Department of Transport and Main Roads Wide Bay/Burnett Region Bruce Highway roadworks – October 2013 Childers to Kolan River Additional travel time: allow 25 minutes Reconstruction works will start during October and are anticipated to be completed during December 2013. Capital works projects will continue through this area during 2013. Works will take place between 6am and 6pm from Monday to Saturday, with some out-of-hours work possible. Maryborough to Childers Additional travel time: allow 20 minutes Reconstruction works will start during October and are anticipated to be completed during December 2013. Capital works projects will continue through this area during 2013. Works will take place between 6am and 6pm from Monday to Saturday, with some out-of-hours work possible. For further information Roadworks are happening across the region and motorists should call 13 19 40 or check www.131940.qld.gov.au before travelling. * Cost of a local call. Higher call charges may apply from mobile phones or payphones. To receive ongoing updates about these works, please contact TMR on 1300 728 390* (during business hours), email [email protected] or visit www.tmr.qld.gov.au (search for “Reconstructing Wide Bay Burnett” and “Bruce Highway”). The Department of Transport and Main Roads has recently completed reconstruction works on the Bruce Highway from the 2010, 2011 and 2012 flood events. Reconstruction works from the 2013 flood events have recently started and will continue during 2014. Capital works projects are also continuing on the Bruce Highway throughout the Wide Bay/ Burnett Region. To assist motorists plan their travels and potentially seek alternative routes, the map provides details of where works are currently occurring and the anticipated delays. The department recommends that motorists factor additional travel time to their journey. At work sites, stop-and-go traffic arrangements are generally in place during work hours and reduced speed limits apply outside of work hours. Please slow down, drive to the changed traffic conditions and obey all signage at roadworks to ensure the safety of roadworkers and motorists. The department appreciates your patience while these essential works are completed. The reconstruction works are being delivered under the Natural Disaster Relief and Recovery Arrangements, with the Australian Government providing 75% of the funding and 25% from the Queensland Government. There are also many capital projects along the highway. For more information about these projects, visit www.tmr.qld.gov.au. To minimise delays to motorists during the peak holiday season, there will be a Christmas shutdown period. Between Saturday 14 December 2013 and Sunday 5 January 2014 (inclusive), roadworks will not involve lane closures on the Bruce Highway. All roadworks sites will be opened to traffic and standard speed limits will be re-instated where possible. Gympie to Maryborough Additional travel time: allow 10 minutes (day) and 10 minutes (night) Reconstruction works will start in early November and are anticipated to be completed during December 2013. The reconstruction works will predominately include asphalt overlay and the works will generally take place between 6pm and 6am from Sunday to Friday.

Upload: others

Post on 09-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wide Bay/Burnett Region - Bruce Highway …/media/Projects/R/Reconstructing Wide...Wide Bay/Burnett Sites to be reconstructed (2013 flood event) Capital works projects Town locations

Department of Transport and Main Roads

KOLAN RIVER

PE R R Y RIV

ER

RIVER

GREGORY

ISIS RIVER

B UR

NET

T R

I VER

Gin Gin

To Miriam ValeBUNDABERG REGIONAL

COUNCIL

Wallaville

Bundaberg

NORTH BURNETTREGIONAL COUNCIL

FRASER COASTREGIONAL COUNCIL

Booyal

Maryborough

Aldershot

Mungar

Howard

Tiaro

Apple Tree Creek

Childers

Torbanlea

GYMPIEREGIONALCOUNCIL

Gympie

Glenwood

Gunalda

Bauple

Curra

Mt Perry

Kilkivan

To Brisbane

5 0 5 10 15 20 25Km

Bruce Highway roadworksWide Bay/Burnett

Sites to be reconstructed(2013 flood event)Capital works projectsTown locationsBruce HighwayState controlled roadsRivers, waterways and catchments

* Map is indicative

N

Wide Bay/Burnett Region Bruce Highway roadworks – October 2013

Childers to Kolan RiverAdditional travel time: allow 25 minutes Reconstruction works will start during October and are anticipated to be completed during December 2013. Capital works projects will continue through this area during 2013.

Works will take place between 6am and 6pm from Monday to Saturday, with some out-of-hours work possible.

Maryborough to ChildersAdditional travel time: allow 20 minutes Reconstruction works will start during October and are anticipated to be completed during December 2013. Capital works projects will continue through this area during 2013.

Works will take place between 6am and 6pm from Monday to Saturday, with some out-of-hours work possible.

For further informationRoadworks are happening across the region and motorists should call 13 19 40 or check www.131940.qld.gov.au before travelling.

* Cost of a local call. Higher call charges may apply from mobile phones or payphones.

To receive ongoing updates about these works, please contact TMR on 1300 728 390* (during business hours), email [email protected] or visit www.tmr.qld.gov.au (search for “Reconstructing Wide Bay Burnett” and “Bruce Highway”).

The Department of Transport and Main Roads has recently completed reconstruction works on the Bruce Highway from the 2010, 2011 and 2012 flood events. Reconstruction works from the 2013 flood events have recently started and will continue during 2014. Capital works projects are also continuing on the Bruce Highway throughout the Wide Bay/Burnett Region.

To assist motorists plan their travels and potentially seek alternative routes, the map provides details of where works are currently occurring and the anticipated delays. The department recommends that motorists factor additional travel time to their journey.

At work sites, stop-and-go traffic arrangements are generally in place during work hours and reduced speed limits apply outside of work hours. Please slow down, drive to the changed traffic conditions and obey all signage at roadworks to ensure the safety of roadworkers and motorists. The department appreciates your patience while these essential works are completed.

The reconstruction works are being delivered under the Natural Disaster Relief and Recovery Arrangements, with the Australian Government providing 75% of the funding and 25% from the Queensland Government.

There are also many capital projects along the highway. For more information about these projects, visit www.tmr.qld.gov.au.

To minimise delays to motorists during the peak holiday season, there will be a Christmas shutdown period. Between Saturday 14 December 2013 and Sunday 5 January 2014 (inclusive), roadworks will not involve lane closures on the Bruce Highway. All roadworks sites will be opened to traffic and standard speed limits will be re-instated where possible.

Gympie to MaryboroughAdditional travel time: allow 10 minutes (day) and 10 minutes (night)Reconstruction works will start in early November and are anticipated to be completed during December 2013.

The reconstruction works will predominately include asphalt overlay and the works will generally take place between 6pm and 6am from Sunday to Friday.