Product range: - Petrol, Diesel, Kerosene,
Lubricants, LPG, Methyl Tertiary Butyl Ether
(MTBE), Aviation Turbine Fuel (ATF) and LubeBase Oils.
Average production: - 12.52 MMT Per year.
Plant Capacity: - 12 MMTPA.
Area where Company products are sold: - All Over
the Country.
Basis of Production Planning: -
As per forecast provided by sales department.
-
8/6/2019 Winter Project PPT
5/14
Flexibility in Production Planning: -
Changes in Model Mix.
Material Purchase
yUse of A, B, C categorization of bought outmaterial Raw material / C / Consumables:
No.
yPurchased material: - Crude Oil.yCriteria for quantity to be ordered: - To meet
Companys Inventory target.
-
8/6/2019 Winter Project PPT
6/14
Receipt / Storage / Qualityy System of receiving bought out material: - By Pipelines.
y Quantity Checks: - By Oil Sensors.
y Quality:- By Quality Control Department.y Storage area: - Containers.
Emphasis on Quality
y How to ensure required quality of purchased material: - Bytransferring to control department for checking.
y Does the Company have TQM: - Yes.
Total Quality management department is an integral andmost important part for any organization. Each
petroleum product has a fixed quality grading. Thecrude oil is brought through pipelines for fractionaldistillation. After that, each separate product isrepeatedly refined until they achieve the required gradewhich is then sent to different depots for distribution.
-
8/6/2019 Winter Project PPT
7/14
-
8/6/2019 Winter Project PPT
8/14
PIPELINES AND RAILINES
-
8/6/2019 Winter Project PPT
9/14
LUB GODOWN/ ENCLOSURE- 150 KLS CAPACITY EACH
-
8/6/2019 Winter Project PPT
10/14
Get details of Maintenance practices
y Criteria for deciding maintenance schedule: - As given in thecompanys manual.
y Is there a maintenance schedule for each machine: - Yes.
y Maintenance is carried out :- Every Year and also in caseof emergency.
Inventory Management System
y Is there a Target for: - Yes (at regular orders and festivals).
y For Finished Goods / Raw Material / Components /WIP
y What is the Actual Inventory Vs Target: - It is flexible, when itis special then actual inventory does not achieve its target.
Action plans for reduction of Inventory for all categories No.
-
8/6/2019 Winter Project PPT
11/14
Logistics
y Company collects from suppliers and Supplier
delivers directly to company.y Logistics for Finished Goods: - Finished products
are stored in containers where 20% is kept assafety stock. Finished goods are brought at thedistribution centers as per the requirement.
Use of IT
y Company uses SAP 9.0 version for purchasing
requisitions, opening and closing of tenders, Stocklevels, creating purchase orders, sales orders,move orders, invoices, etc.
yMonitorial plan Vs Actual production Vs
Actual Daily.
-
8/6/2019 Winter Project PPT
12/14
y Transit time for both Inbound / out bound: - Yes.
y Product wise costing :-
1) Diesel- 42.06 Rs. per Ltr.
2) Petrol- 63.08 Rs. per Ltr.
3) Speed 97 - 70 Rs. Per Ltr.
4) Hi Speed- 44 Rs. Per Ltr.
3) Auto gas- 40.21 Rs. Per Ltr.
4) LPG- 348.45 Rs. Per 14.2 Kg cylinder.
5) ATF- 49046.00 Rs. Per Kl.
6) Kerosene- 12.27 Rs. Per Ltr.
-
8/6/2019 Winter Project PPT
13/14
Improvement Area
Company has coordination meeting betweenSales / Mktg and Production plan /
manufacturing.
-