wg3 – general information on work progress
DESCRIPTION
WG3 – General information on work progress. R. Vuillermet. PP0 area connection. Common reference and mechanical connection between type 1 services and flex. Flex connectors on discontinuous boards Type 1 connectors on a single board. Flex in PP0 area. Type 1 services in PP0 area. - PowerPoint PPT PresentationTRANSCRIPT
1
WG3 – General information on work progress
R. Vuillermet
12/04/2011
2
PP0 area connection
12/04/2011
Common reference and mechanical connection between type 1 services and flex
Flex connectors on discontinuous boardsType 1 connectors on a single board
3
Flex in PP0 area
12/04/2011
4
Type 1 services in PP0 area
12/04/2011
5
VI Beam Pipe Geometry
Component Radial thick[mm]
Outer Diameter [mm]
Alu foil 0.100 55.680Kapton tape 0.120 55.480Aerogel 4.000 55.240Kapton tape 0.120 47.240Heaters 0.200 47.000Beam Pipe 0.800 46.600Beam Pipe ID 45.000
Mark Gallilee
12/04/2011
Use to be 3 mm in
the TDR !
6
Construction of the scale one mock-up in building 180
12/04/2011
Week #15 – Survey of the rail system – installation of the central tower of concrete blockWeek#16 – Installation of the minivans – installation of access stairs – installation of hand rails – Installation of central plate on the towerWeek#17 – Installation of Bridge and scaffolding – installation of ITF – Survey and adjustment