    Estimation is the core activity of any project manager and often gives headache. Managers have to

    balance between being aggressive to get the business and also ensure that the project does not go

    into RED due to shortage of resources.

    Test Estimation assumes a little more complexity, due to the fact that test effort is proportional to

    the maturity of the development process itself.

    Many a time we have struggled to ascertain the types of testing to be done for the product looking

    at the requirements. For ex: A ticket issuing machine has to be robust- In addition to testing the

    software, we need to test the platform where the machine is likely to be installed-bus, train,platform, etc

    The easiest way to arrive the right Test estimates is to break up the testing into functional and non-

    functional aspects and create a questionnaire to elaborate them further. foreg:

    1. How many configurations is the product expected to be tested-browser, devices, OS,etc2. What type of performance testing needs to be done-Response time, Peak usage load, Stress,

    Availability, etc..

    3. Type of installations4. UsabilityAccessibility, self explanatory, localized,etc5. What Functional and Non-Functional testing6. Are there tools available and their cost?

    After the tasks are identified based on a questionnaire, the effort for individual components need to

    be arrived at based on multiple factors likecomplexity, re-usability, type of the activity and so on.

    It is important to have a relevant estimation benchmarks which is based the past experience in that

    company or group or technology.

    Most people make the mistake of taking a template from some other company or project, which

    might have a different composition and hence those benchmark information might result in wrong

    estimates.

    If there is no past experience to bank on, it is important to do a Proof of concept to arrive at a

    baseline and mature the baseline over a period of time.

    Word of Caution-Never plan for unqualified buffers, since they can promote lethargy. Every buffer

    needs to be attached to an identified risk and used only if the risk materialises.

    Test estimationwill differ based on type of projects like data migration projects, development

    projects, application migration projects and so on.

    Keep in mind that the test estimation approach and template will differ, if you are looking at test

    automation projects, performance testing projects, functional testing projects. We will discuss

    about those in a different blog post.

    http://www.winvinaya.com/online-training/roi-based-test-automation-strategy-estimation/http://www.winvinaya.com/online-training/roi-based-test-automation-strategy-estimation/http://www.winvinaya.com/online-training/roi-based-test-automation-strategy-estimation/
  • 8/12/2019 What to consider, when you do Test Estimation?

    2/2

    The most important aspect of estimation is to refine the estimation model as we gain experience by

    collecting metrics and periodically analysing them at a minute task level.

    HAPPY TESTING!!!