mar

ine

Div

isio

n

DP

Dyn

amic

Po

siti

on

ing

DP

Dec

om

mis

sio

nin

g P

rogr

amm

e

DPM

E D

P M

arin

e En

ergy

D

SFB

Dis

tric

t Sa

lmo

n F

ish

erie

s B

oar

ds

EC E

uro

pea

n C

om

mis

sio

n

EcIA

Eco

logi

cal I

mp

act

Ass

ess

me

nt

EEC

Eu

rop

ean

Eco

no

mic

Co

mm

un

ity

EIA

Envi

ron

men

tal I

mp

act

Ass

essm

ent

EMEC

Eu

rop

ean

Mar

ine

Ener

gy C

entr

e

EMF

Elec

tro

Mag

ne

tic

Fiel

d

EMaP

En

viro

nm

en

tal M

anag

emen

t P

lan

EM

P En

viro

nm

en

tal M

on

ito

rin

g P

rogr

amm

e

ENVI

D E

nvi

ron

men

tal I

ssu

e Id

en

tifi

cati

on

EPS

Euro

pea

n P

rote

cted

Sp

ecie

s ER

CoP

Em

erge

ncy

Re

spo

nse

Co

op

erat

ion

Pla

n

ES E

nvi

ron

men

tal S

tate

men

t ES

AS E

uro

pea

n S

eab

ird

s at

Se

a

ETA

Esti

mat

ed

Tim

e o

f A

rriv

al

EU E

uro

pea

n U

nio

n

EUN

IS E

uro

pea

n N

atu

re In

form

atio

n S

yste

m

FAO

Fo

od

an

d A

gric

ult

ure

Org

anis

atio

n

FCS

Favo

ura

ble

Co

nse

rvat

ion

Sta

tus

FEPA

Fo

od

an

d E

nvi

ron

me

nt

Pro

tect

ion

Act

FL

O F

ish

eri

es L

iais

on

Off

icer

FR

EDS

Foru

m f

or

Re

ne

wab

le E

ner

gy D

eve

lop

men

t in

Sco

tlan

d

FRS

Fish

eri

es R

esea

rch

Se

rvic

es

FSA

Form

al S

afe

ty A

sses

smen

t FT

E Fu

ll Ti

me

Equ

ivile

nts

G

DP

Gro

ss D

om

esti

c P

rod

uct

G

HG

Gre

en

ho

use

Gas

Em

issi

on

s G

IS G

eo

grap

hic

al In

form

atio

n S

yste

ms

GPS

Glo

bal

Po

siti

on

ing

Syst

em

HAT

T H

ori

zon

tal A

xis

Turb

ine

H

LV H

eavy

Lif

t Sh

earl

eg V

ess

els

HIA

L H

igh

lan

ds

& Is

lan

ds

Air

po

rts

Ltd

H

IRA

Haz

ard

Iden

tifi

cati

on

& R

isk

Ass

essm

ent

HR

A H

abit

at R

egu

lati

on

s A

pp

rais

al

HS

His

tori

c Sc

otl

and

H

SE H

ealt

h a

nd

Saf

ety

Exe

cuti

ve

ICES

Inte

rnat

ion

al C

ou

nci

l fo

r th

e Ex

plo

rati

on

of

the

Sea

IC

OM

OS

Inte

rnat

ion

al C

ou

nci

l on

Mo

nu

men

ts a

nd

Sit

es.

IFA

Inst

itu

te f

or

Arc

hae

olo

gist

s IE

MA

Inst

itu

te o

f En

viro

nm

en

tal M

anag

emen

t IM

O In

tern

atio

nal

Mar

itim

e O

rgan

isat

ion

IP

CC

Inte

rgo

vern

me

nta

l Pa

nel

on

Clim

ate

Ch

ange

IS

A Im

med

iate

Stu

dy

Are

a

IUC

N In

tern

atio

nal

Un

ion

fo

r C

on

serv

atio

n o

f N

atu

re

JCP

Join

t C

eta

cean

Pro

toco

l JN

APC

Jo

int

Nau

tica

l Arc

hae

olo

gy P

olic

y C

om

mit

tee

. JN

CC

Join

t N

atu

re C

on

serv

atio

n C

om

mit

tee

kg

Kilo

gram

km

Kilo

me

tre

km

2 Sq

uar

e ki

lom

etre

K

m/h

Kilo

me

tre

per

ho

ur

kV K

ilovo

lts

LAT

Low

est

Ast

ron

om

ical

Tid

e

LBAP

Lo

cal B

iod

ive

rsit

y A

ctio

n P

lan

LC

A La

nd

scap

e C

har

acte

r A

sses

smen

t LD

P Lo

cal D

eve

lop

me

nt

Pla

n

LLA

Loca

l Lig

hth

ou

se A

uth

ori

ty

LSC

A La

nd

scap

e Se

asca

pe

Ch

arac

ter

Ass

essm

ent

LSE

Like

ly S

ign

ific

ant

Effe

ct

m M

etr

e

Mar

LIN

Mar

ine

Life

Info

rmat

ion

Net

wo

rk

MA

IB M

arin

e A

ccid

en

t In

vest

igat

ion

Bra

nch

M

ARPO

L In

tern

atio

nal

Co

nve

nti

on

fo

r th

e P

reve

nti

on

of

Po

lluti

on

fro

m S

hip

s M

S M

arin

e Sc

otl

and

M

BES

Mu

ltib

eam

Ech

o S

ou

nd

er

MC

A M

arit

ime

and

Co

astg

uar

d A

gen

cy

MC

S M

arin

e C

on

serv

atio

n S

oci

ety

MC

T M

arin

e C

urr

ent

Turb

ines

Lim

ited

M

ESH

Mar

ine

Euro

pea

n S

eab

ed

Hab

itat

s M

FA M

arin

e an

d F

ish

erie

s A

gen

cy

MG

N M

arin

e G

uid

ance

No

te

MH

WS

Mea

n H

igh

Wat

er S

pri

ngs

M

LWS

Me

an L

ow

Wat

er S

pri

ngs

M

LUR

I Mac

aula

y La

nd

Use

Re

sear

ch In

stit

ute

m

m M

illim

etre

MM

O M

arin

e M

anag

emen

t O

rgan

isat

ion

M

NC

R M

arin

e N

atu

re C

on

serv

atio

n R

evi

ew

MN

NS

Mar

ine

No

n N

ativ

e Sp

ecie

s M

oD M

inis

try

of

Def

en

ce

MP

Mem

be

r o

f P

arlia

men

t M

PA M

arin

e P

rote

cted

Are

a

MPS

Mar

ine

Po

licy

Stat

eme

nt

MS

Mar

ine

Sco

tla

nd

M

SFD

Mar

ine

Stra

tegy

Fra

mew

ork

Dir

ecti

ve

MSF

D M

arin

e St

rate

gy F

ram

ewo

rk D

irec

tive

M

SL M

ean

Se

a Le

vel

MSP

Mea

n S

pri

ng

Pe

ak

MSS

Mar

ine

Sco

tla

nd

Sci

ence

m

s M

etr

es

per

sec

on

d

MSW

Mu

lti S

ea

Win

ter

(ad

ult

sal

mo

n)

MW

Me

gaw

atts

N

ATS

Nat

ion

al A

ir T

raff

ic S

erv

ice

N

MR

S N

atio

nal

Mo

nu

men

ts R

eco

rds

of

Sco

tla

nd

N

BN

Nat

ion

al B

iod

iver

sity

Net

wo

rk

NC

I Nat

ure

Co

nse

rvat

ion

Imp

ort

ance

N

GR

Nat

ion

al G

rid

Ref

ere

nce

N

IEA

No

rth

ern

Irel

an

d E

nvi

ron

me

nt

Age

ncy

N

LB N

ort

her

n L

igh

tho

use

Bo

ard

N

m N

auti

cal m

iles

NPF

Nat

ion

al P

lan

nin

g Fr

amew

ork

N

SA N

atio

nal

Sce

nic

Are

a

NSR

A N

avig

atio

nal

Saf

ety

Ris

k A

sse

ssm

en

t O

CFA

Off

sho

re C

able

Fe

asib

ility

Ass

essm

ent

OSP

AR O

slo

& P

aris

Co

nve

nti

on

s fo

r th

e p

rote

ctio

n o

f th

e m

arin

e en

viro

nm

en

t O

REI

Off

sho

re R

ene

wab

le E

ne

rgy

Inst

alla

tio

n

OS

Ord

nan

ce S

urv

ey

PAD

Pro

toco

l fo

r A

rch

aeo

logi

cal D

isco

veri

es

PAM

Pa

ssiv

e A

cou

stic

Mo

nit

ori

ng

PAN

Pla

nn

ing

Ad

vice

No

te

PBR

Po

ten

tial

Bio

logi

cal R

emo

val

PEXA

Pra

ctic

e an

d E

xerc

ise

Are

a

PPG

Po

lluti

on

Pre

ven

tio

n G

uid

elin

es

PHA

Pre

limin

ary

Haz

ard

An

alys

is

PMF

Pri

ori

ty M

arin

e Fe

atu

re

PSD

Po

wer

Sp

ectr

al D

ensi

ty

RC

AHM

S R

oya

l Co

mm

issi

on

fo

r A

nci

en

t an

d H

isto

rica

l Mo

nu

men

ts f

or

Sco

tla

nd

R

eDAP

T R

elia

ble

Dat

a A

cqu

isit

ion

Pla

tfo

rm T

idal

R

ES R

ene

wab

le E

ne

rgy

Stra

tegy

R

EZ R

ene

wab

le E

ner

gy Z

on

e

RN

LI R

oya

l Nat

ion

al L

ife

bo

at In

stit

uti

on

R

OC

s R

ene

wab

les

Ob

ligat

ion

Cer

tifi

cate

s R

OS

Ren

ew

able

Ob

ligat

ion

Ord

er f

or

Sco

tlan

d

RO

V R

emo

tely

Op

era

ted

Veh

icle

R

OW

Re

ceiv

er

of

Wre

ck, w

reck

ad

min

istr

atio

n d

epar

tmen

t w

ith

in t

he

UK

Mar

itim

e C

oas

tgu

ard

Age

ncy

. R

PM R

evo

luti

on

s p

er M

inu

te

RSP

B R

oya

l So

ciet

y fo

r th

e P

rote

ctio

n o

f B

ird

s R

TP R

oge

r Ty

m a

nd

Pa

rtn

ers

RYA

Ro

yal Y

ach

tin

g A

sso

ciat

ion

SA

AR S

tan

dar

d A

nn

ual

Ave

rage

Rai

nfa

ll SA

C S

pec

ial A

rea

of

Co

nse

rvat

ion

SA

M S

ched

ule

d A

nci

en

t M

on

um

ent

SAM

S Sc

ott

ish

Ass

oci

atio

n f

or

Mar

ine

Scie

nce

SA

R S

ear

ch a

nd

Res

cue

SB

L Sc

ott

ish

Bio

div

ersi

ty L

ist

SCAN

S Sm

all C

etac

ean

Ab

un

dan

ce in

th

e N

ort

h S

ea

SC

ADA

Sup

ervi

sory

Co

ntr

ol a

nd

Dat

a A

cqu

isit

ion

SC

OS

Spec

ial C

om

mit

tee

on

Se

als

SEPA

Sco

ttis

h E

nvi

ron

me

nt

Pro

tect

ion

Age

ncy

SE

A St

rate

gic

Envi

ron

men

tal A

sses

smen

t

Page 7: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West

Isl

ay T

idal Energ

y P

ark

Envi

ronm

enta

l Sta

tem

ent

- -

ii

SFF

Sco

ttis

h F

ish

erm

en’s

Fe

de

rati

on

SH

EP (H

isto

ric

Sco

tlan

d’s

) Sc

ott

ish

His

tori

c E

nvi

ron

me

nt

Po

licy

SHET

L Sc

ott

ish

Hyd

ro E

lect

ric

Tran

smis

sio

n L

td

SHEP

D S

cott

ish

Hyd

ro E

lect

ric

Po

wer

Dis

trib

uti

on

Ltd

SI

FAG

Sco

ttis

h In

sho

re F

ish

erie

s an

d A

dvi

sory

Gro

up

SL

A Sc

enic

Lan

dsc

ape

Are

a

SLVI

A Se

asca

pe

& L

and

scap

e V

isu

al Im

pac

t A

sses

smen

t SM

A Se

al M

anag

emen

t A

rea

SM

RU

Se

al a

nd

Mam

mal

Res

ear

ch U

nit

SM

P Su

rvey

Mo

nit

ori

ng

Pla

n

SNH

Sco

ttis

h N

atu

ral H

erit

age

SN

MP

Sco

tlan

d’s

Nat

ion

al M

arin

e P

lan

SO

LAS

Inte

rnat

ion

al C

on

ven

tio

n f

or

the

Safe

ty o

f Li

fe a

t Se

a

SOS

Secr

etar

y o

f St

ate

SP

A Sp

ecia

l Pro

tect

ion

Are

a

SPG

Su

pp

lem

enta

ry P

lan

nin

g G

uid

ance

SP

L So

un

d P

ress

ure

Le

vel

SPP

Sco

ttis

h P

lan

nin

g P

olic

y SR

SL S

AM

S R

esea

rch

Se

rvic

es L

imit

ed

SS

A Se

ttin

g St

ud

y A

rea

SS

E Sc

ott

ish

an

d S

ou

the

rn E

ne

rgy

SSER

Sco

ttis

h a

nd

So

uth

ern

En

ergy

Re

new

able

s SS

SI S

pec

ial S

ite

of

Scie

nti

fic

Inte

rest

TC

E Th

e C

row

n E

stat

e

TAC

To

tal A

llow

able

Cat

ch

TEC

Tid

al E

ner

gy C

on

vert

er

TGL

Tid

al G

en

erat

ion

Lim

ite

d

THLS

Tri

nit

y H

ou

se L

igh

tho

use

Se

rvic

e

TOC

To

tal O

rgan

ic C

arb

on

TS

S Tu

rbin

e Su

pp

ort

Str

uct

ure

TS

S Tr

affi

c Se

par

atio

n S

chem

e

TTS

Tem

po

rary

Th

resh

old

Sh

ift

UK

Un

ited

Kin

gdo

m

UK

BAP

UK

Bio

div

ersi

ty A

ctio

n P

lan

U

KC

Un

der

Kee

l Cle

aran

ce

UK

HO

UK

Hyd

rogr

aph

ic O

ffic

e

UK

RES

UK

Re

new

able

En

ergy

Str

ate

gy

UN

CLO

S U

nit

ed

Nat

ion

s C

on

ven

tio

n o

f th

e La

w o

f th

e Se

a

UN

ESC

O U

nit

ed N

atio

ns

Edu

cati

on

al, S

cien

tifi

c &

Cu

ltu

ral O

rgan

isat

ion

. VA

TT V

erti

cal A

xis

Turb

ine

V

Vo

lts

VER

s V

alue

d E

colo

gica

l Rec

epto

rs

VHF

Ver

y H

igh

Fre

qu

en

cy

VP V

anta

ge P

oin

t VM

S V

esse

l Mo

nit

ori

ng

Syst

em

VTS

Ves

sel T

raff

ic S

erv

ice

s W

ANE

The

Wild

life

& N

atu

ral E

nvi

ron

men

t (S

cotl

and

) A

ct (

201

1)

WEW

S W

ater

En

viro

nm

en

t &

Wat

er S

erv

ice

s A

ct

WIT

EP W

est

Isla

y Ti

dal

En

ergy

Par

k W

GN

AS W

ork

ing

Gro

up

on

No

rth

Atl

anti

c Sa

lmo

n

WH

O W

orl

d H

ealt

h O

rgan

isat

ion

W

FD W

ater

Fra

mew

ork

Dir

ecti

ve

WSA

Wid

er

stu

dy

are

a

ZAV

Zon

e o

f A

ctu

al V

isib

ility

ZT

V Zo

ne

of

Theo

reti

cal V

isib

ility

Page 8: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

List of Tables: Number Title 1.1 Structure of Environmental Statement (Volume 2) 1.2 List of EIA Assessors 4.1 Project Design Criteria 4.2 Abridged Scoping Opinion 4.3 Responses to Cable Route Assessment Report 4.4 Key Stages of the EIA Process 4.5 Consequence of Impact 4.6 Definitions of Significance Rankings 4.7 Details of Projects Considered in Cumulative Impact Assessment 5.1 Co-ordinates of Proposed Development Area 5.2 Co-ordinates of Sub-sea Cable Route to Islay 5.3 Project Envelope Criteria 5.4 Depth and Spacing Parameters SeaGen S Mark 2 5.5 Depth and Spacing Parameters TGL 5.6 Foundation & Turbine Installation Vessel Options 6.1 Definition of the Shoreline Sensitivity to Erosion or Accretion 6.2 Definition of the Magnitude of Change 6.3 Criteria Matrix Used to Determine the Significance of Impacts from the

Turbine Array Area on the Physical Environment 6.4 Tidal Elevation (m) 6.5 Tidal Elevation (m) Extreme Water level Estimation at Tidal Site 6.6 Summary of Potential Impacts to the Shoreline Relating to Coastal

Processes 7.1 Summary of Legal Status of Species Occurring at the Project Site 7.2 Key Consultation Comments Relevant to Marine Mammals 7.3 Categories for Determining Sensitivity 7.4 Categories for Determining Magnitude 7.5 Matrix for Determining Consequence of Impact 7.6 Descriptions Used for Defining Overall Significance 7.7 Projects Relevant to Cumulative Impact Assessment for Marine Mammals 7.8 Project Parameters Relevant to Marine Mammals and Basking Sharks 7.9 A Summary of Species Considered Relevant for EIA, Based on Recorded

and Likely Occurrence at the Project 7.10 Species Considered in this EIA, According to Species Group 7.11 Summary of Potential Impacts to Marine Mammals and Basking Sharks 7.12 Zones of Influence of Noise on Marine Mammals (Richardson et al.,

1995). 7.13 Minimum Distance Between Potential Vessel Activities and the Nearest

Proposed Haul-out Sites within the West Highland Management Area 7.14 Summary of Estimated Annual Encounter Rates per Turbine Rotor for the

Most Commonly Encountered Marine Mammal Species at the Proposed Development Site

7.15 Estimated Annual Collision Levels for the Proposed Development, for Varying Assumed Avoidance Rates (see discussion for limitations in this

Page 9: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

Number Title method)

7.16 Projects Relevant to Cumulative Impact Assessment for Marine Mammals 7.17 Predicted collisions that are considered in consenting, relevant to PBR

thresholds (442 and 297 for harbour and grey seal, respectively). Note that these figures were not collected using a consistent methodology and so cannot be compared directly

7.18 Summary of Potential Impacts, Mitigation Measures and Overall Significance

8.1 Summary of stakeholder responses relevant to site benthic surveys. 8.2 Summary of previous studies & reviews in the vicinity of the proposed

Islay Tidal Energy Project. 8.3 Summary of site specific survey techniques employed 8.4 Criteria used for assigning magnitude scores to pressures. 8.5 Consequence of impacts 8.6 Rochdale envelope parameters defined for assessing impacts relating to

construction, operation and decommissioning of the tidal array and inter-array cables.

8.7 Biotopes assigned in and around the Tidal Site following analysis of the DDV images collected during subtidal survey work.

8.8 Receptor group found within the Site Survey Area of the Tidal Site 8.9 Summary of predicted pressures to be addressed in impact assessment

at the Tidal Site 8.10 Impact assessment summary of direct physical disturbance and

temporary substratum loss due to construction activities 8.11 Impact assessment summary of smothering (drill cutting release) 8.12 Impact assessment summary of introduction of MNNS 8.13 Impact assessment summary of long term substratum loss and

colonisation of introduced substratum 8.14 Impact assessment summary of decrease in water flow 8.15 Impact assessment summary of contamination 8.16 Impact assessment summary of potential facilitation of spread of MNNS 8.17 Summary of the Impact Assessment of the Tidal Site 8.18 Rochdale envelope parameters defined for assessing impacts relating to

construction, operation and decommissioning of the Western Export Cable Route

8.19 Subtidal biotopes identified along the Western Export Cable Route 8.20 Receptor Groups incorporating biotopes with similar biological and

physical characteristics considered in the EIA. 8.21 Summary of predicted pressures to be addressed in impact assessment

at the Western Export Cable Route 8.22 Impact assessment summary of direct physical disturbance 8.23 Impact assessment summary of increased suspended sediment and

deposition 8.24 Impact assessment summary of introduction of MNNS 8.25 Impact assessment summary of long term substratum loss and

recolonisation 8.26 Impact assessment summary of electromagnetic field effects 8.27 Impact assessment summary of facilitation of the spread of MNNS 8.28 Summary of the Impact Assessment of the Western Export Cable Route

Page 10: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

Number Title 9.1 Rochdale Envelope Parameters related to intertidal otter impacts 9.2 Summary of stakeholder responses relevant to intertidal otter

assessment 9.3 Approach to Identifying Sensitivity for Ecological Receptors 9.4 Criteria for Describing Magnitude (adapted from Percival 2007) 9.5 Criteria for Describing Reversibility of Effects 9.6 Consequence of Ecological Effects 9.7 9.8

Projects with Potential for Cumulative Impacts Summary of Potential Impacts on Otters

10.1 Technical Appendices Referenced by Ornithology Chapter 10.2 Summary of Rochdale Criteria Pertinent to Ornithological Assessment 10.3 Summary of Predicted Impacts, Mitigation and Residual Impacts 10.4 Key consultation comments relevant to birds 10.5 Species Vulnerability to Tidal Energy Converter Impacts Ordered by

Vulnerability Score. Based on Furness et al. 2012 10.6 Determining Factors for Nature Conservation Importance (NCI). 10.7 Criteria Used to Categorise Species Priority for EIA 10.8 Scales of Temporal Magnitude 10.9 Criteria for Assessing the Magnitude of Effects on Bird Populations 10.10 Criteria for Assessment of Sensitivity of Bird Populations 10.11 The Level of Significance of an Impact Resulting from each Combination

of Sensitivity and Magnitude 10.12 The estimated mean number of birds present in the development area

(DA) and development area buffered to 1 km (DA+1km) during the breeding season (see Appendix 3) compared to the assumed regional population. For fulmar, Manx shearwater and gannet the regional population is defined as south-west Scotland (Skye southwards) and Northern Ireland. For all other species the region is defined as Argyll & Bute and County Antrim. Population sizes are from Seabird 2000 census (Mitchell et al. 2004)

10.13 The estimated mean number of birds present in the development area (DA) and development area buffered to 1 km (DA+1km) during the autumn and winter compared to the assumed regional population. In the case of shag and black guillemot the regional population is assumed to be the same as the regional breeding population. For all other species the approximate regional autumn/winter population is derived from densities in Kober et al. 2010 multiplied by an area of 12,000 km2, the approximate seaward extent of NHZ14 and the coast of Northern Ireland.

10.14 Summary of EIA priority, Nature Conservation Importance (NCI) and status of bird species recorded in the development area during the breeding season

10.15 Summary of EIA priority, Nature Conservation Importance (NCI) and status of bird species recorded in the development area during the autumn and winter.

10.16 The potential for cumulative mortality impacts on regional populations of common guillemot and razorbill.

Page 11: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

Number Title 11.1 Technical Studies Referenced within the Natural Fish Chapter 11.2 EIA Chapters Relevant to the Natural Fish Chapter 11.3 Rochdale Envelope Parameters Relevant to the Natural Fish Chapter 11.4 PMFs Found Relative to the Tidal Site and Western Export Cable Route

During the Baseline Investigations and Surveys 11.5 Receptor Sensitivity Definitions used in the Assessment of Natural Fish

and Shellfish Resources 11.6 Impact Magnitude Definitions used in Assessment of Natural Fish and

Shellfish Resources 11.7 Summary of Assessed Potential Effects on Natural Fish and Shellfish

Species at the Tidal Site and Western Export Cable Route to Islay 12.1 Definition of Receptor Sensitivity 12.2 Definition of Magnitude of Impact 12.3 Assessment of Significance 12.4 Risk Matrix Description 12.5 Commercial Fisheries ‘Worst Case’ Scenario for the Islay Tidal Energy

Project 12.6 Details of Projects Considered for Cumulative Assessment 12.7 Summary of Assessed Potential Effects on Commercial Fisheries

Receptors for the Project, Construction Phase 12.8 Summary of Assessed Potential Effects on Commercial Fisheries

Receptors for the West Islay Tidal Project, Operational Phase 12.9 Summary of Assessed Cumulative Effects on Commercial Fisheries

Receptors for the Project, Construction Phase 12.10 Summary of Assessed Potential Effects on Commercial Fisheries

Receptors for the Project, Operational Phase 13.1 Cultural heritage asset impact description. 13.2 Rochdale principle realistic worst case 13.3 Definition of terms relating to the sensitivity to an effect. 13.4 Definition of magnitude of an effect upon receptors. 13.5 Criteria for assessment of sensitivity of a cultural heritage asset to

impacts on its setting. 13.6 Criteria for assessment of magnitude of an impact on the setting of a

cultural heritage asset. 13.7 The level of significance of an impact resulting from each combination of

sensitivity and magnitude. 13.8 NMRS records in the Immediate Study Area. 13.9 Anomalies with High Archaeological Potential in the Immediate Study

Area. 13.10 Anomalies with Medium Archaeological Potential in the Immediate Study

Area. 13.11 Assets Assessed for Setting Impacts. 13.12 13.13

Assets Assessed for Indirect Setting Impacts. Summary of Impacts

14.1 Rochdale Envelope Parameters for Shipping & Navigational Assessment 14.2 Summary of Commercial Shipping Scoping Responses (2009). 14.3 Gear Meshing Frequencies for SeaGen S

Page 12: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

Number Title 15.1 SLVIA Viewpoints 15.2 Landscape Sensitivity Criteria 15.3 Landscape Magnitude of Change Definitions 15.4 Visual Sensitivity Criteria 15.5 Visual Magnitude of Change Definitions 15.6 Assessment of Landscape Effects – Matrix 15.7 Assessment of Visual Effects - Matrix 15.8 Assessment of Visual Effects at Viewpoint 1 15.9 Assessment of Visual Effects at Viewpoint 2 15.10 Assessment of Visual Effects at Viewpoint 3 15.11 Assessment of Visual Effects at Viewpoint 4 15.12 Assessment of Visual Effects at Viewpoint 5 15.13 Assessment of Visual Effects at Viewpoint 6 15.14 Assessment of Visual Effects at Viewpoint 7 15.15 Effect upon the Rubha na Faing to Rinns Point SCU sub-type 15.16 Effect upon the Rubha na Faing to Machir Bay SCU sub-type 15.17 Effect upon the Lossit Bay SCU sub-type 15.18 Effect upon the Rinns Point to Port Charlotte SCU sub-type 15.19 Indirect Effect upon the Rocky Moorland LCT 15.20 Summary of Effects: Operational Phase 16.1 Ferries on the Kennacraig to Islay Service Operated by Caledonian

Macbrayne 17.1 Technical Studies 17.2 Evaluation of Impacts Criteria 17.3 Matrix of Sensitivity and Magnitude 17.4 Summary Impact on Tourism and Recreation Resources (Source:RTP

2012) 17.5 Summary of Tourism & Recreation Impacts and Residual Effects 18.1 Technical Studies 18.2 Evaluation of Impacts Criteria 18.3 Matrix of Sensitivity and Magnitude 18.4 Economic Benefits of Construction Scenario 18.5 Operation & Maintenance Economic Benefits by Scenario 18.6 Decommissioning Economic Benefits 18.7 Summary of Economic Benefits by Phase and Development Scenario 18.8 Cumulative Employment Impacts in Local and Wider Area 18.9 Summary of Potential Economic Impacts and Residual Effects 19.1 Noise Assessment Parameters 19.2 Measured noise levels between 90m and 140m away from a jack-up

barge with operating tugs and survey vessels in the vicinity 19.3 Predicted Installation Noise 21.1 Summary of Potential Impacts Before and After Adoption of Proposed

Mitigation

Page 13: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement ________________________________________________________________

i

List of Figures:

Number Title Location

1.1 Site location Volume 3

3.1 UK Tidal Areas Meeting Selection Criteria Volume 3 3.2 Alternative Connection Route and substation locations Volume 3 4.1 Overview of EIA & HRA Main Steps Embedded

4.2 Projects Considered in Cumulative Impact Assessment Volume 3

5.1 Landfall Options Considered Embedded

5.2 Proposed Grid Connection Cable Route - For Information Embedded

5.3 Site Location Volume 3 5.4 Development Area Volume 3 5.5 Representation of the SeaGen Device Embedded

5.6 Strangford Lough TEC Crossarm Raised for Maintenance Embedded

5.7 Dimensions of SeaGen S Mark 2 Volume 3

5.8 Central Tower Visible During Operation Embedded

5.9 Representation of TGL Turbine Embedded

5.10 Representation of TGL TEC Embedded

5.11 Deleted Deleted 5.12 Deleted Deleted 5.13a Typical 15 Turbine Array Layout Volume 3

5.13b Typical 30 Turbine Array Layout Volume 3

5.14 Quadrapod Foundation Illustrating Temporary Top Beams Embedded

5.15 TGL Tripod Foundation Embedded

5.16 Bluetec Floating Platform Embedded

5.17 Bluetec Mooring System Embedded

5.18 Bauer Renewables BSD3000 Seabed Drill Embedded

5.19 Subsea Hub Embedded

5.20 Typical Cross Section of Double Armoured Cable Embedded

5.21 Ballasting with Stone Bags in Situ Embedded

5.22 Rock Bags Being Lowered Embedded

5.23 Different Applications of Rock Bag Installations Embedded

5.24 Cast Iron Cable Casings Embedded

5.25 Plough for Shallow Waters & Intertidal Zone Embedded

5.26 Onshore Cable Trenching Embedded

5.27 Tidal Zone Cable Plough Trenching Embedded

5.28 Port Locations Volume 3

5.29 Raising Template Following Location of Pin Piles Embedded

5.30 Lowering Pins of Tripod into Pre-piles Embedded

Page 14: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement ________________________________________________________________

ii

Number Title Location

5.31 O&M Vessel Towing TGL Device Embedded

5.32 Installation Methodology TGL Embedded

5.33 Heavy Lift Shearleg Vessel – Rambiz Embedded

5.34 DP Jackup Vessel – Innovation Embedded

5.35 SeaGen S Raised Cross Arm for Maintenance Embedded

5.36 Bluetec Floating Platform Maintenance Embedded

5.37 Indicative Project Programme Embedded

6.1 Location of Video Camera Seabed survey Tracks Volume 3

6.2 Assessment Area Considered Volume 3

6.3 Location of amphidromic point near Islay Embedded

6.4 Current magnitude and vectors during spring ebb condition Embedded

6.5 Current magnitude and vectors during spring flood condition Embedded

6.6 Wave rose at the site (5539200N, 635700E) Embedded

7.1 Harbour seal haul-outs and at-sea density around the development site in the West Scotland (South) Seal Management Area.

Volume 3

7.2 Grey seal haul-outs and at sea density around the development area in the West Highland Management Area.

Volume 3

8.1 Locations of DDV sample stations at the Tidal site Volume 3

8.2 Locations of DDV, grab and epibenthic sample stations at the Western Cable Route

Volume 3

8.3 Biotopes present at the Tidal Site plotted onto UKSeaMap 2010 data

Volume 3

8.4 Biotopes present at the Tidal Site plotted onto Geophysical data Volume 3

8.5 Biotopes present on the Western Cable Route plotted onto UKSeaMap 2010 data

Volume 3

8.6 Biotopes present on the Western Cable Route plotted onto Geophysical survey data

Volume 3

9.1 Islay Intertidal Otter Survey Area Kintra landfall Volume 3

10.1 Site Location Volume 3

12.1 West Islay Tidal Project Commercial Fisheries Study Areas Volume 3

12.2 West Islay Tidal Project Salmon and Sea Trout Study Areas Volume 3

12.3 Landings Values by Species (Average 2006-2010) by in the National Study Area

Volume 3

12.4 Landings Values by Species (Average 2006-2010) in the Regional Study Area

Volume 3

12.5 Landings Values by Method (Average 2006-2010) in the Regional Study Area

Volume 3

12.6 Landings Values by Vessel Category (Average 2006-2010) in the Regional Study Area

Volume 3

12.7 Landings Values (Average 2006-2010) by Licensing Authority within the British Isles

Volume 3

12.8 Creel Grounds in the Vicinity of the Project Volume 3 12.9 King Scallop Landing Values (Average 2006 – 2010) in the

National Study Area Volume 3

12.10 Distribution of Scallop Grounds Based on VMS Data (>15m Volume 3

Page 15: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement ________________________________________________________________

iii

Number Title Location

vessels only) in the Islay Area, 2011

12.11 Scallop Grounds in the Vicinity of the Project Volume 3 12.12 Annual Reported Salmon, Grilse & Sea Trout Catch (Average no.

individuals, 2002-2011) by District in the Regional & Local Study Areas

Volume 3

12.13 Annual Reported Catch (Average no. individuals, 2002-2011) by Method & District in the Regional & Local Study Areas

Volume 3

12.14 Annual (average 2002 to 2011) Net Fisheries Catch by Region & Distribution of Fisheries in Scotland (2009)

Volume 3

13.1 Site Overview and Study Areas Volume 3

13.2 Geophysical Targets and Recorded Wrecks and Obstructions Volume 3

13.3 Headland archaeology setting Volume 3

15.1 Zone of Theoretical Visibility with viewpoint locations Volume 3

15.2a Viewpoint 1. View south west from Portnahaven (Queen St.) - wireframe

Volume 3

15.3a Viewpoint 2. View west from Port Wemyss - wireframe Volume 3

15.4a Viewpoint 3 View south from Local Road, Claddach - wireframe Volume 3

15.5a Viewpoint 4. View south west from A847 - wireframe Volume 3

15.6a Viewpoint 5 View south from Local Road, Ben Cladville - wireframe

Volume 3

15.7a Viewpoint 6. View south west from Lossit Bay - wireframe Volume 3

15.8a Viewpoint 7. View west from Americal Monument, Mull of Oa - wireframe

Volume 3

15.2b Viewpoint 1. View south west from Portnahaven (Queen St.) - Photomontage

Volume 3

15.3b Viewpoint 2. View west from Port Wemyss.) - Photomontage Volume 3

15.4b Viewpoint 3 View south from Local Road, Claddach.) - Photomontage

Volume 3

15.5b Viewpoint 4. View south west from A847.) - Photomontage Volume 3

15.6b Viewpoint 5 View south from Local Road, Ben Cladville.) - Photomontage

Volume 3

15.7b Viewpoint 6. View south west from Lossit Bay.) - Photomontage Volume 3

15.8b Viewpoint 7. View west from Americal Monument, Mull of Oa.) - Photomontage

Volume 3

15.9 Cumulative ZTV: 15km Volume 3

15.10a Viewpoint 1. View from Portnahaven (Queen St.) Cumulative Wireframe

Volume 3

15.10b Viewpoint 1. View from Portnahaven (Queen St.) Cumulative Wireframe

Volume 3

15.11a Viewpoint 3 View south from Local Road, Claddach Cumulative Wireframe

Volume 3

15.11b Viewpoint 3 View south from Local Road, Claddach Cumulative Wireframe

Volume 3

16.1 Potential locations for Turbine shipping Volume 3

17.1 Map of Argyll Embedded

Chart 17.1 Impact of local business prospects Embedded

Chart 17.2 Impact on Argyll and Bute tourism prospects Embedded

19.1 Schematic Showing Measurement and Modelling Interaction Embedded

Page 16: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement ________________________________________________________________

iv

Number Title Location

19.2 Drifting Ears Hydrophone Schematic and Photo of deployment Embedded

19.3 Tracks for Drifting Ears Hydrophones Embedded

19.4 Jack-up barges at Thorton Banks, Belgium Embedded

19.5 Rambiz HLV installing MCT SeaGen at Strangford Lough Embedded

19.6 North Sea Giant DP Vessel installing foundation Voith Turbine Embedded

19.7 Bauer Renewables BSD 3000 Seabed Drill Embedded

19.8 Power Spectral Density of a 50s Sample (blue) and averaged sample (red)

Embedded

19.9 Estimated Third Octave Levels (TOLs) of underwater noise for range of vessels fully underway in open waters.

Embedded

19.10 Typical time history of measured noise levels between 90 m and 140 m away from a jack-up barge with operating tugs and survey vessels in the vicinity.

Embedded

19.11 Frequency content of time history shown in Figure 19.9. Embedded

Page 17: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

- - i

List of Technical Appendices:

5.1 Fluids Tables - MCT

5.2 Materials Data Sheets - MCT

5.3 Materials Data Sheets – TGL

5.4 Fluids Tables - TGL

5.5 Rock Bag Specification

6.1 Metocean Tables

7.1 Baseline Report West Islay Tidal Energy Project

7.2 Baseline Condition Survey

7.3 Encounter Modelling

7.4 Acoustic Modelling Report 1 MCT

7.5 Acoustic Modelling Report 2 TGL

7.6 DP Energy Deal Telemetry Report

7.7 Summary of SMRU Seal Counts and Telemetry Tracks in the Islay Area

7.8 Baseline Noise Assessment SRSL

7.9 HRA Report

8.1 Islay Benthic Video Survey Report

8.2 Islay Tidal Benthic Baseline

10.1 Summary of Bird Surveys Technical Report.

10.2 HRA Ornithology Screening Report

11.1 DPE Natural Fish Baseline Report

12.1 DP Tidal Energy Comm Fish Baseline

12.2 DPE Salmon and Sea Trout Baseline

13.1 Archaeology - Baseline Report

14.1 Preliminary Hazard Analysis

15.1 SLVIA Baseline Report

17.1 SocioEconomic and Recreation and Amenity Baseline Report

17.2 Consultations and Issues Raised

18.1 Consultations and Issues Raised

Page 18: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

Chapter 21: Summary 1 June 2013

Page 19: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

Chapter 21: Summary 2 June 2013

21.0 Summary, Mitigation, Monitoring & Conclusions ................................. 3

21.1 Introduction .................................................................................. 3

21.2 Habitat Regulations Appraisal (HRA) ............................................... 3

21.3 Summary of Key High Level Mitigation and Best Practice Measures .. 4

21.4 Environmental Impact Assessment - Summary of Impacts ............... 4

21.5 Environmental Monitoring Plan (EMP) ........................................... 17

21.5.1 Introduction ............................................................................. 17

21.5.2 Proposed EMP .......................................................................... 17

21.6 Conclusion .................................................................................. 19

Page 20: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

Chapter 21: Summary 3 June 2013

21.0 Summary, Mitigation, Monitoring & Conclusions

21.1 Introduction DPME are submitting an application for consent to build and operate a 30MW tidal energy project, the West Islay Tidal Energy Park, off the south-west corner of Islay in Argyll and Bute in Scotland. The scope of application includes:

Tidal turbines;

Marshalling hub; Inter-array Cabling; and Export Cables to high water mark.

Excluded from the application are the following:

Onshore cabling (overhead or underground);

Sub-station and cable connection infrastructure; Sub-sea cable from Islay to Kintyre; and Service/monitoring Facilities.

The project, which is technology neutral, features a design envelope for the technology and turbine locations. The likely impacts of the Project have been identified in each chapter of the ES in relation to those key issues identified during the EIA process. As discussed in Chapter 2 – Legislative and Policy Context, the impact of the Project on the environment has been assessed against a set of baseline criteria. The significance criteria of the impacts are specific to each chapter and so defined individually therein. Impacts of a “Major” or “Major/Moderate” significance are considered to be “significant” in EIA terms.

21.2 Habitat Regulations Appraisal (HRA) In line with the requirements of the Conservation of Habitats and Species Regulations 2010, and the Conservation (Natural Habitats, &c.) Regulations 1994 (the Habitats Regulations) (‘the Habitat Regulations’), HRA was undertaken to evaluate the likely significant effects arising from the Project. This is provided in a separate report addressing Special Areas of Conservation for marine mammals, along with Special Protection Areas for birds (Technical Appendix 7.9). Based on the results presented in the report, for marine mammals it is concluded that there are no likely significant effects arising from the development, either alone, or in-combination with other plans or projects, and therefore appropriate assessment is not required.

Page 21: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

Chapter 21: Summary 4 June 2013

The HRA screening report (Appendix 10.2) concluded that there is no potential for the development to have a likely significant effect (LSE) on any qualifying ornithological feature at a Natura site. SNH advised that, through applying their screening criteria, there is potential for LSEs on breeding auk qualifying features (guillemot, razorbill and puffin) at six Natura sites. These potential LSEs will require to be examined in more detail through the process of Appropriate Assessment by the regulator. In the case of guillemot SNH advised that potential for LSE should be concluded for Ailsa Craig SPA, Canna and Sanday SPA, Mingulay and Berneray SPA, Rum SPA (all rated as low theoretical connectivity), North Colonsay and Western Cliffs SPA and Rathlin Island SPA (both rated as moderate theoretical connectivity). In the case of razorbill SNH advised that potential for LSE should be concluded for Rathlin Island SPA (rated as low/moderate theoretical connectivity). In the case of puffin SNH advised that potential for LSE should be concluded for Canna and Sanday SPA, Mingulay and Berneray SPA (both rated as low theoretical connectivity) and Rathlin Island SPA (rated as moderate theoretical connectivity).

21.3 Summary of Key High Level Mitigation and Best Practice Measures A number of key mitigation and best practice measures have been proposed throughout the ES spanning a number of receptors and/ or a number of different impacts. These are as follows: Development of an Environmental Management Plan (EMaP) to be agreed

with SNH and Marine Scotland, following submission of this ES. The EMaP will be a working document detailing the environmental actions highlighted in the ES, all activities to be carried out on site, responsibilities for those activities, environmental risks and the management protocols to be put in place to control these, as well as identification of personnel responsible for each element of the EMaP;

An Environmental Monitoring Programme (EMP), to be agreed with Marine Scotland (MS) and Scottish Natural Heritage (SNH);

A detailed Construction Method Statement (CMS) and a Pollution Control and Spillage Response Plan to be prepared and agreed with SEPA, SNH and MS-LOT prior to commencement of construction;

All work will be undertaken to an overarching Health, Safety and Environmental Management System (HSEMS), which will include the CMS, the PIRP and the EMaP. The project will be supervised in accordance with the Construction Design and Management Regulations (2007); and

Pollution Control and Spillage Response Plans to be developed and included in the EMaP;

21.4 Environmental Impact Assessment - Summary of Impacts

Page 22: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

Chapter 21: Summary 5 June 2013

The following information in Table 21.1 summarises the impact assessments carried out under each topic, mitigation measures proposed (where considered necessary) and the residual impact. The commitment to implement the proposed mitigation measures in association with recognised knowledge gaps will assist in informing the proposal to undertake environmental monitoring during construction and operation.

Page 23: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

W

est

Isl

ay T

idal Energ

y P

ark

Environm

enta

l Sta

tem

ent

Chapte

r 21:

Sum

mary

6

June 2

013

Table

21.1

: Sum

mary

of

Pote

ntial Im

pact

s Befo

re a

nd A

fter

Adoption o

f Pro

pose

d M

itig

ation

Ch

ap

ter

Po

ten

tia

l Im

pa

cts

S

ign

ific

an

ce

M

itig

ati

on

Me

asu

re

R

esid

ua

l Im

pa

cts

Bio

logic

al Environm

ent

7 -

Mam

mals

Inju

ry

and

dis

turb

ance

due

to

nois

e

and pre

sence

of

const

ruct

ion vess

els

and a

ctiv

itie

s

n/a

N

o m

itig

ation d

eem

ed n

ece

ssary

, although a

Marine M

am

mal O

bse

rver

(MM

O)

may b

e u

sed d

uring c

onst

ruct

ion a

ctiv

itie

s to

halt o

pera

tions

if

marine m

am

mals

(or

bask

ing s

hark

s) a

re o

bse

rved w

ithin

clo

se r

ange

of th

e c

onst

ruct

ion a

ctiv

itie

s.

Min

or

- in

signific

ant

6.1

.1.1

D

ispla

cem

ent

leadin

g

to

habitat

excl

usi

on a

nd b

arr

ier

effect

s

N

o m

itig

ation d

eem

ed n

ece

ssary

. N

eglig

ible

6.1

.1.2

Colli

sion w

ith o

pera

ting t

urb

ines

6.1

.1.3

N

o m

itig

ation is

deem

ed n

ece

ssary

. To t

he e

xte

nt

feasi

ble

at

this

site,

DPM

E c

om

mit t

o u

ndert

akin

g m

onitoring s

tudie

s to

ass

ess

the a

ctual

level of im

pact

arisi

ng f

rom

the W

est

Isl

ay T

idal Energ

y P

ark

.

Modera

te

6.1

.1.4

Colli

sion w

ith m

ain

tenance

vess

els

Appro

priate

m

itig

ation

measu

res

will

re

duce

th

e

risk

to

m

arine

mam

mals

fr

om

in

tera

ctio

n w

ith vess

els

or

pro

pelle

rs (incl

udin

g th

e

‘cork

scre

w’ se

al is

sue)

to a

n a

ccepta

ble

level

Min

or

6.1

.1.5

Ele

ctro

magnetic

Fie

lds

(EM

F)

N

o m

itig

ation d

eem

ed n

ece

ssary

. N

eglig

ible

6.1

.1.6

Acc

identa

l re

lease

of

conta

min

ants

No m

itig

ation d

eem

ed n

ece

ssary

. M

inor

6.1

.1.7

In

direct

im

pact

s of

changes

to

pre

y

reso

urc

e

N

o m

itig

ation d

eem

ed n

ece

ssary

. N

eglig

ible

8 –

Benth

ic E

colo

gy

Tid

al

Site

Const

ruct

ion (a

nd

deco

mm

issi

onin

g)

Direct

physi

cal

dis

turb

ance

and

tem

pora

ry s

ubst

ratu

m loss

N

ot

signific

ant

No m

itig

ation d

eem

ed n

ece

ssary

N

ot

signific

ant

Sm

oth

ering (

rele

ase

of drill

cutt

ings)

N

ot

signific

ant

No m

itig

ation d

eem

ed n

ece

ssary

N

ot

signific

ant

Intr

oduct

ion

of

Marine

Non

Native

Speci

es

Not

signific

ant

No m

itig

ation d

eem

ed n

ece

ssary

N

ot

signific

ant

Tid

al

Site

Opera

tional

Long

term

su

bst

ratu

m

loss

and

colo

nis

ation o

f in

troduce

d s

ubst

ratu

m

Not

signific

ant

No m

itig

ation d

eem

ed n

ece

ssary

N

ot

signific

ant

Decr

ease

in w

ate

r flow

N

ot

signific

ant

No m

itig

ation d

eem

ed n

ece

ssary

N

ot

signific

ant

Conta

min

ation

Not

signific

ant

No m

itig

ation d

eem

ed n

ece

ssary

N

ot

signific

ant

Pote

ntial

faci

litation of

the sp

read of

MN

NS

Not

signific

ant

No m

itig

ation d

eem

ed n

ece

ssary

N

ot

signific

ant

West

ern

Cable

route

Direct

physi

cal

dis

turb

ance

and

tem

pora

ry

subst

ratu

m

loss

on

all

Not

signific

ant

No m

itig

ation d

eem

ed n

ece

ssary

N

ot

signific

ant

Page 24: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

W

est

Isl

ay T

idal Energ

y P

ark

Environm

enta

l Sta

tem

ent

Chapte

r 21:

Sum

mary

7

June 2

013

Ch

ap

ter

Po

ten

tia

l Im

pa

cts

S

ign

ific

an

ce

M

itig

ati

on

Me

asu

re

R

esid

ua

l

Imp

acts

Const

ruct

ion

rece

pto

rs

Incr

ease

d

susp

ended

sedim

ent

and

deposi

tion o

n a

ll re

cepto

rs

Not

signific

ant

No m

itig

ation d

eem

ed n

ece

ssary

N

ot

signific

ant

Intr

oduct

ion

of

Marine

Non-N

ative

Speci

es

(MN

NS)

on a

ll re

cepto

r N

ot

signific

ant

No m

itig

ation d

eem

ed n

ece

ssary

N

ot

signific

ant

West

ern

Cable

route

Opera

tional

Long

term

su

bst

ratu

m

loss

and

colo

nis

ation o

f in

troduce

d s

ubst

ratu

m

Not

signific

ant

No m

itig

ation d

eem

ed n

ece

ssary

N

ot

signific

ant

Ele

ctro

magnetic

field

s on a

ll re

cepto

rs

Not

signific

ant

No m

itig

ation d

eem

ed n

ece

ssary

N

ot

signific

ant

Faci

litation

of

the

spre

ad

of

Marine

Non N

ative S

peci

es

Not

signific

ant

No m

itig

ation d

eem

ed n

ece

ssary

N

ot

signific

ant

9. O

tters

Const

ruct

ion (a

nd

deco

mm

issi

onin

g)

Dis

pla

cem

ent

and

loss

of

indiv

iduals

thro

ugh co

nst

ruct

ion nois

e,

vib

ration,

incr

ease

d tr

aff

ic or

beco

min

g tr

apped

in e

xca

vations.

Not

signific

ant

Best

pra

ctic

e w

ill b

e f

ollo

wed.

Not

signific

ant

Opera

tional

Dis

pla

cem

ent

thro

ugh

dis

turb

ance

cause

d

by

incr

ease

d

hum

an

act

ivity

during m

ain

tenance

act

ivitie

s.

Not

signific

ant

Best

pra

ctic

e w

ill b

e f

ollo

wed.

Not

signific

ant

10. Birds

Const

ruct

ion

Vess

el dis

turb

ance

of se

abirds

N

eglig

ible

si

gnific

ance

N

ot

required,

but

good p

ract

ice w

ill b

e f

or

pro

ject

vess

els

to s

tick

to

the d

efined r

oute

s and a

dopt

a v

olu

nta

ry s

peed lim

it o

f 15km

/hr.

N

eglig

ible

si

gnific

ance

Direct

habitat

loss

N

eglig

ible

signific

ance

None.

Neglig

ible

signific

ance

Opera

tional

Vess

el dis

turb

ance

of se

abirds

N

eglig

ible

signific

ance

Not

required,

but

good p

ract

ice w

ill b

e f

or

pro

ject

vess

els

to s

tick

to

the d

efined r

oute

s and a

dopt

a v

olu

nta

ry s

peed lim

it o

f 15km

/hr.

Neglig

ible

signific

ance

Seabird

dis

pla

cem

ent

from

, and

att

ract

ion t

o, m

arine h

abitats

N

eglig

ible

si

gnific

ance

Ensu

re t

hat

all

pote

ntial perc

hin

g loca

tions

are

safe

for

birds.

N

eglig

ible

si

gnific

ance

Colli

sion r

isk t

o d

ivin

g s

eabirds.

N

eglig

ible

signific

ance

Should

th

ere

be

evid

ence

of

colli

sion

mort

alit

y,

measu

res

will

be

consi

dere

d t

hat

aim

to p

revent

it o

ccurr

ing.

Neglig

ible

signific

ance

Marine p

ollu

tion a

nd c

onta

min

ation

Neglig

ible

signific

ance

Ensu

re t

hat

all

pote

ntial perc

hin

g loca

tions

are

safe

for

birds.

N

eglig

ible

signific

ance

Deco

mm

issi

onin

g

Vess

el dis

turb

ance

of se

abirds

N

eglig

ible

si

gnific

ance

N

ot

required,

but

good p

ract

ice w

ill b

e f

or

pro

ject

vess

els

to s

tick

to

the d

efined r

oute

s and a

dopt

a v

olu

nta

ry s

peed lim

it o

f 15km

/hr.

N

eglig

ible

si

gnific

ance

Habitat

rein

state

ment

Neglig

ible

signific

ance

Good p

ract

ice g

uid

ance

on h

abitat

rein

state

ment

pre

vaili

ng a

t th

e t

ime

will

be f

ollo

wed.

Neglig

ible

signific

ance

11 –

Natu

ral Fis

h

Page 25: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

W

est

Isl

ay T

idal Energ

y P

ark

Environm

enta

l Sta

tem

ent

Chapte

r 21:

Sum

mary

8

June 2

013

Ch

ap

ter

Po

ten

tia

l Im

pa

cts

S

ign

ific

an

ce

M

itig

ati

on

Me

asu

re

R

esid

ua

l

Imp

acts

Const

ruct

ion (a

nd

deco

mm

issi

onin

g)

Flu

id/c

onta

min

ation

rele

ase

fr

om

const

ruct

ion

and

deco

mm

issi

onin

g

act

ivitie

s.

Neglig

ible

N

o m

itig

ation d

eem

ed n

ece

ssary

. H

ow

ever,

a P

roje

ct E

nvironm

enta

l M

anagem

ent

Pla

n (P

EM

P)

will

put

in pla

ce to

pro

vid

e co

ntr

ols

fo

r

avoid

ance

or

clean-u

p o

f su

ch s

pill

s, a

long w

ith t

he p

rovis

ion o

f sp

ill

kits.

O

nly

ce

rtifie

d co

nst

ruct

ion te

chniq

ues

will

be use

d and re

gula

r m

ain

tenance

check

s w

ill b

e c

arr

ied o

ut

to p

revent

spill

s. I

n a

dditio

n,

low

toxic

ity h

ydra

ulic

oils

and l

ubrica

nts

will

be u

sed,

com

plia

nt

with

national

and i

nte

rnational

standard

s, w

hic

h a

re a

lso b

iodegra

dable

in

most

case

s.

Not

Sig

nific

ant

Lig

ht

Pollu

tion d

uring c

onst

ruct

ion a

nd

deco

mm

issi

onin

g a

ctiv

itie

s

Neglig

ible

W

here

pra

ctic

al

it

may

be

poss

ible

to

lim

it

lighting

to

the

levels

re

quired (i.e

., not

over

light)

although noting th

e need to

m

ain

tain

lighting levels

for

the s

afe

ty o

f th

e o

pera

tions

bein

g c

onduct

ed a

t th

e

tim

e.

Not

Sig

nific

ant

Nois

e

and

vib

ration

during

const

ruct

ion

and

deco

mm

issi

onin

g

act

ivitie

s

Neglig

ible

N

o m

itig

ation d

eem

ed n

ece

ssary

. N

ot

Sig

nific

ant

Incr

ease

in

su

spended

sedim

ents

during

const

ruct

ion

and

deco

mm

issi

onin

g a

ctiv

itie

s

Neglig

ible

N

o m

itig

ation d

eem

ed n

ece

ssary

. N

ot

Sig

nific

ant

Inst

alle

d

Life

(fro

m

Const

ruct

ion

thro

ugh

to

Deco

mm

issi

onin

g)

Flu

id/c

onta

min

ation

rele

ase

d

from

devic

es

during

inst

alla

tion,

opera

tion

and/o

r deco

mm

issi

onin

g

Neglig

ible

N

o

mitig

ation

deem

ed

nece

ssary

.

Although

it

is

note

d

that

the

desi

gners

are

sele

ctin

g l

ow

toxic

ity o

ils a

nd lubrica

nts

to n

ational and

inte

rnational st

andard

s, w

hic

h a

re a

lso b

iodegra

dable

in m

ost

case

s.

Not

Sig

nific

ant

Loss

of sp

aw

nin

g g

rounds

Neglig

ible

N

o m

itig

ation d

eem

ed n

ece

ssary

N

ot

Sig

nific

ant

Loss

of nurs

ery

gro

unds

Neglig

ible

N

o m

itig

ation d

eem

ed n

ece

ssary

N

ot

Sig

nific

ant

Rem

oval/altera

tion of

habitats

due to

pre

sence

of new

devic

es/

cable

s

Neglig

ible

N

o m

itig

ation d

eem

ed n

ece

ssary

N

ot

Sig

nific

ant

Anti-f

oulin

g c

om

pounds

Neglig

ible

Anti-f

oulin

g

pain

ts

meeting

reco

gnis

ed

inte

rnational

and

national

standard

s th

at

do not

require additio

nal

treatm

ent

during opera

tion

are

bein

g s

ele

cted a

t th

e d

esi

gn s

tage.

MIN

OR

-

Not

Sig

nific

ant

Barr

iers

to fis

h s

peci

es

movem

ent

Neglig

ible

N

o m

itig

ation d

eem

ed n

ece

ssary

N

ot

Sig

nific

ant

Page 26: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

W

est

Isl

ay T

idal Energ

y P

ark

Environm

enta

l Sta

tem

ent

Chapte

r 21:

Sum

mary

9

June 2

013

Ch

ap

ter

Po

ten

tia

l Im

pa

cts

S

ign

ific

an

ce

M

itig

ati

on

Me

asu

re

R

esid

ua

l

Imp

acts

Opera

tional

Colli

sion R

isk

Neglig

ible

N

o m

itig

ation d

eem

ed n

ece

ssary

N

ot

Sig

nific

ant

Opera

tional nois

e a

nd v

ibra

tion

Neglig

ible

N

o m

itig

ation d

eem

ed n

ece

ssary

N

ot

Sig

nific

ant

New

ele

ctro

magnetic

field

s in

troduce

d

to t

he T

idal Site

Neglig

ible

For

the d

evic

es,

tra

nsf

orm

er

and p

ow

er

conditio

nin

g e

quip

ment

have

been d

esi

gned i

nte

rnally

, hence

reduci

ng f

ield

eff

ect

s exte

rnal

to t

he

devic

e.

Extr

a h

eavy a

rmoure

d c

able

is

bein

g s

ele

cted f

or

the e

xport

cable

s,

whic

h

has

hig

her

levels

of

insu

lation

(com

pare

d

to

less

arm

oure

d c

able

).

Min

or

- N

ot

Sig

nific

ant

Changes

in t

idal flow

s N

eglig

ible

Consi

dering t

he s

mall

tota

l am

ount

of

energ

y t

aken o

ut

of

the e

xis

ting

extr

em

ely

energ

etic

conditio

ns,

the o

vera

ll co

nse

quence

of

impact

is

consi

dere

d n

eglig

ible

. N

o f

urt

her

managem

ent

act

ions

are

pro

pose

d,

noting t

hat

the d

evic

es

are

bein

g d

elib

era

tely

space

d (

see C

hapte

r 5

Pro

ject

D

esc

ription se

ctio

n 5.6

) w

hic

h ta

kes

acc

ount

of

flow

s and

pre

dic

ted w

ake e

ffect

s.

Neglig

ible

-

Not

Sig

nific

ant

Opera

tional lig

ht

pollu

tion

Neglig

ible

The lig

hting b

y n

atu

re is

desi

gned f

or

horizo

nta

l ill

um

ination,

with t

he

light

base

s als

o

pro

vid

ing

som

e

shie

ldin

g

again

st

dow

nw

ard

illum

ination

Min

or

- N

ot

Sig

nific

ant

Hum

an E

nvironm

ent

12 –

Com

merc

ial Fis

hin

g

Const

ruct

ion

Tem

pora

ry

Loss

of

Fis

hin

g

Gro

unds,

Cre

el Fis

hery

: W

est

ern

Cable

Route

Modera

te

Const

ruct

ion m

anagem

ent

pla

n ca

ble

burial/ro

ck pla

cem

ent,

sa

fety

zones,

Kin

gfish

er

Info

rmation S

yst

em

Min

or

Tem

pora

ry

Loss

of

Fis

hin

g

Gro

unds,

Loca

l Sca

llop

Fle

et:

W

est

ern

Cable

Route

Modera

te

Const

ruct

ion m

anagem

ent

pla

n ca

ble

burial/ro

ck pla

cem

ent,

sa

fety

zones,

Kin

gfish

er

Info

rmation S

yst

em

Min

or

Tem

pora

ry

Loss

of

Fis

hin

g

Gro

unds,

Vis

itin

g

and

Nom

adic

Sca

llop

Fle

et:

West

ern

Cable

Route

Min

or

Not

Required

Min

or

Safe

ty

Issu

es

For

Fis

hin

g

Vess

els

:

Tid

al Site

Bro

adly

Acc

epta

ble

N

ot

Required

Bro

adly

Acc

epta

ble

Safe

ty

Issu

es

For

Fis

hin

g

Vess

els

:

Inte

r arr

ay c

able

s

Tole

rable

w

ith

Additio

nal Contr

ols

See

Chapte

r 14:

Ship

pin

g

and

Navig

ation.

Cable

burial/ro

ck

pla

cem

ent,

safe

ty z

ones,

Kin

gfish

er

Info

rmation S

yst

em

Tole

rable

w

ith

Monitoring

Safe

ty

Issu

es

For

Fis

hin

g

Vess

els

: Tole

rable

w

ith

See

Chapte

r 14:

Ship

pin

g

and

Navig

ation.

Cable

burial/ro

ck

Tole

rable

w

ith

Page 27: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

W

est

Isl

ay T

idal Energ

y P

ark

Environm

enta

l Sta

tem

ent

Chapte

r 21:

Sum

mary

10

June 2

013

Ch

ap

ter

Po

ten

tia

l Im

pa

cts

S

ign

ific

an

ce

M

itig

ati

on

Me

asu

re

R

esid

ua

l

Imp

acts

West

ern

Cable

Route

Additio

nal Contr

ols

pla

cem

ent,

safe

ty z

ones,

Kin

gfish

er

Info

rmation S

yst

em

M

onitoring

Incr

ease

d S

team

ing T

imes:

Tid

al Site

Bro

adly

Acc

epta

ble

N

ot

Required

Bro

adly

Acc

epta

ble

Incr

ease

d

Ste

am

ing

Tim

es:

W

est

ern

Cable

Route

Tole

rable

w

ith

Additio

nal Contr

ols

See

Chapte

r 14:

Ship

pin

g

and

Navig

ation.

Cable

burial/ro

ck

pla

cem

ent,

safe

ty z

ones,

Kin

gfish

er

Info

rmation S

yst

em

Tole

rable

w

ith

Monitoring

Inte

rfere

nce

to F

ishin

g A

ctiv

ity:

Tow

ed

Gear

Bro

adly

Acc

epta

ble

N

ot

Required

Bro

adly

Acc

epta

ble

Inte

rfere

nce

to F

ishin

g A

ctiv

ity:

Sta

tic

Gear

Tole

rable

w

ith

Additio

nal Contr

ols

See C

hapte

r 14:

Ship

pin

g a

nd N

avig

ation.

Const

ruct

ion M

anagem

ent

Pla

n

Tole

rable

w

ith

Monitoring

Dis

pla

cem

ent

of

Fis

hin

g V

ess

els

, C

reel

Fis

hery

: W

est

ern

Cable

Route

Modera

te

Const

ruct

ion m

anagem

ent

pla

n ca

ble

burial/ro

ck pla

cem

ent,

sa

fety

zones,

Kin

gfish

er

Info

rmation S

yst

em

Min

or

Dis

pla

cem

ent

of

Fis

hin

g V

ess

els

, L

oca

l

Sca

llop F

leet:

West

ern

Cable

Route

M

odera

te

Const

ruct

ion m

anagem

ent

pla

n ca

ble

burial/ro

ck pla

cem

ent,

sa

fety

zones,

Kin

gfish

er

Info

rmation S

yst

em

Min

or

Dis

pla

cem

ent

of

Fis

hin

g

Vess

els

,

Vis

itin

g

and

Nom

adic

Sca

llop

Fle

et

West

ern

Cable

Route

Min

or

Not

Required

Min

or

Opera

tional

Perm

anent

Loss

of

Fis

hin

g

Gro

unds,

Cre

el Fis

hery

: W

est

ern

Cable

Route

M

odera

te

Cable

burial/ro

ck p

lace

ment,

Kin

gfish

er

Info

rmation S

yst

em

M

inor

Perm

anent

Loss

of

Fis

hin

g

Gro

unds,

Loca

l Sca

llop

Fle

et:

W

est

ern

Cable

Route

Modera

te

Cable

burial/ro

ck p

lace

ment,

Kin

gfish

er

Info

rmation S

yst

em

M

inor

Perm

anent

Loss

of

Fis

hin

g

Gro

unds,

Vis

itin

g

and

Nom

adic

Sca

llop

Fle

et:

West

ern

Cable

Route

Min

or

Not

Required

Min

or

Safe

ty I

ssues

For

Fis

hin

g V

ess

els

: Tid

al

Site

Bro

adly

Acc

epta

ble

N

ot

Required

Bro

adly

Acc

epta

ble

Page 28: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

W

est

Isl

ay T

idal Energ

y P

ark

Environm

enta

l Sta

tem

ent

Chapte

r 21:

Sum

mary

11

June 2

013

Ch

ap

ter

Po

ten

tia

l Im

pa

cts

S

ign

ific

an

ce

M

itig

ati

on

Me

asu

re

R

esid

ua

l

Imp

acts

Safe

ty

Issu

es

For

Fis

hin

g

Vess

els

:

Inte

r arr

ay c

able

s

Tole

rable

w

ith

Additio

nal Contr

ols

Cable

burial/ro

ck p

lace

ment,

Kin

gfish

er

Info

rmation S

yst

em

Tole

rable

w

ith

Monitoring

Safe

ty

Issu

es

For

Fis

hin

g

Vess

els

:

West

ern

Cable

Route

Tole

rable

w

ith

Additio

nal Contr

ols

Cable

burial/ro

ck p

lace

ment,

, K

ingfish

er

Info

rmation S

yst

em

Tole

rable

w

ith

Monitoring

Incr

ease

d S

team

ing T

imes:

Tid

al Site

Bro

adly

Acc

epta

ble

N

ot

Required

Bro

adly

Acc

epta

ble

Incr

ease

d

Ste

am

ing

Tim

es:

W

est

ern

Cable

Route

Tole

rable

w

ith

Additio

nal Contr

ols

Cable

burial/ro

ck p

lace

ment,

Kin

gfish

er

Info

rmation S

yst

em

Tole

rable

w

ith

Monitoring

Inte

rfere

nce

to F

ishin

g A

ctiv

ity:

Tow

ed

Gear

Bro

adly

Acc

epta

ble

N

ot

Required

Bro

adly

Acc

epta

ble

Inte

rfere

nce

to F

ishin

g A

ctiv

ity:

Sta

tic

Gear

Tole

rable

w

ith

Additio

nal Contr

ols

Opera

tional M

anagem

ent

Pla

n

Tole

rable

w

ith

Monitoring

Dis

pla

cem

ent

of

Fis

hin

g V

ess

els

, C

reel

Fis

hery

: W

est

ern

Cable

Route

M

odera

te

Cable

burial/ro

ck p

lace

ment,

Kin

gfish

er

Info

rmation S

yst

em

M

inor

Dis

pla

cem

ent

of

Fis

hin

g V

ess

els

, L

oca

l

Sca

llop F

leet:

West

ern

Cable

Route

Modera

te

Cable

burial/ro

ck p

lace

ment,

Kin

gfish

er

Info

rmation S

yst

em

M

inor

Dis

pla

cem

ent

of

Fis

hin

g

Vess

els

,

Vis

itin

g

and

Nom

adic

Sca

llop

Fle

et:

W

est

ern

Cable

Route

Min

or

Not

Required

Min

or

13 -

Arc

haeolo

gy

Const

ruct

ion

Direct

im

pact

on

arc

haeolo

gy

and

cultura

l herita

ge due to

in

stalla

tion of

infr

ast

ruct

ure

and c

ablin

g

Majo

r-

modera

te

signific

ance

Tem

pora

ry e

xcl

usi

on z

ones

will

be im

ple

mente

d a

nd infr

ast

ruct

ure

will

be m

icro

-sited t

o p

revent

invasi

ve a

ctiv

itie

s.

Writt

en S

chem

e o

f In

vest

igation (

WSI)

and P

roto

col fo

r Arc

haeolo

gic

al

Dis

coveries

(PAD

) w

ill

be

pre

pare

d

for

the

appro

val

of

His

toric

Sco

tland a

nd A

rgyll

and B

ute

Counci

l to

mitig

ate

const

ruct

ion e

ffect

s in

th

e

event

of

any

unexpect

ed

arc

haeolo

gic

al

dis

coveries

during

inst

alla

tion.

Neglig

ible

si

gnific

ance

Page 29: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

W

est

Isl

ay T

idal Energ

y P

ark

Environm

enta

l Sta

tem

ent

Chapte

r 21:

Sum

mary

12

June 2

013

Ch

ap

ter

Po

ten

tia

l Im

pa

cts

S

ign

ific

an

ce

M

itig

ati

on

Me

asu

re

R

esid

ua

l

Imp

acts

These

measu

res

will

form

part

of th

e C

EM

P

Indirect

im

pact

on

arc

haeolo

gy

and

cultura

l herita

ge

due

to

physi

cal

pro

cess

es

Neglig

ible

si

gnific

ance

W

ritt

en S

chem

e o

f In

vest

igation (

WSI)

and P

roto

col fo

r Arc

haeolo

gic

al

Dis

coveries

(PAD

) w

ill

be

pre

pare

d

for

the

appro

val

of

His

toric

Sco

tland a

nd A

rgyll

and B

ute

Counci

l to

mitig

ate

const

ruct

ion e

ffect

s in

th

e

event

of

any

unexpect

ed

arc

haeolo

gic

al

dis

coveries

during

inst

alla

tion.

Neglig

ible

si

gnific

ance

Opera

tional

Indirect

im

pact

on

se

ttin

g

of

arc

haeolo

gy a

nd c

ultura

l herita

ge s

ites

due t

o s

itin

g o

f in

frast

ruct

ure

Min

or

to N

eglig

ible

si

gnific

ance

N

one.

Min

or

to N

eglig

ible

si

gnific

ance

Indirect

im

pact

on

arc

haeolo

gy

and

cultura

l herita

ge

due

to

physi

cal

pro

cess

es

Neglig

ible

si

gnific

ance

W

ritt

en S

chem

e o

f In

vest

igation (

WSI)

and P

roto

col fo

r Arc

haeolo

gic

al

Dis

coveries

(PAD

) w

ill

be

pre

pare

d

for

the

appro

val

of

His

toric

Sco

tland a

nd A

rgyll

and B

ute

Counci

l to

mitig

ate

const

ruct

ion e

ffect

s in

th

e

event

of

any

unexpect

ed

arc

haeolo

gic

al

dis

coveries

during

inst

alla

tion

Neglig

ible

si

gnific

ance

Deco

mm

issi

onin

g

Direct

im

pact

on

arc

haeolo

gy

and

cultura

l herita

ge

due

to

rem

oval

of

infr

ast

ruct

ure

Neglig

ible

si

gnific

ance

Sam

e a

s co

nst

ruct

ion

Neglig

ible

si

gnific

ance

Indirect

im

pact

on

arc

haeolo

gy

and

cultura

l herita

ge

due

to

physi

cal

pro

cess

es

Neglig

ible

si

gnific

ance

Sam

e a

s co

nst

ruct

ion

Neglig

ible

si

gnific

ance

14 –

Ship

pin

g &

Navig

ation

Ris

ks

to

navig

ation

from

th

e

cable

layin

g

and

devic

e

inst

alla

tion

opera

tions

Tole

rable

w

ith

Additio

nal Contr

ols

Applic

ation of

risk

co

ntr

ols

as

are

id

entified in

th

e N

SRA (T

ech

nic

al

Appendix

14.1

) w

ith re

gard

to

pre

venting vess

els

fr

om

ente

ring th

e

pro

ject

are

a are

im

ple

mente

d

in ord

er

to ensu

re th

at

the risk

is

reduce

d

Tole

rable

w

ith

monitoring

The r

isk t

o n

avig

ation a

risi

ng f

rom

the

pro

pose

d

cleara

nce

depth

s over

the

roto

rs o

f th

e M

CT S

eaG

en a

nd A

lsto

m-

TG

L d

evic

es

Tole

rable

w

ith

Additio

nal Contr

ols

Applic

ation of

risk

co

ntr

ols

as

are

id

entified in

th

e N

SRA (T

ech

nic

al

Appendix

14.1

) w

ith re

gard

to

pre

venting vess

els

fr

om

ente

ring th

e

pro

ject

are

a are

im

ple

mente

d

in ord

er

to ensu

re th

at

the risk

is

reduce

d

Tole

rable

w

ith

monitoring

The r

isk f

rom

vess

els

drift

ing i

nto

the

site

is

consi

dere

d a

s su

ffic

iently low

as

to b

e c

onsi

dere

d

Tole

rable

w

ith

Additio

nal Contr

ols

Ris

k is

suffic

iently low

giv

en t

he v

ess

el tr

affic

levels

and t

he n

um

bers

of re

cord

ed inci

dents

fro

m R

NLI

and M

AIB

data

.

Bro

adly

Acc

epta

ble

The

develo

pm

ent

are

a

should

be

chart

ed

appro

priate

ly

as

a

“Marine

Lim

it

in

Genera

l,

imply

ing

physi

cal

obst

ruct

ions

Tole

rable

w

ith

Additio

nal Contr

ols

This

does

not

excl

ude

navig

ation

but,

alo

ng

with

appro

priate

annota

tion

show

ing

that

limitin

g

depth

s apply

(e

ither

again

st

the

indiv

idual

devic

es

or

as

a ch

art

note

), pro

vid

es

the m

ariner

with

adequate

info

rmation o

n t

he h

aza

rds

pre

sente

d b

y t

he p

roje

ct.

Bro

adly

Acc

epta

ble

Ris

k to

su

ch sm

all

vess

els

due to

th

e

Tole

rable

w

ith

Whils

t pela

gic

and d

em

ers

al fish

ing a

ctiv

itie

s do n

ot

take p

lace

in t

he

Tole

rable

w

ith

Page 30: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

W

est

Isl

ay T

idal Energ

y P

ark

Environm

enta

l Sta

tem

ent

Chapte

r 21:

Sum

mary

13

June 2

013

Ch

ap

ter

Po

ten

tia

l Im

pa

cts

S

ign

ific

an

ce

M

itig

ati

on

Me

asu

re

R

esid

ua

l

Imp

acts

pote

ntial

for

gear

enta

ngle

ment

when

reco

vering o

r la

yin

g s

tatic

gear

Additio

nal Contr

ols

are

a o

r its

imm

edia

te v

icin

ity, cr

eelin

g v

ess

els

do o

pera

te o

ff t

he R

inns

in t

he l

oca

l are

a.

This

would

require t

he i

mposi

tion o

f a “

No F

ishin

g”

are

a co

inci

dent

with th

e ch

art

ing of

the are

a as

a “M

arine Lim

it in

Genera

l co

nta

inin

g haza

rds”

is

im

pose

d fo

llow

ing co

nsu

ltation w

ith

loca

l fish

ing inte

rest

s and M

arine S

cotland

monitoring

The e

xport

cable

pre

sents

a h

aza

rd t

o

scallo

p d

redgin

g a

ctiv

itie

s betw

een t

he

site

and K

intr

a

Tole

rable

w

ith

Additio

nal Contr

ols

The c

able

route

is

chart

ed a

nd info

rmation o

n its

posi

tion p

rovid

ed t

o

Kin

gfish

er

Bro

adly

Acc

epta

ble

The

indiv

idual

devic

es/

sub

arr

ays

require

to

be

chart

ed

appro

priate

ly

subje

ct to

th

e lim

itations

of

the sc

ale

of

the

chart

and

the

need

to

avoid

co

ngest

ion o

f in

form

ation

Tole

rable

w

ith

Additio

nal Contr

ols

The indiv

idual devic

es/

sub a

rrays

are

chart

ed a

ppro

priate

ly s

ubje

ct t

o

the

limitations

of

the

scale

of

the

chart

and

the

need

to

avoid

congest

ion o

f in

form

ation

Bro

adly

Acc

epta

ble

The

sub-s

ea

devic

es

may

not

be

adequate

ly indic

ate

d b

y t

he lig

hting

Tole

rable

w

ith

Additio

nal Contr

ols

Where

the e

xte

nt

of

the s

ub-s

ea d

evic

es

is n

ot

adequate

ly i

ndic

ate

d

by th

e lig

hting and m

ark

ing applie

d to

any su

rface

devic

es

in th

e

arr

ay,

the a

rea s

hall

be m

ark

ed w

ith b

uoys

meeting t

he r

equirem

ents

of th

e I

ALA M

BS

Bro

adly

Acc

epta

ble

15 –

Landsc

ape &

Seasc

ape V

isual

Rec

epto

r

Cum

ula

tive S

LVIA

Rubha

na

Fain

g

to R

inns

Poin

t

Effect

s on

Seasc

ape

Chara

cter

Unit

Sub T

ypes

Not

signific

ant

Sig

nific

ant

cum

ula

tive e

ffect

s w

ould

be p

rim

arily

ass

oci

ate

d w

ith v

iew

s of

the p

ropose

d I

slay O

ffsh

ore

Win

d F

arm

. T

he p

ropose

d W

est

Isl

ay

Tid

al

Energ

y Pro

ject

w

ould

have very

lim

ited cu

mula

tive in

fluence

/

incr

em

enta

l eff

ect

.

Not

Sig

nific

ant

Rec

epto

r

Cum

ula

tive S

LVIA

Rubha

na

Fain

g

to M

ach

ir B

ay

Effect

s on

Seasc

ape

Chara

cter

Unit

Sub T

ypes

Not

signific

ant

The p

ropose

d W

est

Isl

ay T

idal

Energ

y P

roje

ct w

ould

have n

eglig

ible

in

crem

enta

l eff

ect

. N

ot

signific

ant

Loss

it B

ay

Effect

s on

Seasc

ape

Chara

cter

Unit

Sub T

ypes

Not

signific

ant

Sig

nific

ant

cum

ula

tive e

ffect

s w

ould

be p

rim

arily

ass

oci

ate

d w

ith v

iew

s

of

the p

ropose

d I

slay O

ffsh

ore

Win

d F

arm

. The p

ropose

d W

est

Isl

ay

Tid

al

Energ

y Pro

ject

w

ould

have very

lim

ited cu

mula

tive in

fluence

/

incr

em

enta

l eff

ect

.

Not

signific

ant

Kilc

hia

ran B

ay

Effect

s on

Seasc

ape

Chara

cter

Unit

Sub T

ypes

Not

signific

ant

The

pro

pose

d

West

Is

lay

Tid

al

Energ

y

Pro

ject

w

ould

have

no

incr

em

enta

l eff

ect

.

Not

signific

ant

Rin

ns

Poin

t to

Port

Charlott

e

Effect

s on

Seasc

ape

Chara

cter

Unit

Sub T

ypes

Not

signific

ant

The p

ropose

d W

est

Isl

ay T

idal

Energ

y P

roje

ct w

ould

have n

eglig

ible

in

crem

enta

l eff

ect

. N

ot

signific

ant

Rock

y

Moorland

Indirect

Effect

s on

Landsc

ape

Not

signific

ant

The p

ropose

d W

est

Isl

ay T

idal

Energ

y P

roje

ct w

ould

have n

eglig

ible

N

ot

signific

ant

Page 31: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

W

est

Isl

ay T

idal Energ

y P

ark

Environm

enta

l Sta

tem

ent

Chapte

r 21:

Sum

mary

14

June 2

013

Ch

ap

ter

Po

ten

tia

l Im

pa

cts

S

ign

ific

an

ce

M

itig

ati

on

Me

asu

re

R

esid

ua

l

Imp

acts

LCT

Chara

cter

Types

incr

em

enta

l eff

ect

.

Are

a

of

Panora

mic

Qualit

y

Indirect

Effect

s on

Landsc

ape

Desi

gnations

Not

Sig

nific

ant

Sig

nific

ant

cum

ula

tive e

ffect

s w

ould

be p

rim

arily

ass

oci

ate

d w

ith v

iew

s of

the p

ropose

d I

slay O

ffsh

ore

Win

d F

arm

. T

he p

ropose

d W

est

Isl

ay

Tid

al

Energ

y Pro

ject

w

ould

have very

lim

ited cu

mula

tive in

fluence

/

incr

em

enta

l eff

ect

.

Not

signific

ant

Port

nahaven

Vis

ual

Effect

s Experience

d

by

Resi

dents

within

Sett

lem

ents

Not

Sig

nific

ant

Sig

nific

ant

cum

ula

tive e

ffect

s w

ould

be p

rim

arily

ass

oci

ate

d w

ith v

iew

s

of

the p

ropose

d I

slay O

ffsh

ore

Win

d F

arm

. T

he p

ropose

d W

est

Isl

ay

Tid

al

Energ

y Pro

ject

w

ould

have very

lim

ited cu

mula

tive in

fluence

/

incr

em

enta

l eff

ect

.

Not

signific

ant

Port

Wem

yss

Vis

ual

Effect

s Experience

d

by

Resi

dents

within

Sett

lem

ents

N

ot

Sig

nific

ant

Sig

nific

ant

cum

ula

tive e

ffect

s w

ould

be p

rim

arily

ass

oci

ate

d w

ith v

iew

s of

the p

ropose

d I

slay O

ffsh

ore

Win

d F

arm

. T

he p

ropose

d W

est

Isl

ay

Tid

al

Energ

y Pro

ject

w

ould

have very

lim

ited cu

mula

tive in

fluence

/

incr

em

enta

l eff

ect

.

Not

signific

ant

Resi

dents

w

ithin

10km

in

cludin

g:

Win

dyedge,

Port

-

a-R

eid

hle

inn,

Poll

a

Chappuil,

Cla

ddach

,

Bro

okfield

, An

Sabia

l,

the

Old

Sch

ool

House

, Bally

meanach

,

and f

arm

steads

at

Cla

dvill

e

and

Loss

it

Vis

ual

Effect

s Experience

d

by

Resi

dents

within

Dis

pers

ed P

ropert

ies

Not

Sig

nific

ant

Sig

nific

ant

cum

ula

tive e

ffect

s w

ould

be p

rim

arily

ass

oci

ate

d w

ith v

iew

s

of

the p

ropose

d I

slay O

ffsh

ore

Win

d F

arm

. T

he p

ropose

d W

est

Isl

ay

Tid

al

Energ

y Pro

ject

w

ould

have very

lim

ited cu

mula

tive in

fluence

/

incr

em

enta

l eff

ect

.

Not

Sig

nific

ant

A847

Vis

ual Effect

s Experience

d b

y M

oto

rist

s and O

ther

Road U

sers

N

ot

Sig

nific

ant

Sig

nific

ant

cum

ula

tive

eff

ect

s fr

om

lo

calis

ed

sect

ions

of

the

route

w

ould

be

prim

arily

ass

oci

ate

d

with

vie

ws

of

the

pro

pose

d

Isla

y

Off

shore

Win

d F

arm

. T

he p

ropose

d W

est

Isl

ay T

idal

Energ

y P

roje

ct

would

have v

ery

lim

ited c

um

ula

tive influence

/ incr

em

enta

l effect

.

Not

Sig

nific

ant

Port

nahaven

to

Port

Charlott

e via

Kilc

hia

ran

Vis

ual Effect

s Experience

d b

y M

oto

rist

s

and O

ther

Road U

sers

Not

Sig

nific

ant

Sig

nific

ant

cum

ula

tive e

ffect

s w

ould

be p

rim

arily

ass

oci

ate

d w

ith v

iew

s

of

the p

ropose

d I

slay O

ffsh

ore

Win

d F

arm

. T

he p

ropose

d W

est

Isl

ay

Tid

al

Energ

y Pro

ject

w

ould

have very

lim

ited cu

mula

tive in

fluence

/

incr

em

enta

l eff

ect

.

Not

Sig

nific

ant

Min

or

road

to

Cla

ddach

Vis

ual Effect

s Experience

d b

y M

oto

rist

s and O

ther

Road U

sers

N

ot

Sig

nific

ant

Sig

nific

ant

cum

ula

tive e

ffect

s w

ould

be p

rim

arily

ass

oci

ate

d w

ith v

iew

s of

the p

ropose

d I

slay O

ffsh

ore

Win

d F

arm

. T

he p

ropose

d W

est

Isl

ay

Tid

al

Energ

y Pro

ject

w

ould

have very

lim

ited cu

mula

tive in

fluence

/

Not

Sig

nific

ant

Page 32: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

W

est

Isl

ay T

idal Energ

y P

ark

Environm

enta

l Sta

tem

ent

Chapte

r 21:

Sum

mary

15

June 2

013

Ch

ap

ter

Po

ten

tia

l Im

pa

cts

S

ign

ific

an

ce

M

itig

ati

on

Me

asu

re

R

esid

ua

l

Imp

acts

incr

em

enta

l eff

ect

.

Rec

epto

r

Cum

ula

tive S

LVIA

Pic

nic

site a

t Port

Wem

yss

Vis

ual

Effect

s Experience

d

by

Recr

eational Rece

pto

rs

Not

Sig

nific

ant

The

pro

pose

d

West

Is

lay

Tid

al

Energ

y

Pro

ject

w

ould

have

no

incr

em

enta

l eff

ect

.

Not

Sig

nific

ant

Core

Path

(Port

nahaven

to

Port

-a-R

eid

hle

inn)

Vis

ual

Effect

s Experience

d

by

Recr

eational Rece

pto

rs

Not

Sig

nific

ant

Sig

nific

ant

cum

ula

tive e

ffect

s w

ould

be p

rim

arily

ass

oci

ate

d w

ith v

iew

s

of

the p

ropose

d I

slay O

ffsh

ore

Win

d F

arm

. T

he p

ropose

d W

est

Isl

ay

Tid

al

Energ

y Pro

ject

w

ould

have very

lim

ited cu

mula

tive in

fluence

/

incr

em

enta

l eff

ect

.

Not

Sig

nific

ant

Core

Path

(Cla

ddach

)

Vis

ual

Effect

s Experience

d

by

Recr

eational Rece

pto

rs

Not

Sig

nific

ant

Sig

nific

ant

cum

ula

tive e

ffect

s w

ould

be p

rim

arily

ass

oci

ate

d w

ith v

iew

s

of

the p

ropose

d I

slay O

ffsh

ore

Win

d F

arm

. T

he p

ropose

d W

est

Isl

ay

Tid

al

Energ

y Pro

ject

w

ould

have very

lim

ited cu

mula

tive in

fluence

/

incr

em

enta

l eff

ect

.

Not

Sig

nific

ant

Core

Path

(Port

nahaven

to

Oct

ofa

d)

Vis

ual

Effect

s Experience

d

by

Recr

eational Rece

pto

rs

Not

Sig

nific

ant

Sig

nific

ant

cum

ula

tive e

ffect

s w

ould

be p

rim

arily

ass

oci

ate

d w

ith v

iew

s

of

the p

ropose

d I

slay O

ffsh

ore

Win

d F

arm

. T

he p

ropose

d W

est

Isl

ay

Tid

al

Energ

y Pro

ject

w

ould

have very

lim

ited cu

mula

tive in

fluence

/

incr

em

enta

l eff

ect

.

Not

Sig

nific

ant

Sum

mit

of

Ben

Cla

dvill

e

Vis

ual

Effect

s Experience

d

by

Recr

eational Rece

pto

rs

Not

Sig

nific

ant

The p

ropose

d W

est

Isl

ay T

idal

Energ

y P

roje

ct w

ould

have n

eglig

ible

cum

ula

tive e

ffect

.

Not

Sig

nific

ant

Beach

at

Loss

it

Bay

Vis

ual

Effect

s Experience

d

by

Recr

eational Rece

pto

rs

Not

Sig

nific

ant

Sig

nific

ant

cum

ula

tive e

ffect

s w

ould

be p

rim

arily

ass

oci

ate

d w

ith v

iew

s

of

the p

ropose

d I

slay O

ffsh

ore

Win

d F

arm

. T

he p

ropose

d W

est

Isl

ay

Tid

al

Energ

y Pro

ject

w

ould

have very

lim

ited cu

mula

tive in

fluence

/

incr

em

enta

l eff

ect

.

Not

Sig

nific

ant

Sum

mit

of

Bein

n

Tart

a’ M

hill

Vis

ual

Effect

s Experience

d

by

Recr

eational Rece

pto

rs

Not

Sig

nific

ant

The p

ropose

d W

est

Isl

ay T

idal

Energ

y P

roje

ct w

ould

have n

eglig

ible

cu

mula

tive e

ffect

. N

ot

Sig

nific

ant

Cultoon

Sto

ne

Circl

e

Vis

ual

Effect

s Experience

d

by

Recr

eational Rece

pto

rs

Not

Sig

nific

ant

The p

ropose

d W

est

Isl

ay T

idal

Energ

y P

roje

ct w

ould

have n

eglig

ible

cum

ula

tive e

ffect

.

Not

Sig

nific

ant

Rec

epto

r

Cum

ula

tive S

LVIA

The

Geara

ch

hunting e

state

Vis

ual

Effect

s Experience

d

by

Recr

eational Rece

pto

rs

Not

Sig

nific

ant

The p

ropose

d W

est

Isl

ay T

idal

Energ

y P

roje

ct w

ould

have n

eglig

ible

cum

ula

tive e

ffect

.

Not

Sig

nific

ant

Core

Path

(Kilc

hia

ran

to

Mach

ir B

ay)

Vis

ual

Effect

s Experience

d

by

Recr

eational Rece

pto

rs

Not

Sig

nific

ant

The p

ropose

d W

est

Isl

ay T

idal

Energ

y P

roje

ct w

ould

have n

eglig

ible

cum

ula

tive e

ffect

.

Not

Sig

nific

ant

Boat

trip

s fr

om

Port

Elle

n t

o L

och

In

daal

Vis

ual

Effect

s Experience

d

by

Recr

eational Rece

pto

rs

Not

Sig

nific

ant

Not

Sig

nific

ant

Not

Sig

nific

ant

Page 33: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

W

est

Isl

ay T

idal Energ

y P

ark

Environm

enta

l Sta

tem

ent

Chapte

r 21:

Sum

mary

16

June 2

013

Ch

ap

ter

Po

ten

tia

l Im

pa

cts

S

ign

ific

an

ce

M

itig

ati

on

Me

asu

re

R

esid

ua

l

Imp

acts

Saili

ng a

nd f

ishin

g

vess

els

fr

om

Port

nahaven

and

Port

Wem

yss

Vis

ual

Effect

s Experience

d

by

Recr

eational Rece

pto

rs

Not

Sig

nific

ant

Sig

nific

ant

cum

ula

tive e

ffect

s w

ould

be p

rim

arily

ass

oci

ate

d w

ith v

iew

s of

the p

ropose

d I

slay O

ffsh

ore

Win

d F

arm

. The p

ropose

d W

est

Isl

ay

Tid

al

Energ

y

Pro

ject

w

ould

ty

pic

ally

have

very

lim

ited

cum

ula

tive

influence

/ incr

em

enta

l eff

ect

on t

he v

iew

experience

d b

y p

ass

engers

at

dis

tance

s of appro

xim

ate

ly 2

km

or

more

fro

m t

he p

ropose

d T

ECs.

Not

Sig

nific

ant

Am

erica

n

Monum

ent,

M

ull

of O

a

Vis

ual

Effect

s Experience

d

by

Recr

eational Rece

pto

rs

Not

Sig

nific

ant

The p

ropose

d W

est

Isl

ay T

idal

Energ

y P

roje

ct w

ould

have n

eglig

ible

cum

ula

tive e

ffect

.

Not

Sig

nific

ant

16

– T

raff

ic &

Tra

nsp

ort

. N

o m

ajo

r onsh

ore

vehic

le m

ovem

ent

ass

oci

ate

d w

ith t

he p

roje

ct. O

ffsh

ore

vess

el im

pact

s co

vere

d u

nder

chapte

r 12 a

nd 1

4 a

bove.

17 –

Recr

eation a

nd A

menity

Tourism

& R

ecr

eation V

isual Im

pact

s

Min

or

Where

appro

priate

w

ork

s w

ill

be

pro

gra

mm

ed

to

avoid

peak

tourist

ro

ute

s at

peak

vis

itor

tim

es

to

min

imis

e

pote

ntial

congest

ion a

nd/o

r dis

ruption.

Tem

pora

ry in

terr

uption of

recr

eation ro

ute

s during ca

ble

ro

ute

const

ruct

ion (

where

applic

able

) w

ill b

e c

are

fully

managed a

nd a

ny

div

ers

ions

clearly s

ign-p

ost

ed.

During t

he t

em

pora

ry c

able

route

work

s, s

creenin

g m

easu

res

may

be i

mple

mente

d t

o r

educe

im

pact

s on p

ass

ing r

ecr

eational

use

rs

or

from

recr

eational fo

cal poin

ts

Min

or

Tourism

Acc

om

modation I

mpact

s

18 S

oci

o-e

conom

ic

Const

ruct

ion

2-3

Full

Tim

e E

quiv

ale

nt

Jobs

Min

or

Soci

o-e

conom

ic m

itig

ation w

ould

only

apply

as

a r

esu

lt o

f th

ere

bein

g

a

num

ber

of

national,

regio

nal

and

loca

l in

itia

tives

involv

ing

the

Sco

ttis

h G

overn

ment,

re

gio

nal

and lo

cal

develo

pm

ent

agenci

es

with

the a

im o

f pro

vid

ing e

nhance

d s

kill

s tr

ain

ing,

supply

chain

pro

vis

ion,

and s

upport

for

busi

ness

im

pro

vem

ent

work

ing in t

he o

ffsh

ore

marine

devic

es

indust

ry,

in t

he W

est

of

Sco

tland.

These

will

not

act

to r

educe

negative im

pact

s, as

no su

ch im

pact

s have been id

entified in

th

e

ass

ess

ment.

H

ow

ever,

they w

ould

ass

ist

in r

ealis

ing a

nd m

axim

isin

g

the

opport

unitie

s in

th

e

study

are

a

and

where

appro

priate

th

e

applic

ants

will

support

these

initia

tives

Min

or

Opera

tion

&

main

tenance

2-5

Full

Tim

e E

quiv

ale

nt

Jobs

Min

or

Min

or

Deco

mm

issi

onin

g

13 F

ull

Tim

e E

quiv

ale

nt

Jobs

Modera

te

Modera

te

19

-

No

ise –

Pote

ntial im

pact

s addre

ssed in c

hapte

r 7 –

Marine M

am

mals

& C

hapte

r 11 N

atu

ral Fis

h

20

– E

MF -

– P

ote

ntial im

pact

s addre

ssed in c

hapte

r 7 –

Marine M

am

mals

& C

hapte

r 11 N

atu

ral Fis

h

Page 34: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

Chapter 21: Summary 17 June 2013

21.5 Environmental Monitoring Programme (EMP)

21.5.1 Introduction Currently there are no arrays of tidal turbines operating anywhere in the world as tidal energy devices are an emerging technology, with limited operational developments upon which to base aspects of assessment. Where devices have been operating and potential environmental interactions have been monitored, the results to date indicate no significant adverse environmental impacts (Strangford Lough for example). However, it is appreciated that the potential interactions of an array of devices is to some extent unknown, and assessments must be necessarily based on data for single devices from expert judgement based on knowledge of potential receptors and current understanding of the potential effects of single devices extrapolated to encompass an array. In the rapidly developing tidal energy sector, research and environmental monitoring works are either on-going, or planned, at a number of locations in the UK and internationally. In this evolving climate, there is no significant benefit to proposing detailed monitoring plans, the details and premise of which may require considerable revision in the light of new knowledge expected post consent. The knowledge gained from environmental monitoring at tidal array sites will have some elements which are specific to individual sites, elements which are specific to individual technologies, however, much of the data collected will be widely applicable to, and of benefit to, developers in the wider tidal energy sector. It would be perverse, therefore, for the burden of such monitoring to fall solely on the handful of developers who have well developed technology and sites, while benefits from that monitoring are available to other, less pioneering developers. For this reason, national government support for aspects of environmental monitoring at early tidal sites is essential if the burden of knowledge collection is to be fairly shared. An Environmental Monitoring Programme (EMP) will be developed through discussion with the regulatory authorities to ensure that the purpose of the monitoring is agreed; that objectives are set according to consensus on the ability to detect change attributable to the development; and that this is considered according to a reasonable cost / scale of studies, proportionate to the level of risk identified. This will be programme defined over an appropriate timescale, with defined reporting intervals.

21.5.2 Proposed EMP Based on the findings of the EIA Chapters which are summarised in table 21.1 above, marine mammals and basking sharks and birds have been identified as possibly requiring further monitoring to better understand the potential impacts of the array of devices and to confirm the assumptions made in determining the level of potential impact to be attributed.

Page 35: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

Chapter 21: Summary 18 June 2013

21.5.2.1 Marine Mammals

DPME propose to undertake detailed statistical analysis based on the occurrence of species at the site and the scale of change anticipated, to determine feasible monitoring strategies at the site. Noting that the site is an open ocean location, with low densities of marine mammal species and basking sharks, it will be relevant to consider the feasibility, and associated cost of detecting changes attributable to the development. The results of this study will then need to be discussed relative to the anticipated risks at the site to determine the precise scope of the on-going monitoring strategy. The development of an environmental monitoring programme for the West Islay Tidal Energy Park will most likely be undertaken by SRSL who propose to use the latest information gathered from the baseline studies in high energy locations combined with lessons from other marine industries to design an environmental monitoring framework that can be applied to across the tidal-stream sector. The approach will involve a thorough, scientific design phase, to consider the specific tools required for monitoring impacts to marine mammals (and other receptors), including existing techniques and development of new techniques. The statistical power needed to detect change at the project site will be closely investigated, to ensure that experimental design is effective and cost-efficient. This will address the development of EMPs that can assess with a known degree of certainty levels of impact to marine mammals and whether re-design, mitigation or site adjustment are required / effective. DPME recognise that monitoring of effects from tidal arrays is challenging and complex, considering the scale of impacts ranging from impacts upon individuals at the array site, and population level effects. For the regulator to accurately determine and assign effects at a project and sector level, and considering the commitments to do so through strategic assessment, etc, DPME support discussion on where collaborative effort may be initiated, so that collective resources are used efficiently. This would ensure cost-effective gains in evidence of impacts to support development of the sector. For example, resources may be contributed to large scale population level studies such as improving the annual haul-out studies currently undertaken by SMRU. Additionally, certain project locations will be more amenable (more likely to demonstrate effects at reasonable cost) than others where it may be impossible to do so. Experience at Strangford Lough is helpful in demonstrating the level of investment and study required to provide evidence of effects occurring, and considering this relative to an open ocean tidal system will be relevant to determining likely costs and feasibility. In this regard, it may be considered appropriate for developers to share costs of undertaking monitoring at particular sites which are comparable to the proposed project.

Page 36: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

Chapter 21: Summary 19 June 2013

21.5.2.3 Birds

None of the Project’s potential effects on birds are deemed to be of more than minor significance, however, current good practice suggests that an appropriately detailed monitoring programme be agreed and implemented. The two-year bird survey programme was designed to give data that would form a suitable baseline against which to compare future monitoring data. Collection of boat-based survey data using the same method during the installation and operational phases would potentially provide a means to measure the extent of any seabird displacement response to the development. Future monitoring should focus on the species rated as having or medium EIA priority (guillemot and razorbill, no species merited a rating of high priority) and SPA qualifying species for which potential LSE has been identified (guillemot, razorbill and puffin). Nevertheless, monitoring should only be embarked upon if it can be shown (for example by a statistical power analysis) that there is a realistic possibility of showing a significant displacement effect, something that may be unlikely given the generally low encounter rates of auk species during the baseline surveys. The surveys noted above should be conducted during installation and in years 1 to 3, 5 and 10 of the Project’s 25 year operation period. However, flexibility will be retained to cancel this monitoring programme if it is clear that useful information is not being collected. Monitoring the response of diving auks to turbine rotors and provide data on collision risk would also be desirable. However, at this stage it is not clear how this may be practically achieved. The exposed offshore location of the Project means that compared to some other tidal energy developments (e.g., Sound of Islay Demonstration project and MCT Strangford Lough project) this development is a naturally poor candidate for research aimed at better understanding the collision risks posed to diving birds by TECs.

21.6 Conclusion The Environmental Impact Assessment (EIA) has been carried out by DPME in accordance with relevant EU, UK and Scottish regulations and has robustly assessed the potential environmental impacts of the proposed Project. The EIA has assessed the worst-case scenario that would have the greatest effect on the environment. This approach results in a maximum impact assessment, giving security and confidence to the consenting authorities that the environmental impact will be no greater than that which is set out within the Environmental Statement and in fact may be considerably less. The initial array will provide information on the interactions between the array and the environment, increasing the knowledge for the remaining phases of the Project and the tidal stream industry as a whole.

Page 37: West Islay Tidal Energy Park Environmental Statementmarine.gov.scot/datafiles/lot/DP_ME/Environmental... · 2016-10-20 · West Islay Tidal Energy Park Environmental Statement _____

West Islay Tidal Energy Park Environmental Statement

Chapter 21: Summary 20 June 2013

The West Islay Tidal Energy Park represents an important development step for tidal stream technology in terms of the scale of development and in the transition from prototype technology to full development. The development of marine renewables is a key objective for Scotland and the Project represents a key part of the Scottish and UK renewable energy strategies.