wind power snapshot - vikram parekh
TRANSCRIPT
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
1/18
A Snapshot
Wind Power Industry In India
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
2/18
ContentsBasics Wind power & industry
Regulatory framework Indian RE power industry
Benefits General & business
Demand - Supply Power in India
Incentives Schemes Central & state governments
Wind power as a business Revenues, business model, concerns
Way forward Opportunity for Soma, contacts, tentative costs (initial budget)
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
3/18
Basics
Wind Power & Industry Wind is the natural movement of air across land or sea, caused by uneven heating
and cooling of the earth's surface and by earth's rotation
Wind electric generator converts kinetic energy available in wind to electrical
energy by using rotor, gearbox and generator
Wind power is one of the fastest growing energy sources in the world
,
Global warming forcing countriesto generate clean power
Regulatory policies at central and
state level are shaping towards
promoting clean power generating Even international are being
framed towards supporting and
sustaining greenl projects
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
4/18
Quick facts
Indian Wind Power Industry
Expected to deliver at least 10% of the worlds energy production by 2020
Potential of 48561 MW across India considering only 1% of land availability
Wind installed capacity, over 14000 MW till date (fifth in the world)
Only country in the world to have a dedicated Ministry of New and Renewable
Energy (MNRE)
a r y evo ve processes an po cy ramewor
Several established turbine manufacturers, consultants functioning in India.
Turn-around time of less then one year from concept to commission
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
5/18
Ministry of New and Renewable Energy (MNRE) Central authority for all policies,
regulations and approvals relating to renewable energy.
Central Electricity Regulatory Commission (CERC) - deals with the national grid and
inter-state transfer/trading of power,
Regulatory Framework
Indian RE Power Industry
State Electricity Regulatory Commission (SERC) - manage regional distribution and
transmissions. They play a key role in the promotion of renewable energy as they
have the sole authority to ascertain the feed-in tariffs and other policy matters,
such as the Renewable Portfolio Standard (RPS).
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
6/18
Energy Development Agencies (EDAs) - represent the MNRE at the state level. Their
main purpose is to assess and promote renewable energy frameworks for
individual states, and to advise the MNRE, state governments and SERCs.
The Indian Renewable Energy Development Agency (IREDA) promotes financial
assistance for renewable ener and ener efficienc ro ects in India.
Regulatory Framework
Indian Power Industry Cont.
C-WET center for Wind Energy Technology entrusted with carrying out Research
and development in the field of wind power
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
7/18
Benefits - general
Reduces climate change and other environmental pollution
Cheapest source of electrical energy
Can be utilized as a shield against increasing power prices. Fuel source is free, abundant and inexhaustible
Creates employment, regional growth and innovation
It can be tapped from almost any where, even mostremote of locations
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
8/18
Least equity participation required, as well as low cost debt is easily available to
wind energy projects.
A project with the fastest payback period.
A real fast track power project, with the lowest gestation period; and a modular
concept.
Benefits - business
(O&M) costs
No marketing risks, as the
product is electrical energy.
Promotional incentives from
central, state governments inIndia
Potential revenue from Certified
Emission Reductions (CERs)
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
9/18
Demand
Power in India Per capita energy consumption in India is currently at 631 KWH per annum.
India constantly growing at over 7 to 8% annually. Power production needs to
pace up to fuel this growth
Expected to touch 1000
KWH per annum by 2012
th
add 79000 MW to currentcapacity
Power generation needs to
be more than double the
current capacity to fuel thepower needs by the year
2020
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
10/18
Supply
Power inIndia (wind)
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
11/18
Incentives
Central Government Under the Income Tax Act, the Govt. of India permits 80% Accelerated Depreciation
on specified Non Conventional Energy Devices / Systems (including wind power
equipment) in the first year of installation of the projects.
A ten year tax holiday has been allowed in respect of profits and gains of new
industrial undertakings set up anywhere in India for either generation or for
generation and distribution of power.
The Govt. of India has announced Generation Based Incentive (GBI) @ 50 paisa perKWH in respective of developers who are not availing accelerated depreciation
benefit as per MNRE lr no. 53/1/2008-WE dated 17/12/2009. This scheme is not
applicable for third party sale and merchant plants but is applicable for Captive
power generation
The RPS renewable portfolio standard announced by the government shall
guarantee sale of RE power generated for at-least next 10 years
Soft loans from IREDA at lower interest rates (approx 11.75 to 12.9%), along with a
moratorium of 1 year and repayment period of 10 years
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
12/18
Incentives
State Government (Andhra) Each Eligible developer may be allocated available Govt. land to harness upto a
maximum of 200 MW of wind power initially. After commissioning of 100 MW
capacity Wind farms in 1st stage in the allocated Govt. land, the Government mayallocate land for another 100 MW capacity Wind Farms. The application from thedevelopers for Government land will be considered on a first-cum-first-servedbasis.
The state Government has permitted DISCOMs to offer Rs.3.50 / KWH for windpower projects for 10 years from the date of commissioning of the projects, subjectto obtaining the consent of AP Electricity Regulatory Commission. The tariff for theperiod 11th year to 20th year shall be as fixed by APERC.
The DISCOMS (distribution companies) shall have the first right of refusal on PowerPurchase if the Plant continues to operate after the 20th year of operation fromCOD. The tariff beyond 20th year shall be as mutually agreed by both the parties(company & discom).
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
13/18
Incentives
State Government (All States)
State Incentives -
Wind Power
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
14/18
Wind Power as a Business
Potential Revenues Tariff
Varies from state to state (generally ranges from INR 3 to 5 per KWH
Tariff regulated for at-least 10 years from date of commissioning by a Power Purchase
Agreement (PPA)
Higher tariff could be charges in case of merchant selling of generated power
Generation based incentive
It is INR 0.50 per KWH Applicable only to generating companies who do not claim the accelerated depreciation
of 80%
REC
It is approximated at INR 1.5 per KWH (not yet finalized)
It is applicable in case state tariff are not followed
CER
It is approximately EURO 8 per CER (Approximate)
One CER is awarded for 92% of each MW power sold (Approximate)
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
15/18
Wind Power as a Business
Business Model
Cost of setting
up wind power
the range ofINR 7 to 8 Crore
per MW
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
16/18
Wind Power
Generation in India
ION(MW)
YEAR
GENER
AT
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
17/18
Clarity in Grid Code yet to be achieved. Leading to difficulties in integrating
wind power efficiently with the grid, resulting in low capacity utilization factor.
Many people find them loud and unsightly.
Even the most advanced turbines can extract only a maximum of 45 percent of
the winds energy.
Wind Power as a Business
Concerns
Ma or re a ty on unpre cta e source o power ma es t cu t to re y on
power availability and hence asks for large capacities of stand-by power
Land acquisition, costly and complicated
-
8/8/2019 Wind Power Snapshot - Vikram Parekh
18/18
VIKRAM [email protected]