what sub sea processing_low res
TRANSCRIPT
-
8/4/2019 What Sub Sea Processing_LOW RES
1/5
SubseaProcessing
-
8/4/2019 What Sub Sea Processing_LOW RES
2/5
atoilHdro Tordis Subsea Separatio Module
The Siemes ECOII gas compressor
Templates with Gas Compressio Statio
Gas/Liquid Caisso separator at2,500 m / 8,200 t water depth or
the Perdido proect i the GOM
Horiotal ESPs at 2,700 m /8,800 t water depth or theCascade&Chioo Proect
Subsea Processing
Subsea Pumping
Subsea multi-phase pumps have beei successul operatio i dieret parts
o the world or several ears, providigicreased oil recover ad productio
rates to their users.
Boostig is applied to overcome pressurelosses stemmig rom log pipelies ad/
or litig levels, ad to eable ow regimes
outside the sluggig evelope.
Subsea Gas Compression
For gas felds the reservoir pressure drops
over time. Sooer or later gas boostig willbe eeded to recover the remaiig reserves.
Subsea gas compressio is a area wherethe idustr is icreasig its ocus ad eorts
as the techolog represets a potetial orstep-chage cost savigs compared to buildi
a oshore platorm to host the compressor.FMC ad Siemes have etered ito a log-
term alliace to develop ad deliver subseacompressio sstems to the world maret.
Subsea Separation
For maturig felds a subsea processig statio ca
cotribute to icreased earigs, productio adrecover, improvig ad prologig the use o existig
irastructure. Separatio ad re-iectio o bul-water will ree up space i owlies ad risers ad
elimiate the eed or topside equipmet upgrades.
For ew feld developmets it ca eable cost-efcietad evirometall riedl platorm-less solutios,
where the feld is tied bac directl to a existig
oshore acilit or directl to shore.
Emerging TechnologyFMC Techologies is expadig its product
portolio to suppl our customers withstate-o-the-art techolog.
Focus areas iclude:
Deeper waterLoger step-outs
Heav oil separatio
e successul start-up ad operatio o Tordis,
e frst ullfeld Subsea Separatio, Boostig adectio Sstem, delivered b FMC Techologies
d its wholl owed subsidiar CDS. This is agifcat step orward i the implemetatio o
bsea Processig.
MC Techologies is curretl supplig subseaocessig equipmet to several other proects
orldwide, provig that the techolog isaturig rapidl. The eas oil i mature
gios has alread bee developed. Lesscessible oil i mature, ew ad utureshore regios ad felds at greater depths ad
th a loger step-out will lead to morebsea Processig i the comig ears.
a new set of subsea building blocks
Main Drivers orubsea Processing
Accelerated ad/or icreased recover
Developmet o challegig subsea feldsFlow maagemet ad ow assurace
Low qualit assets with low Gas Oil Ratio(GOR), high viscosit ad low permeabilit
ca be redered commercialReduced CAPEX o topside processig
equipmet ad pipeliesFlexibilit o irastructure or all
phases o feld lie
-
8/4/2019 What Sub Sea Processing_LOW RES
3/5
www.mctechologies.com/su
tal Pazfor in Block 17 oshore Angola,ntract value 1 Billion USD.
deep water 600 1,500 m / 2,000 4,500 t
Deliveries commece 2009
Key Facts Subsea Separation Sys
3 idetical CDS Gas/Liquid Separatio U
6 idetical Boostig Uits
Icreased Recover ad Hdrate Cotrol
Desig Capacit o 3 x ~110,000 bpd
pe Subsea Production System (SPS)
49 subsea trees ad wellhead sstems
3 Maiold Sstems1 SIV Sid (Gas Export Isolatio Valve)
1 Topside Wor Over
1 Topside Cotrol
Productio Cotrol Sstems
Coectio equipmet
ROV, Ruig & Tie i Tools
pe Subsea Separation Systems (SSS)
3 Subsea Separatio Sstems
SSS Cotrols Umbilical ad Pump cotrols
-
8/4/2019 What Sub Sea Processing_LOW RES
4/5
Test acilities CDS Arhem
FMC Technologies provides Subsea Processingexpertise throughout the value chain worldwide
We provide:
Studies rom Feasibilitto FEED phase
Techolog developmet adqualifcatio
Deliver proectsCustomer support
Our extesive wor has give us experiece
i desigig a optimal solutio or each
feld ad the abilit to deliver cuttig-edgetecholog. We are also able to leverage
the lessos leared rom ogoig adcompleted proects.
The FMC Techologies cocept o Subsea
Processig is a modularied sstembased o widel used subsea productio
techolog, providig:
Robust ad reliable subsea solutios
Full modular architecture, icludig retrievable uits
Robust separator techolog romFMCs subsidiar CDS
Flexibilit to meet chagig feldcharacteristics
Utilization o existing tie-in and
connection tools and components
or optimized and cost efcient
operations
Reerence Projects
FIELD CUSTOMER AWARD TyPEPROjECTDRIVERS SOLUTIOn
TORDIS StatoilHdro 2005 Browfeld Icreasig waterproductio
Water/Oil Separatorwith sad hadligad boostig
BC-10 Shell 2006 Greefeld Low Reservoir
Pressure/Heav oil
Gas/Liquid Caisso
separators with ESPs
PERDIDO Shell 2007 Greefeld Low ReservoirPressure/Heav oil
Gas/Liquid Caissoseparators with ESPs
CASCADE &CHInOOk
Petrobas 2007 Greefeld Low ReservoirPressure/Heav oil
Horiotal ESPso seabed
PAzFLOR Total 2008 Greefeld Hdrate FormatioRis/Low ReservoirPressure
Gas/Liquid Separatiowith seabed boostig
e Tordis Subsea Separatio Sstem wasstalled late 2007 adacet to the existig
rdis subsea irastructure which is curretloducig to Gullas C platorm.
istallig a ull-scale subsea separatio
cilit, StatoilHdro plas to improve the Tordislds recover actor rom 49 to 55%. Alog
th other upgrades to the feld, FMCs SSBI willow StatoilHdro to extract 35 millio extrarrels o oil rom the Tordis feld.
Tordis SSBI
he Tordis SSBI delivered to StatoilHydro, by FMC Technologiesthe frst ull-feld Subsea Separation Boosting & Injection System.
Value optimizationon Tordis
Water ad sad are removed rom the wellstream subsea ad re-iected directl ito
a separate disposal well, thereb reducigthe bac pressure towards the Tordis feld
ad allowig more hdrocarbos to beprocessed at the Gullas C platorm.
Boostig the well stream combied
with low pressure productio towardsGullas C maes it possible to extract
more hdrocarbos rom the reservoir.
> The Tordis Subsea Processing
cility is now in operation,
roducing according to expectations.
he Process System will be a
gnifcant contributor to our
ork or increased oil recovery.
te Alesaderse,ce Presidet EPn, StatoilHdro
pical challeges or maturebsea oil felds:
Icreased water cutIcreased bac pressure o reservoir
Reduced productio levelsnot possible to restart wells
need or icreased capacit orplatorm water treatmet
need or icreased use o chemicals
or hdrate ad corrosio prevetioIrastructure limitatios
-
8/4/2019 What Sub Sea Processing_LOW RES
5/5
CopyrightApril2008|FMCTec
hnologies|3DillustrationsbyIndustriellDokumentasjon
FMC Techologies1777 Gears RoadHousto TX 77067
USAPhoe: +1 281 591 4000www.mctechologies.com/subsea
FMC TechologiesPO Box 440nO-1373 Aser
norwaPhoe: +47 6675 3600