PUBLIC HEARING Draft Amendments FY 2011/12 – 2015/16 Transportation Improvement Program (TIP). What is the TIP?. Federal legislation requires the TPO to prepare and adopt a TIP annually. The TIP identifies how all federal and state transportation money is anticipated to be spent. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/1.jpg)
PUBLIC HEARINGDraft Amendments
FY 2011/12 – 2015/16 Transportation Improvement
Program (TIP)
![Page 2: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/2.jpg)
What is the TIP?
• Federal legislation requires the TPO to prepare and adopt a TIP annually.
• The TIP identifies how all federal and state transportation money is anticipated to be spent.
• Projects = highway, public transit, rail, aviation, bicycle, pedestrian, safety, and freight-related projects.
![Page 3: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/3.jpg)
Content
• FDOT Five-Year Work Program (FY 2011/12-2015/16)
• Obligated Fiscal Year 2010 projects that are federally funded
• Local government CIP transportation projects
![Page 4: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/4.jpg)
Purpose of Amendments
• Must be consistent with the Long Range Transportation Plan
• Projects must be listed in the TIP with the correct phasing and funding in the year of expenditure in order to receive federal funds
![Page 5: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/5.jpg)
Public Hearing NoticeA legal ad was placed in the Lakeland Ledger on October 2, 2011 to notice this public hearing. Notice is provided in accordance with the adopted Polk TPO Public Participation Plan which complies with federal requirements regarding public involvement in the TPO process.
![Page 6: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/6.jpg)
Traffic signal update:– new signal, pedestrian & ADA features.Protect left turns on US 27:– construct turn lane on Student Dr.Design and construction in FY 2012Total = $ 94,000
US 27 @ Student Drive
![Page 7: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/7.jpg)
SR 37/S Florida Ave @ Pipkin Rd/Lake Miriam Dr
Intersection Improvement:- bring EB to SB right turn under signal control- remove free flow right turn conditions- Upgrade all pedestrian and ADA featuresDesign and construction in FY 2012Total = $ 52,277
![Page 8: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/8.jpg)
SR 563/Harden Blvd @ Ariana St
Intersection Improvement:- Modify separators to extend left turn lanes- Bring EB right turns on Arian under signal controlDesign and construction in FY 2012Total = $ 89,361
![Page 9: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/9.jpg)
SR 60/Polk Ave @ Walker St/MLK Blvd
Intersection Improvement:- Modify existing full median opening to a dual directional
median opening- Extend EB and WB left turn lanes on SR 60Design and construction in FY 2012Total = $ 64,163
![Page 10: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/10.jpg)
Rock Ridge Rd Bridge
Bridge Replacement:- Replace deficient bridge and correct horizontal alignment Design and construction in FY 2012Total = $ 90,000
![Page 11: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/11.jpg)
Rock Ridge Rd from US 98 to Deen Still Rd
Signing and Pavement Markings:- Install audible and vibratory edge lines- Advance curve warning signs with flashing
beacons and chevron signs at curvesDesign and construction in FY 2012Total = $ 10,000
![Page 12: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/12.jpg)
SR 17 from Seminole Ave to Osceola Ave
Drainage Improvements:- Add railroad/construction phase to drainage
project for installation of pip under railroad tracks
- Requires flagmanDesign and construction in FY 2012Total = $ 5,000
![Page 13: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/13.jpg)
Recommendation
The Citizens’ and Technical Advisory Committees approved these draft
amendments during their last respective meetings.
TPO staff recommends the Board approve the amendments to the FY 2011/12-2015/16
TIP as presented.
![Page 14: What is the TIP?](https://reader035.vdocument.in/reader035/viewer/2022062305/568166c9550346895ddad6aa/html5/thumbnails/14.jpg)
Public Hearing
The Polk TPO holds all public hearings in compliance with Titles VI and VIII of the Civil Rights Act. Public participation is solicited