where the dream beginsecrisponsor.org/presentations/mcc cisdi - ecri introduction.pdf · the...

33
The Birds Nest Built by the MCC group Where the dream begins

Upload: others

Post on 16-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

  • The Birds Nest

    Built by the MCC group

    Where the dream begins

  • We are the largest Engineering Company in the Metallurgical sector.

    112th largest company. in the Global Fortune 500.

    One of the Worlds 500 Most Influential Brands

    No. 8 of the ENR TOP 250 GLOBAL CONTRACTORS (2019)

    • 80,000,000,000 USD revenue in 2019• 252,000 Employees - 156,000 technical and managerial. • 130 subsidiaries and 26 JVs around the world

    Who are we….

  • 1

    2

    3

    4

    EPC Contracting

    Equipment Manufacturing

    Real Estate Development

    Resource Development

    • Steel and metal

    • Infrastructure

    • Public building

    • Theme Park

    • Power & Energy• Copper

    • Zinc

    • Nickel

    • Ferro

    • Housing

    • Commercial Building

    • Heavy mechanical Equipment

    • Electrical & Automation Equipment

    • Steel Structure

    A large conglomerate operating four core businesses

    What do we do ….

  • • Providing comprehensive products and services covering the whole life-cycle of Iron & steel, and non-ferrous projects.

    Iron & Steel Complex

    • Pelletizing• Sinter• Coke Oven• Blast Furnace• Steel Making• Continuous Casting• Rolling

    Metals Type NumberCu、AuNi、Co

    Tombar thite 39W、Mo 6V、Ti 11

    Li 5Zr、Hf 14Ta、Nb 3Ge、Gl 8Al、Mg 18

    Mg 5USMINAS Coke Oven Project, Brazil. 0.75Mt/a

    Nickel Smelting Plant, Tagaung Taung, Burma . 85000t/a

    Baosteel Extension Project, 3rd Phase.Overall design and construction

    Steel Making Project in Ardakan, Iron. 0.8 Mt/a Billet

    A part of the MCC groupWhat we do …. Turnkey Contractor (EPC) – Steel and Metal

  • Large scale material Environmental handling project (Engineering)

    Material handling project (EPC)

    CISDI boasts the full-range of core technologies for bulk material storage and handling and holds many national patents, and is a technical leader in this sector ensuring environmentally raw material storage .

    More than 80 references

    References (Design and EPC)*

    * Typical references only

    Client Number

    Baosteel 8

    Panzhihua steel 1

    TISCO 1

    Valin 1

    Zhanjing longteng 1

    Jilin 1

    Vale 1

    FHS 2

    Total 15

    • What we do …. Turnkey Contractor (EPC) – Environmental Control

  • 6

    Typical Steel plant view from Google Earth

    Google Earth 2011

  • After Environmental improvement –97% reduction in air borne polution Google Earth today

  • Universal Studios ,Sentosa, Singapore (EPC)Ocean Kingdom (EPC)

    Adventure Island, Shanghai Theme Park(EPC ) Tomorrow Land, Shanghai Theme Park (EPC )

    A part of the MCC group

    What we do …. EPC contractor - Theme parks

  • A part of the MCC group

    Shanghai Pudong International Airport.Airstrip, taxiway, parking apron and airfield.

    Colombo Airport Express Way, Sri Lanka.

    • Airport

    • Road & Bridge

    • Water Supply & Drainage

    • Power Station

    Water Supply & Transmission Line, Salah, Algeria.70 km pipelines, 50000m3 reservoirs, 8 water towers, and 24 wells.

    A part of the MCC group

    What we do …. Infrastructure

  • Beijing National Olympic Stadium (Bird’s Nest)

    Nanjing Olympic Sports Center

    A part of the MCC group

    What we do …. Stadia

  • What we do …. Equipment Manufacture

  • What we do …. Equipment Manufacture

    750V Rolling Mill TSC Filter Compensator

    10kV Cabinet Reactive Power Compensator (Medium Voltage Reactive Power Compensator and Harmonic Filter )

    KYN28 Series Steel-clad Movable-type AC Metal Enclosed Switchgear

    MNS Low-voltage Switchgear Assemblies—Low-voltage Switch Cabinet

  • Sources: MCC

    • Primary Land Development• Commercial real estate development and Sale

    • Affordable housing projects

    Affordable Housing Projects.

    The 2nd Phase Office Premises Of the Fortune Centre.International Grade-a Office Premises

    Village Projects.Exploration of a new mode of energy conservation, environmental protection.

    MCC Headquarter154m, 92700m2.

    A part of the MCC group

    What we do …. Real Estate

  • Sources: MCC

    APEC Conference VenueWork Scope: Steel structure works and metal roofConstruction

    Xiamen International Conference and Exhibition Center.

    Central Bank of Kuwait.Doha Gate, Qatar.

    • Hotel• Commercial Building• Conference & Exhibition Center• High-End Residence

    A part of the MCC group

    What we do …. Real Estate

  • What we do …. Rail Transportation & Municipal buildings

    Steel structure design for Metro

    Smart City design (E)Control benter building design for Metro Line

    Smart Cities

  • Sources: MCC

    Smelting Plant under Ramu Project in Papua New Guinea.Mining ,concentrating and smelting of laterite-nickel ore.

    Copper & Gold Minerals

    SINO-IRON Project in West Australia

    • MCC holds mining rights for metallic mineral resources such as iron ore ,copper, nickel, cobalt, lead-zinc and the other

    metals.

    • MCC is well experienced in the smelting and processing of Zinc, Lead and copper.

    • MCC has the “Polysilicon preparation technology national engineering laboratory”, “Polysilicon engineering technology

    research center”, and 2 production bases of Polysilicon.

    A part of the MCC group

    What we do …. Resource development

  • Financing Solutions

    Bridge between Client andFinancial sector

    • Financing is our business

    • Sound relations with SINOSURE,CDB and othercommercial banks.

    • Familiar with the procedural requirements of Export Buyer’s Credit loans

    Technical Expertise &Know-how

    Driving force for technical Innovation

    • Authorized to formulate: 26 national standards and 9 industrial standards;

    • 21,025valid patents (by 2018), including 2,214 invention patents.

    • Technology Innovation Enterprise Award

    Group Synergies

    Synergy Effects: revenue growth & cost reduction

    • 14 design and engineering institutes

    • 13 construction companies

    • Group-wide collaboration to enhance strengths

    • Strong Corporate Governance

    What do we do ….

  • Sri Lanka

    SaudiKuwait

    Algeria

    Malaysia

    Indonesia

    Hongkong & Macao Regions

    Russia

    Singapore

    Brazil

    CombodiaVietnam

    Pakistan

    Egypt

    Chile

    Nigeria

    DR Congo

    Australia

    Turkey

    India

    UkraineSerbia

    United Kingdom

    China

    USA

    Global footprint ….

  • CONFIDENTIAL AND PROPRIETARY

    Any use of this material without specific permission of MCC is strictly prohibited

    Group Structure….

    MCC International (Business window & Commercial Leader)

    Engineering , R&D

    OperationInfrastructureWater treatmentIndustrial AutomationIndustrial IT &ERPGreen ArchitectureSmart CityEnergy

    Construction

    CRIBC

    WRIMC

    MCCE

    R&D

    SKET

    WSGRI

    Geologicalsurvey

    CISDI

    CERI

    WISDRI

    MCCT

    Ramu Nico

    MCC 3

    MCC 5

    MCC 13

    MCC 17

    MCC 19

    MCC 20

    Metal & Steel

    ENFI

    CIE

    ACRE

    Mining

    HTC NETC

    CMMI

    Baosteel Technical

    MCC 22

    MCC HY

    BERIS

    MCC 1

    MCC 2

    MCC Real estate

    MCC BG

  • Metallurgical Corporation

    CISDI Group Co.

    Ltd

    CISDI Engineering

    CISDI Equipment SFRE CISDI UK

    CONFIDENTIAL AND PROPRIETARY

    Any use of this material without specific permission of MCC is strictly prohibited

    CISDI Group servicing international clients

    Group Structure….

  • A strong corporate governance policy is led by the management board operates across the group focusing on

    • Safety• Standards• Customer satisfaction• Quality control

    Corporate Governance ….

  • Planning Feasibility Study Engineering OperationDiagnoseUpgrade

    CommercialPlanning

    Market Study

    Overall Planning

    Project Proposal

    Conceptual Study

    CAPEX Analysis

    Pre-feasibility / Feasibility Study

    Basic Engineering

    Detailed Engineering

    EPCM

    Project Supervision

    EMSMaintenance and sparesPerformance Management

    Energy Efficiency DiagnosisCapacity Increase

    Maintenance Improvement

    Technology Upgrading

    Independent third-party services

    Direct service to the client

    Evaluation of Feasibility Study

    Evaluation of Energy Efficiency

    EIA

    Engineering Phase Construction Phase Operation Phase

    B2

    A B C E F

    B3

    B4

    A4

    A5

    A6

    B1 C1

    C2

    A1

    A2

    A3

    E1

    E2

    E3

    F1

    F2

    F3

    F4

    D1

    D2

    ERPE4

    ConstructionD

    Enterprise M&AA7

    Due-diligenceE5

    EPD2

    EPCD3

    Activities ….

  • Planning Feasibility Study Engineering OperationDiagnoseUpgrade

    Bidding Construction Phase Operation Phase

    A B C E FConstruction

    D

    The Company is very risk averse.

    At every stage in the project our opportunities are evaluated

    A committee of our peers ensure the

    project targets, standards and Company ethics are not at risk.

    All subsidiaries are monitored and controlled to ensure compliance

    with company procedures

    Engineering

    Atitude to risk ….

  • Planning Feasibility Study Engineering OperationDiagnoseUpgrade

    Bidding Construction Phase Operation Phase

    A B C E FConstruction

    D

    The Company is very risk averse at all stages.

    1. Are there any safety concerns.

    2. Are all the technical requirements achievable.

    3. Is there any possibility of failure.

    4. Are there any ethical or Environmental concerns.

    5. Can the needs and wellbeing of the employees be met at all project stages.

    We decline more projects than we accept.

    Engineering

    Atitude to risk ….

  • R&D investment

    Post-Doctorial Research National Engineering Research Center

    for Iron & Steelmaking Plant Integration 6 Engineering (Technology) Research

    Centers 19 Laboratories in Iron & Steelmaking

    and other areas Green Building Research Center

    R&D Center

    Filing for over 1,000 patents, received over 400 patents, including 129 invention patents

    85% of patents found application in projects Contributes to preparation of 12 National Standards and 14

    industrial standards More than 40 national awards More than 300 Research awards

    R&D investment constitutes 4% of revenue per year More than 200 specialized and 500 part-time R&D

    personnel More than 20% of the engineering personnel are

    involved in R&D

    R&D Achievements

    R&D Expenditure

    R & D ….

    Chart1

    2010

    2011

    2012

    2013

    2014

    33.3151428571

    39.1942857143

    32.6619047619

    34.8177419355

    29.1573770492

    Sheet1

    7032201033.3

    7905201139.2

    8535201232.7

    9407201334.8

    8894201429.2

    新签合同

    2008150.721507220082392.42392.4

    2009109.511095120091738.31738.3

    2010112.341123420101783.21783.2

    2011118.251182520111877.01877.0

    2012122.341223420121941.91941.9

    科技投入

    20083.9390201061.961.9

    20093.38338200953.753.7

    20103.7370201058.758.7

    20113.05305201148.448.4

    20122.94294201246.746.7

    营业收入

    200870.32703220081116.2

    200979.05790520091254.8

    201085.35853520101354.8

    201194.07940720111493.2

    201288.94889420121411.7

    Sheet1

    Sheet2

    Sheet3

  • First period of growth

    First period of

    adjustment

    Second period of growth

    Second period of adjustment

    Third period of growth

    29 years 17 years 28 years 25 years 18 years

    Main countries developed steel

    industry: UK, USA

    Main countries developed steel

    industry:Germany, Japan,

    USSR

    Main countries developed

    steel industry:

    South east Asia

    4.3%

    0.7%

    6.4%

    -0.2%5.0%

    Trends of Global Iron & Steel Industry – how it influences our businessOligopoly, regional protection, requirements of internal efficiency improvement are driving the technology revolution of iron & steel industry

    Third period of

    adjustment

    • The steel industry follows the path of the world’s economics development, presented 3 growth periods and 2 adjustment periods.

    •The 3rd growth period led by China & south east Asia is about to be replaced by the 3rdadjustment period

    192019101900

    500

    0

    2020201020001990198019701960195019401930

    1,000

    1,500

    2,000

    37%

    Regional Protection

    Trade war between China and US has affected steel supply chain around the world

    Oligopoly – Limited Competition

    Technological Revolution

    World crude steel production (1900-2018) Unit: Mt

    Labor cost increasing pushed intelligent technological revolution

    Resource allocation and utilization efficiency are optimized by intelligenatization and big data

    Production safety improvement

    New Invented Process and Environmental technique improvement

    Top 20 steel companies produced 37.2% of the world’s crude steel (672.52mt out of 1808mt) in 2018

    The merging and reorganization of the steel industry in China is on the rise (Baowu and Maanshan, Shagang and Dongbei Special, and others), the goal is to reach concentration to 60% for Top 10 Steel Companies by 2025

  • Intelligent Manufacture

    27

    2

    CISDI’s intelligent manufacturing has stepped up the innovation of steelworks’ production flow, technological systems and organizational management. Giving higher efficiency & quality, environmental protection and safety control and monitoring.

  • Intelligent Manufacture

    28

    Baowu Group Zhanjiang, Guangdong, China The world’s first eco-friendly, intelligent unmanned stockyardThe world’s first steel intelligent integrated control centerStarted up in 2019

    • Conventionally Large scale industrial plants consist of Multiple processesprovided by different equipment suppliers and are generally controlledseparately with an overall level 3 system which monitors the performanceof each area.

    • A benchmark for the world’s first centralized and massive application ofthe internet of things, mobile internet, big data and cloud computingexpertise to conventional steel flows

    • Labor productivity up by nearly 40%• Cost per tonne of hot metal reduced by USD 3.54• Avg. daily output up by 500 tonnes

  • References of Intelligent Manufacture

    Realize centralized control, flow simulation, production and consumption prediction, system inspection guidance

    Labor productivity up by 20% Energy utilization rate up by 5% Comprehensive energy consumption down by

    4kgce/t

    Realize unmanned locomotive driving, intelligent vehicle scheduling, management data

    Labor productivity up by 60% utilization rate up by 12.5% Transportation efficiency up by 10% Gasoline consumption down by 5%

    smart hot-rolled coil warehouseStarted up in 2019

    The world’s first autonomous locomotive for hot metal transportstarted up in 2019

    The first smart energy centerStarted up in 2019

    Warehouse’s operators reduced by at least 50%

    Warehouse’s overall productivity increased by at least >10%

    Comprehensive energy consumption reduced by 5-10%

    Injury from equipment and goods faults: eradicated

    Significantly reduced operation risk

  • COVID 19 – Influence on Intelligent Manufacture

    The use of AI and robotics for manual work is the target.

    Developments are now in place to remove the requirement for 2 operators to work in close proximity by the end of 2020

    We expect implementation of these developments to be a significant portion of our business long term.

    Since the beginning of the COVID 19 pandemic the investment in Intelligent

    manufacturing systems, robotics and AI has increased 10 fold.

  • Some typical current projects

    What we do ….

  • Overall design of Ha Tinh Steel Plant of Formosa Vietnam P.G. 22.5Mt/a

    Overall design of Zhanjiang steel plant 10 Mt/a

    What we do …. Overall plant design and planning

  • Master Plan, Stockyard and BF at Baosteel Zhanjiang, Guangdong, China

    Typical Steel references in the last Five Years

    Master Plan, Tapping from BF and Night View of 4350m3 BF#1 in FHS, Vietnam

    5870m3 BF#2 of TATA Steel TSK Project, India

    Trial Production of Wire Rod & Bar Mill of MKCIP Steel Works Malaysia

    ArcelorMIttal UkraineBlast Furnace 9 - 5050 m3Start up 2022

    33

    Slide Number 1Slide Number 2Slide Number 3Slide Number 4Slide Number 5Slide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11Slide Number 12Slide Number 13Slide Number 14Slide Number 15Slide Number 16Slide Number 17Slide Number 18Slide Number 19Slide Number 20Slide Number 21Slide Number 22Slide Number 23Slide Number 24Slide Number 25Slide Number 26Slide Number 27Slide Number 28Slide Number 29Slide Number 30Slide Number 31Slide Number 32Slide Number 33