Page 1: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

1

Page 2: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

1

WHO WE AREEstablished as a pure construction firm in 1997, Megawide began with a singular vision: to raise the calibre of Philippine construction and engineering.

Today, it has become a publicly-listed engineering and infrastructure corporation committed to transforming social, utility and transportation infrastructure through exceptional O&M and EPC.

Backed by advanced construction systems and technology, and a strong workforce led by local and international experts, Megawide delivers unparalleled engineering excellence in numerous projects across the country.

Page 3: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

2

Page 4: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

3

To become the Philippines’ leading and largest construction conglomerate

VISION

To improve communities through Engineering Excellence, by continuously delivering the highest quality service to our partners

MISSION

OUR VALUESEx.C.I.T.E.SExcellence. Commitment. Innovation. Teamwork. Safety.

ExCITeS is the acronym of the corporate values of Megawide Construction Corporation. It is about the continuing drive and goal of the company to institutionalize these values and infuse them into its culture.

Page 5: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

4

Page 6: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

5

OUR MILESTONES

1997

• Megawide is established as a pure construction firm

• Megawide secures Triple A license from PCAB

• Megawide is awarded its first SM Development

Corporation (SMDC) project, its biggest project at the time

• Megawide holds Initial Public Offering and is

oversubscribed three times

• Megawide builds its Precast Facility in Taytay, Rizal, one of the largest in

South East Asia

• Citicore-Megawide Consortium Inc. is awarded

the PPP for School Infrastructure Project

(PSIP) – Phase 1 for the construction of over 7,000 classrooms in Regions III

and IVA

2007 2011 2012

Page 7: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

6

• Megawide is awarded the PSIP – Phase 2 for the construction of over 2,000

classrooms in Regions I, II, III, and CAR

• Megawide and partner GMR Infrastructure Ltd. from India are awarded

the Mactan-Cebu International Airport (MCIA) PPP project for the expansion and operation of airport facilities for 25 years

• Megawide is awarded ISO 9001:2008 and ISO 14001:2004 certifications

• Megawide-WalterMart (MWM) Terminals, Inc. is awarded the Southwest Integrated Transport System (SWITS) PPP project for the construction and operation

of terminal facilities for 35 years

• Megawide entered into a new platform in EPC, the construction of Renewable

Energy Power Plants

2013 2014 2015

Page 8: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

7

Megawide is one of today’s leading contractors in Engineering, Procurement, and Construction (EPC), driven by strong capabilities in Architectural and Structural work, BIM, MEPF, Line and Grade, and Earthworks.

The company has a diverse portfolio mix of private and public sector projects built through strong core assets in production, manufacturing, and transportation.

WHAT WE DO

Page 9: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

8

Page 10: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

9

OUR ADVANCED SYSTEMS AND TECHNOLOGY

A. THE MEGAWIDE INDUSTRIAL COMPLEXLocated in Taytay, Rizal, the Megawide Industrial Complex spans an area of 200,000 square meters. The complex is currently comprised of two Precast factory buildings, a dedicated formworks assembly area, and the company’s Construction Equipment and Logistics yard.

Megawide’s highly advanced Systems and Technology transformed industry standards with its consistent delivery of exceptional quality in a fraction of traditional timeframes.

Page 11: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

10

B. PRECASTArea : 16,600 square meters. Capacity : Capable of manufacturing more than 1 million sqm of precast elements per year

Megawide’s Precast facility is considered one of the largest and most advanced in South East Asia. It boasts of a highly advanced European System that allows:

• Achievement of higher levels of standardization and precision in construction, offering lower long-term costs and shorter construction timelines. • The strictly controlled environment ensures that the condition, craftsmanship and quality of materials meet high levels of consistency. • Faster working periods are guaranteed. Embedded connections allow easy installation upon arrival on site. • Production of elements follow client’s preferred colors and finishing

Page 12: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

11

C. FORMWORKSMegawide employs state-of-the-art Formworks technology from Germany for Cast-In-Place construction. This type of construction creates efficient and more resilient structures, making it a preferred building technique by today’s top developers.

Formwork Systems :• Single-sided Formwork - used for standard wall heights. • Wall Formwork - used for casting walls, support walls, pillars, earth retaining walls, and other vertical type castings. • Column Formwork - allows quick assembly and erection on site. • Guided Climbing System - usually used for walls in high-rise construction. • Slab Formwork - allows concrete to be poured and suspended above the ground; supports the weight of the concrete while it sets. • Guided Climbing Screen - promotes optimum work safety especially on slabs or slab edges on high rise construction. • Automatic Climbing System - a crane-independent climbing system, operated using hydraulic drive; used for tall concrete structures.

Page 13: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

12

D. CONCRETE BATCHING PLANTMegawide has two Batching Plant locations to ensure quick and continuous concrete supply: the Megawide Industrial Complex in Taytay, Rizal, and a flagship plant in Taguig City. The plants are compact and fully-automated, with the Taguig plant capable of producing 100 m3 of cement per hour. The plant houses its own laboratory that formulates unique design mixes.

• Capable of producing up to 12,000 PSI concrete, the plant boasts of 1% margin of inaccuracy in production when current European standards are at 3%. • The plant’s control system and transit mixers are the first of their kind in the country. The mixers are electronically controlled and can carry high volumes of up to 12 m3. • The plants are highly sustainable. Silo filters ensure the minimal release of dust into the area while advanced safety devices are in place to prevent mixture overfeeding and leaks.• In-house recycling facilities ensure 100% recovery of materials.• The plants do not contribute to noise pollution, which benefits employees and the surrounding community.

E. EQUIPMENTMegawide has established two strategic locations to deploy its fleet of construction transportation and equipment: the CELD yard in Taytay, Rizal, which includes all precast transportation equipment, and the Motorpool in Makati City. The fleet supports Megawide’s highly specialized methodologies, ensuring consistency and efficiency in construction. Megawide has at least 52 trucks ranging from 10-Wheeler trucks, Knuckle boom trucks, 6-wheeler boom trucks, tractor heads, dump trucks, and mini dump trucks.

Page 14: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

13

MEGAWIDE’S PRESENCE IN DIFFERENT AREAS IS AS FOLLOWS:

1. Mactan-Cebu International Airport2. Southwest Integrated Transport System3. PPP for School Infrastructure Project Phase 14. PPP for School Infrastructure Project Phase 2

A. Solar

B. Hydro

1. Silay Solar Power Plant2. Bataan Solar Power Plant3. Toledo Solar Power Plant

1. Ilaguen Hydro Power Plant

A. ResidentialB. Office/CommercialC. Mixed-useD. Hotels and CasinoE. Low-cost Housing

I. PUBLIC-PRIVATE PARTNERSHIP

III. POWER

II. CONSTRUCTION

Page 15: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

14

1. Mactan-Cebu International Airport2. Southwest Integrated Transport System3. PPP for School Infrastructure Project Phase 14. PPP for School Infrastructure Project Phase 2

II. CONSTRUCTION

I. PUBLIC-PRIVATE PARTNERSHIP

Megawide continues to participate in nation-building through the construction of world-class infrastructures for the Filipino people.

Page 16: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

15

Owner

Location

GFA

Agreement

Scope of Work

Contract Cost

GMR MEGAWIDE Cebu Airport Corporation

Airport Road, Lapu-Lapu City

66,544 sq.m.

Build-Operate- Transfer for 25 years

EPC (Engineering, Procurement, Construction)

34 B

15

Page 17: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

16

MACTAN-CEBU INTERNATIONAL AIRPORTGMR-Megawide Cebu Airport Corporation (GMCAC) reinforced the role of the Mactan-Cebu International Airport as an engine for economic growth with the immediate renovation and upgrade of the existing terminal to transform the ageing facility into a modern gateway.

The enhancements made possible the efficient accommodation of over 7 million passengers despite a design capacity of only 4.5 million passengers per annum.

GMCAC also kicked off the intensive construction of Terminal 2 last June 2015. The terminal will be brought into service by 2018, increasing the airport’s handling capacity to 12.5 million passengers per annum.

Travelers responded positively to the transformation of Terminal 1 and the improved customer service. In a survey by the Guide to Sleeping in Airports website, MCIA was voted 18th Best Airport in Asia.

In 2015, GMCAC received accolades for MCIA as • Asia Pacific Transport Deal of the Year and• Asia-Pacific PPP Deal of the Year

Page 18: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

17

Owner

Location

Project Site

Agreement

Contract Cost

MWM Terminal (Megawide-Waltermart)

Manila-Cavite Expressway, Paranaque

4.59 Hectares

Build- Transfer-Operate for 35 years

3.8 B

17

Page 19: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

18

SOUTHWEST INTEGRATED TRANSPORT SYSTEM

Another key economic infrastructure that is underway is the Southwest Integrated Transport System. This urban transport terminal awarded to the Megawide and Waltermart Property Inc joint venture, will link all provincial buses from Cavite to other modes of inter-city transport as well as to the LRT 1.

The departure area will boast of 36 bus bays leaving at 15 minute intervals while the arrival area will hold 23 bus bays. SWITS is expected to service over 34 million passengers per annum. Commuting will be made easy, safe, and convenient.

This modern, sophisticated, transport Infrastructure will also be a home to BPO Offices and will offer various retail, dining and shopping options.

Page 20: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

19

PHILIPPINE SCHOOL INFRASTRUCTURE PROJECT (PSIP)Megawide designed over 12-types of classrooms to address the country’s shortage of schools and to transform learning in the primary level for Filipino children.

The school buildings have bigger classrooms, more spacious hallways and stairs, and were built to withstand signal #3 typhoon (wind speed of 185kph).

CLASSROOM TYPE-7

Page 21: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

20CLASSROOM TYPE-15

CLASSROOM TYPE-17 CLASSROOM TYPE-8

DEPED PSIP PHASE 2

Owner

Location

Agreement

Contract Cost

Megawide Construction Corporation

2,440 classrooms across Regions 1, 2, 3 and Cordillera Administrative

Region (CAR)

Build-Transfer (Turnkey Construction)

2.3 B

DEPED PSIP PHASE 1

Owner

Location

Agreement

Contract Cost

Citicore-Megawide Consortium, Inc.

7,140 classrooms across Regions 3 and 4A

Build-Lease-Transfer for 10 years

12.8 B

Page 22: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

21

II. CONSTRUCTION

Page 23: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

22

II. CONSTRUCTION

A. RESIDENTIAL

PROSCENIUMClient Rockwell Land Croporation

Location Estrella cor. J.P. Rizal St. Guadalupe

Viejo, Makati City

GFA

Description

234,527 sq.m.

2 Towers (44-storey and 42-storey)

SHANG SALCEDOClient Shangri-La Properties

Location Tordesillas St., Salcedo Village, Makati

GFA 91,617.15 sq.m.

Description 65 Storeys

Page 24: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

23

B. OFFICE/COMMERCIAL

THE CURVEClient IRMO Inc.

Location 32nd St. corner 3rd Ave., Bonifacio Global City, Taguig

GFA 46,665 sq.m.

Description 31-storey Office Building, 7 Parking Floors

JAZZ RESIDENCESClient SMDC

Location Jupiter St. cor. Nicanor Garcia, Makati City

GFA 285,469.07 sq.m.

Description 4 Towers, 36 Storeys, 1 Podium

Page 25: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

24

Client IRMO Inc.

Location 32nd St. corner 3rd Ave., Bonifacio Global City, Taguig

GFA 46,665 sq.m.

Description 31-storey Office Building, 7 Parking Floors

PHILAM LIFE CEBU

CYBERPARK TOWER 2

Client Philam Life

Location Cebu Business Park, Lahug Cebu

GFA 35,000 sq.m.

Description 16 Storeys

Client Araneta Group

Location Araneta Center Cubao, Quezon City

GFA 74,722 sq.m.

Description 30 Storeys

Page 26: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

25

C. MIXED-USE

DOUBLEDRAGON PLAZAClient Double Dragon Properties

Location EDSA Extension cor Macapagal Ave., Pasay City

GFA 230,131 sq.m.

Description 4 Towers with 12-storey Office Complex, Mall, and Basement Parking

SOUTHWOODS MALL AND OFFICEClient Megaworld Corporation

Location Southwoods Eco-Centrum Biñan, Laguna

GFA 61,762 sq.m.

Description 5-storey Mall with BPO Office

Page 27: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

26

THE HIVEClient MySpace Properties

Location San Isidro St., Ortigas Ave. Extn., Taytay, Rizal

GFA 48,029 sq.m.

Description 4 Blocks of 12-level Residential Tower with a CentralPark and Swimming Pool

D. HOTELS AND CASINO

Client H2O Ventures

Location Kalayaan Ave. Cor. Makati Ave.

GFA 61, 109.80 sq.m.

Description 42-storey Hotel and Residential Building

WORLD HOTEL AND RESIDENCES

Page 28: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

27

CITY OF DREAMS

NHA CAMARIN MASS HOUSING

Client Belle Corporation

Location Asean Avenue Cor. Macapagal Boulevard, Paranaque City

GFA 195,200.80 sq.m.

Description 10 storey leisure and entertainment complex

E. LOW-COST HOUSING

Owner

Location

GFA

NHA Housing

Camarin Caloocan City

37,542 sq.m.

Page 29: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

28

8990 URBAN DECA ORTIGAS

8990 URBAN DECA MANILA

Client 8990 Holdings

Location Ortigas Ext., Pasig

GFA 750,860 sq.m.

Description 24 Clusters with 13-storey Residential Complex

Client 8990 Holdings

Location Tondo, Manila

GFA 488,410 sq.m.

Description 14 Clusters with 13-storey Residential Complex

Page 30: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

29

III. POWER

Page 31: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

30

III. POWER

A. SOLAR

BATAAN SOLAR FARMAn 18-megawatt solar power plant in Mariveles

TOLEDO SOLAR FARMA 60-megawatt solar power plant in Cebu

SILAY SOLAR POWER PLANTA 25-megawatt solar power plant in Negros Occidental

Page 32: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

31

ILAGUEN HYDRO POWER PLANTA 30-megawatt hydro power plant in Isabela

A. HYDRO

Page 33: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

32

ISO 9001:2008 Quality Management System

(QMS)

Compliance to ISO 9001:2008 assures customers that Megawide provides consistent, quality services in all its

transactions at all times.

OHSAS 18001:2007 Occupational Health & Safety

Management System (OHSMS)

Attainment of this OHSAS 18001:2007 demonstrates Megawide’s

obligation in maintaining and implementing globally accepted workplace

health and safety standards across all our operational activities.

ISO 14001:2004 Environmental Management System (EMS)

Certification to ISO 14001:2004 upholds Megawide’s commitment to

carry out and implement set of processes and practices that will enable the company

to reduce its environmental impacts and increase its operating efficiency.

Leadership in Energy & Environmental Design (LEED)

Affirms the company’s unparalleled commitment in promoting effective energy

management and sustainability.

AWARDS AND CITATIONS

Page 34: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

33

AAA LICENSE ASiAMONEY Best Managed Companies

CERTIFICATES

AWARDS AND CITATIONS

Megawide’s Triple A license issued by the Philippine Contractors Accreditation Board (PCAB) certifies that the company may undertake up to Large B category projects, which is the highest category set by PCAB for contractors. The license classifies and categorizes companies according to their technical qualifications on the one hand, and financial capability on the other.

Page 35: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

34

COMPANY INFORMATION

Company Name

Office Address

Telephone Numbers

Website

Email Address

Megawide Construction Corporation

20 N. Domingo St., Brgy. Valencia, Quezon City

(02) 655-1111

www.megawide.com.ph

•fb.com/MegawideConstructionCorporationOfficial

•twitter.com/megawidebuilds

[email protected]

AWARDS AND CITATIONS

Page 36: WHO WE AREmegawide.com.ph/devsite/wp-content/uploads/2017/06/... · Corporation (SMDC) project, its biggest project at the time • Megawide holds Initial Public Offering and is oversubscribed

35

WWW.MEGAWIDE.COM.PH