wipp preliminary documented safety analysis for trupact-iii
DESCRIPTION
WIPP Preliminary Documented Safety Analysis for TRUPACT-III. URS Washington TRU Solutions James McCormick. WIPP PDSA for TRUPACT-III. WIPP PDSA for TRUPACT-III. WIPP PDSA for TRUPACT-III. WIPP PDSA for TRUPACT-III. WIPP PDSA for TRUPACT-III. WIPP PDSA for TRUPACT-III. - PowerPoint PPT PresentationTRANSCRIPT
Washington Division
WIPP Preliminary Documented Safety Analysis for TRUPACT-III
URS Washington TRU SolutionsJames McCormick
Washington Division
WIPP PDSA for TRUPACT-III
Washington Division
WIPP PDSA for TRUPACT-III
Washington Division
WIPP PDSA for TRUPACT-III
Washington Division
WIPP PDSA for TRUPACT-III
Washington Division
WIPP PDSA for TRUPACT-III
Washington Division
WIPP PDSA for TRUPACT-III
Washington Division
WIPP PDSA for TRUPACT-III
DOE-Standard - 1189 Major Modification Evaluation Criteria
• Criteria 3 - Change an existing process or add a new process resulting in the need for a safety basis change requiring DOE approval? YES
• Criteria 4 - Utilize new technology or government furnished equipment (GFE) not currently in use or not previously formally reviewed /approved by DOE for the affected facility? YES
Washington Division
WIPP PDSA for TRUPACT-III
DOE-Standard - 1189 Major Modification Evaluation Criteria
• Criteria 5 - Create the need for new or revised safety SSCs? POTENTIAL
• Criteria 6 - Involve a hazard not previously evaluated in the Documented Safety Analysis (DSA)?
POTENTIAL
Washington Division
WIPP PDSA for TRUPACT-III
Washington Division
WIPP PDSA for TRUPACT-III
Overcome Configuration Control Challenge
• Centralized configuration control
• Concurrent review on multiple documents
• Parallel DOE and URS comment resolution
• Comment review cycles compressed
Washington Division
WIPP PDSA for TRUPACT-III
Result
• Conservative SS SSCs downgraded
• No new safety-related SSCs or SACs
• New and revised hazard analysis bound by existing DSA Revision 2.
• TRUPACT-III Readiness on time.