western area manager, labor relations ( ) so. west …...n som2 n som3 s 4 som4 n 5 som 5 sub-total...

99
MANAGER, LABOR RELATIONS Pacific Area August 23, 2011 Omar Gonzalez Western Regional Coordinator, APWU 1350 Old Bayshore HWY. Suite 360 Burlingame, CA 94010 ro?Jx(PSCifiC Area Local(s} ( ) Western Area Loca/(s; ( ) So. West Area Local(s; Ing [ ] This is to advise you of the intent of the San Diego District to utilize the provisions of Article 12.5.C.5 of the National Agreement to involuntarily reassign four (4) full-time maintenance craft employees from the craft and/or installation at four (4) separate offices based on current staffing and scheduling requirements. The specifics as to the offices and position titles are set forth below. IMPACT EVENT # OFFICE POSITION TITLE NUMBER Apple Building Maintenance 22001 Valley Custodian 1 Building Maintenance 22021 Barstow Custodian 1 Building Maintenance 25144 Hesperia Custodian 1 Palm 29057 Springs Laborer Custodial 1 TOTAL 4 The impacted employees will be notified of their involuntary reaSSignments by separate letter. It may also be necessary to detail some or all of the impacted employees until the excessing can be completed. By copy of this notice, we are authorizing the withholding of four (4) residual assignments in the custodial and/or mail handler crafts for placement of the impacted employees. Attached is a copy of the impact statement along with a copy of the operational data supporting the need to excess, a list of the sites where withholding is being authorized and the list of impacted employees. Please add this impact statement to the agenda for our next meeting. Manager, Labor Relations Attachments

Upload: others

Post on 01-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

MANAGER, LABOR RELATIONS

Pacific Area

August 23, 2011

Omar Gonzalez Western Regional Coordinator, APWU 1350 Old Bayshore HWY. Suite 360 Burlingame, CA 94010

ro?Jx(PSCifiC Area Local(s} ~ ( ) Western Area Loca/(s; ( ) So. West Area Local(s;

Ing [ ] Comm~l1ts

This is to advise you of the intent of the San Diego District to utilize the provisions of Article 12.5.C.5 of the National Agreement to involuntarily reassign four (4) full-time maintenance craft employees from the craft and/or installation at four (4) separate offices based on current staffing and scheduling requirements. The specifics as to the offices and position titles are set forth below.

IMPACT EVENT # OFFICE POSITION TITLE NUMBER

Apple Building Maintenance 22001 Valley Custodian 1

Building Maintenance 22021 Barstow Custodian 1

Building Maintenance 25144 Hesperia Custodian 1

Palm 29057 Springs Laborer Custodial 1

TOTAL 4

The impacted employees will be notified of their involuntary reaSSignments by separate letter. It may also be necessary to detail some or all of the impacted employees until the excessing can be completed.

By copy of this notice, we are authorizing the withholding of four (4) residual assignments in the custodial and/or mail handler crafts for placement of the impacted employees.

Attached is a copy of the impact statement along with a copy of the operational data supporting the need to excess, a list of the sites where withholding is being authorized and the list of impacted employees. Please add this impact statement to the agenda for our next meeting.

Manager, Labor Relations

Attachments

Page 2: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

cc: Area Manager, Operations Support Area Manager, Human Resources Area Manager, Finance/A District Manager, San Diego

- 2 -

Manager, Human Resources, San Diego District with attachments Area Complement Coordinator with attachments District Complement Coordinator, San Diego with attachments C. Jackson - NALC with attachments R. Siu - NPMHU with attachments

Page 3: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report

Impacted Bid Cluster

Installation Address

Area Name

Impact Type

Date of Impact

Period (Dates) of Review Performed

Report Prepared By

Report Prepared Date

Reviewed By

Phone

APPLE VALLEY POST OFFICE

PACIFIC

Reduction Other Than by Attrition

01/02/2012

10/2412009 thru 11/05/2010

Sharon Devega

08/18/2011

Dallas Keck

(858) 674-0301

Page 4: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report Craft = MAINTENANCE

A B C D E F G Current Planned Annual Annual FTE Current

Work Hours FTE Hrs Hr Rate

Total 60 27 -33 -132 -1716 -1 1560

OverTime Impact

Current OT Current Planned OT Additional Percent Planned OT Planned OT OT Rate per Week Planned OT Planned OT Hours per Rate

from changes per Week per Week Week

Total 0 0% 0 0 0 0%

Page 5: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report Casuals

a. Current Number of MAINTENANCE Casuals on Rolls

b. Current Total Non-OverTime MAINTENANCE Casuals Hours per Month

c. Planned Reduction in Total Non-OverTime MAINTENANCE Casuals Hours per Month

d. Number of MAINTENANCE Casuals that will have Reduced Hours

e. Number of MAINTENANCE Casuals that will be Terminated

f. Number of MAINTENANCE Casuals Remaining After Impact

g. Provide Narrative Justifying need for Remaining MAINTENANCE Casuals

There are no casual custodians in the bid installation.

Part Time Flexible (PTFs)

a. Current Number of MAINTENANCE PTFs on Rolls

b. Current Total Non-OverTime MAINTENANCE PTFs Hours per Month

c. Planned Reduction in Total Non-OverTime MAINTENANCE PTFs Hours per Month

d. Number of MAINTENANCE PTFs that will have Reduced Hours

e. Will there be any MAINTENANCE PTFs Excessed from Craft or Installation

If Yes how Many MAINTENANCE PTFs

f. Provide Narrative Explaining need for Excessing

There are no PTF custodians in the bid installation.

Transitional Employees (TEs)

a. Current Number of MAINTENANCE TEs on Rolls

b. Current Total Non-OverTime MAINTENANCE TE Hours per Month

c. Planned Reduction in Total Non-OverTime MAINTENANCE TE Hours per Month

d. Number of MAINTENANCE TEs that will have Reduced Hours

e. Number of MAINTENANCE TEs that will be Terminated

o o o o o o

o o o o

NO

o

o o o o o

Page 6: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report

Part Time Regular (PTRs)

a. Current Number of MAINTENANCE PTRs on Rolls

b. Planned Number of MAINTENANCE PTR Positions after

c. Estimated Number of MAINTENANCE PTR Attrition

d. Will there be any MAINTENANCE PTRs Excessed from Craft or Installation

MAINTENANCE PTRs

e. Provide Narrative need for Excessing

There are no PTR custodians in the bid installation.

Full Time Regular (FTRs)

a. Current Number of MAINTENANCE FTRs on Rolls

b. Planned Number of MAINTENANCE FTR Positions After Impact

c. Estimated Number of MAINTENANCE FTR Attrition

d. Will there be any MAINTENANCE FTRs Excessed from Craft or Installation

If Yes how Many MAINTENANCE FTRs

e. Provide Narrative Explaining need for Excessing

A staffing review based upon the MS-47 criteria shows a need to excess 1 full time Building Maintenance Custodian.

o o o

NO

o

2

1

o YES

1

Page 7: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report-MAINTENANCE

Preliminary Summary

a. Total Planned Non-OT Reduction per Month for Regulars and PTRs

b. Planned Reduction in Total OT Hours per Month

c. Planned Reduction in Casual Non-OT Hours per Month

d. Planned Reduction in PTF Non-OT Hours per Month

e. Planned Reduction in TE Non-OT Hours per Month

e. Total Planned Non-OT Hours per Month

f. Total FTE Savings

-132

o o o o

108

-1

Page 8: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

Contra PTR

s 0 SOMO ==~=F~~9 Vacant PSE PSE

S 1 SOM 1 N SOM2 N SOM 3 S 4 SOM4 N 5 SOM 5

Sub·Total Cust Svc MLSIMIDWAY

13.2

Page 1

Page 9: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

112

S SOM 1 N 2 SOM 2 N 3 SOM3 S 4 SOM4 N 5 SOM5

Sub·Total eust Svc

MLSIMIDWAY

·_·_---_-L-___ 2-.1

Contra Vacant PSE PSE

Page

PTR NTFT

22

26.4 30.B

24.4

27.2

Page 10: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

112 AUTHORIZED PTR

_PTR NTFT 6 3

N 2 6 N :3 SOM3 8 S 4 SOM4 N 5 SOM 5

37.2

4

25.6

Page 3

Page 11: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

112 AUTHORIZED Contra PTR

Vacant PSE PSE NTFT

S SOM 1 N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5

Sub-Total ( S

76.8

34.4

Pi1ge 4

Page 12: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

112

N N 3 S 4 N 5

Sub·Total S 921

3

2 7 +---1--

14 34

Pdge 5

Contra PTR PSE NTH

Page 13: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

Contra PTR Vacant PSE PSE NTFT

1

VMf

30.00

u.()O

Page 6

Page 14: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

5/2/11 ,03,01 AM

[,Ic 25 RURAL RSH RURAl, RSTD RURAL 0'1'25 RURAL 025R RURAL, SL25 RURAL

RURAl,

SRRB RURAL CRRB

21

23 26 27 29

STREET

FN2C CITY 92

Weekly Flash Report, Week 31 2011 Finance APPLE VALLEY PO 050276

SOM 3 by ,'inance Ddays 6 Sply Ddays 6- -Act Ddays 25 Sply Ddays 26- ___ _

Act/Plan 04-23--20ll 04--29-2011 Act/Plan 04-01-2011 04-29-2011 SPLY

***** ... **.

o 00

13 o

24 o

.44

4.

.04

44

18,

7,

04 24-2010 04-30-2010 Current Week •••••••••••

Plan 'Plan %SPLY 18 55.6 55.6 o 0 0 0.0

0.0000 1

99 594

485 1,575

26

22 o

,108 3

2 1 235 109.27

o 0.00

3.98 o o

.00 86

:I o 00

44 670.

,317 ,805 ,67 ,480 ,70'J ,130

8,

(l.D -100 0 100 0 100 100 0

0.0 0.0

13 2 0.7

~o.o

-lOO.O 9.1 0.0 2.0

100.0 1.9

21.2 0.0 o 0

:17 1 34.5

o 0 o 0

0.0 7.0

.0 0.0

O.

0.2 o 0

o

.6

-29 8 12.5 - 4.9

1U.7

11. o 9 1 5

o

.7

0.0 0.0 0.0 0_0 0_0

0.0 0.0

-4.9 0.6

-45. B

-100.0 9 1 0.0 1.2 0.0 1.7 7.3

-38.4 37.6 34.1

9 0.0

114 0

116.6 1.11 . 0

117.7 -21. 4

o.

o. O.

o 4 14 42.1 20 j

7.8 O.

.8

5. ~O.

2

.1 46 .,

0.0

SPLY .' •• ***.***

Actual MTD 87 75

16.0000 o

0.00 o

0.00

99 2,475

2,284 6,395

139 o

87 o

8,905 o

9,435 131 79

484 5.44

550 5.83

o 525

5.90 525

5.56 10.4.1

738,899

44 1.7

,671,247

408, 74,980

483, 1,8'17,375

3l0,047 28,692

323.01 115 54 82.98 67.89 96 16

04-01-2010 - 04-30-2010 Month to Date **********

Plan MTD 75

o 0.0000

3 4.00

4 5.33

99

2,025 6,575

108 13 92 o

8,800 12

9,329

109.36 o

o 00 428

4.59 o o

0.00 350

3.75 0.00

29,492 737,296

44 670.

2,755,801 441,732 111,365 553 1 097

1,914,221 288,483 36,465

364 10 112.14

83.55 63.46 94 50

296 296

9

%1' MTD 16.0

0.0 0.0

-100.0 100.0 100.0 100.0

0.0 0.0

12.8 -2.7 28.7

-100.0 5.4 0.0 1.2

-100.0 1.1

20 5 0.0 o 0

28.5 27.1 0,0 0.0 o 0

50 0 48.3 0.0

0.2 0_2 0.0 o 2

-3.1 ··7.4

-32.7 -12.5

-1 9 7.5

21. 3

11.1 3.0 0.7 7.0 1.8

57.1 -3 0

0.0

%S MTD -2.2 -3 8 13.5 o 0 0.0 o 0 0.0

1.6

-9.9 -5.0 24.1

100.0 -7.4

100.0 -6 0

-100,0 -6.2 -0 3

-22.2 -17.2 13.0 -7.2

100.0 35.0 43.5 35.0 43.9

··15. OJ

O. 3. 0.0 o

-01 9.8

-37.8 15.7 4.4 O.B

-25.6

7

8 .0

13 1

9.3 14.

.0

Actual YTD

522 o.eooo

00

99

17,ll 46,199

1,

65,

7

702

7

.0

.0

Page 15: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

,/2/11 2:03 01 AM

L/c Description 03BR PLN'l'&EQUIP

P03B PJ"N'f SL3B PJ,NT &

MANUM,

45 48 FN4C

94 FNC

01'4 OTtR 1'04 RETAIL POT SL4 RETAIL 81, SL4R FNC RATIO MAR FN4 AL RA'frO

TREV

UDFI, VOL UDLT

UDT'l' UDI,T+UDFL

BVLD BVI,M

FNfl ADMIN

ADMIN

",Act Ddays 6 Sply Ddays 6-Act/Plan 04 23-2011 04 29-2011

04 24-2010 04,30 2010 ******.***

L

2.'"

28

.80

o

J

4.

Current Week ****** ••••• Plan %Plan %SPLY 4.17 63.6 0 0

o 0.0 0.0

34 118 142 419

421 14

.33

17 4. 04 o 00

o

12,825 21~362

34,IB7

,159 72

118 (1

o o o

733

40 o

'10 1

10'/

108 88

,33. O.

.0

.4

14 4 66.9 19.3

'100.0 IB.9

100.0 6f3.4

0.0 35.3 13.9 o 0

0.0

'8. 14.8

6.2 12 I)

19.3 .2

O. o 0

0.0 0.0

17 8

.J

"I 2

o 0.0 0.0

100 0

.j

28.6 .2

2.3 19

4

100.0 '11.2 ·45 1 ,38.2

0.0 360.0 418.0 166.9

.. 16 ')

25.4 2.3 8.7

10.5 27.9 42.0

346.2 -100.0 100.0

12 1

9

5. .7

3. 10

o 0.0 o

o

.8 [49.8

Weekly Flash Report: Week 31 2011 Finance APPLE VALLEY PO 050276

SOM 3 by Finance -Act Ddays 25 Sply Ddays 26-

Act/Plan 04-01-2011 04-29-2011 SPLY 04 01-2010 04-30-2010

Actual MTD

3.14 o

11

534 216 437

86S 2,052

o 2,052

114 5.56

12 82

1. 00 13.79

169,286

61,648 112,553 174,201

42,284 326.22

227 1n

39 1"17 307

65,540 lAO,

102,078 38,

2,577 ,809

952.82

168 o

168 o

0.00

o 12,029

504,526

673

.59

618

5.1'1

Month to Date *******.*.

Plan MTD

3.04 o

12

491 141

492 590

1,743 B

1,751 59

3.37 o

70 4.00 0.00

o

53,196 88,938

142,334 38,113 289.89

491 o o

o

48, 106,383

98,845 ,/,

:3 ,

154, 1,098

167 4

.40

,012

499 4.

440

%P M1'D

3.1 o 0

-8.3

53.2 -11.2 46.6 17.7

100.0 17.2 93.2 64.9 0.0

17.1 -0.0 0.0

0.0

15.5 26 6 22.4 10 9 12.5 53.8 0.0 0.0 0.0 o 0

35.2 31 9

3. .6

15.5 .9

13.2

o. .0

0.6 100.0

.. 100 0

1l.O 3.

2 8

34 }O

200,0

4().

)5

%S MTD 293.6

0.0 -31. 2

-0.7 -22.0 -28.4

8.5 9.3

-100.0 -11.4 -46.2 -39.3

0.0 127.8 157.0

46.5

·7.9

-13.3 11 1 1.0 3.6 1.8 1."/

118. "l -48.0 ·20.3

0.0

19.7 27 ,2.0

512.

24. .8

6 -4

20.4 14.8

1100.

40.1

14,

14, 1,808

8.

1,345, o

Page 16: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

5/2/11 2:03 01 AM

Lie TTSB SBPR TTSD SDPR TTSF SFI'R

WPT'l' 1'O'l'AL

'1'0'1'1\1,

OIn' OSHA INJ/ITJL 29A VEH

Act/Plan SPLY

."" •• " ... ***

0

0 O.

0

27

o 00 0

Ddays 6,· -04-29-2011

04-24·2010 04 30-2010

Weekly "'lash Report: Week 31 2011 Finance APPLE VALLEY PO 050276

SOM 3 by l"inanee -Act Ddays 25 Sply Ddays 26-

Act/Plan 04 -01-2011 04-29-2011 SPLY 04 01-2010 04-30-2010

Week *********** ***.****** MOllth to Date ******* •• * Plan %Plan %SPLY Actual MTD Plan M1'D %P M!'D %8 M1'D

0 o 0 0,0 96 0 0.0 1100,0 o 00 0,0 0,0 0.80 0.00 0.0 1185.9

() 0.0 0.0 13 0 0.0 -18 8 DO () 0 0.0 0.11 0.00 0.0 -12.9

0 0 0 50.0 57 0 0.0 58.4 00 o 0 48.8 0.47 0.00 0.0 55.4

0.0 -68.0 281 a 0.0 50.2 0.00 0.0 -67.3 2,34 0.00 0,0 46.6

() II 0 15.5 1,304 0 0.0 15.9 0.00 0.0 -9.9

a 0.0 0.0 C.OO 0.0 0.0 0.00 0.00 0,0 0.0

0 o 0 0.0 0 a 0.0 o 0

Actual 'lTD 381

0.44

0 14 778

0.09

4 8,

Page 17: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

SJECT~ f\uthorized

inc:ude atl recent

Please review the attached C',-.,ro-or'",r,Q

levels conform te

BELA.IR SENIOR PL~NT SAN DIEGO DISTRICT

of your rllost recent IVT8fntenance

for FSS sites.

for the and

r-,1C!<:2,oes for FY-

mix.

the MS:..47 and eWHEP.

Please note that your 38 CKi30E,S need to refiect 3Binvenlory and workload for

LDC's.

you have facilities :hat

time custodian. These facilities need to be monitored through

mainte:>ance starr and oonverted to .c;;SJ:C,![J'd.';;";'~,-=~"-",,,-,,,~,,-,,,=

with a full

vacated.

your staff :rlay ccntaot Ron ,-<",d,U,-"U at 858-674-3187 or Charles Sweet at

858-~67 4-3169,

Page 18: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

~y -20'1 i !v1Atl-JTENANCE STAFFING A.UTHORI7 Ii. nON

SAN DtEGO CS&S 2011

SITE

n~t"'1!~ 1!?011 FileS20 Die:ool Mix2 FY201 i Fi[)31·FSS·01· ',9·2011-P,utnorized.xis

Page 19: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

F'y" -20'1 i h)!A.!NTP·L<\NCE STAFFING .4UTHORfZA TfON

Date: 1 i31 12011 FlleSan Diegol Mix2_FY2011 Final-FSS-D1-19-2011-f.,uthorized,xls

Page 20: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

FY-20i i MAiNTENANCE STAFFING AUTHORiZ.ii<T,ON

f;::;:---" ~----------I Riverside

D;:,t",:1131/2011 FileSan Die:)ol Mix2..FY2011 Fin21-F SS-01-19-2011-Authonzedxls

Page 21: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

AUTHORIZATiON

Page 22: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

Date:1!31!2011 FileSan Diegol Mix2_fY2011 Fln"d~FSS-Ol-19~2011~AuthOrized.xls

Page 23: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

SZitill 8celrrna1\rd~no MS47Y UPDA lfE 2011 ' __ 'M~, ___ ~~._. _____ ~_ _.~_.__ _ -1151201'1

~- ~-----.~.- ... ----';;n-K:;~~~~~~'

CURT0~1t 48S2 Current On Rolls

. . "'.'C,· -,':L' .• , . ~,:e.'.' FTR I PTR I Casual 1 !3MC

~I~;:;;~ ... ~~~l~Q~t~i~vh~ti?~~~~~~;l~~r~:;;~; 2632.5 1.5 1 873 1 3580.1 2.0 2 60 "'-1"'1 I" 1·····1

r----- '-1760 .,,, "'-

;~ iQS()49{l BANNING 92220 1524.4 0.9 '1 .) IV~)\iO'lt' !1:lAK~I.\;)W" 92311 1942.2 1.1 'j 182 1 I ! ---ri

~~o7n ... !~I~~)?MINGTl)~, . 92316 , ...... ,.,,,.,.,,.,p ... -

-i=l~··············r ') 0:109i U m;U\WLEY 92227 12't1.6 0.7 'I / ..

--1-='='~'"'

3474.6 2.0 ~ - 983 l· .. · .. }, .. l ··1····· 2 1§1]12 92234 ... ",.".".~ ..... ,., ... : .. ,

3 OEj?:I .. ~ . 92324 2742.7 1.6 1 ....... .. .... ,,··· .... ,1.···.,'-,··

2 ~::.1 .. ~O 92240 245.0.4 1.4 1 ., •• " .......... < ........ ,~ ••• 2tte3B" ....

92243 Z211.6 1.3 1 ,." .. , ..... " ....... : .. , ... -.. zl .... ·l· .. ·r "'1 3 Qg;274B 92335 2647.9 1.5 1 888 ....... ' .. ".,''', ....... '" .... " .... " ..... ;.;:., .. ' .. '.:Hr'·'·

...... ~.. . 9(;2719 92337 2802.7 1.6 1 1043 3

··l····:·'····'······-·-·l:'i):'i\!itr\'~f·~t~'.&:m;;T.,;:;y::(,;~':~s;:i:(~'S;:if'J;c:;}';\MWi~~l5f;~I"'""'~'::~"~::;""'! 2725.3- 1.6 -i~ '965 r~rl ~I 2 053384 'BIB 8' 110M 1Nl!,p,)·~i<'T,:c~··h~~:'rit"~{..;;it!.i:"id.,,Z,.1\Y1i+"','·,' <:J?fideJ.

369.9 .. 3 2.1 179 I 1 ., ........ i , .... ".~< "" '<" , .... ". t .. H:"\ ...... ,'~' .. a;nhO .. flo<.f,t;."\\<'.,..11\ ,,·\-.u.,-. ,.HIH' .Hi''''f<H;''<'H'''i;h.).·ti~( .. ·tl'j'H IHHJ~I'"""" _ .............. " ...... J 3

1705.'1 1 . .0 2783.5 1.6 1 1581.9 0.9 '1 4772.3 2.7 2 3

11 .. -1-- .........

~1.0')5271 82564 2728.7 '1.6 1 1 3 055316 9Z363 2 9-':i~!~o., . 3968.2 2.3 2 448 ~~ 1 . " .. ,

2 055780 92260 -- ! i·1 r-1 2- 055796 92263 4326.9 2.5 2 807 ......... :-;':':';~7.' •• , .. ......,,"', ...... - ...... , .... , .... 2 058946, 92570 3507.8 2;0 2 1

Page 24: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

S31ru BerrTuand~no IT\1]:ti4f Ul~UP~ u tl:. &\VJ II U

111512011 ~~<:.OI'l'nt':-1""""~ .. ;'Ul;''''I=W-5ii.~I1:"''C~~

" '.t.l ~i'U '~ C L\£'TE:Hlt 4852 -iT'~ . ,Hi " . "",

~'~'----i,} .. , .. " ... ,."''''''''''''''''''''-'';W;.ri;;;~i-'~~~-r- • .·.i.m\y ... ·.~-.l.'0.:l' .... ' .:;:.f;ol.\l.. ~.' ... Q! .. ~ .... _' -+-_.....,....Cl_lr_,enl On I~olls I 11 .:"':',, .......•• , .', j;19%ir~' , SOM

{\RE!\ il:i,-,;JIlce tA. 01 Sta.llo.l.l. .' .' .... ." .. ' ",'. Zip Code ":'\~t;[[~"i!':~~~lt':h-FTR I PTR I Casual I BIVlC __ ........--..,.H",,~~;!'!~~~~~~.~~. _h":~"\ '~n '~I-,OM- --."qto"'l'ii'w}Q ..

:\ iC!:'5876 l~j~tl:.AN.,)c-!~'0';.;:,~~;~~;:,'<:.:iC:,'~,,-~/, 92371 2641,9 '1.5 1 882 1 . --I -'>,q ••••• , .--.-- ·'''''''·-''·'~.''I.I,,,,.'''''''''''·\''.h'''''',,,,,,.~.,:,, ••. :-;.,, ...... ,t."_<I.'.I .. I<: .. ,,, •• !.,'t.:).. ...... " .,., .. ,_', .. ".", .• ,

::l !()G(3QS6 PINON HILLS 92372

;-' 1056350 r{8j);U\N8s?J';::':~r~i';;!,;~1'~(/;,:Mitj~1:,:~;~S;:;!;j,~~ 92373 2517.7 1.4 1 758--1 ....... -, .... ,,~ .... 92373 3639.7 2.1 2 120 2

-~------ ~ j ..

92376 " ....... "", .. ".-

92376 1931.7 '1.1 'I 172 '1 -- ---I------l/--

:J 0:58552 liP 11~§1~,5>: ~,m~8] ~,~ ):~ji,~~ 92507 4349,2 2,5 2 829 2 5 2.£6553·· ru ~~i~l;l 92501 3223.6 1.8 1 1464'1"" .. ,·..·· .. ,"" (3 9~;~~~~., Mi: [~': li~ ,,"I\ig, ~2503 297$.1 1.7 1 1219"":2/"/"'+ !)

5 05G555 RIVER81[)~-RVBIDOUX 9250£1 ,t 402.0 0,8 - ...... "·· .. _"'_" ... '.'.>O.4.~ ... "" ........... , .. : ..• " ..... , ...... ,,.,,""-.,..... ...,.,. •. _ .. (,.:;,..,,,.,.;.~,~ ••

5 066556 RIVEHSIDE-HARDMAN CENrEI'; 92504~

3 Oli6726 SBe-DEL ROSA 92404 '1744.'1 1 ~O ., ...... "." ............. , •• "' ... ,.," ... <>.~ ••• ".".,,

3 !2.§&Wl 92407 2271,9 1.3 1 :3 Q!l6744 92401 3280.8 1.9 1 2 IO!j6822 Q')F;Rf{ 3949.02.;2 2 I 1

2232.1 1.3 1 1 ....... '" .. n'"'_''''' 'l'·'· "' ,· ........ " .. ·tJt ... • ... ~ ... ~"~,,.u," •• • ,,;. 1\ ....... n·O(.H •• >'H.H'hi+'H. ,''''\' , .. ' .......... :.;.;. ~H~;~n1';li ' ........... i."'i.:: .. _. '';''''

2 D~i7600 92588

2 illlli 92591 4530.8 2.6 21011 t 3: I '1 I ~t 3 058148 92392 3629.0 2;1 2 109 t 2 I 1 ;' ···IO;8460·''''~i$'95'''' 3105867;;-' """'9'i2'~9""- 2588.4 1 J; 1

105991 60 44 16 46 5 2 8

North Earned GO [EJ North &South Earned 113

Page 25: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

'1

t1

4

()

o o __ .

'1' .. _"" .... " .. ""' ¥,.:""~ ..... :. o ,0:';6738 IlfNPA~\l ... j" .................... ),;';;;,,,,,,,;,,, o 2lill14 0 ~~Qf{~t '.-. " .. " ••. , ...... __ ..• Ji"~ • ....,4· •• '.'.,\( ••.

(I 066746

San [)~ego N'~S4:l UPttJ#\TE 2(Q)11/~

Current 4852 c201l AuthQdittlttl ", "', ". - .:,," ,') ', .... ' ..

Curreflt Oil Rolls 2010

PTR Casual l3lVIC

Page 26: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

SaUril D~ego ~~~~,l UPUA ~ t: ~\lJn -ll 11512,011

Current 4852 Current On Rolls 20-10

SOf\ll

Zip Code fTR PTE Casual 13IVlC

D

o u D

o o (l

o

53 :n 16 57 '1 '\

C Earned South 53

o

Page 27: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report

Impacted Bid Cluster

Installation Address

Area Name

Impact Type

Date of Impact

Period (Dates) of Review Performed

Report Prepared By

Report Prepared Date

Reviewed By

Phone

BARSTOW POST OFFICE

PACIFIC

Reduction Other Than Attrition

01/0212012

10/24/2009 thru 11/05/2010

Sharon Llcvcua

08/18/2011

Dallas Keck

(858) 674-0301

Page 28: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report Craft = MAINTENANCE

A B C D E F G Current Planned Monthly Annual Annual FTE Current Average Weekly Work Hours Savings FTE

Hrs Hrs Hr Rate

Total 72 36 -36 -144 -1872 -1 1872

OverTime Impact

Current OT Current Planned OT Additional Percent Planned OT Planned OT Average OT Rate per Week Planned OT Planned OT Hours per Rate

Weekly Hrs from changes per Week per Week Week

Total 0 0% 0 0 0 0%

Page 29: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report Casuals

a. Current Number of MAINTENANCE Casuals on Rolls

b. Current Total Non-OverTime MAINTENANCE Casuals Hours per Month

c. Planned Reduction in Total Non-OverTime MAINTENANCE Casuals Hours per Month

d. Number of MAINTENANCE Casuals that will have Reduced Hours

e. Number of MAINTENANCE Casuals that will be Terminated

f, Number of MAINTENANCE Casuals Remaining After Impact

g. Provide Narrative Justifying need for Remaining MAINTENANCE Casuals

There are no casual custodians in the bid installation,

Part Time Flexible (PTFs)

a. Current Number of MAINTENANCE PTFs on Rolls

b. Current Total Non-OverTime MAINTENANCE PTFs Hours per Month

c. Planned Reduction in Total Non-OverTime MAINTENANCE PTFs Hours per Month

d. Number of MAINTENANCE PTFs that will have Reduced Hours

e. Will there be any MAINTENANCE PTFs Excessed from Craft or Installation

If Yes how Many MAINTENANCE PTFs

f. Provide Narrative Explaining need for Excessing

There are no PTF custodians in the bid installation.

Transitional Employees (TEs)

a. Current Number of MAINTENANCE TEs on Rolls

b. Current Total Non-OverTime MAINTENANCE TE Hours per Month

c. Planned Reduction in Total Non-OverTime MAINTENANCE TE Hours per Month

d. Number of MAINTENANCE TEs that will have Reduced Hours

e. Number of MAINTENANCE TEs that will be Terminated

MAINTENANCE TEs After

o o o o o o

o o o o

NO

o

o o o o o

Page 30: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report

Part Time Regular (PTRs)

a. Current Number of MAINTENANCE PTRs on Rolls

b. Planned Number of MAINTENANCE PTR Positions after Impact

c. Estimated Number of MAINTENANCE PTR Attrition

d. Will there be any MAINTENANCE PTRs Excessed from Craft or Installation

MAINTENANCE PTRs

e. Provide Narrative Explaining need for Excessing

There are no PTR custodians in the bid installation.

Full Time Regular (FTRs)

a. Current Number of MAINTENANCE FTRs on Rolls

b. Planned Number of MAINTENANCE FTR Positions After Impact

c. Estimated Number of MAINTENANCE FTR Attrition

d. Will there be any MAINTENANCE FTRs Excessed from Craft or Installation

If Yes how Many MAINTENANCE FTRs

e. Provide Narrative Explaining need for Excessing

A staffing review based upon the MS-47 criteria shows a need to excess 1 full time Building Maintenance Custodian.

o o o

NO

o

2

1

o YES

1

Page 31: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report-MAINTENANCE

Preliminary Summary

a. Total Planned Non-aT Reduction per Month for Regulars and PTRs

b. Planned Reduction in Total aT Hours per Month

c. Planned Reduction in Casual Non-aT Hours per Month

d. Planned Reduction in PTF Non-aT Hours per Month

e. Planned Reduction in TE Non-aT Hours per Month

e. Total Planned Non-aT Hours per Month

f. Total FTE Savings

-144

o o o o

144

-1

Page 32: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

112 AU' f Contra PTn

FT PTR PTR HRS I Vacant PSE PSE NTFT SOMO !51Jl§7 29.54 13 6 661 SOM 1 35118 19.96 10 3 397 i

~ I 2

I SOM2 68173 38.71 20 6 751 6 1 5 6

3 SOM3 69254 .. 39.30 20 8 772 7 5 3 4 4 SOM4 41882 23.82 15 1 353 3 2 3 2 5 SOM 5 2340l .3.3C -- 6 4 _ ~?93 .1 1 1

Sub·Total Cust Svc MLS/MIDWAY

J:U

Pdfje 1

Page 33: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

112 28 VLU From MS47 F38 84 4852 AUTHORIZED Contra PTR LLT SOM HRS FTE FT PTR PTRHRS Vacant PSE PSE NTFT

S 0 SOMO 51967 29.54 13 6 661 1 S 1 SOM 1 35118 19.96 10 3 397 1 1 5 1 N 2 SOM2 68173 38.71 20 6 751 6 1 5 6 N 3 SOM 3 69254 39.30 20 8 772 7 5 3 4 S 4 SOM4 41882 23.82 15 1 353 3 2 3 2 N 5 SOM5 23400 13.30 6 4 293 1 1 1

Sub· Total Cust Svc 2119794 104.03 114 211 3227 111 9 l~ 14 S 921 MLS/MIOWAY 127301 72.34 70 2 93 N 924 SB.MVOOC 86846 49.34 48 1 53

TOT TOTAL 503941 286 202 31 3373 18 9 18 14

N N NORTH 247672 140.65 94 19 1869 14 6 9 11 S S SOUTH 256268 145.66 108 12 1504 4 3 9 3

TOT TOTAL 503941 286.31 202 31 3373 18 9 18 14

N 2 DESERT HOT SPRINGS 2450 1.39 1 16 S 1 DULZURA N 2 EARP 139 0.08 3

S 1 EL CAJON - Bostonia Station 1691 0.96 38 1 22 S 1 EL CAJON MAIN 4565 2.59 2 1 24 N 2 EL CENTRO 2212 1.26 1 10 1 S 4 ENC-CARDIFF 690 0.39 16 S 4 ENCINITAS - leucadia Branch 170 0.10 4 S 4 ENCINITAS MAIN 3816 2.17 2 7 1 26.4 S 4 ESCONDIDO 3798 2.16 2 6 1 30.8 S 4 ESCONDIDO - Orange Glen 1605 0.91 36 I Y S 4 ESCONDIDO - Postal Store 1229 0.70 28 1 Y S 4 FALLBROOK 2236 1.27 1 11 1 I -1 N 3 FAWNSKIN 310 0.18 7 Y I N 3 FON-MAIN 2648 1.50 1 1 20 2 3 3 2 -r -1 N 3 FON-SOUTHSIDE 2803 1.59 1 1 24 -1 I_..:.! N 3 FOREST FALLS 210 0.12 5 ..!... N 2 HEBER N 3 HELENDALE 814 OA6 18 N 2 HEMET-MAIN 2725 1.55 1 1 22 1 N 2 HEMET-YALE STATION 156 0.09 4 N 3 HESPERIA 3699 2.10 2 4 N 3 HESPERIA VMF 111 0.06 2 N 3 HIGHLAND 1766 1.00 1 1

Y

; I ' : :: :' LW I : I -, 8 N 3 HINKLEY :£ N 2 HOLTVILLE N 2 HOMELAND 397 0.23 9 N 2 IDYLLWILD 566 0.32 13 N 2 IMPERIAL 351 0.20 8 S 1 IMPERIAL BEACH Y N 2 INDIO 1705 0.97 39 1 Y I I 1· I I In II I 1 5 1 JACUMBA 186 0.11 4 Y S 1 JAMUL Y N 2 JOSHUA TREE 909 0.52 21 1 Y S 4 JULIAN 648 0.37 15 Y S 1 LA JOLLA 1469 0.83 33 1 24.4 0 S 1 LA JOLLA - Annex 1075 0.61 24 Y S 1 LA JOLLA - Finance 292 0.17 7 Y N 3 LAKE ARROWHEAD 1054 0.60 24 1 Y N 5 LAKE ELSINORE 1254 0.71 28 1 Y S 1 LAKESIDE 1150 0.65 26 1 S 1 LA MESA 1108 0.63 25 1 5 1 LA MESA - Annex 793 0.45 18 272 I ~ I : 1 : 1: 15 S 1 LA MESA - Station A y

Page 2

Page 34: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

112 F3B fl41 4852 AUTHORIZED Contra PTR

fI!L PTR HRS PSE NTFT S 0 SOMO S SOM 1 1 N SOM 2 6 N 3 SOM 3 5 4 SOM4 N 5 SOM 5

Sub·Total Cust Svc

MLSIMIDWAY

37.2

.~_._. _ 18~

+······:::.~::-··-+·····:.:.=-t··~-::·--···+··· --....... ~ ... -'-' ···1 25.6

Page 35: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

112

S 0 SOMO S SOM1 N SOM2 N SOM 3 S 4 SOM4 N 5 80M 5

Sub·Total eUS\ Svc

MLS/MIDWAY

26.8

14.4

Page 4

Page 36: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

112 Contra PTR

PSE NTFT

S SOM 1 N SOM 2 6 N 3 SOM3 S 4 SOM4 N 5 SOM 5

Sub·Total Cust Svc S 921 MLSIMIDWAY

2

20 --_.-

5

Page 37: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

55.00

30,00

1 18

84 28 112

Page 6

PTR NTFT

Page 38: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

5/2/1) 2:03,01 AM

L/C De.cription 25 RURAL, CARRIERS RSH RURAL STANDARD HOURS RSTIJ RURAl, TO STANDARD 01'25 RURAL 01' 025R RURAL 01' HATIO 81,25 HUH!\L S25R HURAl, HI, RATIO A25R FN2A AI, RATIO

BRAB RURAL MS'rR: BOXES CRrul CUM RURAL BOXES HCRB CONTRACT DELIVERIES

20 21 22 23 26 27

Dis SUPERVTSOH OFFIC),; STREET

FN2C CITY 92 OPNS PN211 CITY DEI,IVE:RY CHCD FN2C OT2C CITY

OT2B 02lJR P02e

81.28

A2BR

3DI'll CllpD

CTRT

CITY

Weekly Flash Report: Week 31 2011 Finance BARSTOW PO 050516

SOM 3 by Finance -Act Ddays 6 Sply Ddays 6-- -Act Ddays 25 Sply Ddaya 26--

Act/Plan 04-23-2011 04 29-2011 Act/Plan 04-01-2011 04-29-2011 SPLY 01 24 2010 04-30-2010 SPLY 04 01-2010 04-30-2010

Actual '13 76

9474 o

0.00 o

o 00 () 00

87-1

5,244 ,04

80 DO 638

17

1

2>1 8()9

o 890

100 80 47

S.Bl 47

o 7"1

77

7.

131 90,

890.

224,80"1

24,439

,DOO ,119 ,688

Cu:t:rent Week .,lrk*"" •• "' •••

plan 74

o o 0000

2 2.70

3 4.05 0.00

874 5,244

o

81 159 702

6 2

20 887

972 104.0-1

o 0.00

39

01 ()

o 0.00

38 .91

0.00

642 93,852

1"1

920.1

9,619 42,800

165,302 ,4:51

2,

In 69 .33 .76

"Plan 1.4 (j.0 o 0

-100.0 100.0

-100.0 100.0

0.0

%SPLY 21.7 7.0

-74.5 0.0 0.0 0.0 0.0

100.0

0.0 0.0

0.0 0.0 0.0 10300.0

1.2 18.2

9.1 183.3 -50.0

20.0 -8 8

100 0 - 8.4 3.1 0.0 0.0

20.5 31 6

0.0 0.0 0.0

102.6 121.

o 0

.3

3 3 o

3.3

6.3 -31

27.6 -0.1 11. 6

.4

.2

lllll"

37.5 -21. 2

9.9 -43.3

0.0 84.6 11. 7

0.0 14.8 -4 7

235 "I

2BO.l 235.7 294. 2

o 0 862.5 989.8 862 5

1030 1 63.5

-2.7 2.7

"10.5 8.7

2.7 20 8 36.6

-24.0 1.3 7.1

-18.4

23.5 ') 9

10.1 35.

16(, 7

0"0

Actual MTD 350 317

10.4101 o

0.00 o

0.00 0.86

874 21,850

104

324

496 2,717

103 13 80

3,396

o 3,733 84.22

133 3.92

137 3.67

194 5.71

194 5.20

10.37

15,135 378,3"18

17 890.3

911,321

122,542 30,310

152,852 643,64"1

114,822 6,615

762 86 139 26

110.99 78.27 95.50

Month to Date *** ••• ***. Plan MTD %P MTD "8 MTD

306 14.4 26.8 o 0.0 1.9

0.0000 0.0 192.5 8 100.0 0.0

2.61 100.0 0.0 11

3.59 0.00

874 21,850

o

337 664

2,931 25

8 83

3,703 8

4,056 104.18

o 0.00

188

4.64 o

0.00 153

3.77 0.00

15,639 390,9"10

17 919 9

1,003,958 13B,4"15

40,143

178,618 689,818 135,422

10,566

588.81 133.39

192 192

100.0 100.0

0.0

0.0 0.0

-129.6

o 0 1. 0 0.0 -4.8 0.0 10300.0

-3.9 -25.3 -7.3

312.0 62.5

3.6 8.3

100.0 8.0

-19 2 0.0 0.0

-27.1 -20.8

0.0 0.0

o ° 26.8 37.8

0.0

-3.2 -3.2

o 0

9. 11.5

-24.5 -14 4

-6.7 15.2 37.4

29 4.4 5.6

22.9

12

100.0

-21. 2 -31. 4

11.5 -14.2 225 0

8.1 14.8

0.0 15.2 18.3 13. "I 33.5

9.9 6 3 0.0

142 184.8 142.5 186.0

47.7

-2.7

6.4 10.5

8.8

""10.1 11.6 '17. 22.0 -7.5

"I

-24.0

36.4 5.8 9

30.7 3

886

87 o 0

Actual YTD 2,139 2,

O.

0.94

0.00 2.

874 152,

2,348 3,

24,

27,

89 1,

I,

4 '11

7,069,

1,

o 0.0 o 0

o

Page 39: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

5/2/11 2:03:01 AM

L/e DescriptIon onR PLNT&EQUIlI 01' SL311 PLNT Ii EQUIP 8L

'l4 PO BOX 45 WINDOI~ S~~RVIeE

48 ADMIN MISe ''N4C cis er,ERK/MH BRS 94 OPNS e/s HIB l!'N 4 TOTAL llRS 01'4 OPS RE1'ATL OT o'r4R FN4 OT POI OPS RETAIl, 81.4 RETAIL 81. 8[,4R FN4 81. RATIO

AL41 FN4 Al" RATIO

TREV TO'rAT. REVENUE AT.W AUTO LTR WOHK

UllFL UNIT DIST FLAT VOL mlLT UNIT VOL trrJTT UlJ!/!,+lJllF'L

PACKAGES nVVl DIST 1,43A UNIT

BOXF

BVLD MANUAl,

BVP BXVL

80 98 FNB

OTeR

1,

Weekly Flash Report: Week 31 2011 Finance BARSTOW PO 050516

SOM 3 by Finance ~Act Ddays 6 Sply Ddays 6 ~Act Ddays 25 Sply Ddays 26~- - -- ~ --

Act/Plan 04-23,·2011 04 29-2011 Act/Plan 04-01-2011 04-29 2011 SPLY

0,00 o

In 109

o 328

4.5'/

o <I

1 ],2, ao

3,

D

7,110

.lA

04 24-2010 04 30-2010 Current Week •• *** ••• ***

Plan %Plan %SPI,y 4 35 100 0 0.0

2

132 no 339

1

340 12

3. 53 o

14

4.12 0.00

o o

5,066

9, 14,874

,728 1'L

o o o

14,561

1,406

,641 078 14

o

40 o

o

,864

74 1

100.0

0.0 0.8 o 9 3.

100.0 -3. 25.0 29.6

0.0 -71.4 ~70 4

0.0

0.0 0.0

7. a 16.9

B.S 16.5

. a

() 0 . 0

o 0

0.0

.5 o

-57.0 -2'1 0

-0

o

0,0 0.0 o 0 0.0 0.0

.1

4

,'I

6 .0

-100.0

-51 2 -13.2

o 9 17.4 0,0

..17.4

25.0 -9.2 0.0

-85.2 82.1

167 6

-24.6 o 0

·10 1 -30.7 -23. '7

6 8 5.9

37.5 -76 5 -'12,2 -46,2 62.

5,1 4,0

-0 1

50 9 1'7.7

1.3 .1

0.0 0.0 0,0

o 0

0.0

.2 ,4

,4

103 2 0,0

SP[,Y

Actual MTD 0.00

1

126 378 707

1,460 o

1,460 75

5.14 o

50 3.42 9.25

135,935 o

19,444 36,867

56,311 2'1,915 226,15

141 15 25 68

108

31,719 61,034 58,745

2,289 1,784

92,783 736,37

184 o

184

o 00 o

6,016 247,588

212 3.51

04·01-2010 - 04-30-2010 Month to Date **********

Plan MTD 4,17

8

550 457

1,413

1,417 50

3.53 o

57 4.02 0.00

o o

21,090 40,835 61,925 28,010 194.73

:n8 o o o o

27,786 66,478 60,625

5,855 2,168

94,264 071.18

167 o

167 o

o 00 4

6,138 256,788

251 4.14

4

%P MTD 100.0

87.5

43.2 -31. 3

54,., 3.3

-100,0 3.0

50.0 45.6

o 0 -12.3 14.9

().O

0.0 0.0

-7.B -9.7 -9.1 11.0 16.1 55.7 0.0 0,0 0,0 0.0

14, :I -8,2

-3.1 60.9

-1'1.7 1.6

-31. 3

10.2 0.0

10. 0.0 0.0

-100.0

·1 5 3.6

16.5 ,3

100,0

%8 MTD o 0

-98.9

-3.1 -45.3 30.4

-15.6 0,0

15,6 -11 8

4.5 0.0

-39,8 -28,7 -4.3

16,7 0.0

-23 6 -32,8 -29.9 13. a

3 1 17.5

-82.4 47 .

-39,8

56.1

6,

.9 10.3 57.4 0,)

·7.9 -S,O

4.5 0,0

4. o 0

0.0 100,Q

8 .4

10. 0,

Actual

762 ,790

4,087

10,900 o

10, 930

8. o

9,00

1,064,091

151,

339, 491, 198,814

96L

1,

o

o 0

3,

Page 40: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

5/2/11 2:03:01 AM

Lie Description 8LTT TOTAL STCK LEAVE SI,TR TOTAL SL RATIO

TTSB TOTAL FMI,A SBPR TOT IPMLA % l'lKlIRS TTSD TOTM, NON r'MLA SDPR TOT NON FMLA WK

T'rSJ!' TOTAL J!'MLA NO B.·PR TOT r'MI,A WKHRS

WPTT TOTM, LWOP

WPPC TO'!' LWOP WKHRS

AL1'1' TOTAL AL ALTR T01'M, AI. RATIO

29.' TOT OSHA IN.l/n.I.NESS OIH' OSHA IN,} / ILL FRE:Q

29A VEl! TOTAL

Weekly Flash Report: Week 31 2011 Finance BARSTOW PO - 050516

SOM 3 by Finance

--Act Ddays 6 Sply Ddays 6-- ------Act Ddays 25 Sply Ddays 26-Act/plan 04 23-20]1 04-29-2011 Act/Plan 04-01-2011 04-29-2011 SPI.Y 04 24 2010 04 30-2010

•••••••••• Current Week * •••••••••• Actual

81 ,74

o 00

o o 00

61 4 32

4-113

B.Ol

141.74 o

Plan

58

94

o 0.00

o 0.00

o 0,00

o .00

o 0.00

o o 00

o

%Plan 39 7 45.7

0,0

0.0 o 0 0.0 0.0 0,0

0.0 0.0 0.0 0.0

0,0 0,0 0.0

%SPLY 17.4 30.8

0.0 0.0 0.0 0.0

306.7 353.1

510.0 579.6

-8.9 1.5

0.0 0.0 0.0

SPLY 04-01-2010 04-30 2010 ********** Month to Date *** ••••• * •

Actual M'l'D 245

4.05

0 0.00

16 0.26

109 1 80

178 2 94

535 8.85

1

33.08

Plan M'l'D 233

3.80

° 0.00 a

0.00 0

0.00

0 0.00

0 0.00

o 0.00

o

%P MTD 5.2 6.B

0,0 0.0 0.0 0.0 o 0 0.0

0,0 0.0 0.0 o 0

0.0 0.0 0.0

%8 MTD -23.4 14.5

100.0 -100.0

0.0 0.0

10.1 22.9

150,7 179.9

-8.5 2.1

0.0 0.0

,0

Actual Y'l'D ,572 3.

0.24

0.10

O.

801 2 01

3,975 9.

9.

()

o ,0

0, 0.0 O. O.

0.0 0.0 O.

Page 41: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

SLJBJECT' ;::\ulhorlzed

/:;"ea Maintenance has

28 1 to include aU recent

P!e2se revievv the attached

BEL/\IR SENIOR PLA.NT SAN DIEGO "",LC'""~1:)',r-·T"

a iaview of your most recent Maintenance

,,,,'irm"',,,,<:: for FSS sites.

for the

The levels conform to b18 criteria and

Please note :hat

for FY-

and eWHEP.

and wClrklcad for

you have fac:iIltfes that for ==';=~==-c::!...;:::;..~=,--,-,"-,-",,-.:;;Q:f':::f'.:!,i.'~';'=,j::=:= but, are staffed with a full

maintenanCe starr and converted to g'.Q:C!lfJ'2!Z~2~lilll§E,;;];~ when v.",,,,,,,_,,,.,-,.

your -staff may contact Ron Prodigalldad at 858-'674-3187 or Charles SWeet at 558-674-3169.

Page 42: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

~Y-20'11 fv1A!NTENANCE STAFFING AUTHORIZATtON

SAN DiEGO CS&S 2011

SITE

r:?tp'1 nlJ7011 FileSan Dieool Mix2 FY2011 Final~FSS-01-19-2011-Authorized...xls

Page 43: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

FY-20ii l';.i1AINTEN.pj~CE STAFF!NG AUTHORtZATION

Date: 1/31 f2011 File$an Diegol Mix2_FY2011 final-FSS-D1-19-2011-F.utl1orized.xls

Page 44: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

FY-2011 r,,1AiNTENANCE STI~FF~NG AUTHORIZATION

Page 45: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

ST AFF!NG iUJTHOR1ZtHiON

Page 46: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

Date: /3 'iI20: 1 FlleSan Diegol r,j,ix2_FY2011 Flna!-FSS-O~-19-2011-Authorized.xJs

Page 47: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

~iBlU"U belrlfl@lra~no aWU~~~~(f YM~- Ulf,y~ II L AkoIj,,~1 II lJ

Cunront 14852 Current On Rolls

-T"~·_~Mr····_~""·"··'·l" I ' " .~ ._t,' ', .• :' , ~ ~.

:I:l,¢(jr~r,: .' SOM I ,

tr~~[t~':, PTR I Casual I BMC -:' FTR "

2632.0 1.5 1 873 1 3580.1 2.0 2 60 '1' . """1'1''-

2 !ill '~::1llli .BA.NNING 92220 1524.4 0'.9 1760 'j

'l~~~~~~g!::;;~·.~iii>·' . --_. --n " QQQ.5'!Q 92311 '1942.2 1.1 1 182 1 ::

3 Ob0792 92316 , ... ", ........... ,_ .. ......... ! .. ·· .. ·1··' '

? o..S.~1~,., 922n 12'71,6 0.7 1 ."", ......... , ....... ".,',, .... --

2 05i3~2 92234 3474.6 2.0 2 2. .. , ...... ", ..... , .. , ... ", .. , 2742.1

..... "., ...... ,t""' ..... 3 gN?.1,.6.., 92324 1.6 1 983 1 2 O(5Z'160 Q??.1n 2450.4 1.4 1 690 1

2211.6 1.3 1 .11.

2647.9 1.5 1 888 ~ 2 I 1 3 Q;271J:! 92337 2802 .. 7 1.6 1 1043

:r,';';~"" .• """., .............. ., ............... - , 3 Ob3372 HELENDALE J}2;;)42

\ .. , ...... , ...... ( ... ;.. .. ,: ......

R=~ r~r"r1 2 82543 272B.3 ' 1.6 965 :> 92345 36~.9,3 2~1 179 I 1

nO,.,.,

3 ." ..... ",., .~ .. - '--.' ....•.. ,- ....

2 :~W.3..6.!.a.." .. " ""' ... 17(Nl.1 1.0 i 2 ~~4 2783.5 1.6 1

3 954410 1581.9 0.9 'I 5 O?s.~".O.O._. . 4772.3 2.7 2 ....... ., "" .. ·f"···t·· .. ··1 .-,

O~5271 925.64 2728.7 '1.6 1 L

:3 055316 91':363

3968.2 2,3 2 448 12 I 1 ...... _ .. .. ". """~l' ""', .• "" ~" .i~H""'~f"".H4fh;;th ... "Itf1+lH;;.£f.,~¥hH\\";A.~.\ .... j..4I ....... ).-i"\~i(.1,.;\'.'::"Frri'fl:.ll:t'oI,i;fi ··· .. ' .. gS:ie·ii···· 2 055780 -

Im~11 i 2 055796 ...... ~,~~.?~;." .... 4326~9 2.5 2 807 i ... " .... ;':":C"''',"H .. t~ .......

2 258940 92570 3507.8 2~O 2 ..... " ..

Page 48: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

s; i01U~~ Be ITY"U aI nd ~ ill 0 N~ 541 U rP D t\'T IE :2 (t))'ll c~

Page 49: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

SOIVI

4

'1

4

o o o o

o !~ l""'fl~~}J t..~J,i-G~ ·,··'"t"·''''··'··''··'-·',< _~~~->:..-, ••• ..:~ ... t.}~hQ->1.

o

Saurll llJ~ego tl~U~f?'{l' U U Ij' 11.J)/t"'\>. 11 11- (k\VI II U

115[.201 '\ ~~~--~-~""""-~~~'N::'"",,-.;J'~~I'!r""I'>'\":"'l~~"~C""""""'~'"""~""""''''~'~C1'l';~J_;~~'IIr''~'1~.r ... ~:"tf'=;O:~·~":''I'?l~'''''\!~~~~I~~'Tl"'''' '-~--.---------.-~--.""'""'\\

... ..", , ~orn \,4'UWTent /, .. oJ..(. Current On Rolls 2010

PTR Casual BlVlC

... "."" ... " ... ,.

I .... , .. , ........... + ...

Page 50: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

San [)~egJo ~V~S47' UPDATE 21[])"~ 1 1151201 1

i~'--~--~------~--------- ----~' .... -~~~.~~J"'"~~L~~~~Iln."!''",.':~l----a.,..K''''''""'''i'f~~ ...... ·ll~'I..-.~~~.l:l~.r."'~~"""~'"'''-..loJ''''''J------''' .. -~--.... ---<---....... ---~-~.--..-.-

sarli

[I

r' ,I

(]

o o o (\

o

Cun(~nt 4852

53 37 16 [ -Earned South 5~

Currl?nt On Rolls 2010

FTR PTR Casual l3MC

57 I '!

o

Page 51: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report

Impacted Bid Cluster

Installation Address

Area Name

Impact Type

Date of Impact

Period (Dates) of Review Performed

Report Prepared By

Report Prepared Date

Reviewed By

Phone

HESPERIA POST OFFICE

PACIFIC

Reduction Other Than by Attrition

01/1212012

03/13/2010 thru 03/18/2011

Sharon Devega

08/22/2011

Dallas Keck

(858) 674-0301

Page 52: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report Craft = MAINTENANCE

A B C D E F G Current Planned Annual Annual FTE Current

Work Hours FTE Weekly Hrs Hrs Hr Rate

Total 102 67 -35 -140 -1820 -1 1768

OverTime Impact

Current OT Current Planned OT Additional Percent Planned OT Planned aT Average aT Rate per Week Planned aT Planned OT Hours per Rate

Weekly Hrs from changes per Week per Week Week

Total 3 2.9% -1.2 0 2 2.7%

Page 53: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report Casuals

a. Current Number of MAINTENANCE Casuals on Rolls

b. Current Total Non-OverTime MAINTENANCE Casuals Hours per Month

c. Planned Reduction in Total Non-OverTime MAINTENANCE Casuals Hours per Month

d. Number of MAINTENANCE Casuals that will have Reduced Hours

e. Number of MAINTENANCE Casuals that will be Terminated

f. Number of MAINTENANCE Casuals Remaining After Impact

g. PrOVide Narrative Justifying need for Remaining MAINTENANCE Casuals

There are no casual custodians in the bid installation.

Part Time Flexible (PTFs)

a. Current Number of MAINTENANCE PTFs on Rolls

b. Current Total Non-OverTime MAINTENANCE PTFs Hours per Month

c. Planned Reduction in Total Non-OverTime MAINTENANCE PTFs Hours per Month

d. Number of MAINTENANCE PTFs that will have Reduced Hours

e. Will there be any MAINTENANCE PTFs Excessed from Craft or Installation

If Yes how Many MAINTENANCE PTFs

f. PrOVide Narrative Explaining need for Excessing

There are no PTF custodians in the bid installation.

Transitional Employees (TEs)

a. Current Number of MAINTENANCE TEs on Rolls

b. Current Total Non-OverTime MAINTENANCE TE Hours per Month

c. Planned Reduction in Total Non-OverTime MAINTENANCE TE Hours per Month

d. Number of MAINTENANCE TEs that will have Reduced Hours

e. Number of MAINTENANCE TEs that will be Terminated

o o o o o o

o o o o

NO

o

o o o o o

Page 54: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report

Part Time Regular (PTRs)

a. Current Number of MAINTENANCE PTRs on Rolls

b. Planned Number of MAINTENANCE PTR Positions after Impact

c. Estimated Number of MAINTENANCE PTR Attrition

d. Will there be any MAINTENANCE PTRs Excessed from Craft or Installation

MAINTENANCE PTRs

e. Provide Narrative Explaining need for Excessing

There are no PTR custodians in the bid installation.

Full Time Regular (FTRs)

a. Current Number of MAINTENANCE FTRs on Rolls

b. Planned Number of MAINTENANCE FTR Positions After Impact

c. Estimated Number of MAINTENANCE FTR Attrition

d. Will there be any MAINTENANCE FTRs Excessed from Craft or Installation

If Yes how Many MAINTENANCE FTRs

e. Provide Narrative Explaining need for Excessing

A staffing review based upon the MS-47 criteria shows a need to excess 1 Building Maintenance Custodian.

o o o

NO

o

3

2

o YES

1

Page 55: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report-MAINTENANCE

Preliminary Summary

a. Total Planned Non-aT Reduction per Month for Regulars and PTRs

b. Planned Reduction in Total aT Hours per Month

c. Planned Reduction in Casual Non-aT Hours per Month

d. Planned Reduction in PTF Non-aT Hours per Month

e. Planned Reduction in TE Non-aT Hours per Month

e. Total Planned Non-aT Hours per Month

f. Total FTE Savings

-140

-5

o o o

268

-1

Page 56: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

Page 1

Page 57: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

.. ~ ~- VL,U From M_ .-

lim 84 4852 l LLT .~.!OM H_RS

.~

FTE

S 0 SOMO 51967 29.54 S 1 80M 1 35118 19.96 N 2 SOM2 68173 38.71 N 3 80M3 69254 39.30 S 4 SOM4 41882 23.82 N 5 SOM5 23400 13.30

Sub·Total Cust Sve 289794 L64.63

S 921 MLS/MIDWAV 127301 72.34 N 924 SB.MVDDC 86846 . .49 .34

TOT TOTAL §Q.3.~~:!" 286

N N ~~~~~ 247672 140.65

S S 256268 .. 14;;.66

1 TOT TOTAL 503941 286.31 .. .. N 2 DESERT HOT SPRINGS 2450 1.39 S 1 DULZURA N 2 EARP 139 0.08

S 1 EL CAJON - Bostonia Station 1691 0.96 S 1 EL CAJON MAIN 4565 2.59 N 2 EL CENTRO 2212 1.26 S 4 ENC-CARDIFF 690 0.39 S 4 ENCINITAS - Leucadia Branch 170 0.10 S 4 ENCINITAS MAIN 3816 2.17 S 4 ESCONDIDO 3798 2.16 S 4 ESCONDIDO - Orange Glen 1605 0.91 S 4 ESCONDIDO - Postal Store 1229 0.70 S 4 FALLBROOK 2236 1.27 N 3 FAWNSKIN 310 0.18 N 3 FON-MAIN 2648 1.50 N 3 FON-SOUTHSIDE 2803 1.59 N 3 FOREST FALLS 210 0.12 N 2 HEBER N 3 HELENDALE 814 0.46 N 2 HEMET-MAIN 2725 1.55 N 2 HEMET-VALE STATION 156 0.09 N 3 HESPERIA 3699 2.10 N 3 HESPERIA VMF 111 0.06 N 3 HIGHLAND 1766 1.00 N 3 HINKLEY N 2 HOLTVILLE N 2 HOMELAND 397 0.23 N 2 IDYLLWILD 566 0.32 N 2 IMPERIAL 351 0.20 S 1 IMPERIAL BEACH N 2 INDIO 1705 0.97 S 1 JACUMBA 186 0.11 S 1 JAMUL N 2 JOSHUA TREE 909 0.52 S 4 JULIAN 648 0.37 S 1 LA JOLLA 1469 0.83 S 1 LA JOLLA - Annex 1075 0.61 S 1 LA JOLLA - Finance 292 0.17 N 3 LAKE ARROWHEAD 1054 0.60 N 5 LAKE ELSINORE 1254 0.71 S 1 LAKESIDE 1150 0.65 5 1 LA MESA 1108 0.63 S 1 LA MESA - Annex 793 0.45 S 1 LA MESA - Station A

AUTHORIZFI'l F' PTR PTRHRS

1 6 661 1 3 397 21 ('; 751 21 8 772 15 1 353 6 4 293

84 28 3227 70 2 93 48 1 53

2Q.? .. 3L . 3373 94 19 1869 108 12 1504 . - -202 31 3373 - -"-

1 16

3

38 2 1 24 1 10

16 4

2 7 2 6

36 28

1 11 7

1 1 20 1 1 24

5

18 1 1 22

4 2 4

2 1

9 13 8

39 4

21 15 33 24 7 24 28 26 25 18

Contra

kJ~~~nl; PSE PSE

1 1 1 5 6 1 5 7 5 3 3 2 3 1 1

18 9 18 ~

1~ 9 18 14 6 9 4 3 9 18 9 18

1

1

:i;~{,;~~~~:t:~~Uc;;". 1

\t~~>; ':".:;\',,"; ~'". 'f:it\~j{2~X::7J:·, .

1

1

1

1

1

Page 2

PTR NTH

1 6 4 2 1 l4

14 11 3 ..

22

26.4 30.8

24.4

27.2

Y

Y V IL-JI -1 V Y Y Y Y

~ I I 1 I [TIl I' .1 Y V V Y

0 Y Y V

.Y. V

0 Y 1 I ILLJI 1 I V

Page 58: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

112 28 VLUFrom MS47

1m 84 4852 AUTHORIZED Contra PTR

LLT SOM HR8 FTE FT PTR PTR HRS ~iqim\ PSE PSE NTFT

S 0 SOMO 51967 29.54 13 6 661 1 S 1 SOM 1 35118 19.96 10 3 397 1 1 5 1 N 2 SOM2 68173 38.71 20 6 751 6 1 5 6 N 3 SOM3 69254 39.30 20 8 772 7 5 3 4 S 4 SOM4 41882 23.82 15 1 353 3 2 3 2 N 5 SOM5 23400 13.30 6 4 293 1 1 1

Sub· Total Cust Sve 289794 L64.63 84 28 3227 L8 9 l8 [4 S 921 MLS/MIDWAY 127301 72.34 70 2 93 N 924 SB.MVDDC 86846 49.34 48 1 53

TOT TOTAL 503941 286 202 31 3373 18 9 18 14 N N NORTH 247672 140.65 94 19 1869 14 6 9 11 S S SOUTH 256268 145.66 108 12 1504 4 3 9 3

TOT TOTAL 503941 286.31 202 31 3373 18 9 16 14

S 1 LA MESA-SPRING VALLEY 2808 1.60 1 1 24 .CC::'~"k'·' ,,', S 1 SPRING VALLEY - Casa De Oro 11'W"f:\~':",'~'

N 2 LA QUINTA 689 0.39 16 I I~r '/i:(':-'<';";:' N 2 LA QUINTA-MAIN 2784 1.58 1 1 23 1

S 1 LEMON GROVE 1565 0.89 36 1 N 3 LOMA LINDA ;,-'\",\1",,'; ,c

N 3 LOMA LINDA ANNEX 1582 0.90 1 36 1 N 3 LUCERNE VALLEY 819 0.47 19 N 3 LYTLE CREEK 114 0.06 2

N 2 MECCA 266 0.15 6 N 3 MENTONE 326 0.18 7

N 5 MORENO VALLEY· MAIN 4772 2.71 2 1 28

N 5 MORENO VALLEY-MORENO STA 171 0.10 4 !;" :,

N 5 MORENO VALLEY-POSTAL AVE 821 0.47 19 N 2 MORONGO VALLEY 835 0.47 19

N 2 MOUNTAIN CENTER 127 0.07 3

S 1 MOUNT LAGUNA N 2 MURRIETA 669 0.38 15 "

N 2 MURRIETA ANNEX 2729 1.55 1 1 22 1 37.2 S 1 NATIONAL CITY 1956 1.11 1 4 1

S 1 NATIONAL CITY - Lincoln Acres 119 0.07 3 - -' ~~ , "

N 3 NEEDLES 1210 0.69 28 1

N 3 NEWBERRY SPRINGS 136 0.08 3 N 2 NILAND N 2 NORTH PALM SPRINGS 195 0.11 4 N 2 NUEVO 736 0.42 17 S 4 OCEANSIDE - 1st Street Station 733 0.42 17 "

S 4 OCEANSIDE - Brooks Street Statio 1950 1.11 1 4 S 4 OCEANSIDE - Camp Pendleton S 4 OCEANSIDE - ColleQe Plaza , S 4 OCEANSIDE MAIN 4304 2.45 2 18 S 4 SAN LUIS REY

,

N 2 OCOTILLO N 3 ORO GRANDE 167 0.09 4 N 2 PALM DESERT-MAIN 3968 2.25 2 10 N 2 PALM DESERT-PORTOLA 2020 1.15 1 6 N 2 PALM SPRINGS-MAIN 4327 2.46 2 18 1 25.6

N 2 PALM SPRINGS-SMOKETREE 309 0.18 7 S 4 PALA S 4 PALOMAR MOUNTAIN N 2 PALO VERDE N 2 PARKER DAM 283 0.16 6 N 3 PATION 266 0.15 6 S 4 PAUMA VALLEY 238 0.14 6 N 2 PERRIS 3508 1.99 1 1 40 1 N 3 PHELAN 2642 1.50 1 1 20 1 1

Page 3

Page 59: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

lim --- 8~ --- '48'5';'-" AUTHORIZED Contra PTR

L LL T SO!L, , ,',"~, "" HRS FTE, , FT, PTR PTR HRS I~~~~'ilbt' PSE PSE NTFT S 0 SOM 0 51967 29,54 13 6 661 1 S 1 SOM1 3511819,96 10 3 397 1 1 5 1 N 2 SOM2 6817338,71 20 6 751 6 1 5 6 N 3 SOM 3 69254 39,30 20 8 772 7 5 3 4 S 4 SOM4 41882 23,82 15 1 353 3 2 3 2 N 6 SOM 5 23400 13,30 6 4 293 1 1 1

Sub-Total Cust Svc ,l1!!J7!J'I Ib'l.b::S 84 28 :3227 18 9 L8 L4 S 921 MLS/MIDWAY 127301 72 34 70 2 93 N 924 SB.MVDDC 86846 49.34 48 1 53

TOT TOTAL 503941 28l 202 31 3373 18 9 18 14

N N NORTH 247672 140.65 94 19 1869 14 6 9 11 S S SOUTH 256268 145.66 108 12 1504 4 3 9 3

t TOT TOTAL • 50~!l.11. .286.31., 202 31 3373 18 9 18 14

S 1 PINE VALLEY S 1 PINE VALLEY, Guatay 1',1' N 3 PINON HILLS 960 0.55 22 1 N 2 PIONEERTOWN S 1 POTRERO 119 0.07 3 S 1 POWAY 1974 1.12 1 5 S 4 RAMONA 3648 2.07 2 3 N 2 RANCHO MIRAGE 1922 1.09 1 4 1 S 4 RANCHO SANTA FE 699 0.40 16 1 26.8 S 4 RANCHO SANTA FE ' Del Rayo Pia 473 0.27 11;01",' N 3 REDLANDS 2518 1.43 1 17 ;",.,,: N 3 REDLANDS-LUGONIA 3640 2.07 2 3 1 N 3 RIALTO 1582 0.90 36 .'(", N 3 RIALTO-ANNEX 1932 1.10 1 4 N 3 RIMFOREST 79 0.04 2 N 5 RIVERSIDE, DVRF 150 0.09 4 N 5 RIVERSIDE' MARB 135 0.08 3 N 5 RIVERSIDE'ARLINGTON 2979 1.69 1 1 28 N 5 RIVERSIDE,DOWNTOWN 3224 1.83 1 1 33 1 N 5 RIVERSIDE'HARDMAN CENTER 782 0.44 18 N 5 RIVERSIDE'LA SIERRA FINANCE 914 0.52 21 N 5 RIVERSIDE'MAGNOLIA CENTER 736 0.42 17 . N 5 RIVERSIDE'MAIN 4349 2.47 2 1 19 N 5 RIVERSIDE,RUBIDOUX 1402 0.80 32 N 3 RUNNING SPRINGS 646 0.37 15 N 3 RUNNING SPRINGS'GREEN VLY 95 0.05 2 N 3 SBC,DEL ROSA 1744 0.99 40 1 34.4 N 3 SBC-MAIN OFFICE 3281 1.86 1 1 34 N 3 SBC'MAIN'FINANCE STA 829 0.47 19 N 3 SBC'NORTHPARK 2272 1.29 1 12 1 N 3 SBC,UPTOWN 1239 0.70 28 N 3 SBC-WESTSIDE 972 0.55 22 S 0 ANDREW JACKSON 1073 0.61 24 1 S 0 ANTI-SUB WARFARE UNIT 8 S 0 CARMEL MOUNTAIN POSTAL STOR S 0 CARMEL VALLEY ANNEX 1418 0.81 1 32 S 0 CARMEL VALLEY FINANCE S 0 CITY HEIGHTS 932 0.53 21 S 0 COLLEGE GROVE 423 0.24 10 S 0 CORONADO 855 0.49 20 S 0 DOWNTOWN STATION 5511 3.13 3 5 S 0 ENCANTO EARL B. GILLIAM 2119 1.20 1 8 S 0 GEORGE WASHINGTON 546 0,31 12 S 0 GOLDEN TRIANGLE STORE 336 0.19 8 S 0 GRANTVILLE 2051 1.17 1 7 5 0 GRANTVILLE - NPU #7

Page 4

FT 37

C E .--"-,+-::..:'-l--,,, .... +,, .. ,' o L t--:--t-~-+ N E TG R I AS C L T E

r Y Y Y Y

Y Y Y

Y Y Y

Y Y Y

IYI

2

L;,~; I L ·1);:1

'4~1!

IEElE _,n1 .~ II .1 I . 1.

l'IBL=t2'1 Y I -.

I Y Y Y Y

1\ I ." 1 I J§fI 1 :1 Y Y Y

2 I II 2 II ) I

Y Y

It=lt=1 Y

VARIANCE FT PTR 6 -6 9 -2

-1 -8 -1 -4

-1

-1

.-4------

-1 -1

-1 1

1 -1

-1

-1

-1 -1

-1

Page 60: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

112 28 VLlJ From "1547

lim 84 4852 AUTHORIZED Contra PTR LLT SOM HRS FTE FT PTR PTRHRS ~~~rQ~ PSE PSE NTFT

S 0 SOMO 51967 29.54 13 6 661 1 S 1 SOM1 35118 19.96 10 3 397 1 1 5 1 N 2 SOM2 68173 38.71 20 6 751 6 1 5 6 N 3 SOM 3 69254 39.30 20 8 772 7 5 3 4 S 4 SOM4 41882 23.82 15 1 353 3 2 3 2 N 5 SOM5 23400 13.30 6 4 293 1 1 1

Sub-Total Cust Svc 28!17!1'1 Ib'l.b:J 8'1 28 :JZZ7 18 !I 18 1'1

S 921 MLS/MIDWAY 127301 72.34 70 2 93 N 924 SB.MVDDC 86846 49.34 48 1 53

TOT TOTAL 503941 286 202 31 3373 18 9 18 14

N N NORTH 247672 140.65 94 19 1869 14 6 9 11 S S SOUTH 256268 145.66 108 12 1504 4 3 9 3

TOT TOTAL 503941 286.31 202 31 3373 18 9 18 14

S 0 HILLCREST 1913 1.09 1 4 S 0 HORTON PLAZA STORE 440 0.25 10 S 0 JOHN ADAMS 822 0.47 19 S 0 LINDA VISTA 2723 1.55 1 1 22 -1 -1 S 0 MARINE CORPS RECRUIT DEPOT 143 0.08 3 ;~r~1,;ff~0;;'>,:\F~1{;(¢tJt;f:;;~~1:t{· S 0 MIDWAY OFFICE BOX SECTION '~ ...... 'V

S 0 MIDWAY OFFICE WINDOWS ., S 0 MIRA MESA 1856 1.05 1 2 S 0 MIRAMAR STATION POST OFFICE 293 0.17 7 S 0 MISSION VALLEY - DELIVERY ")'M." '., S 0 MISSION VALLEY RETAIL 598 0.34 14 S 0 NAVAJO 1495 0.85 34

I~~~~£~~~;,t:ril S 0 NAVAL AIR STATION NORTH ISLA~ S 0 NAVAL HOSPITAL S 0 NAVAL STATION, 32nd STREET S 0 NAVY AMPHIBIOUS BASE '.' S 0 NORTH PARK 861 0.49 20 S 0 OCEAN BEACH 982 0.56 22 S 0 OLD TOWN - DELIVERY S 0 OTAY MESA CARRIER ANNEX 1689 0.96 1 38 S 0 Otay Mesa Postal Store 580 0.33 13 ";. , S 0 PACIFIC BEACH 1885 1.07 1 3 S 0 PARADISE HILLS 592 0.34 14 S 0 POINT LOMA 818 0,46 18 y S 0 RANCHO BERNARDO 1751 0.99 1 40 I 1 1 1 1 1 1 .1 -1 S ° RANCHO BERNARDO POSTAL STO 631 0.36 14 Y I . :"X: "'".; 1";'[·:,:,':' 1;:0';;;~, ',' S 0 RANCHO PENASQUITOS 2656 L51 1 1 20 1 j 1 -1 S 0 RIVERFRONT - 92104/92116 DELI 2705 1.54 1 1 22 S 0 SAN YSIDRO 1286 0.73 29

1 i 1 -1 yl 1 -:1 1: ,".k· 1

S 0 Scripps Ranch Carrier Annex 2159 1.23 1 9 I I -1 S 0 SERRA MESA 1284 0.73 29 l S ° SORRENTO VALLEY 1063 0.60 24 S 0 SOUTHEASTERN 937 0.53 21 !.. S ° TlERRASANTA DELIVERY S 0 TlERRASANTA STORE 474 0.27 11

I.''''':' S 0 UNIVERSITY CITY Y Y

S 0 UNIVERSITY CITY' Annex 2479 1.41 1 16 S 0 WILLIAM H. TAFT 1586 0.90 36 Y N 2 SAN JACINTO 3949 2.24 2 10 S 4 SAN MARCOS 2194 1.25 1 10 S 4 SANTA YSABEL 358 0.20 8 S 1 SANTEE 2820 1.60 1 1 24 1

, I I : I I ~ I 2

I 2 -1 N 2 SEELEY Y N 3 SHOSHONE Y N 3 SKYFOREST 131 0.07 3 Y S 4 SOLANA BEACH 1045 0.59 , .2L_ 1 Y

Paae 5

Page 61: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

112 28 VLU From MS47 84 4852 AUTHORIZED Contra PTR ON ROLLS ± VARIANCE

ill SCM HRS FTE FT PTR PTR HRS j~,~'llli~; PSE PSE NTFT FT 37 FT 38 PTR CA~J:s:utl I:QC ~7 -!QT.~ ,E:r%'L.=LJ:'I~ S 0 SOM 0 51967 29.54 13 6 661 1 19 19 1 20 6 -6 S 1 80M 1 35118 19.96 10 3 397 1 1 5 1 C E 1 18 lit) 20 9 -2 N 2 SOM 2 68173 38.71 20 6 751 6 1 5 6 0 L 1 20 5 1 27 27 1 -1 N 3 SOM 3 69254 39.30 20 8 772 7 5 3 4 N " 6 19 25 25 _.~ -8 S 4 SOM 4 41882 23.82 15 1 353 3 2 3 2 N 5 SOM 5 23400 13.30 6 4 293 1 1 1

Sub-Tolal Cust Sve 921 MLS/MIOWAY

SUN CITY

SB.MVOOC TOTAL

NORTH SOUTH "TOT!;k

N 2 SUN CITY ANNEX N 2 SUN CITY ROMOLAND 157 0.09 4 S 1 TECATE 310 0.18 7 N 3 TECOPA N 2 TEMECULA-MAIN OFFICE 4531 2.57 2 1 23 I 3 I~JL~_4 N 2. TEMECULA-OLD TOWN STATION 850 0.48 19 N 2 THERMAL 534 0.30 12 N 2 THOUSAND PALMS 493 0.28 11 N 2 TWENTYNINE PALMS 1828 1.04 1 2. 1 Y I_IL_ .. JI -1 N 2 TWENTYNINE PALMS MCB 426 0.24 10 1,' -0,

N 3 TWIN PEAKS 251 0.14 6 S 4 VALLEY CENTER 1416 0.80 32

N 3 VICTORVILLE 3629 2.06 2. 2. I 1 I 2 I I Ii EEl I 3 t 1 N 3 VICTORVILLE,SVL 721 0.41 16 Y p,. . -.' . ·,lh.,...·I,,):: .. : S 4 VISTA 1811 1.03 1 1 I 1 1 1 1 1 _L_-1 S 4 VISTA Annex 2214 1.26 1 10 f----::-S 4 WARNER SPRINGS 257 0.15 6 i---+.-N 2 WESTMORLAND ~ N 5 WILDOMAR 1711 0.97 __ 39 ~

N 2 WINCHESTER 876 0.50 20 i---+.-N 2 WINTERHAVEN i---+.-N 3 WRIGHTWOOD 723 0.41 16 i---+.-N 3 YERMO 260 0.15 6 ~

N 3 YUCAIPA 2588 1.47 1 1 19 l' 1 l' 1 1 1 1 1-1 N 2 YUCCA VALLEY 2027 1.15 1 6 Y I I I 1 -1 N 2 YUCCA VALLEY-LANDERS 376 0.21 8 Y < li,- '" '. •. ,' S 921 M. L. Sellers P&DC 77847 44.23 44 9 231 51 l' I 74 1 75 30 S 921 M. L. Sellers VMF 1000 0.57 1 23 1 l' l' 1 -1 S 921 Midwav CFS Annex 3091 1.76 1 1 30 ",'1'", I~i "'.' -1 1 -1 S 921 Midwav P&DF 43031 24.45 24 18 8 I 28T l' 36 36 12 S 921 Mldwav VMF 2332 1.33 1 13 y, -1 N 924 MORENO VLY DDC 28812 16.37 16 15 3 I 12 I I 15 15 -1 N 924 SAN BERNARDINO- PLANT 56692 32.21 32 8 17 I 37 I I 54 54 22 N 924 SAN BERNARDINO-VMF 1342 0.76 1 30 I I I I -1

Page 6

Page 62: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

/14/11 :49:20 AM 053420

,!C Description :5 RURAL CARRIERS lSH RURAl, STANDARD HOURS lS1'D RURAL % TO S1'ARDARlJ )T25 RURlIl, 0'1'

)25R RURAL OT RA1'IO iI,2S RURAL SL 125R RURlIl, RA'rIO ,25R FN2A AI,

IRRB RUlU\!, MSTR: BOXES :RRB CUM RURAl,

11

<2 l3 16 27

OF'F'ICE STREET O'l'H!lR CC CUS SUPPORT

19 ROt)'l'ERS

CITY CARRIER HRS 12 OPNS DIS HIlS ,'N2B CITY DEI,IV}~RY

;MCD l"N2C '" STANDARD Cl'rY CARR IER OT

nCR CITY )T2B P'N2B

)2BR F'N2B CI'l'Y

H,2C Crf'l l2CR CITY

lL2B cn'Y l2BR CITY \2BR FN2B

lDPD :UPD :TRT cDPR DgL

:DV :SFL :SI:r :SVI,

lEI

'EX

'DPH

N3B

- . -Act Act!Plan Sl?LY

Weekly Flash Report: Week 37 2011 Finance HESPERIA PO - 053420

80M 3 by Finance Ddays 6 Sply Ddays 6- -- -Act Ddays 9 Sply Ddays 10-

06-04-2011 06-10-2011 Act!Plan 06-01-2011 06-10-2011 06-05-2010 06 11-2010 SPLY 06-01-2010 06-11-2010

*.* ••• *.*. Current Week •••••••• *.* *******.*. Month to Date ********** Actual

412 393

4.8346

l.

40 9.71

.88

,570

t,292

o

I,

11

14

° ()

o 11

119 44

,737

444.

11]

Plan 404

o 0.0000

11 2,72

14 3.47 0,00

,139

428 1,281

12

21 o

1,742 2

,868 .38

o 0.00

89 4,76

° o 0.00

'13

o 00

160,

71.1.4

549,738 94,087

,123

379, 10 54, 4,561

%Plan 2.0 0.0 0.0

-54,5 -55.4 185.7 180.2

0.0

0.7

15,7 0,9

100.0 100.0 38.1 0,0

<l. 4

100.0 -1. 0 ·0 6 0.0 o 0

175,3 178.1

0.0 0.0 0.0

63.0 64. 7 0.0

0,1

O. .8

3 0

-5.3

·24 6 -0.7

·20,1 .4

·').9 18. 1

18.7 -0.7

4 0 .7

O.

46 J

%SPLY -0.7 0.0

-13,6 66.7

-66.4 0.0 0.0 0.0

1 8 1.8

·10.2 -2,9

'100. ° 0.0

52.6 0.0 6,9 0.0

-4.2 4.1

150,5 169.1 129.0 139.1

0.0 108.8 124,3

108.8 118.0 B.

0,4

0.4 5.4 6.2

-6.3 ·17.8 -24.4 19.5 <302 0,3

-19,2

11. 8 3.5 7.9

33 ,) 1.5

-5.2 ·5.9

Actual MTD 577 590

2,2034

6 1. 04

72 12.48

7.63

6,095 54,855

552 1,997

9 o

42 o

2,600 o

2,861 116.81

309 11,88

322 11. 25

° 135 5.19 135

4.72 12.30

26,722 240,498

35 763.

769,56', 101,303

32,549 133,852

535,887 99,828

5,841

435. 120.43

92.50 72.'11

160

Plan Wl'D

605 o

0.0000 18

2.98 19

3.14 0.00

6,139

648 1,936

18 4

31 o

2,633 3

2,822 112.76

o 0.00

141 5.00

o

0.00 105

3.72 0.00

26,691 240,219

36 741. 4

831,043 142,427

33,358 175,785 573,346

81,912 6,893

370.71 124,08

90 99 56,59 94. :;0

112 112

%1' MTD

-4.6 0.0 0.0

66,7 65 0

278,9 297.3

0.0

a 7

-14.8 3,2

50.0 ·100,0

35.5 0.0

.1. 3

-100.0 1.4 3.6 0.0 0.0

128.4 125.3

0.0 0,0 0.0

28.6 26.8

0.0

0.1 0.1

·2 8 3.0

-7.4 28.9

2.'! 23.9

,5

21.9 -15.3

17. S

·2.9 1.7

28 .. 5 0.2

·12.5 42.9

%s wrD 11. 8 9,9

1343,2 81. 8

-79,4

·1900,0 -2140.2

24.7

.8 a,4

90.2 0.0

20.0 0.0

'15,3 0.0

12 .5 10.3 50.7 78.0 41.2 61.4

100 0 '3.6 13,9

·3.6 10.2 11.4

0.4 '9.6 5.4 6.2

20.4 ·3S,9 ·2f],9

34 2 19.3 0.3

11.6

13,3 1.9

.8 32 1 0.8

12,

Actual n'D 13,826 13,693 0.9713

237 1. 71

673 4.87 3 67

6,095

15,147 46,861 2,113

148 871

2 64,994

127 71,139 128

6,403 9 9S

7, 10.34

84 2,923

:1,(0)

4.

9

26, 5,580,064

.1

19,951, 2,602,187

870,040 3,472,

14,311, ,16'1,

169,

119.08 85,4 69,77

1, 1,

1

Page 63: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

5/14/11 4:48:20 AM 053420

L./C Dt:8cription )T3B OPS PLANT & r~QUIP 01' )JBR PI,N'l'&EQUIP 01' RA'l'IO

13 UNIT DIST MANUAl, 14 PO BOX DIST 15 WINDOW SgRVrCE:

18 ADMIN

'N4C CIS CI"gRK/Ml! lIRS 14 OPNB TNG lIRS

"N4 TOTAl, ciS fiRS

1'r4 OPB Rl!TAIL OT )1'4R FN4 0'1' RA1'10

'04 OPB RgTAIl" PO'!' Jr.4 RETAIL SI, lL4R FN4 SL RA1'IO IJ,4R },'N4 AI, RATIO

:'REV 1'O'l'AL REVENUE

IOFl, UNIT FLAT VOL <DL'!' UN IT Ul'RS VOL Jf)l'T UDl,'l't UDFL

'AK PACKAGES

IV?1 DIST PROD PCS/43

,131'. UNIT HRS ALLI ED ,43F' UNIT fiRS FLA1'S

,4 JL UNIT HRS LETTER ,Br UNIT fiRS PARe!':!,

,43'1' IA3L,IAH'+L43P

,OXF BOX Fl,II1' VOl, ,oxr~ BOX LTRS VOL ,VLD BOX U:l'T811S IV],M VOL LTRS ,VI?

,XVI, BOXF+BOXL

OXP BOX

o PM/lNSTAI,!, MGll N8 ADMIN liB

BTT TOTAL

OTT

1'8B 'rO'rAL

·A<:1

Act/Plan SPI,Y

Actual 1

0.90 8

,9

492

492 50

10.16 o 4

0,81 13 41

4'1,31'1

6, 19,806 26,

8,543 168.

144

,180

24,061

1,494 60A

34,

10.

1'1

o.

Weekly Flash Report: Week 37 2011 Finance HESPERIA PO - 053420

SOM 3 by Finance Ddays 6 Sply Ddays 6- ----Act Ddays 9 Sply Ddays 10-

06 04-2011 06-10-2011 Act/Plan 06-01-2011 06-10-2011 06-05-2010 06-11-2010 SPLY 06-01-2010 06-11-2010 Current Week *.* •• * •••• *

Plan %Plan %SPLY

3,95

111

33 136 14

42'1 2

426 15

3,

o 17

3.99 0.00

o

9,237

23,

111

o o o o

f 60:~

1,046

40 40

liB 4.19

108

()

O.GO

66.'1 0.0 -77.2 166.7

40,5 78.B 19.1

·10.4

16.0 100,0 15,5

233.3 188,6

0.0 76.5

-79.6 0,0

0.0

-30.S 13 .1 18 1 -'/,6

41.8

89.2 0,0 0,0 0.0 0.0

13,5

6.8 12,8 42.6 38,0 0,6

43,8

0,0 o 0

100.0

155. ] 147.2 100.0

58,3 53,4

.0 0.0

6.3

1 3 22.9

5,2 91.7 15.0 0,0

15,0 11,1

3,3 0.0

-80,0 -82,6 43,5

-3 0

32.5 '1. 9

-13.5 -7.8 12.4

.. 73.3

11.5 7,1

44,

27.4

24.8 2.0 6.4

-39. 9.7 6,8

-24.2

0.0 0.0

79.2 80,9 0,0

113 8 115,8

0.0 0.0

Actual MTD

2 1. 25

S

242 99

250 166 '157

o 757

'/0

9.25 o

0.53 13.08

74,517

9,247 28,262 37,509 12,928 155.00

27 37 44

134 215

14,805 35,861 33,667

2,194 917

50,666 511,78

64 64 o

178,023

400 05 o

219 4. 96

(J.OO

Month to Date ***.***.*. Plan M1'D

4 3.57

5

50 206 214 643

3 646

23 3.56

o 26

4.02 0.00

o

13,984 34,523 48,507 13,991 288,73

168

o o o o

16,065 36,229 32,290 3,941 1,485

52,294 1,045,88

60 60

186 4,38

15'/ ),70

o 0,00

%P MTD

50.0 65 0 60,0

44.0 98.0 21.4 22,4

17. 'I

-100.0 17.2

204,} 159.7

0.0 -84.6 .. 86.9

0,0

0.0

-33,9 -18.1

22. .. 7.6

-46.3

83.9 0.0 0.0 0.0 0.0

.8 .1. 0

4.3 -44. -\ .. 38.2 ·3.1

-51.1

6.7 6 .. /

115. 106.6 100.0

39.5 34.0

.0

O.

%8 MTD 100,0 127.5 166.7

.. 7 6.5 0.8

39. 3.0 o [1

3.0 18.6

·21.0 0.0

-86.2 86.6 7.6

13.8

40.6 25.3

..29.8

12 ~

24.3 64.

,6

2. 30.1 16.8

14 1

-20.9 19.3 38 9 20.4 13.1 18,4

11.1 11. 0.0

14 27.8

100 0

30.4 44.9

0.0 .0

Actual

1,950 ,461

3,818 17,239

46 17,285

2,338 3.53

34 1,133

6. 8,09

1,966,2'1'7

301,811 906,

1,211,196 368,304

1,392

,537 <I,

251,

947, 872 1

75, 19,

1,198,777 614,7

1,304 1,304

t 94 9 30

003 4. 6fl

0,

o.

,1

Page 64: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

/14!11 : 48: 20 AM 053420

,/C llescript.ion 'l'Sll 1'01'A!, NON PMLA DC .llPR 1'01' NON ,'MLA I'/K 'TSl? TOTAL l?MLA NO :FPR TOT l"MLA W!(HRS

:P1'T To'rAL I.WOP :PPC TOT LWOp WKHRS .LTT 'rOTA!, AI,

)IIF

~9A

Weekly Flash Report., Week 37 2011 Finance HESPERIA PO - 053420

SOM 3 by Finance -Act lldays 6 Sply lldays 6 - -Act Ildays 9 Sply Ddays 10-

Act/plan 06-04-2011 - 06 10-2011 Act!Plan 06-01-2011 06 10-2011 SPLY 06-05-2010 06 11-2010 SpLY 06-01-2010 06-11-2010

1,1'1 •• ",****** Actual

o 0.00

o.

1.10 322

0.00 0

Current Week *** ••• *.*** Plan %plan %SPLY

0 0.0 0.0 0.00 0.0 0.0

0 o 0 0.0 0.00 0.0 0.0

0 0.0 -85.4 0.00 0.0 -85.2

0 0.0 41. 9

0.00 0.0 0.0 0 0.0 0.0

.*.******. Month to Date **********

Actual MTD Plan MTll %1' MTD %8 M'I'D 0 0 0,0 0,0

0.00 0.00 0.0 0.0 21 0 0.0 31.2

0.48 0.00 0.0 45.9

20 0 0.0 -95.6 0.45 0.00 0.0 -95.1

520 0 0.0 -3.2 0.00 0.0 7.7

0 0.0 100.0 0.00 0.00 0.0 -100.0

0 0 0.0 100.0

Actual Y'm 133

0.12

o 81

2,478 2.

9,047 8

H.

Page 65: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

SU8JEC;' P"uthorfzed

,A. rea fv)aintenance has

11 to include at! recent

Ple3se rev1e'vV the attached

BELAJR SEMI OR PLP,NT S,A.N DIEGO DISTRICT

a review of your most recent Maintenance '-'~·=,.,.:rnn: '-;"U'K."'''

,,,'rn,,,,,,'C' for FSS sites.

f:;r the authorized and mix,

for FY-

The levels conform co the crite~ia and set forth the MS .. 47 and eWHEP.

:::)!ease note that your 38 need to reflect and workload for

you have facilities that for =~=C~~':":"::~~=~.!.:::l..=::...:..c= but, are staffed with a full

",11"'''''::>f,[,[ committee and

maintenance staff and converted to =~~"-'-~=-'!.!.'-'::L"'-","-,-~"'" when VOVQ",<'-'.

your s~aff may contact Ron Prodigaiidad at 858-'674-3187 or Charles Sweet at

858-67,1-3169.

P Munoz

Page 66: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

FY-2u'l1 E¥1AINTENANCE STAFFING AUTHORIZATION

SAN DiEGO CS&S 2.01 i

SITE

n~t,,1 /":11?01 i FileSan DieQol Mix2 FY2011 Fin81-FSS-01-19-20i I-Authorized..xls

Page 67: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

FY-20ii l'!1A!NTENANCE STAFFING AUTHOR{ZAT!ON

Date: 1 131 12011 FileSan D;egol Mix2_FY2011 Final-FSS-01-19-2011-!',u!horized.xls

Page 68: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

FY-20i'i MAINTENANCE STf~FFING AUTHORIZATION

0",12: 1 13112011 FileSal'1 DieQOI Mix2._FY2011 Final-F SS-01-19-2011-AuthorIzed.xls

Page 69: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

h3TENANCE STAFF!NG ,~,UTHORIZAT!ON

Page 70: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

FY-2Gi1 MAINTENANCE STAFFiNG AUTHORIZATION

Dme 1/3112011 FlleSan Diegol Mix2_FY2011 Final-FSS-01-19-2011-Authorized.xls

Page 71: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

S(6jU'~ Berrs«3Jrdhuo N]S4'1 UP!1)/\lfE 201'~

Cunent 1~852

2632.5 ~-{5~-

3580.1 2.0 1524.4 0.9 1942.2 1.1

12'11,6 3474.6 2142.7 2450.4 2211,6 2647.9 4802.7

2725.3 ' 313$.9,3

1705;1 2783.5 1581.9 4772.3 2728.7

3968.2

43:26.9 3507.8

0.7 2.0 1.6 1A 1.3 1.5 1.6

1.6 2.1

1.0 '1.6 0.9 2.7 '1.6

2.3

2.5 2.0

11512011

Current On I~olls

FTR I PTF{ I Casual I ElVIe

1 2 S:03 13 r------- ~-J-176a 'I

1

1 182 II '1 'I

'1 2 2 rr--+1-9-S3-r··-··· ......... , .. ···· .... ·· .. .. 1 . " .............................. .

l' 1

1 1 2

.... 1" ....

1 1043 ...... ··· ...... · .. 1·· ........ · .. · .. ·«

i '1

2 1

1 1 1 1

2 1252 ~ 3 1969 ...... ·1"'···· .. · .... · 1

2 448 2 1

2 1 2 1

Page 72: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

S \01 n kJ'> e uYll aHr a ~ n «) ~~tl ~&{l. (j UlltkJ1#'~ U Ie LV; IJ U

i C lHTent 4852 r ~,\A~t'ijqt~;t;~!i; .~ Current On Rolls

- - .. -

I ~ SOM

I\REA iFi'1flllCe AO I Station . ~~~>;:%Imw'~>~::'~~'~~ '.lV~¥! " FIR I PTR I Casual I BMC Zip Code ,·"E": ' ',"! o'IIo ...... _~~ ....

E~i~~i:1.~:.!ay:t,~!:l1fJ~E~~~~'iJ:[::;i;I~: ~ ~'f"-p :,'~: ' '~:,,-,"

7 9237'1 2641.9 '1.5 1 SSI! 1 " •• , •• , .. , ..... , ... , ••••••• , .... 1 ''''''''''''''''''1'' .......... ,. ....... , .

3 056056 PiNON HILLS 92372'

3 ., lo.5~~o. ... ~~~1li~~.I~~{~~tr~~~1~~;~~~~;!~~!~jltJ[i~~t\~\~~tm ..... ,,9..~~?:3.,,~.,.. 2517.7 1.4 1 758 1 3 Ip'~F;3Gn RrtCl!:v\NDg~1,;i J ~0NI'I~,l",::i'·'::,"'ik"!.:.,{ ~t:: 92373 3639.7 2,1 2 120 :2 .____ .... '»,-...; '" , .... ' ,."~ •. ,' .. ,'>",' '-··"-';'·1:.:~1 lI.. .• \:I,..~':/,--<~·~>~:,··~'-~·j~.~~~;1;:t'rJ1H~ . ~

.3 .1?~~426 ..... y.z..~.!.~ .. ,. 1 "'?JZli 92376 1931.7 '1.1 1 172 1

~ ....... ~~~;~~ .. ,. ::: .. ·:~:~:~·~i::.:~: 4349.2 2.5 2 829 2 3223.6 1.8 1 1464 1

""""'"

_ .... ~ .. I05()554 92503 2979.1 1.7 1 1219 2 ,. ;,)

-'~ ... to: 6555 RIVERSIPE·RUBIDOUX . 92559 1402,0 0:8 1.760 1 .... _ ••• -,,,,, •••• , ••• ,--. - .......... '" ... -- ••••• , ....... ,.~.~ ....... ,., ......... , •• ; ............. , ...... r<"'_"_'_' ................. ,,"'. • ........ " •• ~,l •• p.~ ... ••· ••• >J,·

5 0(;(3556 F<IVERSIOE-HARDMAN CEI'.JTER 9ZpO'f

1744:1 1~O

3 gQG72a ~24b7 2271.9 1.3

H " 0567,t4 3280.8 1.9 "

2 g~56~Z2 3949.0 2.Z I 429 I 1 2 Q,~7_6??._ 22:32.1 1.3 ........ " 2 057600

2 QJiFSO 4530.8 2.6 2 1,011 F}:1 1 3 058148 92392 3629.0 2;1 2 109 I 1 " ........ ~~ .... ,.,

;······j~·~;1i~-·:··· *i~i~4t~~~~1~r:~;~;i;··Sj~·,~~:~~~tT~~{I,~~{~~ 920% ..... ~.-...... "'-........... 92'399 2588.4 1.5 1

MO '" Bold 105991 60 44 16 46 5 2 8

North Earned 60 [ill North&. South Earned 113

Page 73: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

SOIVI AREA

4

4

'1

4

4

0

0

0

~I~:;m NAVAJO

Salllll !D~ego MS477 UP[DJ~ IE 2011 11511.0'1 '\

Gurrent 4852 CUfnlllt 011 r~01l5 2010

PTR Casual 8f\~C

92111 ., .............. ~ .. ,. 92114 ..............

92119

Page 74: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

~ a Il1l IlJ ~ ee' 9 0 ~\4~ ~.q], f U If"' ILJi A U ti:, tk. \Lll U 1/51201i r--,......,'-... _- ·-"-----~---'--.....--. .... ---~=-~w=r~~!;"<>,.T:"!;.,...,.oJ~~.!'-....,..."'~;"'.o<,t'1""'Yf'~~1"!'i""'-""""JI.~~I-J:;n'<."I;>1~.~',' ..... y....,.,"'>I.t",.-4,."""',r___-----

I

o o II

o o o

o

Curf0nt l~852 Piuthtwh:edl

FIR

53 37 16 57 I-~ -EarMd-S;~t~I--- 53- I

-~~---"---'-

Current On Rolls 2010

PTR Casual BIVlC

'1 '!

o

Page 75: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report

Impacted Bid Cluster

Installation Address

Area Name

Impact Type

Date of Impact

Period (Dates) of Review Performed

Report Prepared By

Report Prepared Date

Reviewed By

Phone

PALM SPRINGS POST OFFiCE

PACIFIC

Reduction Other Than Attrition

02/0412012

07/31/2010 thru 08/05/2011

Sharon Ue:V"'Ud

08/22/2011

Dallas Keck

(858) 674-0301

Page 76: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report Craft = MAINTENANCE

A B C D E F G Current Planned Weekly Hrs Monthly Annual Annual FTE Current

Weekly Savings Savings Work Hours Savings FTE Yearly Hrs Savings Hr Rate

Total 102 68 -34 -136 -1768 -1 1768

OverTime Impact

Current OT Current Planned OT Additional Percent Planned OT Planned OT Average OT Rate per Week Planned OT Planned OT Hours per Rate

Weekly Hrs from changes per Week per Week Week

Total 0 0% 0 0 0 0%

Page 77: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report Casuals

a. Current Number of MAINTENANCE Casuals on Rolls

b. Current Total Non-OverTime MAINTENANCE Casuals Hours per Month

c. Planned Reduction in Total Non-OverTime MAINTENANCE Casuals Hours per Month

d. Number of MAINTENANCE Casuals that will have Reduced Hours

e. Number of MAINTENANCE Casuals that will be Terminated

f. Number of MAINTENANCE Casuals Remaining After Impact

g. Provide Narrative Justifying need for Remaining MAINTENANCE Casuals

There are no maintenance casuals in the bid installation.

Part Time Flexible (PTFs)

a. Current Number of MAINTENANCE PTFs on Rolls

b. Current Total Non-OverTime MAINTENANCE PTFs Hours per Month

c. Planned Reduction in Total Non-OverTime MAINTENANCE PTFs Hours per Month

d. Number of MAINTENANCE PTFs that will have Reduced Hours

e. Will there be any MAINTENANCE PTFs Excessed from Craft or Installation

If Yes how Many MAINTENANCE PTFs

f. Provide Narrative Explaining need for Excessing

There are no PTFs in maintenance in the bid installation.

Transitional Employees (TEs)

a. Current Number of MAINTENANCE TEs on Rolls

b. Current Total Non-OverTime MAINTENANCE TE Hours per Month

c. Planned Reduction in Total Non-OverTime MAINTENANCE TE Hours per Month

d. Number of MAINTENANCE TEs that will have Reduced Hours

e. Number of MAINTENANCE TEs that will be Terminated

f. of MAINTENANCE

o o o o o o

o o o o

NO

o

o o o o o

Page 78: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report

Part Time Regular (PTRs)

a. Current Number of MAINTENANCE PTRs on Rolls

b. Planned Number of MAINTENANCE PTR Positions after Impact

c. Estimated Number of MAINTENANCE PTR Attrition

d. Will there be any MAINTENANCE PTRs Excessed from Craft or Installation

MAINTENANCE PTRs

e. Provide Narrative Explaining need for Excessing

There are no PTRs in maintenance in the bid installation.

Full Time Regular (FTRs)

a. Current Number of MAINTENANCE FTRs on Rolls

b. Planned Number of MAINTENANCE FTR Positions After Impact

c. Estimated Number of MAINTENANCE FTR Attrition

d. Will there be any MAINTENANCE FTRs Excessed from Craft or Installation

If Yes how Many MAINTENANCE FTRs

e. Provide Narrative Explaining need for Excessing

A staffing review based upon the MS-47 criteria shows a need to excess 1 full-time Laborer Custodian from the Palm Springs Bid Installation.

o o o

NO

o

3

2

o YES

1

Page 79: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

WorkHour Impact Report-MAINTENANCE

Preliminary Summary

a. Total Planned Non-OT Reduction per Month for Regulars and PTRs

b. Planned Reduction in Total OT Hours per Month

c. Planned Reduction in Casual Non-OT Hours per Month

d. Planned Reduction in PTF Non-OT Hours per Month

e. Planned Reduction in TE Non-OT Hours per Month

e. Total Planned Non-OT Hours per Month

f. Total FTE Savings

-136

o o o o

272

-1

Page 80: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

Page 1

Page 81: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

8/5/11 2:35:40 11M 055796

L/C Description 20 D/S SUPERVISOR 21 OFFICE 22 STREET 23 OTHER 26 CC CUS SUPPORT 21 COLLECTIONS FN2C CITY CARRIER HRS 92 OPNS D/S !~G HRS FN2B CITY DEI,IVERY CMCD FN2C % TO STANDARD OT2C CITY CARRIER OT 02CR CITY CARR OT RA'I'IO OnB FN2B OT 02BR FN2B 0'1' RAt'IO P02C CITY CARRIER PO Sr,2C CI'l'Y CARRIER SL S2CR Cn'Y CARR SL RATIO SL2B CI'1'Y DELIVERY SL S2BR CITY DEL SL RATIO AlBR FN2B AL RA~'!O

SDPD UDSF CITY DEL POSS CUpD CUM CITY PDS CTR'l' UDeF COON'1' cn'Y RTES CDpR CI'l'Y DEL PER ROUTE

CDV '1'0'1' CDV PIECE CSFL CASED FLATS CSL'l' CASED I,E'1'TERS CSVL '1'0'1' CASED VOL Fsa CI'l'Y CARRIER FSS DPS CI'1'Y CARR DPS SEQ SEQUENCED VOl,ONE pKCC cn'Y CARR rER pKGS

OEI OFFICE EFP' INIlICA1'OR SEI STREE'1' EFF INll TEl CI'1'Y DEL PER HOUR 1'DPII TOTAL DEI, PER IIOUR

43 44 45 48 .'N4C 94 .'N4 01'4

%

UNIT DIS'1' MANUAL PO BOX DIST WINDOW SERVICE ADMIN MISC CIs CLERE/MH HRS OPNIl CIs TNG IIRS TO'1'AL Cis HRS OPS RETAIL 01'

-Act Act/Plan SPLY .....•....

Actual 144 441

1,606 71 o

66 2,184

o 2,328

113.89 124

5.68 148

6.36 o

169 7.74

169 7.26

13 .53

34,812 208,872

46 756.8

500,097 83.441 16,074 99,515

o 336,584

63,998 3,654

473.63 130.06

95.64 78.07 95.44

60 53

192 258 545

o 545

77

Weekly Flash Report: Week 44 2011 Finance PALM SPRINGS PO - 055796

SOM 2 by Finance Ddays 6 Sp1y Ddays 6-- -----Act Ddays 24 Sply Ddays 25--

07-29-2011 07-30-2010

07-23-2011 - 07-29-2011 Act/Plan 07-01-2011 07-24-2010 07-30-2010 SPLY 07-01-2010 Current Week •••••••••••

Plan %Plan %SPLY 164 12.2 -10.0 583 -24.4 -28.2

1, 547 61

4 80

2,271 3

2,442 213.07

o 0.00

119 4.87

o o

0.00 98

4.01 0.00

3.8 16.4

-100.0 -17.5 -3.8

-100.0 -4.7

-46.5 0.0 0.0

24.4 30.5

0.0 0.0 0.0

'J2.4 80.9

0,0

6.4 4.4 0.0

-1.5 -3.3

-100.0 -3.8

-31.4 -30.7 -28.3 -27.1 -24.2

-100.0 15.8 19.7 -9.1 -5.5 -6.7

. .•..•.... Actual MTD

612 1,937 6,444

275 o

276 8,932

o 9,544

115.90 532

5.96 584

6.12 :2

540 6.05

540 5.66

11.40

Month to Date •••••••••• Plan MTD %P MTD %S MTD

657 -6.8 -11.0 2,358 -17.9 -23.3 6,264 2.9 -1.0

244 12.7 -18.4 16

319 9,185

11 9,869

211.52 o

0.00 509

5.16 o o

0.00 373

3.78 0.00

-100.0 -13,5 -2.8

-100.0 -3.3

-45.2 0.0 0.0

14.7 18.6 0.0 0.0 0.0

44.8 49.7 0.0

-100.0 -10.4 -7,8

-100.0 -8.0

-14,1 -32.5 -26.8 -28.8 -22.6 -50.0 -10.0 -2.4

-17.7 10.5 -6.8

- ----------- ---------- - -34,751

208,506 46

755.5

606,468 31,223 22,630 53,853 97,368

389,016 66,231

2,493

357.64 134,78

91.53 74.27 94.50

80 46

209 184 528

2 530

19

0.2 0.2 0.0 0.2

17.5 167.2 -29.0 84.8

-100.0 -13 .5 -3.4 46.6

32.4 -3.5 4.5 5.1 1.0

-25.0 15.2 -8.1 40.2 3.2

100.0 2.8

305.3

0.5 0,5 0.0 0.5

34,'189 834,936

46 756.3

34,745 833,8S3

46 755.3

0.1 0.1 0.0 0.1

--------- - -. - --------0.7 10.8 -6.4 7.6 0.0

-3.1 0.3

-48.2

39.9 -5.5 4.0

15.8 0,2

1.6 47.4 4.2

-100.0 3.8

35.1

2,113,741 386,566

64,141 450,707

o 1,407,014

256,020 14,567

2,454,980 133,144

91,517 224,661 386,887

1,575,243 268,189 10,095

13.9 190.3 -29.9 100.6

-100.0 -10,7 -4.5 44.3

- -------- ----------431.05 129.57

93.48 75.26

793 940

2,264 o

2,264 193

353.64 133.12

90.52 73.39 94.51

333 189 856 741

2,155 a

2,163 '/7

21.9 -2.7 3.3 2.6 1.2

-1.2 16.4 -7,4 26.9 5.1

-100.0 4.7

150,6

0.5 -3.5 -1.7 2.2

-5.5 -12.1 -31. 8 -15.6

0.0 -2.8 0.4

-49.8

25.9 -2.5 4.7

15.2

-26.9 1.5

31.8 -LO

-100.0 1.1

-31. 6

Actual Y'1'D 6,648

23,037 69,182 3,578

17 3,191

98,988 334

105,987 109.35

5,593 5.65

6,149 5.80

85 3,422

3.46 3,518

3.32 9.84

34,702 8,675,446

46 754.4

26,407,164 5,452,765

961,563 6,420,328

o 16,907,214

3,079,622 278,729

376.59 125.40

87.33 70.32 94.59

2,762 9,057

10,057 25,648

42 25,690

1,804

to Date ••••••••••• 'Ill' YTD

-3.0 -4.6 1.7

40.8 -89.2 -3.7 1.0

171.5 0.8

-7.0 0.0 0.0 6.4 5.5 0.0 0.0 0.0

-12.7 -13 .3

0.0

0.1 0.1 0.0 0.1

-0 lL5

-2. .4

-100.0 -0.9 6.0

155,0

Page 82: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

8/5/11 2.35.40 AM 055796

],/C Description ONR FN4 OT RA'l'IO 1'04 OPS RETAIL POT SL4 RETAIL SL SL4R FN4 SL RATIO AL4R FN4 A], RATIO

TREV TOTAL REVENUE ALW AUTO I,TR WORK HOURS

UDFL UNIT DIST FLAT VOl, UDI,T UNIT DrST LTRS VOl, !JDTI' UDL'!'+UDFL PA!( PACKAGES DVP1 DIST PROD PCS/43 L43A UNIT DIST HRS Al,LIED 1.431' UNIT DIST HRS FI,A'l'S L43L UNIT DIST HRS LETTER 1.431' UNIT DIST HRS PARCEl, 1,43T IA3L+L43F+I,43p

BOX I' BOX DrST FLAT VOL BOXL BOX DIST LTRS vor, BVI,D DPS BOX LETTERS BVLM MANUAL BOX VOl, LTRS BVP BOX PARCELS BXVL BOXI'+BOXI. BOXp BOX PRODUCTIVITY

79 BULK MAIL ACC I'N7 TO'!' MKTNG I< COMM HRS 0'1"1 MKTNG I< COMM OT OT7R FN7 0'1' RATIO SI,7 MK'l'NG I< COMM ilL SL7R FN7 SL RATIO

80 PM/INSTALL MGR FN8 ADMIN T01'AL SL8" ADMIN SL SLaR FN8 sr, RA'rIO

Weekly Flash Report. Week 44 2011 Finance PALM SPRINGS PO - 055796

SOM 2 by Finance

-Act Ddays 6 Sply Ddays 6------ --- --Act Ddays 24 Sply Ddays 25-Act/Plan 07-23-2011 - 07-29-2011 Act/Plan 07-01-2011 - 07-29-2011 SPI.Y

Actual 14 .13

o o

0.00 14.68

80,395 o

8,510 20,241 28,751

6,663 479.18

14 12 10 24 46

12,036 34,782 33,230

1,552 725

46,818 883,36

o o o

0.00 o

0.00

40 40 o

0.00

07-24-2010 - 07-30-2010 Current Week •••••••• _ ••

Plan \Plan \SPLY 3.58 294.1 30.1

1 22

4.15 0.00

o o

7,271 22,439 29,710

6,992 371.38

SO o o o o

14,899 37,519 34,262

3,257 911

52,418 1,139.52

o o o

0.00 o

0.00

40 40

1 2.50

-100.0 -100.0 100.0

0.0

0.0 0.0

17.0 -9.B -3.2 -4.7 29.0

-82.5 0.0 0.0 0.0 0.0

-19.2 -7.3 -3.0 52.3

-20.4 -10.7 -22.5

0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0

-100.0 -100.0

-100,0 -100.0 -100.0

-3.7

-12,3 0.0

-19.7 23.6

6.6 3.2

69.7 -65.0

0.0 -37.5 11.1

-16.4

-13.7 -0.1 -0.7 14 .0

-32 .8 -4.0 5.0

-100.0 -100.0

0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0

SPLY • .... ** ••••

Actual MTD 8.52

o 61

2.69 10.69

348,956 o

38,382 77,521

115,903 28,511 352.29

142 50 39 98

187

55,122 143,242 136,053

7,189 3,207

198,364 901. 65

o o o

0,00 o

0.00

136 136

o 0.00

07-01-2010 07-30-2010 Month to Date ••••••••••

Plan MTD \P MTD \S MTD 3.56 139.5 -30.8

3 91

4.21 0.00

o o

29,769 91,875

121,644 28,630 365.30

333 o o o o

61,005 153,619 140,282

13,336 3,731

214,624 1,135.58

o o o

0.00 o

0.00

160 160

4 2.50

-100.0 -33.0 -36.0

0.0

0.0 0.0

28.9 -15.6 -4.7 -0.4 -3.6

-57.4 0.0 0.0 0.0 0.0

-9.6 -6.8 -3.0

-46.1 -14 .0 -7.6

-20.6

0.0 0.0 0.0 0.0 0.0 0.0

-15.0 -15.0

-100.0 -100.0

100.0 110.3 112.7 -24.3

-10.4 0.0

-12.3 -2,9 -6.2 -2.0 31.4

-31.4 -5.7

-54.7 -14 .8 -26.4

-9.3 6.0

-7.1 20.3 -6.9 -7.0 27.3

-100.0 -100.0 -100.0 -100.0

0.0 0.0

-19.0 -19.0

0.0 0.0

Actual Y'l'D 7.02

14 565

2.20 7.82

4,614,755 4

509,443 1,210,186 1,719,629

382,605 454,09

1,414 561 600

1,212 2,373

607,199 1,682,611 1,578,404

104,207 42,805

2,289,810 829.04

327 327

13 3.98

o 0.00

1,456 1,456

56 3.85

SPLY to Date .** ••• *~~*.

\1' YTD

101.3 -33.3 -43 6 -44.3

0.0

0.0 0.0

54. 19.1 27 .8 20.8 65.8

-71. 2 0.0 0.0 0,0 0.0

10.0 1.0 1.7

-29.3 3.7

-3.5 -26.

-21. 0 -21.0 85.7

135.1 -100.0 100.0

-12.0 -12.0 -6.7

6 . .1 ===~==.==== ••••••••••••••••••••••••••••• = •••••••• - •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• HR'l"l' TOTAL HOURS BBTT TO'fAL SAL/BEN

01'TA TOTAL OVERTIME OT'IR TOTAL 01' RATIO PO'J'T TOTAL POT

Sl.TT TOTAl, SICK {,EAVE SUrR TO'I'AL SL !<A'rIO

T'l'SB 'l'OTAL FMl.A DC SBPR TOT P·MI,l\. DC % WKHRS 1''l'SD 'l'O'l'AI, NON FMLA DC SDPR TOT NON FMLA DC \ WK ~"rSF TO~'A!. FIIII,l\. NO DC SP'PR TOT FMLA WKIIRS

WPT'l' TOTAl. l.WOP

2,984 125,163

225 '1.54

o

169 5.66

o 0.00

o 0.00

97

109

3,107 132,384

141 4. 54

2

125 4.02

o 0.00

o 0.00

o 0.00

o

-4.0 -5.5

59.6 66.2

-100.0

35.2 40.8

0.0 0.0 0.0 0.0 0.0 0.0

0.0

-3.2 -1. 9

-13.5 -10.6

-100.0

-15.1 -12.3

0.0 0.0

-100.0 -100.0 102.1 106.7

7.9

12,373 523,873

777 6.28

2

601 4.86

16 0.13

9 0,07

345 2.79

489

12,572 542,355

598 4.76

7

483 3.84

o 0.00

o 0.00

o 0.00

o

-1. 6 -3.4

29.9 32.0

-71.4

24.4 26.4

0.0 0.0 0.0 0.0 0.0 0.0

0.0

-6.6 -4.4

-29.6 -24.7 -75.0

-12.3 -6.1

-50.0 -46.5 -43.8 -39.8 44.4 54.5

11. 9

137,634 5,626,160

7,966 5.79

99

4,243 3.08

92 0.0'1

195 0.14

1,122 O.

5,589

o. '/ -1.

16.8 16.0 35.

-19. -20.1

0.0 0.0 O. 0.0 0.0 O.

0.0

Page 83: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

UKt't:~ (.;omplement vs Caps/Plans Lead/Office: PALM SPRINGS PO (055796)

_Q ____ ~ _____ J:'~yJ:»_cl_jJL_EY"~_QtL Pay Pd 21 Pay Pd 15 CHANGE FY 2011 FY 2011 FY 2011 FY 2012 FY 2012 fRQM=~==-~" P~if:Cf2~=:j~j'~~OBy"" "FROM~"""~." T6----E---;I-"~ """ ·-------"·1--"---]-ACiIV-J.---~-""""""-

___ ~ _______ " __ " ____ " ___ "_""" __ "" _______ "_" __ ~~~{~~;~:~!~_ ~~~Mths ___ ~~ __ ~~~;~""" "_~~";_~~~_ PLA: ~~~~ PLA~

('rOO?

RESTRICTED INFORMATION Paqe 1 of 1

Page 84: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

ORPES Complement vs Caps/Plans Lead/Office: PALM SPRINGS PO (055796)

_~ ___ ~ _~ ______ J~~}'eQ?J) __ fY_£Ot()_ Pay Pd 21 Pay Pd 20 CHANGE FY 2010 FY 2010 FY 2010 FY 2010 FY 2010 ~~~-~-~~~--~~~--~~~~l--~~~~-~~-~E~~-~l---~--~J~~]~~--~--~]~--------'l-~-----~--

_.____________________~ ____ ~~;;~_ ;~~._ IN ~~~~ _____ CAP ~~~~~ _____ ~~~~ _____ ~~;~ __ ~_~~_~ __ ~~~~__ PLA: ~ ____ ~~, ~_"~"_e~.~~. _

Function 2 - DEL MGMT

Function 4 - CUST SE~V

cr002

RESTRICTED INFORMATION Page 1 of 1

Page 85: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

"'i".''''''''':::,", OPERATiONS SUPPORT AREA

2011

SUBJECT:

Area has a review 0'fyour m0'st recentlViaintenal1ce S'!',::rtt!"'r! Packages for FY-

2011 t0' include all recent adjustmentsf0'f FSS sites.

Please review the attached spreadsheets f0'r theauthon;Z€;d cQmpfement and complement mix,

Trre staffing levels conform to the criteria ahc:l guidelihes setr6lih the MS'-47 and eWHEP.

Please neite that y0'ur 38 Staffing Packages need t0' accurately reflect Y0ur3B'in;;ren'tory and workload for

all LOC's.

Additionally,y0'u have facilities that qUalITy for subconftadingof tiealiina servIces but, are staffed with a full

time custodian, These facilities need to be monitored through ybufcomplement comrnittee.and

maintenance staff and converted to contractcleal1ing serviceswhel1 vacated.

questions your staff may have; please contac~ Ron Prodigqlipadat a58...q74,-3187 or CharleS SWeet at

858-674-3169.

I L> '--------. P. fv1unoz

Page 86: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

L SELLERS P&DC wJFSS

Page 87: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

San Bernardino P&DC Authorized Z(}11 Comptement

o o o o a

o -l 1 Z ~9

o

o o o o

G

2

-3

Page 88: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

Midway Authorized 2011 Complement

Dale 113112011 File:San Diegol Mix2jY2011 Finai-FSS-01-19-2011-Authorized.xls

Page 89: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

Moreno Valley DDC Authorized 2011 Complement

Date:1!31!2011 File:San Diegol Mix2_FY2011 Final-FS$·01-19-Z011-Au(honzedxls

Page 90: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

SAN OtEGO CLOSTER F3B 2011 AUTHORIZED STAFFING TOTALSs wJFSS

LDC35 LDe3S LDC37 LDess LDG39 TOTAL

MLS P&DC 20 97 22 52 11 202

5 10 24 4 66

SAN BERNARDlNO 13 ·14 7 141

ORENO VALLEY DOC

Page 91: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

FY-20i1 MAINTENANCE STAFFING AUTHORIZATiON

SAN D1EGO CS&S 2011

n::.t",·1f:>'1/;I()11 FileSan Dieool Mix2 fY2011 Final-FSS-OI-19-201'-Authorized..xis

Page 92: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

FY-2011 MAINTENANCE STAFFING AUTHORIZATION

Date: 1131[2011 FifeSan Diegol Mix2_FY2011 Final-FSS-01-19-2011-Authorrzed.xls

Page 93: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

FY-ZOi1 MAINTENANCE STAFFING AUTHORIZATION

Date:1/31/2011 FileSan DieQol Mtx2_FY2011 Final-FSS-01-19-2011-AlJthorized.xls

Page 94: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

FY..:2011 MAINTENANCE STAFF!NG AUTHORIZATiON

Laoorer,C.ustotliai

Laborer, CHstod.ial SDG-HlJIc'ftlst

Laborer. Custodia!

Page 95: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

FY-2011 MAINTENANCE STAFFiNG AUTHORIZATION

Date: 1/31/2011 FoeSan Diegol Mix2_FY20"'i 1 Flnal-FSS-01-19-2011-Authorized .xls

Page 96: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

Sarti BernarcUno MS41 UPDA lrE 2011

Current 4852 Current On Rolls

I Casual I SMC

3560,1 2.0

I : \160 I 1 I 1

1'5i~;4 0.9 1942.2 1.,1

1171;;6 0.7

I '" 98;i"-~ I I 1

3414.6 ;z.o 2 '2;7'42~1 1.6 1 1 245:0A 1..4 2:211,& 1.3 2647.9 1.5 28027 1.6

272,5.3 1.6 R 3699.~3 2.1 I 179 i 2

'11.Q:iji1· t.O 2183.5 1.6. 1 1581~9 0.9 ~ 4772.3 2.7 2 2728.7 ~1.6 ~

3968.2 2.3 2 448 ,: ... ;.,.~ ...... , 1 .................. 1' ............

4326~9 2.5 2 807 2 I 1 3501.8 2.0 2 1 1

Page 97: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

San BernancHno M~4f Ut"UA 8 It:. LlP U U

Current 4852 Current On Rolls

it""(!!"":',,1,'t,,: FIR I PTR I Oasuall SMC

2641,S 1..5 1 882 I 1

2517.7 1.4 1 758 N 1 3639.7 2.1 2 120

1931.7 1.1 4349.2 2;5 3223,.6 1.:8 297~L1 1.7

14'12~O 0 .. 8'

1744~1 1~O 2271,9 1.3 3280.8 1.9 3949.0 2.2 2 I 429 D I 1

2232.1 1.3

4530Jl 2.6 3629.0 2:1 2 109 "o._.? I I I 1

~\ ....... " 2588.4 1J3 1 828 1

MO '" Bold 105991 60 44 16 46 5 2 8

North Earned 60 [ill North & Squth Earned 113

Page 98: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

San D~ego MS41 UPDATE 2011

Current 4852 Ourrent On Rolls 2010

SOIVI

PTR Casual BIVIC

92114

o 92119

Page 99: Western Area MANAGER, LABOR RELATIONS ( ) So. West …...N SOM2 N SOM3 S 4 SOM4 N 5 SOM 5 Sub-Total ( S 76.8 34.4 Pi1ge 4 . 112 N N 3 S 4 N 5 Sub·Total S 921 3 2 +---1--7 14 34 Pdge

San lDnego M~4f U~UA u t:. ,t:ll1ll 11512011

Current 4852 Current On Rolls 2010

PTR Casual I BMC

53 37 16 &7 i 1 [- Earned'S'Quth .~ -- -- 53-- ]

o