WILMINGTON DISTRICTDREDGING PROGRAM
WILMINGTON DISTRICTDREDGING PROGRAM
NAD/SAD REGIONAL DREDGING
MEETING/WEDA
NAD/SAD REGIONAL DREDGING
MEETING/WEDA US Army Corps of Engineers Wilmington District
US Army Corps of Engineers Wilmington District
Morehead City Harbor Morehead City Harbor FY08 WorkFY08 Work
Inner HarborInner Harbor
Estimated Quantity: 400,000 Estimated Quantity: 400,000 CYCY
Depth: 35’+2’ and 45’+2’Depth: 35’+2’ and 45’+2’
Bucket and barge to ODMDSBucket and barge to ODMDS
Distance: approximately 7 Distance: approximately 7 milesmiles
Ocean BarOcean Bar
Estimated Quantity:Estimated Quantity: 800,000 800,000 CYCY
Depth: 45’+2’Depth: 45’+2’
Hopper to near shore for Hopper to near shore for suitablesuitable
Hopper to ODMDS for Hopper to ODMDS for unsuitableunsuitable
Environmental window: : 1/1 – Environmental window: : 1/1 – 3/313/31
Solicitation date: 10/26/2007Solicitation date: 10/26/2007
Approximate start date: Approximate start date: 1/23/20081/23/2008
Morehead City HarborMorehead City HarborDredge Material Dredge Material
Management PlanManagement Plan Will look at disposal needs and alternatives for MHC Will look at disposal needs and alternatives for MHC
Harbor over the next 20 yearsHarbor over the next 20 years Will factor environmental considerations into Will factor environmental considerations into
decision processdecision process Disposal plan will be chosen based on federal Disposal plan will be chosen based on federal
standard of least cost alternative, consistent with standard of least cost alternative, consistent with sound engineering practices, and environmentally sound engineering practices, and environmentally sustainablesustainable
Will look at placing material on Brandt Island, Will look at placing material on Brandt Island, offshore, nearshore, and on the beachesoffshore, nearshore, and on the beaches
Final report expected in late 2009Final report expected in late 2009
Norfolk to Alligator River – FY08 and FY09 DMMP and EIS for Disposal Areas (North Landing River and Currituck Sound)
Alligator River to Pamlico River – FY07 Maintenance Dredging of Alligator-Pungo Landcut; and FY08 / FY09 DMMP and EIS for Disposal Areas (Alligator River)
Neuse River to Beaufort – FY07- Core Creek Landcut Maintenance Dredging.
Beaufort to Cape Fear–FY07- Topsail Inlet Crossing Maintenance Dredging. FY08- Maintenance Dredging of 1 to 3 shoaled areas.
Cape Fear to Little River– FY08/FY09 – No Funding
Norfolk, VA to Jacksonville, FL – Kick Off Meeting for Regional DMMP (Week of October 15th). Work to be completed with FY08 funds.
Atlantic Intracoastal Atlantic Intracoastal Waterway (AIWW)Waterway (AIWW)
FY08 WorkFY08 Work
Maintenance Dredging at Five Different Sites Total Estimated Quantity: 550,000 CYDisposal Locations: Beach / Upland
Manteo (Shallowbag) Manteo (Shallowbag) Bay, NC Bay, NC
FY08 WorkFY08 Work
Interior Channels ContractInterior Channels Contract
Estimated Quantity: 700,000 CYEstimated Quantity: 700,000 CY
Depth: 12’ + 2’Depth: 12’ + 2’
Type of Equipment: PipelineType of Equipment: Pipeline
Disposal Area: Bird Islands / Disposal Area: Bird Islands / UplandUpland
Solicitation Date: 10/18/2007Solicitation Date: 10/18/2007
Approximate Start Date: Approximate Start Date: 12/20/200712/20/2007
FY 08 Ocean Bar / Spit FY 08 Ocean Bar / Spit Contract(s)Contract(s)
Estimated Quantity: Estimated Quantity:
Ocean Bar: 560,000 CYOcean Bar: 560,000 CY
Navigation Spit: 200,000 CYNavigation Spit: 200,000 CY
Depth: 14’ + 3’Depth: 14’ + 3’
Type of Equipment: Hopper or Type of Equipment: Hopper or PipelinePipeline
Disposal Area: Nearshore or Disposal Area: Nearshore or BeachBeach
Approximate Start Date: Approximate Start Date: June/July 2008June/July 2008
PROJECT: Far CreekPROJECT: Far Creek (Option (Option Item in FY08 Manteo Interior Item in FY08 Manteo Interior Channel Contract)Channel Contract)
Type Work: MaintenanceType Work: Maintenance
Depth: 10’ + 2’Depth: 10’ + 2’
Width: 80-100 ft Width: 80-100 ft
Quantity: 250,000 cy @ 12 ft.Quantity: 250,000 cy @ 12 ft.
Type of Material: Silt & SandType of Material: Silt & Sand
Disposal Area: UplandDisposal Area: Upland
Type of Equipment: Pipeline Type of Equipment: Pipeline
Last Dredged: 1999Last Dredged: 1999
Environmental Window: Environmental Window: Oct 1 – March 31 (Shrimp, Oct 1 – March 31 (Shrimp, Fisheries)Fisheries)
**Far Creek is located **Far Creek is located approximately 30 miles from the approximately 30 miles from the Manteo (Shallowbag) Bay Manteo (Shallowbag) Bay Project.Project.
Manteo (Shallowbag) Bay, Manteo (Shallowbag) Bay, NC NC
Dredge Material Dredge Material Management PlanManagement Plan
Will look at disposal needs and alternatives for Will look at disposal needs and alternatives for Manteo (Shallowbag) Bay over the next 20 years for Manteo (Shallowbag) Bay over the next 20 years for the entire Project (Interior Channels, Spit Channel, the entire Project (Interior Channels, Spit Channel, and Ocean Bar Channel).and Ocean Bar Channel).
Will factor environmental considerations into decision Will factor environmental considerations into decision processprocess
Disposal plan will be chosen based on federal Disposal plan will be chosen based on federal standard of least cost alternative, consistent with standard of least cost alternative, consistent with sound engineering practices, and environmentally sound engineering practices, and environmentally sustainablesustainable
Will look at current disposal options and future Will look at current disposal options and future needs, while coordinating this process with both needs, while coordinating this process with both resource agencies and local stakeholders.resource agencies and local stakeholders.
Final report expected in late 2009Final report expected in late 2009
Navigation Branch Chief:Navigation Branch Chief: Mr. Roger Bullock Mr. Roger Bullock (910) 251-4822 (910) 251-4822
[email protected]@usace.army.mil
Waterways Management Section: Mr. Jimmy Hargrove Waterways Management Section: Mr. Jimmy Hargrove (910) 251-4479 (910) 251-4479
[email protected]@usace.army.mil
Navigation Contract Questions:Navigation Contract Questions: Mr. Danny Kissam Mr. Danny Kissam (910) 251-4424 (910) 251-4424
[email protected]@usace.army.mil
Current Construction Contracts:Current Construction Contracts: Mr. Dennis Mr. Dennis LynchLynch
(910) 251-4642 (910) 251-4642
[email protected]@usace.army.mil
Wilmington DistrictWilmington DistrictPoints of ContactPoints of Contact