western washington hydrology model 2005 awra annual conference doug beyerlein, p.e. joe brascher...
TRANSCRIPT
Western Washington Western Washington Hydrology ModelHydrology Model
2005 AWRA Annual Conference2005 AWRA Annual Conference
Doug Beyerlein, P.E. Doug Beyerlein, P.E. Joe BrascherJoe Brascher
Shanon WhiteShanon WhiteClear Creek Solutions, Inc.Clear Creek Solutions, Inc.www.clearcreeksolutions.comwww.clearcreeksolutions.com
Western Washington Western Washington Hydrology ModelHydrology Model
Presented at the Presented at the 2005 AWRA 2005 AWRA Annual Conference, Seattle, WAAnnual Conference, Seattle, WA
© Clear Creek Solutions, Inc.© Clear Creek Solutions, Inc.All Rights Reserved.All Rights Reserved.
Clear Creek Solutions’ Clear Creek Solutions’ Hydrology ExpertiseHydrology Expertise
Clear Creek Solutions, Inc., provides complete range of hydrologic and stormwater modeling services.
• Clear Creek specializes in continuous simulation hydrologic modeling.
• We have 30+ years of experience modeling complex hydrologic and stormwater problems.
• We created WWHM3 for Washington State Department of Ecology and are adapting it to model Bay Area watersheds and facilities.
• We teach WWHM and HSPF workshops.
PresentationPresentation
IntroductionIntroduction
WWHM Background and Theory WWHM Background and Theory
WWHM and HSPFWWHM and HSPF
WWHM Application WWHM Application
Adaptation to Other RegionsAdaptation to Other Regions
Questions & AnswersQuestions & Answers
WWHM Introduction
Developed for the State of Washington Department of Ecology.
Project Manager: Dr. Foroozan LabibDepartment of EcologyPO Box 47600Olympia, WA 98504-7600(360) 407-6439email: [email protected]
WWHM Introduction
Developed for the 19 counties of western Washington.
Part of Ecology’sStormwater ManagementManual
WWHM Introduction
Available free from the Washington State Department of Ecology web site:
http://www.ecy.wa.gov/programs/wq/stormwater/
WWHM Background and Theory
Washington State Department of Ecology’s Stormwater Management Manual updated in 2001 to comply with:
Federal Clean Water Act Federal Endangered Species Act State Water Pollution Control Act
WWHM Background and Theory
Ecology’s Stormwater Management Manual
Specifies a flow duration standard
Requires the use of Western Washington Hydrology Model (WWHM)
WWHM Background and Theory
Flow duration standard: based on erosive flows.
WWHM Background and Theory
Flow Duration Analysis: Percent of time the flow exceeds a specific value.
Requires continuous simulation hydrology to compute flow duration.
WWHM Background and Theory
Continuous simulation hydrology models the entire hydrologic cycle for multiple years.
Stormwater runoff = surface runoff + interflow.
Where the rain goes:Where the rain goes:
Fore
st
Imp
erv
iou
s
Evapotranspiration
0%
100%
Surface Runoff
InterflowInterflow
Groundwater/Base FlowGroundwater/Base Flow
Land use development
Ponds designed based on Ponds designed based on a single event are too a single event are too
small.small.
Single-event flow frequency standards are based on inappropriate assumptions.
The need is to NOT increase flow durations for the range of erosive flows (for Western Washington the range is from 1/2 of the 2-year to 50-year flow event).
Inappropriate assumptions Inappropriate assumptions used by single event used by single event
methods:methods:
Assume stormwater detention facilities are empty at start of a rain event.
Assume too large predevelopment runoff when using SCS Curve Numbers.
Assume matching flow frequencies will result in no increase in erosive flows.
Ponds designed using single-Ponds designed using single-event methods fail because:event methods fail because:
The ponds are too small to store the additional runoff.
The number of hours of erosive flows increases even if the flow frequency does not.
The downstream riparian corridor is damaged by the increase of erosive flows.
WWHM Capabilities
WWHM uses continuous simulation hydrology to compute stormwater runoff for both
predevelopment and post-development conditions.
Predevelopment Post-development
WWHM Capabilities
WWHM continuous simulation computations from HSPF (included in WWHM software).
HSPF runs in the background with calibrated parameter values and local meteorological data.
HSPF sponsored and funded by EPA and USGS.
How HSPF works
Drainage areas are divided into pervious land segments based on soil, vegetation, and land slope and impervious land segments.
Pervious and impervious segments are linked to conveyance pathways (pipes, ditches, ponds, streams, rivers, lakes, etc.)
Historic rainfall and evaporation are used as input.
How HSPF works
The entire water cycle is modeled on an hourly or shorter time step for multiple years.
The model computes changes in soil moisture, evapotranspiration, and runoff every time step.
Three types of runoff: surface runoff interflow groundwater/base flow
How HSPF works
Pervious and impervious parameter values are calibrated using observed streamflow data.
Calibration uses multiple years of observed flow data so that the model is calibrated for both dry years and wet years.
We use a number of different statistical tests to judge the accuracy of the calibration.
How WWHM works
Calibrated parameter values are built into WWHM (different calibrated parameter values are used for different climatic regions).
Local precipitation and evaporation data are included in WWHM.
How WWHM works
User locates project on county map, inputs pre- and post-development land use, and proposed mitigation measure(s).
Predevelopment and mitigated flows are compared at Point of Compliance (POC).
Mitigated flows are not allowed to exceed flow duration standards.
How WWHM works
User outputs report file and project file.
Output files can be submitted to the permitting agency for approval.
Permitting agency can load project file and rerun analysis, if needed.
Report file summarizes input data and output results.
How WWHM works
Guidance/help is provided by User Manual Training Workshops CCS Project Book
WWHM Application:
Example: Convert forest to suburban residential housing.
WWHM Application: Step 1
User selects land development location and places red dot on map.
WWHM Application: Step 2
User inputs pre- and post-development land use.
Pre: Forest Post: roof, street, landscaping, & pond
WWHM Application: Step 2 cont’d.
User inputs initial pond specifications or uses AutoPond to optimize pond size.
WWHM Application: Step 3
WWHM computes and compares predevelopment and post-development routed runoff statistics
Flow frequency (2-year to 100-year):
WWHM Application: Step 3 cont’d.WWHM compares predevelopment and post-development routed runoff statistics
Flow duration (50% of 2-year to 100% of 50-year):
WWHM Application: Step 3 cont’d.
WWHM identifies water quality flow rates and volumes for separate treatment facilities based on Washington treatment standard of 91% of total runoff volume:
WWHM Application: Step 4
WWHM output summarizes statistics and whether or not the facility meets Washington State Department of Ecology’s standards:
WWHM Application: Step 4
WWHM designed pond meets Washington State Department of Ecology’s standards:
WWHM: LID Options
WWHM includes the following LID options:
Dispersion of impervious surface runoff on adjacent pervious surface (example: roof runoff to lawn)
Infiltration of impervious surface runoff on adjacent pervious surface (soil dependent)
Pervious pavement
PSAT (Puget Sound Action Team) recommends how to represent other LIDs in WWHM
WWHM LID Analysis Tool:
WWHM compares different development options selected by the user and shows the runoff distribution:
POC 1: ConventionalPOC 2: Dispersion (20% reduction in pond volume)
POC 3: Dispersion and Infiltration (84% reduction in pond volume)
WWHM Adaptation to Other Regions
HSPF model construction/calibration/parameterization Meteorological data Interface modification AutoPond rules Documentation and user manual Training workshops Maintenance and support Distribution
WWHM Future Enhancements
low impact development/source BMPs wetland modeling hydraulic routing HSPF water quality 3-D graphical interface your ideas?