Wind-Diesel Hybrid Power
Trials and Tribulations at Ascension Island
Gary Seifert, EE PE
Kurt Myers, MSEE PE
Idaho National Laboratory
March 2006
![Page 2: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/2.jpg)
Background information
![Page 3: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/3.jpg)
Background Information
![Page 4: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/4.jpg)
Background information
![Page 5: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/5.jpg)
• Air Force power was generated by diesel power
• Loads range from 1.6 to 2.4 MW
• Two 1900 kW diesel generators operate in parallel
with the wind farm
• Waste engine heat and fuel fired boilers power the
desalination system
• Fresh water production uses over 300,000 gallons
of Diesel a year
Background
![Page 6: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/6.jpg)
Before, Diesels and …….
![Page 7: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/7.jpg)
Diesel Fired Steam Boilers for Desalinated Water
![Page 8: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/8.jpg)
Desalination System, Fresh Water From Sea Water
![Page 9: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/9.jpg)
Long History of Wind On Ascension
![Page 10: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/10.jpg)
Wind farm at Ascension
Phase 1
Phase 2
![Page 11: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/11.jpg)
System Description – Phase One
• Four three-bladed 225 kW MICON wind turbines for a total of 900 kW
• Average Ascension wind speed: 7.8 m/s (17.5 mph)
• 4 Up-wind Micon Turbines
(40/225kW EA.)
• 30m Tower Height
• Fixed Pitch Stall Regulated
• 29.8 m Rotor Diameter
![Page 12: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/12.jpg)
Phase 1
• Average wind power output - 342 kW (38%
capacity factor)
• Average Penetration - 14-24%
• Maximum Observed penetration - 46-56%
• Stable Operation
• No Added Controls Needed
Performance
![Page 13: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/13.jpg)
System Description – Phase Two• Add two “900 kW” MICON wind turbines for a total wind
farm of 2700 kW• 30m Tower (very short)
• Fixed Pitch Stall Regulated
• 52 m Rotor Diameter
• High Penetration Design
• Synchronous Condensor
• 2 each 1 MW Electric Boilers with Fast Electronic
Controls (Generation Following)
![Page 14: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/14.jpg)
Phase 2
• Average wind power output of 1026 kW (38%
capacity factor)
• Average Penetration - 43-64%
• Maximum predicted penetration - 112 to 169%%
• How????
• Other features needed for stable operation
• Condensers, active controls, etc
Performance
![Page 15: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/15.jpg)
Phase Two Economics and Operational Impacts
• Fuel Saving will grow
– 650,000 extra gallons of fuel a year
– a total of more than one million gallons of fuel saved every year
• 70,000 gallons of fresh drinking water can be produced every day with green wind energy, instead of diesel
• Simple Payback in 7 years
• Significantly reduces CO2 and NOX Emissions
• Stable, reliable, green, wind energy 5000 miles from home
![Page 16: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/16.jpg)
High Penetration Design• Synchronous Condenser
(VAR support and Rotating Mass)
• 2 each (1 MW) electric boilers designed for;
• Steady state average load, plus
• Control variability - fine tuning
• Automated load/generation leveling
• Boiler controls monitor wind farm output
• Manage boiler load to wind farm output
• Keep Penetration low (adding boiler load)
![Page 17: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/17.jpg)
Ascension Wind Farm
225 Kw 225 Kw 225 Kw 225 Kw
1900 Kw 1900 Kw 1900 Kw
DieselGenerators
Island Loads
Ascension Wind Diesel System Phase 1
1350 Kw 650 Kw
![Page 18: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/18.jpg)
Ascension Wind Farm
225 Kw 225 Kw 225 Kw 225 Kw
900 Kw900 Kw
PF Control
More WindMore Electric Boiler
Less Fuel
Less WindMore Fuel
Boiler Power Control
Controller
Electric Boiler2 x 1000 kw
1900 Kw 1900 Kw 1900 Kw
DieselGenerators
Fuel Oil Boiler
Island Loads
Synchronous Condenser
Ascension Wind Diesel Hybrid System
1350 Kw 650 Kw
![Page 19: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/19.jpg)
• Remote shipping - 5000 miles from Port Canaveral
• Restricted shipping schedules
• Pier restrictions
• Limited crane reach
–Very short towers
• Limited island access
Remote Challenges - Examples
![Page 20: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/20.jpg)
Watch out for NativesBoth 2 legged andClawed Varieties – Just Kidding
This little land crab was one of our night time visitors during construction.
![Page 21: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/21.jpg)
LESSONS LEARNED• Perform resource assessments
• Partner at the beginning
• Performance based specifications
• Control system design and integration crucial
• Integrate load management into the control system for stability and high penetration
• Plan and model loads up front
• Wind/Diesel systems are very compatible
• You can have penetration above 25%, but plan and design for high penetration
![Page 22: Wind-Diesel Hybrid Power Trials and Tribulations at Ascension Island Gary Seifert, EE PE Kurt Myers, MSEE PE Idaho National Laboratory March 2006](https://reader030.vdocument.in/reader030/viewer/2022032703/56649cf95503460f949cad74/html5/thumbnails/22.jpg)
Before
After
Questions?
Gary Seifert
208-521-8385
Kurt Myers
208-521-1108